Loading...
HomeMy WebLinkAbout20081319 Ver 3_Year 4 Monitoring Report Ph I_20130306RUTMAN CREEK WATERSHED RESTORATION PROJECT HYDE COUNTY, NORTH CAROLINA IN SUPPORT OF THE PCS PHOSPHATE COMPANY, INC. MODIFIED ALTERNATIVE L AURORA, BEAUFORT COUNTY, NORTH CAROLINA YEAR 4 MONITORING REPORT - PHASE 1 anti 1 t. sit "r, ow Prepared by: Wetlands Resource Center Canal Winchester, Ohio Land Management Group, Inc. Wilmington, North Carolina February 2013 I&NOW p I MAR 0 6 2013 w -iwl —m OURM � &- PotashCorp Helping Nature Provide March 5, 2013 Mr. Tom Steffens U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 West 5t" Street Washington, North Carolina 27889 Dear Mr. Steffens: 0S_ -13 i 9 PotashCorp - Aurora Federal Express v3 Enclosed are the Rutman Creek Watershed mitigation site monitoring reports for the 2012 monitoring year. Each phase has its own report, and each entire report, including the hydrology graphs and Palmer Hydrologic Drought Index maps are located on the CD which accompanies each report. The reports are "Rutman Creek Watershed Restoration Project Hyde County, North Carolina, Year 4 Monitoring Report — Phase 1 ", "Rutman Creek Watershed Restoration Project Hyde County, North Carolina, Year 3 Monitoring Report — Phase 2 ", and "Rutman Creek Watershed Restoration Project Hyde County, North Carolina, Year 2 Monitoring Report — Phase 3 ". If you have any questions, please call me at (252) 322 -8249, or Christian Preziosi of Land Management Group at (910) 452 -0001. Sincerely, C, J ey C. Furness Senior Scientist PC: Karen Higgins, DWQ- Raleigh Amy Adams, DWQ -Wash. R.M. Smith M. Brom Cal Miller, WRC -Ohio C. Preziosi, LMG -Wilco 23 -11 -018 w /encl. w /encl. w /Exec. Summaries w /Exec. Summaries w /encl. 1 S30 NC Hwy 306 South, Aurora, NC USA 27806 T (252) 322 -4111 PotashCorp. I www.potashcorp.com RUTMAN CREEK WATERSHED RESTORATION PROJECT HYDE COUNTY, NORTH CAROLINA IN SUPPORT OF THE PCS PHOSPHATE COMPANY, INC. MODIFIED ALTERNATIVE L AURORA, BEAUFORT COUNTY, NORTH CAROLINA YEAR 4 MONITORING REPORT - PHASE 1 k r p Prepared by: Wetlands Resource Center Canal Winchester, Ohio Land Management Group, Inc. Wilmington, North Carolina February 2013 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY 2.0. PROJECT OVERVIEW ....................... A. Introduction ... ............................... B. Mitigation Goals and Objectives C. Project Implementation ............... 3.0. MONITORING REQUIREMENTS 4.0 MONITORING RESULTS.. A. Vegetative Monitoring B. Hydrologic Monitoring 5.0 CONCLUSION LIST OF FIGURES, TABLES, AND APPENDICES 4 Figure 1 ................................................................... ............................... ...................Construction Phase Map Figure 2 .............................................................................. ............................... Phase 1 (Well and Plot) Map Figure 3 ................................................................................ ............................... Estimated Hydrologic Zones Figure 4 ........................................................ ............................... ......................Reference Well Map (On -site) Figure 5 ............................................................ ............................... Reference Well Map (Cameron Property) Table 1 ..................................................................... ............................... Phase 1 Planting List (March 2009) Table 2 ......................................... ............................... List of Acceptable Volunteer Species by Habitat Type Table 3 .................................. ............................... Summary of Year 4 Vegetative Monitoring Data (Phase 1) Table 4A ............ ............................... Summary of Year 4 Hydrologic Monitoring Data (Phase 1 Restoration) Table 413 ............. ............................... Summary of Year 4 Hydrologic Monitoring Data (Phase 1 Restoration) Table 5A ............................. ............................... Summary of Year 4 Hydrologic Monitoring Data (Reference) Table 513 ............................ ............................... Summary of Year 4 Hydrologic Monitoring Data (Reference) AppendixA ........................................................................................... ............................... Site Photographs Appendix B ................................................................ ............................... Vegetative Monitoring Data (2012) Appendix C .......................................................................... ....................Hydrographs (2012) — enclosed CD Appendix D .................... ............................... NC Division of Water Resources Drought Maps — enclosed CD Appendix E .......................................................... ............................... Palmer Drought Indices — enclosed CD 1.0 EXECUTIVE SUMMARY On behalf of PCS Phosphate Company, Inc. (PCS), Wetlands Resource Center LLC (WRC), has completed the fourth year of annual monitoring of Phase 1 of the Rutman Creek Watershed Restoration Project. Phase 1 includes the restoration of 680 acres and the preservation of 142 acres of non - riparian headwater wetlands. Two wetland community types, bay forest and swamp forest, were restored based on landscape position and soil composition. Construction of this phase was completed in March 2009. Work included the backfilling of interior (lateral) ditches, disking of fields, the installation of clay plugs, and the planting of over 329,000 bare -root seedlings (refer to the As -Built Report submitted July 2009). Per the approved restoration plan, monitoring of the site includes the assessment of both hydrologic and vegetative conditions over the course of a five year monitoring period. Following the completion of the earthwork, a total of sixty -eight (68) 0.10 acre plots were established throughout the planted area. A total of thirty -four (34) shallow groundwater monitoring wells were installed within 50% of the plots. Additional wells were installed within the outlet canals and select transects across former agricultural fields to provide additional data relating to site response to grading activities. Wells have collected data from February 2009 through the present. Please refer to the Year 1 Annual Monitoring Report (AMR) (submitted February 2010) documenting site conditions during the 2009 growing season. Refer to the Year 2 AMR (submitted February 2011) and the Year 3 AMR (submitted February 2012) for site conditions during the 2010 and 2011 growing seasons. Annual monitoring for Year 4 was conducted in October 2012. Based on the data collected during this effort, the site exhibits high rate of survivorship ( >90 %) of planted species as evidenced by the recorded, mean density of 467 stems per acre. In addition, the restoration project area continues to exhibit increased hydroperiods in response to the earthwork completed in March 2009. With the exception of two wells, documented hydroperiods ranged between 31 consecutive days (equivalent to 11.8% of the growing season) and 262 days (equivalent to 100% of the growing season). The mean hydroperiod of all wells was 71.7 days (equivalent to 27.4% of the growing season). The following AMR provides more detailed information regarding the findings of Year 4 monitoring. Rutman Creek Watershed Restoration Project Phase 1 — Year 4 Annual Monitoring Report February 2013 2.0 PROJECT OVERVIEW A. Introduction Wetlands Resource Center (WRC) began implementation of Phase 1 of the restoration project (encompassing 822 acres of the 4,213 -ac project area) in February 2009. Phase 1 is located at the northeastern end of the mitigation site and is bounded by New Lake Road, Mooney Canal, and Airport Road (Figure 1). Restoration activities included grading, plug installation, planting of characteristic seedlings, and installation of monitoring devices. Placement of fill material within existing ditches was authorized under Nationwide Permit 27 issued by the U.S. Army Corps of Engineers (USACE) with attached conditions (issued February 20, 2009), and the NC Division of Water Quality (DWQ) 401 Water Quality Certification with attached conditions (issued March 16, 2009). Refer to the Phase 1 As -Built Report for copies of these authorizations. The restoration project is designed to provide suitable, high - quality wetland and stream restoration to mitigate for authorized impacts associated with the PCS mine continuation project in Aurora (Beaufort County), NC (USACE Permit No. SAW- 2001 - 10096; DWQ 401 Certification No. 3771). B. Mitigation Goals and Objectives The objective of the Rutman Creek project is to provide for the functional restoration and ecological up- lift of wetland and stream habitat via the re- establishment of characteristic hydrologic conditions and vegetative assemblages. Anticipated functions and values resulting from the restoration project include increased nutrient retention /transformation, sediment retention, floodwater storage /flood abatement, wetland /wildlife habitat, and groundwater recharge. Given the scale of the restoration effort, the project will provide considerable habitat benefits on a watershed and regional level. The project offers the unique opportunity to provide habitat connectivity between vast acreage of wildlife refuge areas (to the northeast) and the Pungo River Estuary (to the southwest). Phase 1 of the project is intended to restore the hydrology and vegetation to 680 acres of previously disturbed wetland habitat. An additional 142 acres of preservation is also included within the boundaries of Phase 1. Restoration and preservation efforts will contribute to enhanced water quality and food -web support of downstream waters. The vegetative restoration component is intended to Rutman Creek Watershed Restoration Project 2 Phase 1 — Year 4 Annual Monitoring Report February 2013 reestablish a characteristic assemblage of bay forest and swamp forest species (e.g. bald cypress, swamp tupelo, pond pine, etc.) coinciding with existing topography, soil types, and restored hydroperiods. The restored wetland community types will provide valuable refuge and feeding habitat previously degraded or removed entirely by historic conversion and long -term farming operation. C. Project Implementation Restoration activities within the existing farm fields were initiated in February 2009 with the backfilling of the existing network of lateral ditches. Clay plugs were then installed in six (6) specific locations within outlet canals per the approved restoration plan (Figure 2). Clay material for these plugs was excavated from existing spoil piles along Mooney Canal. The plug material was placed within the canals and subsequently compacted utilizing the excavator equipment. All the clay plugs were installed in March 2009. Clay plugs #1 through #5 are 50 ft in length. The length of clay plug #6 (within the larger Mooney Canal) is 100 ft. To provide additional reinforcement during high -flow events, filter- fabric and large rip - rap was placed over the entire length of each plug (including the upstream and downstream slopes). Plug #6 was initially installed in Mooney Canal at the immediate up- gradient boundary of Phase 1. To ensure that Airport Road would not be adversely affected by inundation, the plug was moved approximately 40 ft down - gradient of Airport Road upon completion of subsequent phases of the project. All water - control structures on each of the canals within Phase 1 were removed from operation. Note that access across the water - control structures has been maintained to provide all- terrain vehicle ingress /egress for monitoring and long -term management. Planting of the 680 -acre restoration area was conducted by Superior Tree Planting Service during the week of March 2 through March 7 (2009). All planting activities were supervised by environmental scientists from Land Management Group, Inc. (LMG). Plant material was provided by Arborgen Nursery (Blenheim, SC). Per the restoration plan, two non - riparian vegetative communities (swamp forest and bay forest) were established throughout the 680 -acre restoration area. The bay forest community (approximately 203 ac) was planted with characteristic species such as bald cypress (Taxodium distichum), sweet bay (Magnolia virginiana) and pond pine (Pinus serotina). The swamp forest community (approximately 477 ac) was planted with species such as Atlantic white cedar (Chamaecyparis thyoides), bald cypress, green ash (Fraxinus pennsylvannica), and swamp tupelo (Nyssa biflora). A total of 329,038 seedlings were planted (corresponding to an average density of 483 Rutman Creek Watershed Restoration Project 3 Phase 1 — Year 4 Annual Monitoring Report February 2013 stems /ac). Table 1 provides additional information regarding community composition and total stem counts for Phase 1. Table 1. Planted Species List (Phase 1 — March 2009) Swamp Forest 477 ac. Non - Riparian Restoration Common Name Scientific Name % Composition # Planted Swamp Tupelo Nyssa biflora 26% 57,200 Bald Cypress Taxodium distichum 26% 57,200 Atlantic White Cedar Chamaecyparis thyoides 12% 25,050 Pond Pine Pinus serotina 11% 23,000 Green Ash Fraxinus pennsylvanica 19% 42,000 Tulip Poplar Liriodendron tulipifera 6% 13,100 TOTAL 217,550 Bay Forest 203 ac. Non - Riparian Restoration Common Name Scientific Name % Composition # Planted Sweetbay Magnolia virginiana 18% 19,750 Pond Pine Pinus serotina 26% 29,000 Atlantic White Cedar Chamaecyparis thyoides 2% 2,338 Bald Cypress Taxodium distichum 27% 30,200 Swamp Tupelo Nyssa biflora 27% 30,200 TOTAL 111,488 GRAND TOTAL 329,038 3.0 MONITORING REQUIREMENTS Annual monitoring is being conducted near the end of each growing season for a period of five years. This monitoring includes both a vegetative and hydrologic component per the approved restoration plan. The vegetative component for Phase 1 includes an assessment of the conditions within each of the 68 permanent monitoring plots that have been established throughout the project area (Figure 2). Rutman Creek Watershed Restoration Project 4 Phase 1 — Year 4 Annual Monitoring Report February 2013 Hydrologic monitoring is conducted via thirty -four (34) automated, shallow groundwater monitoring wells recording daily (refer to Figure 2 for location of the monitoring wells). Data from the wells are downloaded on approximate three -month intervals and imported into graphing software for analysis. The following are the specific success criteria for both the vegetation and hydrologic monitoring of the Rutman Creek Watershed Project. Note that the hydrologic success criterion for Phase 1 (bay forest and swamp forest community types) is identified in 2b below. (1) Demonstrated density of planted species to meet or exceed 260 trees per acre at the end of 5 years (post planting). ' (2) The hydrologic criterion is premised on the specific community type to be restored. (a) For the nonriverine wet hardwood forest community (mineral soils), the hydrologic criterion will be the establishment of a static water table at, or within, 12" of the soil surface for 6% of the growing season (equivalent to 16 days based upon a growing season from March 11th through November 27th) during periods of normal rainfall. (b) For the nonriverine bay forest and swamp forest communities (organic soils), the hydrologic criterion will be the establishment of a static water table at, or within, 12" of the soil surface for 10% of the growing season (equivalent to 26 days based upon a growing season from March 11th through November 27th) during periods of normal rainfall. (c) For the small stream swamp (headwater riparian) community (zero -order geomorphic position), the hydrologic criterion will be the establishment of a static water table at, or within, 12" of the soil surface for 12.5% of the growing season (equivalent to 33 days based upon a growing season from March 11 th through November 27th) during periods of normal rainfall. Monitoring reports include results of vegetative monitoring and photographic documentation of site conditions. Reports also identify any contingency measures that may need to be employed to remedy any site deficiencies. For instance, deer browse tubes and fencing may need to be used if evidence of 1 Volunteer species may be counted toward meeting the success criteria based upon the list of species identified in Table 2; however, they will be tracked separately. 2 As determined from long -term climatic data of published WETS Table of Belhaven, NC station. Rutman Creek Watershed Restoration Project 5 Phase 1 - Year 4 Annual Monitoring Report February 2013 significant herbivory or deer browse is observed. In addition, supplemental planting may be necessary in areas of reduced survivorship. Table 2. List of Acceptable Volunteer Species by Habitat Type Swamp Forest 1,251 ac Bay Forest 1,705 ac Common Name Scientific Name Common Name Scientific Name Sweetbay Magnolia virginiana Fetterbush Lyonia lucida Red Bay Persea palustris American Titi Cyrilla racemiflora American Titi Cyrilla racemiflora Gallberry Ilex coriacea Wax Myrtle Morelia cerifera Inkberry Ilex glabra Fetterbush Lyonia lucida Dahoon Holly Ilex cassine Sweet Pepperbush Clethra alnifolia Wax Myrtle Morelia cerifera American Holly Ilex opaca High -bush Blueberry Vaccinium corymbosum High -bush Blueberry Vaccinium corymbosum Wet Hardwood Forest 344 ac Small Stream Swamp 42 ac Common Name Scientific Name Common Name Scientific Name Red Bay Persea palustris Fetterbush Lyonia lucida Wax Myrtle Morelia cerifera American Titi Cyrilla racemiflora Sweet Pepperbush Clethra alnifolia Wax Myrtle Morelia cerifera American Holly Ilex opaca Tulip Poplar Liriodendron tulipifera High -bush Blueberry Vaccinium corymbosum High -bush Blueberry Vaccinium corymbosum 4.0 MONITORING RESULTS (YEAR 4) A. Vegetation Monitoring A total of 3,317 plant stems (3,176 stems and 141 stems of planted and acceptable volunteer species, respectively) were enumerated throughout the sixty -eight (68) plots. The total number of planted stems identified corresponds to an average density of 467 stems per acre within the project area (Table 3). Of all the planted species identified, bald cypress exhibited the highest number of individual stems (1,079). Other planted species such as swamp tupelo, green ash, and pond pine were also abundant within the monitored plots. With the inclusion of acceptable volunteer species (namely wax myrtle and red bay) the mean stem density for Year 4 is 488 stems per acre. Additional volunteer species identified in Phase 1, but not counted towards the overall monitoring success, include eastern baccharis ( Baccharis halimifolia), black willow (Silax nigra) and winged sumac (Rhus copalinnum). Rutman Creek Watershed Restoration Project 6 Phase 1 — Year 4 Annual Monitoring Report February 2013 Overall, the site exhibited a diverse assemblage of characteristic trees and shrubs (as depicted in Table 3). It was noted during the Year 4 monitoring efforts that herbaceous vegetation was very dense in a number of plots, however most planted tree seedlings remain unaffected. There was no indication of significant mortality that would require implementation of contingency measures. All 68 plots met the minimum success criterion and exhibited relatively high stem densities (ranging between 29 stems to 71 planted stems per 0.10 -acre plot) through Year 4 monitoring. Refer to Appendix A for photographs of current site conditions. A comprehensive vegetation plot data table is provided in Appendix B. Table 3. Summary of Year 4 Vegetative Monitoring Data (Phase 1) Species Common Name Planted (P) or Volunteer (V) Total Stems # plots Average # Stems Taxodium distichum bald cypress P 1,079 65 16.6 Nyssa biflora swamp tupelo P 908 66 13.8 Fraxinus pennsylvanica green ash P 545 44 12.4 Pinus serotina pond pine P 304 40 7.6 Chamaecyparis th oides Atlantic white cedar P 208 29 7.2 Magnolia virginiana sweetbay P 77 9 8.6 Liriodendron tuli ifera tulip poplar P 55 9 6.1 Morella cerifera wax myrtle V 131 12 10.9 Persia borbonia red bay V 10 6 1.7 Total Planted Stems (68 Plots) 3,176 46.7 Total Planted and Acceptable Volunteer Stems (68 Plots) 3,317 48.8 B. Hydrologic Monitoring Per the approved mitigation plan, a total of thirty -four (34) shallow groundwater monitoring wells were installed in the center of selected vegetation plots in February 2009. In April 2009, six calibration wells were installed at selected plots (two wells each at Plots 37, 57, and 67). As indicated previously, lateral ditches were completely filled by February 25 (2009) and all plugs installed by March 20 (2009). The final plug installed was within Mooney Canal, the primary outlet for Phase 1. Data from the wells depicted a gradual decrease in rate of discharge during Year 1 monitoring as a result of the earthwork conducted during the early growing season of 2009. According to regional drought indices (including the North Carolina Division of Water Resources Drought Status Monitoring Program and the Palmer Drought Index), the Hyde County area experienced Rutman Creek Watershed Restoration Project 7 Phase 1 — Year 4 Annual Monitoring Report February 2013 drought conditions during the early growing season through April 2012. The NC Drought Status Maps indicate "1St Level Drought" conditions in January and "Abnormally Dry" conditions from February through April. Palmer Drought Index maps indicate "Moderate Drought" from January through April 2012. Both indices document normal rainfall conditions from May through December. On -site rain gauges document variable rainfall conditions with briefer periods of below normal rainfall ( <30th percentile) and above normal rainfall ( >70th percentile) (particularly in June and November 2012). Total on -site rainfall for the year was 49.11 inches. The nearest CRONOS Station recorded 56.09 inches for the year. According to the WETS long -term climatic data, mean annual rainfall for Belhaven, NC is 49.74 inches. Site - specific rainfall data are included on the hydrographs in Appendix C. The available North Carolina Drought Status Maps (NC DWR) for 2012 are included in Appendix D. The Palmer Drought Indices are included in Appendix E. All three appendices are provided digitally on the enclosed CD. Even with drought conditions throughout the early part of the growing season (through May 2012), all but two wells of Phase 1 met the hydrologic success criterion (i.e. hydroperiods meeting or exceeding 10% of the growing season). One of the remaining wells (Well #55) is located in an area of slightly higher topography adjacent to New Lake Road. The other well (Well #21) narrowly missed meeting the hydrologic success criterion as its water table dropped just below 12 inches for one day during the early growing season. Hydroperiods for all other wells ranged between 31 consecutive days (11.8% of the growing season) (Well #7) and 262 days (100% of the growing season) (Well #37W). The mean hydroperiod for Phase 1 (Year 4) was 71.7 days (27.4% of the growing season). Refer to Table 4A for a summary of the Year 4 hydrologic data. Complete hydrologic monitoring data (i.e. hydrographs) are provided in Appendix C (electronic format). The estimated hydrologic zones of Phase 1 are depicted in Figure 3. Note that based upon recent federal guidance regarding the length of the growing season in the Atlantic and Gulf Coastal Plain Region (as detailed in the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region), biological indicators and soil temperature data often indicate that the growing season of a particular county may be longer than that identified in WETS tables. As a result, the state Interagency Review Team (IRT) has recommended the use of a growing season beginning February 1 and ending November 30 of each year (unless site- Rutman Creek Watershed Restoration Project 8 Phase 1 — Year 4 Annual Monitoring Report February 2013 specific data indicate otherwise). In light of recent agency guidance, supplemental tables (evaluating hydroperiods from February 1 through November 30) are provided for informational purposes (refer to Tables 4B and 513). When well data were analyzed using this extended growing season, one of the wells that did not meet hydrologic criterion during the WETS growing season (Well #21) met the criterion with a hydroperiod of 35 days (11.6 %) of the growing season. Cumulative days of groundwater levels within 12 inches of the soil surface were significantly higher during Year 4 than during any other year of monitoring (Year 1 x= 81.8; Year 2 x= 206.5; Year 3 x= 230.1; Year 4 x= 273.4; p <0.0001). Every successive year of monitoring has exhibited an increase in the number of days with groundwater levels within 12 inches of the soil surface. Hydrologic data document a gradual elevation of the static water table over the four years of monitoring. The amplitude and duration of saturation for the mitigation wells appears to match or exceed that of the reference wells (refer to Tables 4 and 5). Three wells within the bay forest reference area (Bay Forest #1, 2, and 3) exhibited abnormally low groundwater levels throughout previous monitoring periods. These wells were relocated February 29, 2012 and are now referred to as Bay Forest wells #6, 7, and 8. One of these wells (Bay Forest #8) continues to exhibit abnormally low groundwater levels despite its relocation. With the exception of this well, the remaining reference wells exhibit hydroperiods between 12.2% (Bay Forest #5) and 52.7% (Bay Forest #7). 