HomeMy WebLinkAbout20130201 Ver 1_Approval Letter_20130314A �
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
Jason Brown
Starcraft Builders
728 Piney Grove Wilbon Road
Holly Springs, NC 27540
Subject Property:
Dear Mr. Brown.
Division of Water Quality
Charles Wakild, P E
Director
March 14, 2013
John E Skvarla, III
Secretary
DWQ # 13 -0201
Wake County
Authorization Certificate per the Neuse Riparian Buffer Rules
511 Rosengarten Aly
You have our approval, in accordance with 15A NCAC 02B 0233 and any conditions listed
below, to permanently impact 273 square feet of Zone 2 Neuse protected riparian buffer, as
described within your application, received by the N C Division of Water Quality (Division) on
March 4, 2013. In addition, you should obtain or otherwise comply with any other required
federal, state or local permits before you go ahead with your project including (but not limited
to) Erosion and Sediment Control, Non - discharge, and other regulations This Authorization
Certificate shall expire five (5) years from the date of this letter.
This authorization certificate is for the purpose and design that you described in your
application. If you change your project, you must notify us and you may be required to send us
a new application. If the property is sold, the new owner must be given a copy of this
authorization letter and is thereby responsible for complying with all conditions. This
authorization requires you to follow the conditions listed below.
Conditions of Certification:
Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met No other impacts are
approved including incidental impacts:
Type of Impact
Amount Approved (Units)
Plan Location or Reference
Zone 2 - permanent
273 (Square ft.)
Section 6b. of PCN
Wetlands, Buffers, Stormwater — Compliance and Permitting (Webscape) Unit One
1650 Mail Service Center, Raleigh, North Carolina 27699 -1650 NorthCarofina
Location 512 N Salisbury St Raleigh, North Carolina 27604 //
Phone 919 - 807 -63001 FAX 919 -807.64941 Customer Service 1- 877 -623 -6748 �gtut'Q"
Internet www ncwaterquality org ' t/
511 Rosengarten Aly
Page 2 of 3
March 14, 2013
2 Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within
these boundaries approved under this authorization shall be clearly marked with orange
warning fencing (or similar high visibility material) for the areas that have been approved to
Infringe within the buffer, wetland or water prior to any land disturbing activities to ensure
compliance with 15A NCAC 02B 0233.
3 Diffuse Flow
All constructed stormwater conveyance outlets shall be directed and maintained as diffuse
flow at non - erosive velocities through the protected stream buffers such that it will not re-
concentrate before discharging into a stream as identified within 15A NCAC 213.0233 (5). If
this is not possible, it may be necessary to provide stormwater facilities that are considered
to remove nitrogen and phosphorus. This may require additional approval from this Office.
4. No Waste, Spoil, Solids, or FIII of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre - Construction Notification. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur.
5. Certificate of Completion
The applicant and /or authorized agent shall provide a completed Certificate of Completion
Form to the DWQ Webscape Unit within ten days of project completion (available at:
http_• / /Portal.ncdenr ore/ web /wq /swp /ws/ 401 /certsandpermits /apply /forms).
This Certification can be contested as provided in Articles 3 and 4 of General Statute 1508 by
filing a written petition for an administrative hearing to the Office of Administrative Hearings.
You may obtain a petition form from the Office of Administrative Hearings at
http //www ncoah com/ or call (919) 431 -3000 for information.
Within sixty (60) calendar days of receipt of this Certification, you must file the petition with the
Office of Administrative Hearings A petition is considered filed when the original and one (1)
copy is received in the Office of Administrative Hearings during normal office hours (Monday
through Friday between 8:OOam and 5 OOpm, excluding official state holidays).
The petition may be faxed to the Office of Administrative Hearings at (919) 431 -3100, provided
the original and one copy of the petition is received by the Office of Administrative Hearings
within five (5) business days following the faxed transmission
Mailing address for the Office of Administrative Hearings-
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699 -6714
One (1) copy of the petition must also be served to DENR
Lacy Presnell, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh, NC 27699 -1601
Unless such a petition is filed, this Certification shall be final and binding.
CC. Karen Higgins, DWQ CO files
File Copy
511 Rosengarten Aly
Page 3 of 3
March 14, 2013
�+ rely,
u
Danny Smi h, Supervisor
Surface Water Protection — Raleigh
Regional Office
File name 130201RosengartenAly(Wake)_NBR docx