HomeMy WebLinkAbout20050732 Ver 26_Stormwater Approval_20130308Pat McCrory Governor FWA '„'`►i® �" ®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Charles Wakild, P. E. Director March 8, 2013 Mr. Bill Mumford, Assistant Vice President NNP — Briar Chapel LLC 16 Windy Knoll Circle Chapel Hill, NC 27516 Subject Property: Briar Chapel, Phase 7 APPROVAL OF MODHUD STORMWATER PLAN Dear Mr. Mumford: John E. Skvarla, III Secretary DWQ Project # 05- 0732v26 Chatham County On January 11, 2008, the Division of Water Quality (DWQ) issued a revised 401 Water Quality Certification to temporarily impact 339 linear feet of stream and 0.157 acre of 404 wetlands and to permanently impact 1,666 linear feet of stream and 0.159 acre of 404 wetland in order to construct the Briar Chapel Subdivision in Chatham County. In order to meet Condition 10 of the 401 Certification for this project, a temporary stormwater management plan (SMP) for roadway portion of Briar Chapel — Phase 7, dated January 23, 2013, was received on January 29, 2013. The DWQ approves the temporary §W-- as satisfying Condition 10 of the General Water Quality _ Certification until the remainder of Phase 7 is developed. The final SMP for Phase 7 must be received 6d approved by the DWQ before construction of the lots is commenced. The approved final SMP foe Phase 7 must be constructed and operational before any permanent building or other structure associates ith that phase is occu ied This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new SMP. This approval requires to you follow the conditions listed in the General Water Quality Certification for the project and the following additional conditions listed below: 1. The temporary SMP approved by the DWQ consists of three (3) level spreaders and all associated stormwater conveyances, inlet and outlet strictures, and the grading and drainage patterns depicted on plan sheets dated January 23, 2013. The plans and specifications for Phase 7 approved by DWQ are incorporated by reference into this approval and are enforceable by DWQ 1617 Bali Servire Ct•nter Raleigh, W.1h Carol .a 27699 -1617 Location ,1214 Saltsut ry Sr Rnlei& 'Iorl'i Cafjli a 27604 Phune A9-i,17-6300 i AX -,19 R' 7 ti ^:['.pus, r, -r S -,rwre 1 -8t - ^11-6 48 1- tern' wq N iCwatefw !, oru •knF4-v- .n .it, fr- nat-,en: on- nc,4, NorthCarof ina Alty'railly Mr. Bill Mumford March 8, 2013 Page 2 of 2 provided however that any modification of the design for the stormwater management system that is accepted by DWQ shall take precedence over the original plans and specifications. The maximum allowable drainage area for the approved level spreaders shall be in accordance with the table below. Built -upon area includes, but is not limited to, roofed structures, asphalt, concrete, gravel, brick, slate, coquina and parking areas, but does not include raised, uncovered open slat decking or the water surface of swimming pools. Any changes to these maximum areas shall require the applicant to submit and receive approval for a revised stormwater management plan by the DWQ. Levels reader # Max. drainage areas Max built upon area s 2 163,077 47,505 3 243,922 62,469 4 151,391 87,075 2. The footprint of all stormwater management devices as well as an additional 10 -foot wide area on all sides of the devices shall be located in either public rights -of -way, dedicated common areas or recorded easement areas. The final plats for the project showing all such rights -of -way, common areas and easement areas shall be in accordance with the approved plans. 3. Maintenance activities for the level spreaders shall be performed in accordance with the notarized O &M agreements signed by Kevin Graham (Vice President, Operations) on January 16, 2013. The O &M agreement must transfer with the sale of the land or transfer of ownership /responsibility for the BMP facility. DWQ must be notified promptly of every transfer. 4. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the DWQ within thirty (30) days of project completion (available at http:H portal .ncdenr.org /web /wq /swp /ws/401 /certsandpennits/apply /forms). Thank you for your attention to this matter. If you have any questions or wish to discuss these matters further, please do not hesitate to contact me at (919) 807 -6381. Sincerely, Annette Lucas, P.E. Wetlands, Buffers and Stormwater Compliance and Permitting (Webscape) Unit AML /aml Cc: Becky Fox, EPA USACE, Raleigh Cherri Smith, DWQ Raleigh Regional Office Chatham County Public Works Dept., P.O. Box 1550, Pittsboro, NC 27312 File Copy Filename: 050732v26BriarChapelPhase6North (Chatham)_SW_Mo4 Approve.docx