5.0 CONCLUSION Based upon the results of the Year 4 monitoring, Phase 1 is progressing well toward the target wetland community types (bay forest and swamp forest). Wells on the site continue to exhibit significantly increased numbers of days with water tables within 12 inches of the soil surface — suggesting that the measures employed to eliminate prior site drainage (e.g. backfilling of ditches and installation of impervious clay plugs) are functioning as intended. With the exception of two wells, observed hydroperiods (of the remaining 32 wells) exceed the stated hydrologic success criterion for the site. Note that one of these wells did meet hydrologic success criterion using the extended growing season recently proposed by the IRT rather than the WETS growing season. Rutman Creek Watershed Restoration Project 9 Phase 1 — Year 4 Annual Monitoring Report February 2013 Phase 1 also exhibits a diverse and characteristic assemblage of wetland tree and shrub species. Survivorship of planted stems remains high as exhibited by the recorded mean stem density (467 stems per acre) across the site. Volunteers thus far do not appear to have any significant, adverse effect on shrub or tree growth. Overall the Phase 1 project area appears to be performing very well. Monitoring results indicate that target wetland functions (including floodwater storage, increased hydrologic residency times, nutrient/sediment retention, and wildlife habitat) are already being performed across the site. As a result, no contingency measures are planned. The site will be continued to be monitored over the next year (through Year 5), and the findings of such will be provided in a subsequent annual monitoring report for agency review and concurrence. Rutman Creek Watershed Restoration Project 10 Phase 1 — Year 4 Annual Monitoring Report February 2013 Table 4A. Summary of Year 4 Hydrologic Monitoring (Phase 1 - Restoration) 2012 Growing Season March 11 - November 27 Well Number Total Number of days within 12" (Jan 1, 2012 thru Dec 31, 2012) Longest Number Of Consecutive Days Meeting Wetland Hydrology Criteria During Growing Season Dates of Longest Number of Consecutive Days Meeting Wetland Hydrology Criteria Percentage of Growing Season 10% Success Criteria (26 Days) >6- 12.5% 12.5 - 25% 25-75% 0 >75 /o 1 330 61 Marl 1 - May 10 23.3 Yes -- X -- -- 3 242 38 Mar 11 - Apr 17 14.5 Yes -- X -- -- 5 281 59 Marl 1 -May 8 22.5 Yes -- X -- -- 7 179 31 Mar 11 - Apr 10 11.8 Yes X -- -- -- 9 338 100 Aug 20 - Nov 27 38.2 Yes -- -- X -- 11 293 58 Marl 1 -May 7 22.1 Yes -- X -- -- 13 340 130 Jul 21 - Nov 27 49.6 Yes -- -- X -- 15 233 36 Mar 11 - Apr 15 13.7 Yes -- X -- -- 17 298 130 Jul 21 - Nov 27 49.6 Yes -- -- X -- 19 256 36 Mar 11 - Apr 15 13.7 Yes -- X -- -- 21 145 20 Mar 21 -Apr 9 7.6 No X -- -- -- 23 260 57 Marl 1 -May 6 21.8 Yes -- X -- -- 25 350 130 Jul 21 - Nov 27 49.6 Yes -- -- X -- 27 307 61 Marl 1 - May 10 23.3 Yes -- X -- -- 29 283 58 Marl 1 -May 7 22.1 Yes -- X -- -- 31 297 54 Marl 1 -May 3 20.6 Yes -- X -- -- 33 342 85 Jul 21 - Oct 13 32.4 Yes -- -- X -- 35 336 98 Jul 21 -Oct 26 37.4 Yes -- -- X -- 37W 366 262 Mar 11 - Nov 27 100.0 Yes -- -- -- X 37 301 55 Marl 1 -May 4 21.0 Yes -- X -- -- 37 E 358 96 Jul 21 -Oct 24 36.6 Yes -- -- X -- 39 328 84 Jul 1 - Oct 12 32.1 Yes -- -- X -- 41 199 32 Mar 11 - Apr 11 12.2 Yes X -- -- -- 43 248 55 Marl 1 -May 4 21.0 Yes -- X -- -- 45 251 56 Marl 1 -May 5 21.4 Yes -- X -- -- 47 354 130 Jul 21 - Nov 27 49.6 Yes -- -- X -- 49 251 38 Mar 11 - Apr 17 14.5 Yes -- X -- -- 50 257 55 Mar 11 - May 4 21.0 Yes -- X -- -- 51 258 58 Mar 11 - May 7 22.1 Yes -- X -- -- 53 223 36 Mar 11 - Apr 15 13.7 Yes -- X -- -- 55 48 5 May 31 - Jun 4 1.9 No -- -- -- -- 57 266 57 Marl 1 -May 6 21.8 Yes -- X -- -- 59 315 62 Mar 11 - May 11 23.7 Yes -- X -- -- 63 286 57 Marl 1 -May 6 21.8 Yes -- X -- -- 65 312 59 Marl 1 -May 8 22.5 Yes -- X -- -- 67W 352 100 Aug 20 - Nov 27 38.2 Yes -- -- X -- 67 289 54 Marl 1 -May 3 20.6 Yes -- X -- -- 67 E 348 130 Jul 21 - Nov 27 49.6 Yes -- -- X -- Rutman Creek Watershed Restoration Project Phase 1 - Year 4 Annual Monitoring Report February 2013 Table 4B. Summary of Year 4 Hydrologic Monitoring (Phase 1 - Restoration) 2012 Growing Season February 1 - November 30 Well Number Total Number of days within 12" (Jan 1, 2012 thru Dec 31, 2012) Longest Number Of Consecutive Days Meeting Wetland Hydrology Criteria During Growing Season Dates of Longest Number of Consecutive Days Meeting Wetland Hydrology Criteria Percent age of Growin 9 Season 10% Success Criteria (31 Days) >6- 12.5% 12.5- 25% 25-75% 0 >75 /o 1 330 100 Feb 1 -May 10 33.0 Yes -- -- X -- 3 242 77 Feb 1 - Apr 17 25.4 Yes -- -- X -- 5 281 98 Feb 1 - May 8 32.3 Yes -- -- X -- 7 179 70 Feb 1 - Apr 10 23.1 Yes -- X -- -- 9 338 138 Feb 1 - Jun 17 45.5 Yes -- -- X -- 11 293 97 Feb 1 - May 7 32.0 Yes -- -- X -- 13 340 138 Feb 1 - Jun 17 45.5 Yes -- -- X -- 15 233 75 Feb 1 - Apr 15 24.8 Yes -- X -- -- 17 298 133 July 21 - Nov 30 43.9 Yes -- -- X -- 19 256 75 Feb 1 - Apr 15 24.8 Yes -- X -- -- 21 145 35 Feb 14 - Mar 19 11.6 Yes X -- -- -- 23 260 96 Feb 1 - May 6 31.7 Yes -- -- X -- 25 350 141 Feb 1 - Jun 20 46.5 Yes -- -- X -- 27 307 100 Feb 1 -May 10 33.0 Yes -- -- X -- 29 283 97 Feb 1 - May 7 32.0 Yes -- -- X -- 31 297 93 Feb 1 - May 3 30.7 Yes -- -- X -- 33 342 101 Feb 1 -May 11 33.3 Yes -- -- X -- 35 336 98 Feb 1 - May 8; Jul 21 - Oct 26 32.3 Yes -- -- X -- 37W 366 303 Feb 1 - Nov 30 100.0 Yes -- -- -- X 37 301 94 Feb 1 - May 4 31.0 Yes -- -- X -- 37 E 358 101 Feb 1 -May 11 33.3 Yes -- -- X -- 39 328 97 Feb 1 - May 7 32.0 Yes -- -- X -- 41 199 71 Feb 1 - Apr 11 23.4 Yes -- X -- -- 43 248 94 Feb 1 - May 4 31.0 Yes -- -- X -- 45 251 95 Feb 1 - May 5 31.4 Yes -- -- X -- 47 354 141 Feb 1 - Jun 20 46.5 Yes -- -- X -- 49 251 77 Feb 1 - Apr 17 25.4 Yes -- -- X -- 50 257 94 Feb 1 - May 4 31.0 Yes -- -- X -- 51 258 97 Feb 1 - May 7 32.0 Yes -- -- X -- 53 223 75 Feb 1 - Apr 15 24.8 Yes -- X -- -- 55 48 7 Mar 4 - Mar 10 2.3 No -- -- -- -- 57 266 96 Feb 1 - May 6 31.7 Yes -- -- X -- 59 315 101 Feb 1 -May 11 33.3 Yes -- -- X -- 63 286 96 Feb 1 - May 6 31.7 Yes -- -- X -- 65 312 98 Feb 1 - May 8 32.3 Yes -- -- X -- 67W 352 103 Aug 20 - Nov 30 34.0 Yes -- -- X -- 67 289 93 Feb 1 - May 3 30.7 Yes -- -- X -- 67 E 348 133 Jul 21 - Nov 30 43.9 Yes -- -- X -- Rutman Creek Watershed Restoration Project 12 Phase 1 - Year 4 Annual Monitoring Report February 2013 Table 5A. Summary of 2012 Hydrologic Monitoring (Reference and Enhancement Wells) 2012 Growing Season March 11 - November 27 Well Number Reference Well (R) or Enhancement Well E () Total Number of days within 12 (Jan 1 -Dec 31) Longest Number Of Consecutive Days Meeting Wetland Hydrology Criteria in growing season y gy ( g g ) Dates of Longest Number of Consecutive Days Meeting Wetland Hydrology Criteria (ingrowing season) Percentage of Growing eason g Success Criteria >6 - 12.5% 12.5- 25% 25- 75% >75% ° 6 /0 (16 Days) ° 10 /o (26 Days) Bay # 4 R 243 61 Mar 11 - May 10 23.3 N/A Yes -- X -- -- Bay # 5 R 164 32 Marl 1 -Apr 11 12.2 N/A Yes X -- -- -- Bay # 6 R 131 39 May 23 - Jun 30 14.9 N/A Yes -- X -- -- Bay # 7 R 268 138 May 22 - Oct 6 52.7 N/A Yes -- -- X -- Bay # 8 R 0 0 N/A 0.0 N/A No -- -- -- -- Hardwood Flat #1 R 106 34 Mar 11 - Apr 13 13.0 Yes N/A -- X -- -- Hardwood Flat #2 R 122 37 Mar 11 - Apr 16 14.1 Yes N/A -- X -- -- Hardwood Flat #3 R 162 61 Mar 11 - May 10 23.3 Yes N/A -- X -- -- Table 5B. Summary of 2012 Hydrologic Monitoring (Reference and Enhancement Wells) 2012 Growing Season February 1 - November 30 Well Number Reference Well R or () Enhancement Well (E) Total Number of days within 12 (Jan 1 - Dec 31) Longest Number Of Consecutive Days Meeting y g Wetland Hydrology Criteria (in growing season) Dates of Longest Number of Consecutive Days Meeting y g Wetland Hydrology Criteria (in growing season) Percentage of g Growing Season Success Criteria >6 -12.5% 12.5-25% 25-75% >75% 6% (19 Days) 10% (31 Days) Bay # 4 R 243 100 Feb 1 - May 10 33.0 N/A Yes -- -- X -- Bay # 5 R 164 53 Feb 19 -Apr 11 17.5 N/A Yes -- X -- -- Bay # 6 R 131 39 May 23 - Jun 30 12.9 N/A Yes -- X -- -- Bay # 7 R 268 138 May 22 - Oct 6 45.5 N/A Yes -- -- X -- Bay # 8 R 0 0 N/A 0.0 N/A No -- -- -- -- Hardwood Flat #1 R 106 73 Feb 1 - Apr 13 24.1 Yes N/A -- X -- -- Hardwood Flat #2 R 122 76 Feb 1 - Apr 16 25.1 Yes N/A -- -- X -- Hardwood Flat #3 R 162 100 Feb 1 - May 10 33.0 Yes N/A -- -- X -- Rutman Creek Watershed Restoration Project 13 Phase 1 — Year 4 Annual Monitoring Report February 2013 j4 `h TP y - F li •' i Ifs•, .'� - -� s L i ;' � +•i�' k' }L J '' J + ; of a � �' _ v•� r r f _ } r r y a 4 f { kl .is.• _..%w��r ��ati�..b_�t+� I. _.�_.a r��.+r._` }i..r r - - .— 1 J 1 J ' + 11 � `� ._ +�4 {_ •_W.0. i J ,�+ _ a I _ yr. ,� 11 =��MY SiT1 -,'• __ _ _ .. .. _ r i•• F� _ ',�• I �X .� • i'f 4 � - � 1� v r •_ry �• 4 5 {, Ar { Legendw y� Rutman Creek Project Boundary ..r i Phase 1 (822 ac.)'�,�: Phase 2 (1,680 ac.) _ r '•� Phase 3 (1,711 ac.) LMG Rutman Creek Watershed Restoration nn Project LAND MANAGEMENT Cons pants HC. Figure 1. Construction Phase Map — Environmental Consultants �i �i I 2,400 7 1 "= 2,400' 4,800 = Feet — "' Plug # 3 BAY • • • . - ......... .... . ....... .. ................ ...,,...,,,a Plug # 4 #! t . 1 .� ....... . .. ..�M1 •4 0 • • Plug # 5 Legend 0 Plug Location Plug # 6 Phase 1 Plot Location (no well) 0 Phase 1 Plot Location (includes well) Bay Forest (203 ac.)= Swamp Forest (477 ac.) Phase 1 Boundary (822 ac.) Y y 4 ! LMG LAND MANAGEMENT GROUP �HC. Environmental Consultants Plug # 1_ ` r� r • 4 '4 -19 40 22 018 t �YM1W._n ' S - Plug # 2 •4++'" .......... ... ......... YY .... t ^ r - 4 i IGt 3R �• J M _ _ S � 'w _ ' xw:Yr#',wr�M'.+►+iM11MM L1i►iL' �'_� I4�h�h' +��" '+ - ��� r 5 I��1' ''"lk�'4, y" I' l_•,', •'M1I•y; �r 2h�h�# .�"�� -t _ �- � 'ter •__ .` - -t .f„ � -+#•� �#+ ,`_ -- �- - _ ! , M14 ,y y�j .` } _ _ 5x_zi�� y R •1' •�4 f �45 tir''z � �M1a- ' h � NFhf� %, l,+ '�� � IF SL'41YLyF'�x '.�'I y'Yr��h.ail J I' 4 \ �h'4 -•yr �.I'~ ��' h t• jFr1'rl -•I4 Jk ' �I'' i 'i r E� • w, ^� `rte` Y , �- I 5;ry543'4` 5 I y Rutman Creek Watershed Restoration Project 0 800 Figure 2. Well and Plot Location Map 1 "= 800' 1,600 Feet A F 0 n 7 r 7 r r l' IT r IITI I^ r I .Ti! i71i F�-,z T 71'i • f�r¢JJ w. � J^ Far 1'�. rrrr. , Mfr f F �'Ti+"' — __ •��. �'f1`r ?=ar � - LLr�c+f i.:• r' pMF'� � I � Jy . N� f jri T,. � Y nf�f�.w rj�E Legend _ _ _ _ ._ � r - Tfr� w"'�_ %'�f•r r T , A / s [ r, ��� F i� 'P-'[ rf +'h c 7 Jr - ../ 'T f.. ry t, 5•i.+ .. �f�r r-- t ' S t :.'f [i� r �'Jt I �I. rr''� �.F..7J.