January 11, 2013
DWQ# 12 -0072V2
Mecklenburg County
Mr. Adam Long
Piedmont Natural Gas
4720 Piedmont Row Drive
Charlotte, NC 28273
Subject: Request for revision of crossing method; Stream 3.1 (Piedmont Natural Gas)
This Office is in receipt of your request to change the method of stream crossing at
stream 3.1 from a jack and bore to open cut. In your original permit application, Stream
crossing number 3.1 was permitted as a jack and bore, with a 70 -foot construction corridor (30
feet permanent and 40 feet temporary) to account for removal of stream bank vegetation,
potential bank grading and piling placement to accommodate a temporary equipment bridge.
Due to the extremely incised stream channel, it is our understanding that the contractor
determined that-the bore pit would require a depth and width exceeding that which could be .
accomplished practicably. Therefore you have requested that stream crossing No. 3.1 be
changed from a jack and bore to a conventional (trenched) crossing as an amendment to the
existing 401 permit and NWP -12. This Office has no objection to this request and it is hereby
granted. It is our understanding that no additional impacts will be incurred as a result of this
change in crossing method.
If you have any questions, please contact Michael Burkhard in the Mooresville Regional
Office at 704 -663 -1699 or Ms. Karen Higgins in the Central Office in Raleigh 919- 807 -6360.
Sincerely,
for Chades Wakild, P.E.
cc: Army Corps of Engineers, Asheville
Karen Higgins, Wetlands Unit
Joey Lawler, S&ME
1617 Mail Service Center, Ralegh, North Carolina 27699 -1617
Location: 512 N. Salisbury SL Raleigh, North Carolina 27604
Phone: 919.807.63001 FAX 919 -807 -6492
Internet w w wwateroualitv.oro
An Equal OPPortirnify %Affirmative Action Employer
A ye Carolina
urally
l�
F *- WA
I�CDEE
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Pat McCrory Charles Wakild, P. E. John E. Skvarla, III
Governor Director Secretary
February 22, 2013
Mr. Adam Long
Piedmont Natural Gas
4720 Piedmont Row Drive
Charlotte, NC 28273
Subject: Stream Crossing Revision Request
Stream Crossing No 7.1
Piedmont Natural Gas
DWQ No. 12 -0072 v2
Mecklenburg County
Dear Mr. Long,
This Office is in receipt of your request to change the method of stream,crossing at Stream No.
7.1 from a jack and bore to an open cut. In your original application, Stream crossing number 7.1 was
permitted as a jack and bore, with a 70 -foot construction corridor (30 feet permanent and 40 feet
temporary) to account for removal of stream bank vegetation, potential bank grading- and piling placement
to accommodate a temporary equipment bridge. It is our understanding that the contractor has been
unable to successfully penetrate the rock since November, 2012, due to presence of sub - surface bed
rock. Such being the case, your request to have Stream crossing No. 7.1 changed from a jack and bore
to a conventional (trenched) crossing as an amendment to the existing 401 Certification is hereby
granted. It Is our understanding that the stream Impacts expected during this trenched crossing were
authorized in the original 401 Certification, and that no additional impacts will be incurred as a result of
this change in crossing method.
If you have any questions, please contact Michael Burkhard in the Mooresville Regional Office at 704-
663 -1699 or Ms. Karen Higgins in the Central Office in Raleigh 919- 807 -6360.
Sincerely,
for Charles Wakild, P. E.
cc: Army Corps of Engineers, Asheville
Karen Higgins, Wetlands Unit
Joey Lawler, S &ME
1617 Mail Service Center, Ra"h, North Carolina 27699.1617
Location: 512 N. Salbbury St Raleigh, North Carolina 27604
Phone: 9194070M 1 FAX 919-007 6492
Intemet wuvw.nanatem►ieItty om
An Equal oppaw* 1 Al6mretive action Employer
11e Carolina
N�A wra!!
Impacts r Mltlgatlons r Fees r Affiliations r Events r Inspections r Comments r History
Detailsl Details2 Permits and Carts Cross Refs
Project Number 20120072 Ea w Version D Status ssued LastAcbon Desc roject Issued $ave
Project Name PNO Une #170 Pipeline Project I Program Area 401 I Primary County Iredell
*EventType
Event Date
Due Date
Cateaory
Comment
LastU date
ILast
Application received in CO
1 110 672 01 2
bevstricIdand
11 1/0
Application sent to Region
1 110 9/2 01 2
bev stncldand
11 M
Application received in RO
0110212013
michael bur .10211
Project issued
0111 V201 01 3
michael bur
0211
III
/
gdd
gemove
Eirnsh Cancel
114 Events found lReady SID WPEV