HomeMy WebLinkAboutWQ0029792_More Information (Received)_20210519Alan & Anne Campbell 501 Lost Way Conversion to E-Z Treat System t t C• � 17069 •..... O # iIPIII; f lldlf ; ` i0%� Project Specifications MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Ste 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fag: (919) 319-6510 Table of Contents for Specifications TreatmentArea and Trench Clearing and Grubbing.............................................................................................1 WastewaterDisposal Area Clearing........................................................................................................................1 Trenching and Silt Fencing: .....................................................................................................................................2 Excavation and Backfilling........................................................................................................................ ...........3 Fertilizing, Seeding, & Mulching...............................................................................................................................4 Septic, Recirculation, and Field DosinglStorage Tank Installation and Testing...................................................6 Piping Installation and Testing..................................................................................................................................7 E-Z Treat Recirculation Pump and Control Panel..................................................................................................8 E-Z Treat Treatment Unit Installation.....................................................................................................................8 Effluent Bypass Valve ...................................................................... 8 DenitrificationAssembly.............................................................................................................................................9 UltravioletDisinfection Unit......................................................................................................................................9 Project Specifications Treatment Area and Trench Clearing and Grubbing 1. The treatment area within the construction limit, unless otherwise noted or where property line permits, shall be cleared and grubbed of all trees, stumps, shrubs, debris, and brush. 2. Roots, matted roots, stumps, and other vegetable matter shall be removed to 12 inches below existing ground at the treatment area. 3. In foundation sub -grade areas, the grubbed material shall be removed to 12 inches below the sub -grade. 4. The cleared and grubbed material shall be removed from the construction site and disposed of by the Contractor at his expense. 5. The Contractor shall take particular care to minimize soil disturbance and compaction while clearing and grubbing the areas designated for the wastewater treatment field for the on -site wastewater treatment system. 6. Vehicular traffic shall be minimized and limited to that equipment required to perform the activities required in these areas. 7. Only rubber -tire, light -duty equipment shall be used in these areas. Wastewater Disposal Area Clearing I. The wastewater disposal area within the construction limit, unless otherwise noted or where property line permits, shall remove any dead, dying and sickly treas. Any vegetation that is less than 2 inches in diameter shall cut at ground level and removed. 2. The cleared material shall be removed from the construction site and disposed of by the Contractor at his expense. 3. The Contractor shall take particular care to minimize soil disturbance and compaction while clearing the areas designated for the wastewater disposal fields for on -site wastewater disposal system_ 4. Vehicular traffic shall be minimized and limited to that equipment required to perform the activities required in these areas. 5. Only rubber -tire, light -duty equipment shall be used in these areas. Alan & Anne Campbell Conversion to EZ Treat System MacConnell & Associates, P.C. Project No.: A88201.00 Trenching and Silt Fencing: For Pipe Trenches: a. Excavate trenches to true line and grade as shown on the Contract Drawings, except where field adjustments are necessary to avoid other underground utilities. All alignment changes shall be subject to the Engineer's approval. b. Accomplish trench excavation with equipment suitable for this type of service. If backhoes or drag lines are used, the size of bucket must be such that the width of trench excavated is compatible with the diameter of pipe to be installed. c. Construct sides of the trench as near to vertical as possible, taking into consideration the type of soil encountered, applicable safety requirements, and the width of area in which the lines are installed. Operations resulting in wide top dimensions sloping directly to the pipe shall not be permitted. Trench width from a point one (1) foot above the crown of the pipe to the bed of the trench shall not exceed the diameter of the pipe bell plus 12 inches on each side of the bell unless special permission of the Engineer is secured. d. Excavate the bottom of the trench to assure a firm bearing support uniformly throughout the length of the pipe. Excavate a space under and around each bell to relieve it of any Ioad. Blocking under the barrel or bell will not be permitted. Where ground water conditions are encountered, the Engineer may require dewatering equipment to be provided. e. Remove rock or boulders encountered in the bottom of the trench to a depth six (6) inches below the grade of the pipe. Place a suitable tamped foundation of earth material to bring the bottom of the trench to proper sub -grade over rock or boulders. £ When unstable conditions are encountered at the invert elevation of the pipe and dewatering or similar measures will not prevent or cure this condition, suitable stabilization material shall be placed in the trench. g. When pipe laying is not in progress, plug the open end of the pipe to prevent entry of