+• }� r'fel. i Fr _ ryr 7r k� r ei�G rTZ a, �:t.r df+rT` Ems' �.� '•J Phase 1 Plot Location (no well) '' , r'h:u• ''`,�� �.;.�� aR x �'. r F��? ;� - ' f •,,• f. "� r •;�� fri. �,J'.;[+f�.� -:.ti ": f.1,'•�.�,.�'�-v rF4 :L� �`y '� !`t +7r�!�" r E�"�`"' �_ Phase 1 Plot Location includes well `' ""� =� 'eft -� " %" -`,�v : "'r r"" r',t�`•. O ( ) ' G °i F=• r r.- 'r3' f: .•-i [ r• � '.'r i,n ��r•rj��:•rs.�'.: '(4`i �- �f'�1 �.,, c�tt'�•f r �r.�,� •'��{rr'���r.�y�,�'.t+•'`i o � r.ri'f'r^�+.:errcr.rt�.M�� �; r r •- � �'.� r • t':1���� ` c;,r� <6 /o Growing Season Hydroperiod g r r= •: ' = -'`''. �. r � Y-- 'r�"r+r�"1 ' /r•.?�. a} `F,rpf T' -rl� r�L`.fi�?_`r .Ir'.:r.ii�� Ci r v✓ �ii�- C�rf f r �•F•��`Yr ••'•l�•1,'�1r�fr ,-'+ a`' �� - .:r.^�:j.. .!;:�A,.r �lsE,'� r�lt, '- "`�' t ryj+�r'�•• i �� •,� ,'�Gr,e.�i'r.':r!`M�+ ���":� {�d�r.12ISr�'r. �ji O -r ..F f;' 1 •!../ ��` rsT i „��rT••.:'.�rl, '." r � ,,f; «•.-:� - .("r.. µ �.. tt�� S�ii k�. 'Shit' �'.,,.r >6 -12.5 /o Growing Season Hydroperiod -. '� rn�•. r �'F•'• �.rl'�f �.YY ^�r:4 �N ! /��.,� v- •�il�^' ��•{.r! /�R7. -�. yr�iiS•�]'J /n1 Y r r r r r •r fit� fit .rr yr w hr >12.5-25% Growing Season Hydroperiod � r•-� _ >25 -75% Growing Season Hydroperiod LMG LAND MANAGEMENT GROUP rxr. hnvironmWoi CansWronie 10 It Rutman Creek Watershed Restoration Project Figure 3. Phase 1 - Estimated Hydrologic Zones E 1 1 F Map is for illustrative purposes only. Boundaries are approximate and not meant to be absolute. Boundaries are based on extrapolation of monitoring well data and have not been verified with field indicators. 0 800 1,600 Feet 1 "= 800' � s r -- I .Ti! i71i F�-,z T 71'i • f�r¢JJ w. � J^ Far 1'�. rrrr. , Mfr f F �'Ti+"' — __ •��. �'f1`r ?=ar � - LLr�c+f i.:• r' pMF'� � I � Jy . N� f jri T,. � Y nf�f�.w rj�E Legend _ _ _ _ ._ � r - Tfr� w"'�_ %'�f•r r T , A / s [ r, ��� F i� 'P-'[ rf +'h c 7 Jr - ../ 'T f.. ry t, 5•i.+ .. �f�r r-- t ' S t :.'f [i� r �'Jt I �I. rr''� �.F..7J.+• }� r'fel. i Fr _ ryr 7r k� r ei�G rTZ a, �:t.r df+rT` Ems' �.� '•J Phase 1 Plot Location (no well) '' , r'h:u• ''`,�� �.;.�� aR x �'. r F��? ;� - ' f •,,• f. "� r •;�� fri. �,J'.;[+f�.� -:.ti ": f.1,'•�.�,.�'�-v rF4 :L� �`y '� !`t +7r�!�" r E�"�`"' �_ Phase 1 Plot Location includes well `' ""� =� 'eft -� " %" -`,�v : "'r r"" r',t�`•. O ( ) ' G °i F=• r r.- 'r3' f: .•-i [ r• � '.'r i,n ��r•rj��:•rs.�'.: '(4`i �- �f'�1 �.,, c�tt'�•f r �r.�,� •'��{rr'���r.�y�,�'.t+•'`i o � r.ri'f'r^�+.:errcr.rt�.M�� �; r r •- � �'.� r • t':1���� ` c;,r� <6 /o Growing Season Hydroperiod g r r= •: ' = -'`''. �. r � Y-- 'r�"r+r�"1 ' /r•.?�. a} `F,rpf T' -rl� r�L`.fi�?_`r .Ir'.:r.ii�� Ci r v✓ �ii�- C�rf f r �•F•��`Yr ••'•l�•1,'�1r�fr ,-'+ a`' �� - .:r.^�:j.. .!;:�A,.r �lsE,'� r�lt, '- "`�' t ryj+�r'�•• i �� •,� ,'�Gr,e.�i'r.':r!`M�+ ���":� {�d�r.12ISr�'r. �ji O -r ..F f;' 1 •!../ ��` rsT i „��rT••.:'.�rl, '." r � ,,f; «•.-:� - .("r.. µ �.. tt�� S�ii k�. 'Shit' �'.,,.r >6 -12.5 /o Growing Season Hydroperiod -. '� rn�•. r �'F•'• �.rl'�f �.YY ^�r:4 �N ! /��.,� v- •�il�^' ��•{.r! /�R7. -�. yr�iiS•�]'J /n1 Y r r r r r •r fit� fit .rr yr w hr >12.5-25% Growing Season Hydroperiod � r•-� _ >25 -75% Growing Season Hydroperiod LMG LAND MANAGEMENT GROUP rxr. hnvironmWoi CansWronie 10 It Rutman Creek Watershed Restoration Project Figure 3. Phase 1 - Estimated Hydrologic Zones E 1 1 F Map is for illustrative purposes only. Boundaries are approximate and not meant to be absolute. Boundaries are based on extrapolation of monitoring well data and have not been verified with field indicators. 0 800 1,600 Feet 1 "= 800' k + Rutman Creek Watershed Restoration Project Figure 4. Reference Well Map (On -site) 1,100 2,200 Feet 10, M 06, L ..4 Legend 0 Reference Wells ILI 4 to UI 021 K Wet Hardwood Forest (3) Rutman Creek Watershed Restoration Project 0 1,000 2,000 m Feet Figure 5. Reference Well Map (Cameron Property) P SITE PHOTOGRAPHS 1 (1) View of Plot 5 i- — e k (2) View of bald cypress at Plot 4 Rutman Creek Watershed Restoration Project Phase 1 LMG LAND MANAGEMENT GROUP,.- Environmental Consultants Site Photographs Annual Monitoring (Year 4) (1) View of Plot 58 (2) View of green ash at Plot 61 Rutman Creek Watershed Restoration Project Phase 1 LMG LAND MANAGEMENT GROUP,.- Environmental Consultants Site Photographs Annual Monitoring (Year 4) (1) View of Atlantic white cedar at Plot 21 r (2) View of black gum at Plot 31 Rutman Creek Watershed Restoration Project Phase 1 LMG LAND MANAGEMENT GROUP,.- Environmental Consultants Site Photographs Annual Monitoring (Year 4) APPENDIX i !V PLOT DATA (YEAR Rutman Creek Watershed Restoration Project - Phase 1 (Year 4) Appendix B -Vegetation Data by Plot Species Common Name Planted (P) or Volunteer (V) r 0 — a N 0 — a M 0 — a I* 0 — a W) 0 — a W 0 — a 1%. 0 — a Oo 0 — a a) 0 — a O r 0 — a r r 0 — a N r 0 — a M r 0 — a I* r 0 — a W) r 0 — a W r 0 — a 1'. r 0 — a CO r 0 — a 69 r 0 — a O N 0 — a T_ N 0 — a N N 0 — a M N 0 — a Chamaecyparis thyoides Atlantic white cedar P 8 1 4 5 6 2 10 10 10 6 12 7 20 19 8 6 4 15 6 5 green ash Fraxinus pennsylvanica green ash P 8 16 7 7 12 21 12 3 6 4 8 16 8 10 8 9 11 26 18 15 11 26 8 Liriodendron tulipifera tulip poplar P 5 17 1 11 2 2 sweet bay P Magnolia virginiana sweet bay P 9 4 3 5 10 6 17 3 Nyssa biflora swamp tupelo P 18 20 Nyssa biflora swamp tupelo P 22 10 24 23 7 12 16 16 18 6 5 9 15 14 20 17 18 7 9 5 14 6 26 Pinus serotina pond pine P 12 2 5 22 14 1 8 3 6 20 5 3 8 4 3 8 bald cypress 4 15 11 23 1 Taxodium distichum bald cypress P 17 21 11 4 8 8 10 18 18 32 7 21 13 23 16 38 16 14 14 21 8 11 15 Morella cerifera wax myrtle V 1 2 29 1 25 1 1 16 V 4 Persea borbonia red bay V 1 1 1 4 1 34 50 44 50 51 29 47 56 54 Total Stems of Planted Species 55 49 40 49 37 34 39 45 49 42 42 46 37 45 48 46 50 53 47 58 39 48 50 Total Stems of Planted Species + Acceptable Volunteer Species 55 49 40 50 37 34 39 45 49 42 42 48 41 46 49 46 50 53 51 58 39 48 50 Species Common Name Planted (P) or Volunteer (V) I* N 0 — a W) N 0 — a W N 0 — a 1,. N 0 — a Go N 0 — a 69 N 0 — a O M 0 — a T_ M 0 — a N M 0 — a M M 0 — a I* M 0 — a W) M 0 — a W M 0 — a 1%. M 0 — a Go M 0 — a 69 M 0 — a O I* 0 — a T_ I* 0 — a N I* 0 — a M I* 0 — a I* I* 0 — a W) I* 0 — a W I* 0 — a Chamaecyparis thyoides Atlantic white cedar P 1 4 6 2 10 10 8 6 12 7 20 9 1 3 8 7 Fraxinus pennsylvanica green ash Fraxinus pennsylvanica green ash P 7 30 7 7 12 21 4 14 6 32 8 11 8 10 7 11 16 11 7 10 25 P Liriodendron tulipifera tulip poplar P 4 5 11 Magnolia virginiana sweet bay P Magnolia virginiana sweet bay P 9 4 3 5 17 3 Nyssa biflora swamp tupelo P 18 20 Nyssa biflora swamp tupelo P 17 2 31 11 11 6 11 11 10 20 9 7 33 10 11 4 7 14 17 6 16 18 4 Pinus serotina pond pine P 12 10 5 8 2 8 13 6 8 5 5 15 3 12 bald cypress 4 15 11 23 14 Taxodium distichum bald cypress P 24 25 4 26 10 12 9 17 10 11 14 26 30 16 4 38 25 11 20 14 42 16 Morella cerifera wax myrtle V 1 2 29 25 14 Persea borbonia 16 V 2 Persea borbonia red bay V 1 2 1 34 50 44 50 51 29 47 56 54 Total Stems of Planted Species 36 32 50 49 47 41 30 38 36 37 47 55 71 43 47 61 44 53 52 50 68 59 38 Total Stems of Planted Species + Acceptable Volunteer Species 36 32 50 49 48 41 31 40 65 37 47 55 96 57 48 77 44 53 54 50 68 59 38 Species Common Name Planted (P) or Volunteer (V) 1,. 0 — a Go 0 — a 69 0 — a O 0 — a T_ 0 — a N 0 — a M 0 — a I* 0 — a W) 0 — a W 0 — a 1%. 0 — a Go 0 — a 69 0 — a O 0 — a T_ 0 — a N 0 — a M 0 — a I* 0 — a W) 0 — a W 0 — a 1%. 0 — a Go 0 — a Chamaecyparis thyoides Atlantic white cedar P 4 10 12 1 20 3 3 7 Fraxinus pennsylvanica green ash P 7 7 30 6 25 4 4 1 32 19 29 5 11 5 Liriodendron tulipifera tulip poplar P 8 Magnolia virginiana sweet bay P 9 3 5 3 Nyssa biflora swamp tupelo P 18 23 9 10 15 17 27 12 22 25 13 7 14 16 10 1 37 12 11 9 12 Pinus serotina pond pine P 10 1 5 3 10 1 14 10 5 8 11 1 5 1 Taxodium distichum bald cypress P 6 11 23 3 17 5 3 9 23 10 14 18 25 11 17 12 25 18 28 33 22 33 Morella cerifera wax myrtle V 35 Persea borbonia red bay V 2 Total Stems of Planted Species 34 50 44 50 51 29 47 56 54 44 46 57 58 39 47 47 37 56 51 57 35 55 Total Stems of Planted Species + Acceptable Volunteer Species 34 50 79 50 51 29 47 56 54 44 46 57 58 39 47 47 37 56 51 57 37 55 Page 1 of 1 APPENDIX C. Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record ► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 1,3, &5 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 N 4 d t V 0 d d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 Hydrology Assessment ---- 777;;;;;F77� ------------------------ m March, 2012 ��� �e� deb deb <1e� 10 ' � ' � �'� 0 0 ' �� ' �� 00n-site Raingauge —30 day total - 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp 80 75 70 65 60 55 50 45 40 35 30 Well 1 - 1 OFAA69E -+-Well 3 - 11311033 Well 5 - 1130D88B —12in below surface I On -site Raingauge Slide A -13 7 6 N 0 3 m a� m 0 y 5 m n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record ► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 1,3, &5 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment June, 2012 - -- Soil Temp Logger destroyed by_ wildlife _6- 1.5 -12 ------------------------------------------- - - - - -- - - - - - - -- ------- - - - - -- �_ --- - - - - -- - - - -- -------------------- - - - - -- ------------ - - - - -- - -- ------- -------------------------- - - - - -- - - - - - -- ------- - - - - -- - ----------------- i---------------- - - - I -- ----- PQ� PQ� PQ� PQ� PQ� PQ� 10, ,-A ��� 10, ��'A ��'A ��� 11' 6 N N6 n�, o`er N 4 d t 0 d d -4 J -8 v -12 U) -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 On -site Raingauge —30 day total 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp ` < � • A it r� I� ■ 80 75 70 65 60 55 50 45 40 35 30 qY �� �� ��� �6� 2�� "Y ��� h5 Nod N�h 'V 'hr �o� Well 1 - 1 OFAA69E -+-Well 3 - 11311033 Well 5 - 1130D88f3 —12in below surface On -site Raingauge Slide A -14 7 6 N 0 3 m a� m 0 m N 5 n 4 a 0 3 M M Rutman Creek - PHASE I Precipitation data obtained 1 from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 `(wcc.nres.usda.gov) Monitoring Well Record ► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 1,3, &5 ► Ecotone WM 20 ► July 1, 2012 - ► Spetember 30, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 -20 U Land Management Group, Inc. www.lmgroup.net Hydrology Assessment September, 2012 80 75 N 70 2. 65 60 m a� 55 m 50 0 45 40 y T 35 30 Po Po Po Po Po �eQ e Q �eQ �eQ ' e) _'p D N�` N0, 2�` 20, WffOn -site Raingauge 30 day total 30th percentile —70th percentile MBelhaven Raingauge Soil Temp '0 �6 2�, 26 ��- �P �oP ��P 2oP 2�P 2oP �5 'e Nt5 X05 2�5 205 Well 1 - 1 OFAA69E 4-Well 3 - 11311033 Well 5 - 1130D88B —12in below surface On -site Raingauge Slide A -15 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record ► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 1,3, &5 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ;;Pe --- December, 2012 Oo Oo On -site Raingauge —30 day total 30th percentile 70th percentile ■Belhaven Raingauge Soil Temp y^ 4 d t 0 as d -4 J -8 v -12 N -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. Well 1 - 1 OFAA69E -+-Well 3 - 11311033 Well 5 - 1130D88B —12in below surface 2 ... 1 W I On -site Raingauge I Slide A -16 FALS 5 2. 0 13 M Well 1 - 1 OFAA69E -+-Well 3 - 11311033 Well 5 - 1130D88B —12in below surface 2 ... 1 W I On -site Raingauge I Slide A -16 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 7,9, &11 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a 10 9 8 7 6 5 4 3 2 1 0 fq 4 d t V 0 Z d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 Hydrology Assessment ---- 777;;;;;F77� --------------------- March, 2012 ��� �e� "e", "I <,eb <,eb \ " \�� 9 2 1� `� �� �`� 10 1v 26 �� Well 7 - 1130E5AE -+-Well 9 - 1 131 20133 Well 11 - 11312D613 —12in below surface 1 On -site Raingauge Slide B -13 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 N 3 m a� m 0 y 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 7,9, &11 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N t E c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment June, 2012 Soil Temp Logger destroyed by_ wildlife _6- 1.5 -12 ------------------------------------------- - - - - -- - - - - - - -- ------- - - - - -- - - - -- -------------------- - - - - -- ------------------ ----------------- i- ----------------- - I - - -- - - - -- ------------------------- PQ� PQ� PQ� PQ� PQ� PQ� 10, ,-A ��� 10, NV ��'A �'A �� On -site Raingauge —30 day total 30th percentile —70th percentile ■Belhaven Rainaauae —Soil Temp fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 �P 6P 1, Nb 1,1 26P N, 60 NN NV 9. 