Loading...
HomeMy WebLinkAbout20110737 Ver 1_Stormwater Approval_20130207A'Na NCDENR North Carolina Department of Environment and Division of Water Quality Pat McCrory Charles Wakild, P E Governor Director February 7, 2013 Mr Tom Furlong Andale Data Center 1601 S California Avenue Palo Alto, CA 94304 Natural Resources Subject Stormwater Management Plan Amendment — Approval Andale Data Center DWQ Project # 11 -0737 [401 Water Quality Certification] Rutherford County BRD02 / Second Broad River / 9- 41 -(12 7) / WS -V Dear Mr Furlong John E Skvarla, III Secretary The Division of Water Quality has completed the review of the stormwater management plan amendment associated with with the subject project listed above This amendment entailed the addition of Wet Detention Pond BMP6 to accommodate the building area referred to as FRC -4 This approval is for the purpose and design that you described in your application If you change your protect, you must notify us and may be required to submit a new or amended application All other conditions specified in the 401 Water Quality Certification approved October 4, 2011 still apply Stormwater Management Plan Conditions: The stormwater management system (including this amendment of the addition of Wet Detention Pond BMP6), all stormwater conveyances, and the grading and drainage patterns depicted on the amended plans and specifications submitted December 17, 2012, as approved by this office must be maintained in perpetuity No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality The stormwater management structures shall have maintenance access for the ability to maintain the structures, and to perform corrective actions 2 The stormwater easements shall be recorded to provide protection of the structures from potential alterations by future property owners Documentation of the easements shall be made after completion of the stormwater management system or by November 30, 2013 The Asheville Regional Office — Surface Water Protection Section shall be notified after completion of the easement documentation Location 2090 U S Highway 70, Swannanoa, North Carolina 28778 Phone 828 - 29645001 FAX 828 - 299 -7043 Internet www ncwaterquallty org An Equal Opportunity t Affirmative Action Employer NorthCarohna ,aturallty Tom Furlong February 7, 2013 Page 2 of 2 Operation and Maintenance (O &M) Agreements shall be signed and notarized after completion of the stormwater management system or by November 30, 2013. However, Andale Data Center representatives must comply with the requirements of the 0 &M Agreements immediately upon completion of the stormwater management system Copies of the signed and notarized O &M Agreements shall be submitted to the Asheville Regional Office — Surface Water Protection Section Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties If you do not accept any of the conditions of this amended Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing You must act within 60 days of the date that you receive this letter To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N C 27699 -6714 This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of your amended plan by the Division of Water Quality under Section 401 of the Clean Water Act If you have any questions, please contact Susan Wilson in the Asheville Regional Office at (828) 296 -4500 or at susan a wilsonna ncdenr gov Sincerely, Charles(4kild, P E , Director C W /saw Enc Stormwater Management System Plan Amendment cc WBSCP Unit File Copy Greg Hoffman — McGill (e -copy) S \SWP\Rut herford \401s\Non- DOT\Andale\Andale BMP Amendment 1 2013\APRVL Amendment BMP6 2 2013 doc