X Mayor Development -in an Area of Environmental Concern
pursuant to NCGS 113A -118
X Excavation and/o"r filling pursuant to, NCGS 113 -229
Issued to N C Wildlife Resources Commission, 1701 MSC, Raleigh, NC 27699 -1701 = As
Authorizing development in Pender' v " M1 County at adLto the Northeast Cane River, "at 527
Paitestocking •aiidmg Rd., m Buraaw, as requested in the permittee's letter dated 1 /25/1 , Jncliading hie
attached work flan drawing (1) dated 10/29/12
This permit; issued on -,,- February 1, 2013 - is subject to compliance with the application (where consistent < 1'
with the permit), all applicable regulations, special conditions and notes set forth below Any violation of these°terms,may
be subject to fines, imprisonment or civil action, or may cause the permit to be null and void ;
1) Unless specifically- altered herem,3this minor `modificatlon authorizes the bank gfadmg, riprapTp lace mznt,
and the construction of a concrete pad associated with °the existing floatmg'dock and boat rai pb. ll as
expressly nand specifically set forth in the "attached workplan drawings No other additional structiires, 1
whether floating or statiotiary,'or any additional boat slips; shall become a permanent partt this' docking
facility without permit modification No non water dependent uses of structures shall be conducted on, in ,
or over public trust waters without permit modification Y
2) The authorized - riprap revetment sill shall' adhere to the alignment depicted, on the attached- workplan ,,
drawings - , ` . - - _ - <
(See attached - sheet for Additional Conditions) -
This permit action may -be appealed by the permittee or
other qualified persons -withm- twenty (20) days of the issuing
date' An appeal requires.resolution prior to work initiation or
continuance as the case maybe
1 his permit must be - accessible on -site , to ,Department
personnel when the,project is mspecterd for'compliance'-, `
w - - - - u
Any maintenance work- or--y project modification not covered
hereunder requires further Division,approval
All work must cease when the permit expires on
December 31, 2015
In issuing this permit; the State of-North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program -
Signed by the authority of the_ Secreta6,of DENR and the
Chairman of the Coastal Resources Commission
✓ - % N s ~ t
4 i
Braxton = r vis; - irector
- _ r
Division of Coastal_ilanagemerit
This permit and its conditions are hereby accepted
Signature of Permittee ,
.C. Wildlife Resources Commission Permit # 94 -12
F N 2
Page 2 of 2
ADDITIONAL CONDITIONS
3) The riprap material shall be free from loose dirt or any pollutant It shall -be of a size sufficient to., §
prevent its movement from the approved alignment by wave or current,actiori
4) The concrete pad shall either be poured at an upland location and pushed into place once hardened, or
poured entirely within a watertight containment structure Live concrete shall not be allowed to contact
waters of the State or waters that will enter waters of the State
Sedimentation and Erosion Control
5) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters_
6) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands,-watercourses and, property (e g silt fence; ti
diversion swales, etc) -
General
7) No new vegetated wetlands shall be excavated or filled _
8) In order to protect anadromous fish spawning, no in -water work shall be permitted between February 1
and September 30 of any year without the prior, approval of the Division ,of Coastal Management, in
consultation with the N C Wildlife Resources Commssion
NOTE: In consultation with Wildlife Resources Commission, a two week extension into -the in -water
work moratorium referenced in Condition No 8 is granted for the 2013 work lseason only. The 3
v_ moratorium dates referenced in Condition No` 8 shall remain in place -for all subsequent years
9) -The permittee and /or his contractor shall meet with a representative of the Division prior to project,,,
initiation
i
10) = This minor modification shall be attached to the original Permit No 94 -12, which was issued on 8/7/12,
;and copies of all- documents shall be readily available on site when Division personnel inspect-the y
broiect -for compliance
11) All conditions and stipulations of the active permit remain in force under this minor modification-unless-
specifically altered - herein _ ;