26, 6�: h5 Nod NV 16 � 26� 60� Well 7 - 1130E5AE -+-Well 9 -113120133 Well 11 - 11312D613 —12in below surface On -site Raingauge Slide B -14 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 N 3 m a� m 0 m N 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 `(wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 7,9, &11 ► Ecotone WM 20 ► July 1, 2012 - ► Spetember 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 C -20 cD Land Management Group, Inc. www.lmgroup.net -24 Hydrology Assessment September, 2012 Po Po Po Po Po �eQ e Q �eQ �eQ ' e) _'p D N�` N0, 2�` 20, WffOn -site Raingauge 30 day total 30th percentile —70th percentile MBelhaven Raingauge Soil Temp INNIF1 I - Well 7 - 1130E5AE -+-Well 9 -113120133 Well 11 - 11312D613 —12in below surface 1 On -site Raingauge Slide B -15 80 75 N 70 2. N 65 � 60 m a� 55 m 50 0 45 40 y T 35 30 7 6 5 n 4 0 3 M M �•�� �•�� �•�� �•�� �•�� �•�� �•�� oQ' oa' oa' oa' oa' oa' eQ eQ eQ eQ eQ eQ �- ��- �6 2�, 26 ��- �P �oP ��P 2oP 2�P 2oP V5 05 ��5 N05 2�5 205 - Well 7 - 1130E5AE -+-Well 9 -113120133 Well 11 - 11312D613 —12in below surface 1 On -site Raingauge Slide B -15 80 75 N 70 2. N 65 � 60 m a� 55 m 50 0 45 40 y T 35 30 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 7,9, &11 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ;;Pe December, 2012 Oo Oo fq 4 d t V 0 Z d -4 J -8 v -12 cC N -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 L On -site Raingauge —30 day total 30th percentile 70th percentile ■Belhaven Raingauge Soil Temp Well 7 - 1130E5AE -+-Well 9 -113120133 Well 11 - 11312D613 —12in below surface On -site Raingauge Slide B -16 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. 7 6 5 2. 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 13,15, &17 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ---- 777;;;;;F77� --------------------- March, 2012 fq 4 d t V 0 Z d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 00n-site Raingauge —30 day total - 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp 1< 11 <,e6 <,e� Well 13 - 11310460 -+-Well 15 - 1 131 21394 Well 17 - 1131382E —12in below surface 1 On -site Raingauge Slide C -13 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 fD 3 m a� m 0 le y 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 13,15, &17 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment June, 2012 Soil Temp Logger destroyed by_ wildlife _6- 1.5 -12 ------------------------------------------- - - - - -- - - - - - - -- ------- - - - - -- - - - -- -------------------- - - - - -- ------------------ ----------------- i- ----------------- - I - - -- - - - -- ------------------------- PQ� PQ� PQ� PQ� PQ� PQ� 10, ,-A ��� 10, NV ��'A �'A �� On -site Raingauge —30 day total 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 �P 6P 1, Nb 1,1 26P N, 60 NN NV 9. 26, 6�: h5 Nod NV 16 � 26� 60� Well 13 - 11310460 -+-Well 15 - 1 131 21394 Well 17 - 1131382E —12in below surface On -site Raingauge Slide C -14 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 fD 3 m a� m 0 le m N 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 ,.—(wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 13,15, &17 ► Ecotone WM 20 ► July 1, 2012 - ► Spetember 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. N d t V as d J d as V cC N 0 1, Land Management Group, Inc. www.lmgroup.net 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment September, 2012 80 75 N 70 2. N 65 � - - 60 m _ a� 55 E m 50 0 45 40 y T 35 30 �eQ ,�2 �eQ eQ �eQ ,�2 ,�2 ,�2 � _eQ WffOn -site Raingauge 30 day total 30th percentile —70th percentile MBelhaven Raingauge Soil Temp 4 ------------------ 0 -- - -- - -- - - - - -- - - - - -- ---- -- -12 -16 ------------------------ - - - - -- -- -20 - - -- - - -- - -- - ---- - - - - -- -24 eQ eQ eQ eQ eQ eQ Well 13 - 11310460 -+-Well 15 - 1 131 21394 Well 17 - 1131382E —12in below surface 1 On -site Raingauge Slide C -15 7 6 5 4 3 2 1 0 �D n 0 M 2 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 13,15, &17 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ;;Pe December, 2012 Oo Oo fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 On -site Raingauge —30 day total 30th percentile 70th percentile ■Belhaven Raingauge Soil Temp Well 13 - 11310460 -+-Well 15 - 1 131 21394 Well 17 - 1131382E —12in below surface On -site Raingauge Slide C -16 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 19,21, &23 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ---- 777;;;;;F77� --------------------- March, 2012 fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 00n-site Raingauge —30 day total - 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp e e� <,16 � 9 Il 1 11 �`� R0 1v 0 �� �0 2� 20 l� Wel 19 - 11310DA0 -+-Well 21 11312BFB Well 23 - 10FACBBF —12in below surface On -site Raingauge Slide D -13 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 N 3 m a� m 0 y 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 19,21, &23 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment June, 2012 Soil Temp Logger destroyed by_ wildlife _6- 1.5 -12 ------------------------------------------- - - - - -- - - - - - - -- ------- - - - - -- - - - -- -------------------- - - - - -- ------------------ ----------------- i- ----------------- - I - - -- - - - -- ------------------------- PQ� PQ� PQ� PQ� PQ� PQ� 10, ,-A ��� 10, NV ��'A �'A �� fq 4 d t V 0 Z d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 On -site Raingauge —30 day total 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp �P 6P 1, Nb 1,1 26P N, 60 NN NV 9. 26, 6�: h5 Nod NV 16 � 26� 60� Wel 19 - 11310DA0 -+-Well 21 - 11312BFB Well 23 - 10FACBBF —12in below surface On -site Raingauge Slide D -14 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 fD 3 m a� m 0 le m N 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 19,21, &23 ► Ecotone WM 20 ► July 1, 2012 - ► Spetember 30, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 fq 4 d t V 0 as d -4 J -8 12 U) -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 Hydrology Assessment September, 2012 Po Po Po Po Po �eQ e Q �eQ �eQ ' e) _'p D N�` N0, 2�` 20, WffOn -site Raingauge 30 day total 30th percentile —70th percentile MBelhaven Raingauge Soil Temp ,�2 ,�2 ,�2 ,�2 ,�2 ,�2 ,�2 �0 �� eQ eQ eQ eQ eQ eQ �5 05 4� Nw q� 205 Wel 19 - 11310DA0 -+-Well 21 11312BFB Well 23 - 10FACBBF —12in below surface On -site Raingauge Slide D -15 80 75 N 70 2. 65 60 m a� 55 m 50 0 45 40 y T 35 30 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 19,21, &23 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ;;Pe December, 2012 Oo Oo fq 4 d t V 0 as d -4 J -8 -12 cC U) -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 On -site Raingauge —30 day total 30th percentile 70th percentile ■Belhaven Raingauge Soil Temp Wel 19 - 11310DA0 -+-Well 21 11312BFB Well 23 - 10FACBBF —12in below surface On -site Raingauge Slide D -16 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. 7 6 5 n 4 0 3 M M -II ° ,,., Wel 19 - 11310DA0 -+-Well 21 11312BFB Well 23 - 10FACBBF —12in below surface On -site Raingauge Slide D -16 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 25, 27, & 29 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ---- 777;;;;;F77� --------------------- March, 2012 fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 00n-site Raingauge —30 day total - 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp 1< 11 <,e6 <,e� Well 25 - 11311008 +Well 27 - 1130EC94 Well 29 - 11311034 —12in below surface On -site Raingauge Slide E -13 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 N 3 m a� m 0 y 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 25, 27, & 29 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment June, 2012 Soil Temp Logger destroyed by_ wildlife _6- 1.5 -12 ------------------------------------------- - - - - -- - - - - - - -- ------- - - - - -- - - - -- -------------------- - - - - -- ------------------ ----------------- i- ----------------- - I - - -- - - - -- ------------------------- PQ� PQ� PQ� PQ� PQ� PQ� 10, ,-A ��� 10, ��'A ��'A ��� 11' 6 N N6 n�, o`er fq 4 d t V 0 Z d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net 1110n-site Raingauge —30 day total 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp -24 - ,�2 PQ� PQ� PQ� PQ� PQ� PQ� ��� ��� ��'A ��'A A SO So� So� S§1 poi 1,1 Nb 1,1 16) N' 6 ��' N6 2�' by '�'' h ,�' ,'h' 16 1h Well 25 - 11311008 +Well 27 - 1130EC94 Well 29 - 11311034 —12in below surface On -site Raingauge Slide E -14 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 fD 3 m a� m 0 le (D N 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 ,.—(wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 25, 27, & 29 ► Ecotone WM 20 ► July 1, 2012 - ► Spetember 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. N d t V as d J d as V cC N 0 Land Management Group, Inc. www.lmgroup.net 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment September, 2012 80 75 N 70 2. N 65 � - - 60 m _ a� 55 E m 50 0 45 40 y T 35 30 �eQ ,�2 �eQ eQ �eQ ,�2 ,�2 ,�2 � _eQ WffOn -site Raingauge 30 day total 30th percentile —70th percentile MBelhaven Raingauge Soil Temp 4 ---------- - - - - -- - - -- - - - -- - - -- -- - ---------- - - - - -- - - -- - -- 0 ISLI 4 - - - -- - - - -- s- -- - - - -- - - -- -12 16 - -- - -- - - - - -- - -- -------------------------------------------- -20 - -- -- - - - - -- ------------------- -24 4� X05 2�5 205 Well 25 - 11311008 +Well 27 - 1130EC94 Well 29 - 11311034 —12in below surface 1 On -site Raingauge Slide E -15 7 6 5 4 3 2 1 0 �D n 0 M 2 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 25, 27, & 29 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ;;Pe December, 2012 Oo Oo fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 On -site Raingauge —30 day total 30th percentile 70th percentile ■Belhaven Raingauge Soil Temp Well 25 - 11311008 +Well 27 - 1130EC94 Well 29 - 11311034 —12in below surface On -site Raingauge Slide E -16 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 31, 33, & 35 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ---- 777;;;;;F77� --------------------- March, 2012 fq 4 d t V 0 Z d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net 00n-site Raingauge —30 day total - 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp -24 Well 31 - 1131091A -+-Well 33 - 1 131 090B Well 35 - 1130E45C —12in below surface On -site Raingauge Slide F -13 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 fD 3 m a� m 0 le y 5 n 4 3 0 Well 31 - 1131091A -+-Well 33 - 1 131 090B Well 35 - 1130E45C —12in below surface On -site Raingauge Slide F -13 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 fD 3 m a� m 0 le y 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 31, 33, & 35 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment June, 2012 Soil Temp Logger destroyed by_ wildlife _6- 1.5 -12 ------------------------------------------- - - - - -- - - - - - - -- ------- - - - - -- - - - -- -------------------- - - - - -- ------------------ ----------------- i- ----------------- - I - - -- - - - -- ------------------------- PQ� PQ� PQ� PQ� PQ� PQ� 10, ,-A ��� 10, NV ��'A �'A �� On -site Raingauge —30 day total 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 �P 6P 1, Nb 1,1 26P N, 60 NN NV 9. 26, 6�: h5 Nod NV 16 � 26� 60� Well 31 - 1131091A -+-Well 33 - 1 131 090B Well 35 - 1130E45C —12in below surface On -site Raingauge Slide F -14 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 fD 3 m a� m 0 le m N 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 31, 33, & 35 ► Ecotone WM 20 ► July 1, 2012 - ► Spetember 30, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 Hydrology Assessment September, 2012 ------------ - - - - -- --------------------- - - - - -- ----------------------- --------------- 111 ----------- ---------------- . -------- III ------------------ _ ,�2 ,�2 ,�2 ,�2 ,�2 ,�2 ,�2 ,�2 ,, 2 ,�2 Po Po Po Po Po �eQ �eQ �eQ �eQ ' e) _'p D N�` �0, 2� 20, "On -site Raingauge 30 day total 30th percentile —70th percentile ■Belhaven Raingauge Soil Temp �o` �o` �o` �o` �o` �� �� �� �� �� �� eQ eQ eQ eQ eQ eQ '�, �6 2�, 26 ��- �P �oP ��P 2oP 2�P 2oP N5 05 ��5 X05 2�5 205 - Well 31 - 1131091A -+-Well 33 - 1 131 090B Well 35 - 1130E45C —12in below surface On -site Raingauge Slide F -15 80 75 N 70 2. 65 60 m a� 55 m 50 0 45 le 40 y T 35 zn 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 31, 33, & 35 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ;;Pe December, 2012 Oo Oo fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 On -site Raingauge —30 day total 30th percentile 70th percentile ■Belhaven Raingauge Soil Temp Well 31 - 1131091A -+-Well 33 - 1 131 090B Well 35 - 1130E45C —12in below surface On -site Raingauge Slide F -16 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 37, 39, & 41 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ---- 777;;;;;F77� --------------------- March, 2012 fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 00n-site Raingauge —30 day total - 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp 80 75 70 65 60 55 50 45 40 35 30 e e� <,16 � 9 Il 1 11 �`� R0 1v 0 �� �0 2� 20 l� Well 37 - 113124AF -+-Well 39 - 11312D6A Well 41 - 1130F7C2 —12in below surface On -site Raingauge Slide G -13 7 6 N 0 N 3 m a� m 0 y 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 37, 39, & 41 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. Hydrology Assessment 10 9 8 7 6 5 4 3 2 1 0 June, 2012 80 75 70 65 60 55 50 45 40 35 30 PQ� PQ� PQ� PQ� PQ� PQ� 10, ,-A ��� 10, NV ��'A �'A �� fq 4 d t V 0 Z d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 On -site Raingauge —30 day total 30th percentile —70th percentile MBelhaven Raingauge —Soil Temp ------------ -- -------- Well 37 - 113124AF -+-Well 39 - 11312D6A Well 41 - 1130F7C2 —12in below surface On -site Raingauge Slide G -14 7 6 N 0 fD 3 m a� m 0 le m N T 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 37, 39, & 41 ► Ecotone WM 20 ► July 1, 2012 - ► Spetember 30, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 fq 4 d t V 0 as d -4 J -8 v -12 U) -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 Hydrology Assessment September, 2012 Po Po Po Po Po �eQ e Q �eQ �eQ ' e) _'p D N�` N0, 2�` 20, WffOn -site Raingauge 30 day total 30th percentile —70th percentile MBelhaven Raingauge Soil Temp ,�2 ,�2 ep '0 �6 2�, 26 ��' hP �oP P 2oP 2�P 2oP �5 05 4� Nw q� 205 - Well 37 - 113124AF -+-Well 39 - 11312D6A Well 41 - 1130F7C2 —12in below surface On -site Raingauge Slide G -15 80 75 N 70 2. 65 60 m a� 55 m 50 0 45 40 y T 35 30 7 6 5 n 4 a 0 3 M M wwwi ,�2 ,�2 ep '0 �6 2�, 26 ��' hP �oP P 2oP 2�P 2oP �5 05 4� Nw q� 205 - Well 37 - 113124AF -+-Well 39 - 11312D6A Well 41 - 1130F7C2 —12in below surface On -site Raingauge Slide G -15 80 75 N 70 2. 65 60 m a� 55 m 50 0 45 40 y T 35 30 7 6 5 n 4 a 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 37, 39, & 41 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ;;Pe December, 2012 Oo Oo fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 On -site Raingauge —30 day total 30th percentile 70th percentile ■Belhaven Raingauge Soil Temp Well 37 - 113124AF -+-Well 39 - 11312D6A Well 41 - 1130F7C2 —12in below surface On -site Raingauge Slide G -16 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 43, 45, & 47 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a 10 9 8 7 6 5 4 3 2 1 0 fq 4 d t V 0 Z d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 Hydrology Assessment ---- 777;;;;;F77� --------------------- March, 2012 ��� �e� "e", "I <,eb <,eb \ " \�� 9 2 `5 0 10 1v 26 �� Well 43 - 113131391 -+-Well 45 - 11313AEB Well 47 - 11310461 —12in below surface On -site Raingauge Slide H -13 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 N 3 m a� m 0 y 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 43, 45, & 47 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment June, 2012 Soil Temp Logger destroyed by_ wildlife _6- 1.5 -12 ------------------------------------------- - - - - -- - - - - - - -- ------- - - - - -- - - - -- -------------------- - - - - -- ------------------ ----------------- i- ----------------- - I - - -- - - - -- ------------------------- Q� , ,-A �� , 'A 'A �� �Q 6PQ ��PQ �6PQ 2�PQ 26PQ 11 S 6�S �N75 Nv 9� 26� 1 �1: fq 4 d t V 0 Z d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 �P 6P 1, Nb 1,1 26P N, 60 NN NV 9. 26, 6�: h5 Nod NV 16 � 26� 60� Well 43 - 113131391 -+-Well 45 - 11313AEB Well 47 - 11310461 —12in below surface On -site Raingauge Slide H -14 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 N 3 m a� m 0 m N 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 43, 45, & 47 ► Ecotone WM 20 ► July 1, 2012 - ► Spetember 30, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a 10 9 8 7 6 5 4 3 2 1 0 fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 Hydrology Assessment September, 2012 ------------ - - - - -- --------------------- - - - - -- ----------------------- --------------- 111 ----------- ---------------- . -------- III ------------------ _ ,�2 ,�2 ,�2 ,�2 ,�2 ,�2 ,�2 ,�2 ,, 2 ,�2 Po Po Po Po Po �eQ �eQ �eQ �eQ ' e) _'p D N�` �0, 2� 20, , 2 , �5 05 4� Nw q� 205 Well 43 - 113131391 -+-Well 45 - 11313AEB Well 47 - 11310461 —12in below surface On -site Raingauge Slide H -15 80 75 N 70 2. 65 60 m a� 55 m 50 0 45 40 y T 35 zn 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 43, 45, & 47 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ;;Pe December, 2012 0�� ��� 6 2Y fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 0�� F ell 43 - 113131391 -+-Well 45 - 11313AEB ell 47 - 11310461 —12in below surface n -site Raingauge Slide H -16 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 49, 50, & 51 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ---- 777;;;;;F77� --------------------- March, 2012 fq 4 d t 0 Z d -4 J -8 -12 U) -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 00n-site Raingauge —30 day total - 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp 80 75 70 65 60 55 50 45 40 35 30 7 6 5 4 N 0 fD 3 m a� m 0 le y 0 3 M 2 ... 1 0 Well 49 - 11312D56 -+-Well 50 - 11310D9F Well 51 - 113130135 —12in below surface 1 On -site Raingauge Slide 1 -13 �X K 80 75 70 65 60 55 50 45 40 35 30 7 6 5 4 N 0 fD 3 m a� m 0 le y 0 3 M 2 ... 1 0 Well 49 - 11312D56 -+-Well 50 - 11310D9F Well 51 - 113130135 —12in below surface 1 On -site Raingauge Slide 1 -13 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 49, 50, & 51 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment June, 2012 Soil Temp Logger destroyed by_ wildlife _6- 1.5 -12 ------------------------------------------- - - - - -- - - - - - - -- ------- - - - - -- - - - -- -------------------- - - - - -- ------------------ ----------------- i- ----------------- - I - - -- - - - -- ------------------------- PQ� PQ� PQ� PQ� PQ� PQ� 10, ,-A ��� 10, ��'A ��'A ��� 11' 6 N N6 n�, o`er On -site Raingauge —30 day total 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp fq 4 d t V 0 Z d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 fD 3 m a� m 0 le (D N 5 n 4 0 3 M 2 ... 1 0 PQ� PQ� PQ� PQ� PQ� PQ� ��� �'A 'A �A SO So� So� So1 poi 1,1 ti) N' 6 ��' �6 2�' by ��' h Nlz' NV 16 1h Well 49 - 11312D56 -+-Well 50 - 11310D9F Well 51 - 113130135 —12in below surface On -site Raingauge Slide 1 -14 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 49, 50, & 51 ► Ecotone WM 20 ► July 1, 2012 - ► Spetember 30, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 Hydrology Assessment September, 2012 Po Po Po Po Po �eQ e Q �eQ �eQ ' e) _'p D N�` N0, 2�` 20, WffOn -site Raingauge 30 day total 30th percentile —70th percentile MBelhaven Raingauge Soil Temp �o` eQ eQ eQ eQ eQ eQ '�, �6 2�, 26 ��- �P �oP ��P 2oP 2�P 2oP V5 05 N X05 It 5 IV Well 49 - 11312D56 -+-Well 50 - 11310D9F Well 51 - 113130135 —12in below surface 1 On -site Raingauge Slide 1 -15 80 75 N 70 2. 65 60 m a� 55 m 50 0 45 40 y T 35 30 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 49, 50, & 51 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ;;Pe December, 2012 Oo Oo fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 L On -site Raingauge —30 day total 30th percentile 70th percentile ■Belhaven Raingauge Soil Temp Well 49 - 11312D56 -+-Well 50 - 11310D9F Well 51 - 113130135 —12in below surface On -site Raingauge Slide 1 -16 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 53, 55, & 57 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ---- 777;;;;;F77� --------------------- March, 2012 fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 00n-site Raingauge —30 day total - 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 N 3 m a� m 0 y 5 n 4 0 3 M 2 ... 1 0 e e� <,16 � 9 Il 1 11 �� R0 1v 0 �� �0 2� 20 l� Well 53 - 1131101 B -+-Well 55 - 1 131 1 02A Well 57 - 1130ED135 —12in below surface On -site Raingauge Slide J -13 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 53, 55, & 57 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment June, 2012 Soil Temp Logger destroyed by_ wildlife _6- 1.5 -12 ------------------------------------------- - - - - -- - - - - - - -- ------- - - - - -- - - - -- -------------------- - - - - -- ------------------ ----------------- i- ----------------- - I - - -- - - - -- ------------------------- PQ� PQ� PQ� PQ� PQ� PQ� 10, ,-A ��� 10, NV ��'A �'A �� fq 4 d t 0 Z d -4 J v -12 U) -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 On -site Raingauge —30 day total 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp IL a I �. -, Well 53 - 1 131 1 01 B -+-Well 55 -1131102A Well 57 - 1130ED135 —12in below surface On -site Raingauge Slide J -14 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 fD 3 m a� m 0 le m N 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 53, 55, & 57 ► Ecotone WM 20 ► July 1, 2012 - ► Spetember 30, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 fq 4 d t 0 -4 d J -8 v -12 U) -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 Hydrology Assessment September, 2012 Po Po Po Po Po �eQ e Q �eQ �eQ ' e) _'p D N�` N0, 2�` 20, WffOn -site Raingauge 30 day total 30th percentile —70th percentile MBelhaven Raingauge Soil Temp 1 r 205 Well 53 - 1131101 B -+-Well 55 - 1 131 1 02A Well 57 - 1130ED135 —12in below surface On -site Raingauge Slide J -15 80 75 N 70 2. 65 60 m a� 55 m 50 0 45 40 y T 35 30 7 6 5 n 4 a 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 53, 55, & 57 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ;;Pe December, 2012 Oo Oo fq 4 d 0 d d -4 J -8 -12 cC U) -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 On -site Raingauge —30 day total 30th percentile 70th percentile ■Belhaven Raingauge Soil Temp 1" 3A ed ed eC, ed ed ed Well 53 - 1131101 B -+-Well 55 - 1 131 1 02A Well 57 - 1130EDB5 —12in below surface On -site Raingauge Slide J -16 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 59, 63, & 65 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ---- 777;;;;;F77� --------------------- March, 2012 fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 00n-site Raingauge —30 day total - 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp 1< 11 <,e6 <,e� Wel 59 - 11313BF6 -+-Well 63 - 11310D8C Well 65 - 11311A18 —12in below surface On -site Raingauge Slide K -13 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 N 3 m a� m 0 y 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 59, 63, & 65 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment June, 2012 Soil Temp Logger destroyed by_ wildlife _6- 1.5 -12 ------------------------------------------- - - - - -- - - - - - - -- ------- - - - - -- - - - -- -------------------- - - - - -- ------------------ ----------------- i- ----------------- - I - - -- - - - -- ------------------------- PQ� PQ� PQ� PQ� PQ� PQ� 10, ,-A ��� 10, NV ��'A �'A �� On -site Raingauge —30 day total 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 P -20 U Land Management Group, Inc. www.lmgroup.net -24 �P 6P 1, Nb 1,1 26P N, 60 NN NV 9. 26, 6�: h5 Nod NV 16 � 26� 60� Wel 59 - 11313BF6 -+-Well 63 - 11310D8C Well 65 - 11311A18 —12in below surface On -site Raingauge Slide K -14 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 fD 3 m a� m 0 le m N 5 n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 59, 63, & 65 ► Ecotone WM 20 ► July 1, 2012 - ► Spetember 30, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 -20 U Land Management Group, Inc. www.lmgroup.net Hydrology Assessment September, 2012 Po Po Po Po Po �eQ e Q �eQ �eQ ' e) _'p D N�` N0, 2�` 20, WffOn -site Raingauge 30 day total 30th percentile —70th percentile MBelhaven Raingauge Soil Temp i -24 L O ■ LL I IL .01 �5 05 4� Nw q� 20 5 Wel 59 - 11313BF6 -+-Well 63 - 11310D8C Well 65 - 11311A18 —12in below surface On -site Raingauge Slide K -15 80 75 N 70 2. 65 60 m a� 55 m 50 0 45 40 y T 35 30 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 59, 63, & 65 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ;;Pe December, 2012 Oo Oo fq 4 d t V 0 as d -4 J -8 v -12 cC N -16 -20 U Land Management Group, Inc. www.lmgroup.net -24 On -site Raingauge —30 day total 30th percentile 70th percentile ■Belhaven Raingauge Soil Temp Wel 59 - 11313BF6 -+-Well 63 - 11310D8C Well 65 - 11311A18 —12in below surface On -site Raingauge Slide K -16 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. 7 6 5 n 4 0 3 M M Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 67 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ---- 777;;;;;F77� --------------------- March, 2012 4 N d t 0 G as > -4 as J -8 V -12 0 N -16 0 O -20 U Land Management Group, Inc. www.lmgroup.net 00n-site Raingauge —30 day total - 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp -24 ti'Nb ti6 ��, �0 �� 20, 2�, �, 6 -+-Well 67 - 113ODD1 C —12in below surface On -site Raingauge I Slide L -13 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 N 3 m a� m 0 y 5 m n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 67 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N t S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment June, 2012 Soil Temp Logger destroyed by_ wildlife _6- 1.5 -12 ------------------------------------------- - - - - -- - - - - - - -- ------- - - - - -- - - - -- -------------------- - - - - -- ------------------ ----------------- i- ----------------- - I - - -- - - - -- ------------------------- PQ� PQ� PQ� PQ� PQ� PQ� 10, ,-A ��� 10, ��'A ��'A ��� 11' 6 N N6 n�, o`er 4 N d t 0 G as > -4 as J -8 V -12 0 N -16 0 O -20 U Land Management Group, Inc. www.lmgroup.net On -site Raingauge —30 day total 30th percentile —70th percentile ■Belhaven Raingauge —Soil Temp -24 �P V �6P 2�P 26P ,e V, , 2,1� -+-Well 67 - 113ODD1 C —12in below surface rOn -site Raingauge Slide L -14 80 75 70 65 60 55 50 45 40 35 30 7 6 N 0 N 3 m a� m 0 m N 5 m n 4 3 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 67 ► Ecotone WM 20 ► July 1, 2012 - ► Spetember 30, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 4 N d t 0 G as > -4 as J -8 V -12 cC i N -16 0 O -20 U Land Management Group, Inc. www.lmgroup.net -24 Hydrology Assessment September, 2012 ------------ - - - - -- --------------------- - - - - -- ----------------------- --------------- 111 ----------- ---------------- . -------- III ------------------ _ ,�2 ,�2 ,�2 ,�2 ,�2 ,�2 ,�2 ,�2 ,, 2 ,�2 Po Po Po Po Po �eQ �eQ �eQ �eQ ' e) _'p D N�` �o, ti� 20, "On -site Raingauge 30 day total 30th percentile —70th percentile ■Belhaven Raingauge Soil Temp -+-Well 67 - 113ODD1 C —12in below surface 80 75 N 70 2. 65 60 m a� 55 m 50 0 45 40 y T 35 zn 7 6 5 m n 4 3 2 1 W lPlun -site Raingauge I Slide L -15 0 c: Q � �eQ D 4 -. r tip` IV -+-Well 67 - 113ODD1 C —12in below surface 80 75 N 70 2. 65 60 m a� 55 m 50 0 45 40 y T 35 zn 7 6 5 m n 4 3 2 1 W lPlun -site Raingauge I Slide L -15 0 Rutman Creek - PHASE I Precipitation data obtained from: On -site Raingauge (phase I airplane hangar), NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Restoration Wells - ► 67 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .Q a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment ;;Pe December, 2012 Oo Oo On -site Raingauge —30 day total 30th percentile 70th percentile ■Belhaven Raingauge Soil Temp 4 N d t 0 G as > -4 as J -8 V -12 cC i N -16 0 O -20 U Land Management Group, Inc. www.lmgroup.net -24 -+-Well 67 - 113ODD1 C —12in below surface FmOn -site Raingauge I Slide L -16 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. 7 6 5 m n 4 3 0 Oo Oo� Oo� Oo� Oo Oo Oo °, " " " " " " peg peg peg peg peg peg -+-Well 67 - 113ODD1 C —12in below surface FmOn -site Raingauge I Slide L -16 80 75 N 70 2. 65 60 m 55 m 50 0 45 40 y 35 51r. 7 6 5 m n 4 3 0 Precipitation data obtained from: On -site Raingauge, NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Reference Wells - ► Bay Forest 4 & 5 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N S a 0 .Q m a. N d t V .w- Land Management Group, Inc. www.lmgroup.net 10 9 8 7 6 5 4 3 2 1 0 4 0 -4 -8 -12 -16 -20 -24 -28 -32 -36 -40 Hydrology Assessment March, 2012 �z� �z� �z� �z" <e" <e" <1 <'e6 <'e6 \ �" ��� ��� ��� �� �� 0 �. N6 9 Il �� h Nlz �� IV IV N� 6 NN, N6 9� Il 1 �1 FM—On-site Raingauge 30 day total -30th percentile —70th percentile MBelhaven Raingauge L I ------------------------------------------------------------ - - - - -I Bay Reference 4- EBD0009 -+-Bay Reference 5- EBD7FDF —12in below surface On -site Raingauge 11 10 9 8 7 6 5 4 3 2 1 0 Slide A -12 m n O M M Precipitation data obtained from: On -site Raingauge, NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Reference Wells - ► Bay Forest 4 & 5 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N S a 0 .Q m a. N d t V .w- Land Management Group, Inc. www.lmgroup.net Hydrology Assessment 10 9 8 7 6 5 4 3 2 1 0 June, 2012 PQ� PQ� PQ� PQ� PQ� PQ� 10, ,A 1 0 1�0 'A 'A A � ■ On-site Raingauge 30 day total 30th percentile 70th percentile MBelhaven Raingauge 4 0 -4 -8 -12 -16 -20 -24 -28 -32 -36 -40 L--- --------------------------------------- - - - - -- ------- ------------- - - - - - I Bay Reference 4- EBD0009 -+-Bay Reference 5- EBD7FDF —12in below surface On -site Raingauge 11 10 9 8 7 6 5 4 3 2 1 0 Slide A -13 m n 0 M M Precipitation data obtained from: On -site Raingauge, NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Reference Wells - ► Bay Forest 4 & 5 ► Ecotone WM 20 ► July 1, 2012 - ► September 30, 2012 ► One reading per day ► at 7:00am N S a 0 .Q m a. N d t V .w- Land Management Group, Inc. www.lmgroup.net 10 9 8 7 6 5 4 3 2 1 0 4 0 -4 -8 -12 -16 -20 -24 -28 -32 -36 -40 Hydrology Assessment September, 2012 5eQ 5eQ 5Z' 5eQ 5eQ 5eQ D � ' � 2� 20' In On -site Raingauge 30 day total -30th percentile —70th percentile MBelhaven Raingauge L I o� eQ eQ eQ eQ eQ eQ Ncj ��P 2oP 2�P 2oP �5 05 ��5 X05 q� 205 Bay Reference 4- EBD0009 -+-Bay Reference 5- EBD7FDF –12in below surface On -site Raingauge 11 10 9 8 7 6 5 4 3 2 1 0 Slide A -14 m n 0 M M Precipitation data obtained from: On -site Raingauge, NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Reference Wells - ► Bay Forest 4 & 5 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .9 .Q m a. N d t V .w- Land Management Group, Inc. www.lmgroup.net 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment December, 2012 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ------------- -- * ------- ,�2 ,�2 ,�2 ,�2 ,�2 Oo Oo Oo Oo Oo Oo NV 9, 2y 1 j1: 51-On-site Raingauge 30 day total -30th percentile —70th percentile MBelhaven Raingauge 4 0 -4 -8 -12 -16 -20 -24 -28 -32 -36 -40 L I -!■�!-_ Imo, ;MA ,�2 ,�2 0 Q e ed ed ed 6 �� �6 2�" 26 ��" �� �0� ��� 20� 2�� 20� �O X00 NCO 200 2L0 200 Bay Reference 4- EBD0009 -+-Bay Reference 5- EBD7FDF -12in below surface On -site Raingauge 11 10 9 8 7 6 5 4 3 2 1 0 Slide A -15 m n 0 M M Precipitation data obtained from: On -site Raingauge, NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Reference Wells - ► Bay Forest 6, 7, & 8 ► Ecotone WM 20 ► January 1 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N S c 0 .Q m a. N d t V G d d J d as V cn 0 Land Management Group, Inc. www.lmgroup.net 10 9 8 7 6 5 4 3 2 1 0 4 0 -4 -8 -12 -16 -20 -24 -28 -32 -36 -40 Hydrology Assessment March, 2012 �z� �z� �z� �z" <e" <e" <1 <'e6 <'e6 \ �" ��� ��� ��� �� �� 0 �. N6 9 Il �� h Nlz �� IV IV N� 6 NN, N6 9� Il 1 �1 FM—On-site Raingauge 30 day total -30th percentile —70th percentile MBelhaven Raingauge 1� �h IV 1h ��' �� 2�' by 1 �1 Bay Reference 6 (138BC1AD) -+-Bay Reference 7 (EBD32C1) Bay Reference 8 (9DE5E8A) —12in below surface On -site Raingauge Slide C -1 7 6 5 n 4 O 3 M M Precipitation data obtained from: On -site Raingauge, NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Reference Wells - ► Bay Forest 6, 7, & 8 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N S c 0 .Q m a. Hydrology Assessment 10 9 8 7 6 5 4 3 2 1 0 June, 2012 PQ� PQ� PQ� PQ� PQ� PQ� 10, ,A 1 0 1�0 'A 'A A � ■ On-site Raingauge 30 day total 30th percentile 70th percentile MBelhaven Raingauge j 4 d V 0 G -4 > -8 d J 12 as -16 20 -24 q) -28 -32 O -36 (7 -40 Land Management Group, Inc. www.lmgroup.net Cam-- 1Y�d�_,1-__� N, 6 � �,� �6� �,� �6� 'N, h� �o� ��,� 20� 1�r Bay Reference 6 (138BC1AD) -+-Bay Reference 7 (EBD32C1) Bay Reference 8 (9DE5E8A) —12in below surface On -site Raingauge Slide C -2 7 6 5 n 4 3 M 7 Precipitation data obtained from: On -site Raingauge, NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Reference Wells - ► Bay Forest 6, 7, & 8 ► Ecotone WM 20 ► July 1, 2012 - ► September 30, 2012 ► One reading per day ► at 7:00am N S c 0 .Q m a. N d t V G d d J d as V cn 0 Land Management Group, Inc. www.lmgroup.net 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment September, 2012 �eQ �eQ �eQ �eQ �eQ �eQ D � ' � ti� 20' In On -site Raingauge 30 day total -30th percentile —70th percentile MBelhaven Raingauge 4 0 -4 ---------- - - - - -- -------------------- - - - - -- - - - - - -- --------- - - - - -- ----- -12 - - - -- --------------------------- -20 -------------------------------------------------------------------------- -24 j -32 - - - - - - - - - - - - - - - -- -- - - - - -- ---- - - - - -- - -- -- - - - - - - - --- - - - - -- -40 (1; �o D NV No, tip` 1P EBa * Reference 6 (138BC1AD) -+-Bay Reference 7 (EBD32C1) Reference 8 (9DE5E8A) —12in below surface site Raingauge Slide C -3 7 6 5 n 4 0 3 M M Precipitation data obtained from: On -site Raingauge, NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Reference Wells - ► Bay Forest 6, 7, & 8 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .9 .Q m a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment December, 2012 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ------------- -- * ------- ,�2 ,�2 ,�2 ,�2 ,�2 Oo Oo Oo Oo Oo Oo NV 9, 2y 1 j1: 51-On-site Raingauge 30 day total -30th percentile —70th percentile MBelhaven Raingauge y 4 d V 0 G -4 > -8 d J 12 as -16 20 -24 N -28 -32 O -36 -40 Land Management Group, Inc. www.lmgroup.net OEM • Bay Reference 6 (138BC1AD) -+-Bay Reference 7 (EBD32C1) Bay Reference 8 (9DE5E8A) —12in below surface 10n-site Raingauge I Slide C -4 7 6 5 4 ^: 3 M M Precipitation data obtained from: On -site Raingauge, NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Offsite Reference Wells - ► 1,2 &3 ► Ecotone WM 20 ► January 1, 2012 - ► March 31, 2012 ► One reading per day ► at 7:00am N S c 0 .Q m a. 10 9 8 7 6 5 4 3 2 1 0 j 4 d t V _= 0 as d -4 J -8 v -12 U) -16 -20 c� -24 Land Management Group, Inc. www.lmgroup.net Hydrology Assessment March, 2012 �eN$ ■ On-site Raingauge 30 day total -30th percentile —70th percentile MBelhaven Raingauge -Well 1 - 1131085A -+-Well 2 - 11312D57 Well 3 - 1130E4D6 —12in below surface -On -site Raingauge Slide A -13 7 6 5 n 4 0 3 M M e� 011 � h 10 -Well 1 - 1131085A -+-Well 2 - 11312D57 Well 3 - 1130E4D6 —12in below surface -On -site Raingauge Slide A -13 7 6 5 n 4 0 3 M M Precipitation data obtained from: On -site Raingauge, NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Offsite Reference Wells - ► 1,2 &3 ► Ecotone WM 20 ► April 1, 2012 - ► June 30, 2012 ► One reading per day ► at 7:00am N S c 0 .Q m a. Hydrology Assessment 10 9 8 7 6 5 4 3 2 1 0 June, 2012 PQ� PQ� PQ� PQ� PQ� PQ� 10, ,A 1 0 1�0 'A 'A A � ■ On-site Raingauge 30 day total 30th percentile 70th percentile MBelhaven Raingauge j 4 d t V _= 0 as d -4 J -8 v -12 U) -16 -20 c� 24 Land Management Group, Inc. www.lmgroup.net 2�P 26P ,� o� �,� �6� 2,� 26� �,� h� �o� �h� 20� 2hS �oS F Well 1 - 1131085A -+-Well 2 - 11312D57 Well 3 - 1130E4D6 —12in below surface On -site Raingauge Slide A -14 7 6 5 n 4 0 3 M M Precipitation data obtained from: On -site Raingauge, NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Offsite Reference Wells - ► 1,2 &3 ► Ecotone WM 20 ► July 1, 2012 - ► September 30, 2012 ► One reading per day ► at 7:00am N S c 0 .Q m a. 10 9 8 7 6 5 4 3 2 1 0 w 4 d t V _= 0 as d -4 J -8 v -12 U) -16 -20 cD Land Management Group, Inc. www.lmgroup.net Hydrology Assessment September, 2012 5eQ 5eQ 5Z' 5eQ 5eQ 5eQ D � ' � ti� 20' In On -site Raingauge 30 day total -30th percentile —70th percentile MBelhaven Raingauge -24 -- ,�2 Po Po Qo Po Po Po 5eQ 5eQ Cep q 5eQ 5eQ o� .� 2 2 ' h "Z ,�h' 20' 2h �o' D 4 �o, tip` IV -*-Well 1 - 1131085A -+-Well 2 - 11312D57 Well 3 - 1130E4D6 —12in below surface —On -site Raingauge Slide A -15 7 6 5 n 4 0 3 M M Precipitation data obtained from: On -site Raingauge, NOAA station Belhaven 3 NE, and AccuWeather.com Belhaven Station - (ncdc.noaa.gov) (AccuWeather.com) 30/70% 30 year averages obtained from WETS Station: BELHAVEN, NC0674 1979 -2008 (wcc.nres.usda.gov) Monitoring Well Record �► PCS Mitigation ► Hyde County, NC ► 40 -07 -073 ► Offsite Reference Wells - ► 1,2 &3 ► Ecotone WM 20 ► October 1, 2012 - ► December 31, 2012 ► One reading per day ► at 7:00am N S c 0 .9 .Q m a. 10 9 8 7 6 5 4 3 2 1 0 Hydrology Assessment December, 2012 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ------------- -- * ------- ,�2 ,�2 ,�2 ,�2 ,�2 Oo Oo Oo Oo Oo Oo NV 9, Il 1 j1: 51-On-site Raingauge 30 day total -30th percentile —70th percentile MBelhaven Raingauge w 4 d t V _= 0 as d -4 J -8 v -12 U) -16 -20 U Land Management Group, Inc. www.lmgroup.net i■ ■ -� - _sue u �• -24 Oo -*-Well 1 - 1131085A -+-Well 2 - 11312D57 Well 3 - 1130E4D6 —12in below surface —On -site Raingauge Slide A -16 7 6 5 n 4 0 3 M M t t A A� NC Drought Status Map O North Carolina Drought Status Map i+ + 4 01/03/2012 r Page 1 of 1 WRISARS Drought Monit Layers Legend %V State Boundary of HC Energency Hater Conservatj Mandatory Hater Conservatj Voluntary Hater Conservatj State Boundaries TVA States Counties Hydrography D4 - Exceptional Drought 03 - Extrene Drought 1E D2 - Severe Drought 01 - First Level Drought 09 - Abnornally Dry r http: / /www.ncwater.org/DM /frames dhtml.html ?layer = basins &layer--nc &zoomsize =2& map= D: /ms4w /Apache/htdocs /DM /maps... 2/5/2013 NC Drought Status Map North Carolina Drought Status Map + + 02/07/2012 Page 1 of 1 WRISARS Drought Monit Layers Legend /% State Boundary of NC Energency Rater Conservati Mandatory Rater Conservati Voluntary Rater Conservati State Boundaries TVR States Counties Hydrography 04 - Exceptional Drought 03 - Extrene Drought M D2 - Severe Drought 01 - First Level Drought D9 - Rbnornally Dry http:llww w. ncwater.org/DM/frames_dhtml.html ?layer= basins &layer= nc &zoomsize =2 &map= D : /ms4wlApache/htdocs /DM/maps... 2/5/2013 NCDWR �ti 11rI _ i ' I / Car. SITE `�-'NQrth 1 a Page 1 of 1 WRISARS Drought Monit Layers Legend /% State Boundary of NC Energency Rater Conservati Mandatory Rater Conservati Voluntary Rater Conservati State Boundaries TVR States Counties Hydrography 04 - Exceptional Drought 03 - Extrene Drought M D2 - Severe Drought 01 - First Level Drought D9 - Rbnornally Dry http:llww w. ncwater.org/DM/frames_dhtml.html ?layer= basins &layer= nc &zoomsize =2 &map= D : /ms4wlApache/htdocs /DM/maps... 2/5/2013 NC Drought Status Map f North Carolina Drought Status Map ;4 i 4W Ca SITE i ncowR y� Page 1 of 1 WRISARS Drought Monit 0310612012 -1 Layers Legend �► so� /V State Boundary of HC Energency water Conservatj Mandatory water Conservatj Voluntary water Conservatj State Boundaries TVR States Counties Hydrography 04 - Exceptional Drought 03 - Extrene Drought — 02 - Severe Drought D1 - First Level Drought 08 - Rbnornally Dry 0 http:// www. ncwater .orgIDMIframes_dhtml.html ?layer= basins &layer= nc &zoomsize -2& map= D :Ims4wlApachelhtdocsIDNvmaps... 2/5/2013 NC Drought Status Map North Carolina Drought Status Map i ❑ ' _ 4-. 04/03/2012 - - NCDWR w..•1 �' ;y SITE Worth Car-'' 4+ta- -- r 'y I ✓ r '. WRISARS Page 1 of 1 Drought Monit Layers Legend State Boundary of NC Energency Rater Conservati Mandatory Rater Conservati Voluntary Rater Conservati State Boundaries TVA States Counties Hydrography D4 - Exceptional Drought D3 - Extrene Drought M" D2 - Severe Drought 01 - First Level Drought 00 - Abnornally Dry 0 http:l /www.ncwater.orgIDMlframes dhtmI.html? layer = basins &layer= nc &zoornsize =2& map= D :Ims4wlApachelhtdoesIDMImaps... 2/5/2013 NC Drought Status Map id North Carolina Drought Status Map 105/01/ z - NCDWR r fi• SITE a Car -� ft WRISARS Page 1 of 1 Drought Monit Layers Legend /% State Boundary of NC Energency Water Conservati Mandatory Water Conservatj Voluntary Water Conservatj State Boundaries TVR States Counties Hydrography D4 - Exceptional Drought DS - Extrene Drought D2 - Severe Drought D1 - First Level Drought D9 - Rbnornally Dry http:llwww.ncwater. org/DM/frames_dhtml.html? layer = basins& layer =nc &zo omsize =2 & map— D: /ms4w /Apaehelhtdocs /DM/map s... 2/5/2013 NC Drought Status Map North Carolina Drought Status Map ❑ Q -f--7 North Caro-1 i F, OWA ,., rvwwe 66/05/2012 Q 1 [ ? -- • V.* Page 1 of 1 WRISARS Drought Monit Layers Legend State Boundary of HC ® Energency Water Conservatj Mandatory Water Conservati Voluntary Water Conservatj State Boundaries TVR States Counties Hydrography 04 - Exceptional Drought 03 - Extrene Drought 02 - Severe Drought D1 - First Level Drought D9 - Rbnornally Dry http: / /www.ncwater.org /DM /frames dhtml.html? layer = basins& layer— nc &zoomsize -2 &map= D: /ms4w /Apache /htdocs /DNvmaps... 2/5/20133 NC Drought Status Map North Carolina Drought Status Map 0911$12012 - r' , -�rth Car.o44-f)tr- --- 3� 1 tvcowR a d r., Page l of 1 WRISARS Drought Monit Layers Legend %V State Boundary of HC Emergency Water Conservati Handatorg Water Conservati Voluntary Water Conservati State Boundaries TVR States Counties Hydrography D4 - Exceptional Drought D3 - Extreme Drought D2 - Severe Drought D1 - First Level Drought D© - Abnormally Dry http: l/ www. ncwater .org /DM /frames_dhtml.html? layer = basins& layer= nc &zoomsize =2 &map= D: /ms4w /Apache /htdocs /DM /maps... 2151201 NC Drought Status Map North Carolina Drought Status Map ® 4 tw 110/09/2012 - Q s ` _ SITE ^��,-North' Car, 1 f 4b Nwwe i p a r4.0 Page 1 of I WRISARS Drought Monit Layers Legend /% State Boundary of HC Energency water Conservati Mandatory water Conservati Voluntary water Conservati State Boundaries TVA States Counties Hydrography 04 - Exceptional Drought 03 - Extrene Drought W D2 - Severe Drought 01 - First Level Drought DO - Abnornally Dry r http:llwww.ncwater.org/DM /frames dhtml.html ?layer= basins& layer= nc &zoomsize =2& map= D:lms4w /Apache /htdoc,s /DMJmaps... 2/5/2013 NC Drought Status Map North Carolina Drought Status Map ❑' ` =y '' �' 11/06/2012 rth f - r• I� �ryjuwH Page 1 of 1 WRISARS Drought Monit Layers Legend /% State Boundary of NC Energency Dater Conservatj Mandatory Hater Conservat3 Voluntary Hater Conservati State Boundaries TVA States Counties Hydrography 04 - Exceptional Drought 03 - Extrene Drought 10 02 - Severe Drought D1 - First Level Drought D9 - Abnormally Dry Y http:// www. newater .orgIDMIframcs_dhtml.html ?layer— basins &layer =nc &zoomsize =2& map— D: Ims4-vvlApachclhtdocsIDNvmaps - -- 2/5/2013 NC Drought Status Map Page 1 of 1 North Carolina Drought Status Map WRISARS Drought Monit i� ® ,� `` � _ � ro Layers Legend iz4�za�z - - -rxNorth C r __ f _ SITE a I{ State Boundary of NC Energency Rater Conservati Mandatory Hater Conservati Voluntary Rater Conservatj State Boundaries TVR States Counties Hydrography D4 - Exceptional Drought 03 - Extrene Drought D2 - Severe Drought D1 - First Level Drought DB - Rbnornally Dry http: / /www.newater.orgIDNVfratnes dhtml_html ?layer= basins &layer=nc &zoomsize =2& map= D :Ims4wlApachclhtdocsIDMImaps... 2/5/2013 APPENDIX PALMER y Natlon Palmer Hydrological Drought Index Long -Term (Hydrological) Conditions January 2012 �. • } MIMMO sIDaare moderate mki- MOOO Mlely r�r ectmmely droughl dravg ht d rought rerig0 MWU mpllk m0b-t Ll M M 4.00 -3.00 -2.000 -1A +20 4M &4jDO and to to 10 10 10 and below .3,99 -2,99 &is &Z 4-99 Ot t Natlom Palmer Hydrological Drought Index Long -Term (Hydrological) Conditions Fetyruary 2012 IMMMs S&V&M m o-d cr2t-0 mId- moderately "r + extMrMly drought draught d rotlght rarnge mok &[ malst molot 4- -3.1D -2,00 -1 _' $ *2-00 4_00 A and to to No 10 10 and below .3,99 -2,99 AM +2M 4.90 Obo+ip Nztlon Palmer Hydrological Drought Index Long -Term (Hydrological) Conditions March 201 IRR ;�k, I A"' MiFftme S&V&'e moor* mld- moderately 'b" eawnely droughl droug ht drought "LNO moist MOW moist M L L_-, M M 4_00 -3.00 -M -1.00 .140 00 64 and to to 10 10 10 and below .3." .2n 61.99 *M9 Obo+0 Nztlon Palmer Hydrological Drought Index Long-Term (Hydrological) Conditions April 201 } f .w. extreme S&Vffre M068rate Mkl- Moftwely extrem -Bly draught -droug ht d rought range moist moist moist M I u M M 4_00 4M 4-1I0 -1 A +2M SAO A -00D end to to 10 10 10 and below - -2.9rq 61.9$ +,2.51$ n b vi tiDn Palmer Hydrological Drought Index Long -Term (Hydrological) Conditions May 2012 ffArem0 aewar0 moderate mld- moderately y r extremely drought droug#it draught rarnga mol st rr ist mot" M M F-1 0 0 -and 101 to No #1 10 arnd below 4 4-1" +L" +xM 4-90 Obo+0 } f Notion Palmer Hydrological Drought Index Long -Term (Hydrological) Conditions June 2012 } f IY amr-ftms RNWO M MO&Fate Mw- MO*MWY sxtrom -aly drought draught d Mught rarngs MIAO mollk moist 4_IO -3jOO -2.00 -1 -" +x.00 4A +4 -[YD a nd to to 10 10 10 and below -3" -2.M AM FZ99 X90 in bmr Nat �Dn Palmer Hydrological Drought Index Long -Term (Hydrological) Conditions July 201 exiMms sffvftra ma,derate Mw- m rvWy vary a mely drought drouOt drought range mold molat molik M M. -: -� M 0 4.00 -3-00 too -1 Ikzw 4A0 &AjDQ end to to W 10 10 and below -3,g9 -2,99 +1.99 *M9 +S." t ip } Nati0P. Palmer Hydrological [drought Index Long -Term (Hydrolligicarl) Conditions August 2012 F Idrems E&V& a moderate mki- MOOO MY Y ti melt' drought draught drought "WV moist mel5t moist M M M M M end to to 10 10 10 and below .3, -L" 61.9$ +Z +13-H a b vas Palmer Hydrological Drought Index Long -Term (Hydrological) Conditions September 201 emir-9ms RNW&M nwWrate mid- MOOOM 01g 64MMOty drought draught drought rarg0 moist r lit moist M M Ll L-1 M M 4_00 40D -2.)D -1 A #loo 4M &4jDO at' d to to 10 101 10 and ba18w -M -2-" 61.9$ F2SO 4.90 40th* Nztlon Palmer Hydrological Drought Index Long -Terra (Hydrological) Conditions October ZD1 2 fir, -&xlrems S&V& 0 moderate MW- Modmialy MY eltmMety drought draught draught range moist MOIR mom M M Ll L-1 L. W M 4_oa 40D -too -1, #x.00 4M +4A0 -e nd to to 10 10 10 a below -3., -9-95 +1.9$ +1 @ 6199 OR* ftflan Palmer Hydrological Drought Index Long -Term (Hydrological) Conditions November 2012 am ms E&V& a Moderate mld- m rawly extremely drought -droppM d Mught range moist melt# moist 4.00 -3.1D -2.00 -119 .1k2M A -DO -e n(f to to No 10 le and below .3, -2,119 AM +M9 +3." n bdvi� - } f Natlon Palmer Hydrological Drought Index Long -Term (Hydrological) Conditions December 2012 MIMMO serer$ moderate mld- moderwwy eztmrrraly draughl draug ht d mught range mold rr ,It MOOS -t 4- -3.I -2.10 -1 _' $ *2.00 4A0 &AjDQ and to to 10 10 10 and below -3,99 -2,99 +1M *2.99 +190 O r0