water, dirt, tools, or other foreign platter into the pipeline. Do not use the pipe as a means of carrying groundwater away from the work area. 2. Temporary Silt Fence: a. Filter fabric to be of polypropylene, nylon, polyester, or polyethylene yard with a minimum standard strength of 30 pounds per linear inch, a minimum 85 percent filtering efficiency, and a minimum slurry flow rate of 0.3 gallons per square foot per minute. Fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum construction life of six (6) months. Alan & Anne Campbell Conversion to EZ Treat System MacConnell & Associates, P.C. Project No.: A88201.00 b. Posts shall be of four (4)-inch diameter pine, two (2)-inch diameter oak, or 1.33-pound per linear foot steel. Wood shall be a minimum six (6) feet in length, and steel posts shall be at least five (5) feet in length. c. Install silt fence on low side of stockpiles and undeveloped right-of-ways, parallel to surface waters, and in locations shown on the Contract Drawings. Extend fence around approximately 90 percent of the perimeter of the stockpile. d. Construct silt fence as shown on the Contract Drawings. Excavation and Backfilling 1. Excavated materials acceptable as backfill shall be stockpiled in a location approved by the Owner. The materials shaIl be located away from the edge of any excavations. Excavated materials shall not be stored within the driplines of existing trees. 2. All open excavations shall be barricaded when construction in the area has stopped. Night barricading should include posted warning lights. 3. Protect existing structures, utilities, sidewalks, pavement, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations. Protect root systems from damage or dry -out to the greatest extent possible. 4. Soil materials shall be free of boulders, roots, sod, organic matter, and frozen material. 5. Bedding materials for pre -cast concrete structure installation shalI be #57 washed stone to the dimensions and depth shown on the construction drawings_ 6. All excavation is unclassified and includes excavation to subgrade elevations indicated on the construction drawings regardless of character of materials and obstruction encountered. In the event that rock is encountered, the Contractor shall remove it at no additional cost to the owner. 7. Stability of excavations shall be maintained by sloping of the sides and shall comply with local codes, ordinances, and requirements of agencies having jurisdiction_ Where space restrictions prevent sloping of the sides, shoring and bracing of the walls shall be employed in full compliance with OSHA requirements_ In the case of pipe installations, sheeting shall remain in place until backfilling progresses to a stage where no damage to the pipe will result from removal. The Contractor shall attempt to prevent surface and subsurface water from flowing into excavations. The Contractor shall provide equipment, materials, and work necessary to dewater any accumulation of water in the excavation to prevent softening of the soils, undercutting of footings, and changes to the soils detrimental to the stability of the improvements_ Alan & Anne Campbell Conversion to EZ Treat System MacConnell & Associates, P.C. Project No.. A88201.00 9. Excavations for structures shall conform to dimensions and elevations shown on the construction drawings within a tolerance of plus or minus 0.10 feet and to the standards of ASTM C891-90. 10. Backfill shall be installed to excavated spaces in 8-inch lifts and tamped by hand or pneumatically around pipe or structures_ Tamping shall be performed evenly on both sides of pipe and around sides of structures to a depth such that damage to the pipe or structures is avoided as a result of subsequent methods of compaction. Extreme care shall be exercised in backfilling operations to avoid displacement of pipe and structures either horizontally or vertically. Backfill consolidation by ponding water is not permitted. Compaction of each layer of backfill and the top 6 inches of subgrade shall achieve a 90 percent maximum dry density as measured by AASHTO method T-99. 11. Remove all waste materials including unacceptable excavated material, trash, and debris and legally dispose of it off Owner's property. Where settling is measurable or observable at excavated areas during project warranty period, the Contractor shall remove surface finish, add backfill material, compact, and replace surface treatment to a quality and appearance matching adjacent areas of previous work. 12. Site specific excavation and backfilling requirement shall also comply as shown on the construction drawings. Fertilizing, Seeding, & Mulching 1. Permanent seeding is required for treatment and trench areas disturbed by construction, except for areas covered by structures, pavements, etc_ Temporary seeding is required for those treatment areas disturbed by construction and left exposed for periods of 30 days or more before being brought to final grade and permanently seeded. Fertilizing, seeding and mulching are not required for wastewater disposal fields_ 2. Fertilizer shall be 10-10-10 commercial fertilizer conforming to statutory requirements and all rules and regulations adopted by the North Carolina Department of Agriculture. 3. Limestone shall conform to all statutory requirements and all rules and regulations adopted by the North Carolina Department of Agriculture. 4. Seed shall conform to all statutory requirements and all rules and regulations adopted by the North Carolina Department of Agriculture. Provide seed mixtures as tabulated below. Deliver seed to the site in original containers bearing the appropriate guaranteed mixtures. Seed shall show a purity of not less than 90 percent and germination quality of not less than 85 percent. 5. During late winter and early spring, the temporary seed mixture for general areas shall consist of 120 pounds per acre of Rye (grain) and 50 pounds per acre of Annual Lespedeza (Kobe in Alan & Anne Campbell Conversion to EZ Treat System MacConnell & Associates, P.C. Project No.: A88201.00 Piedmont and Coastal Plain, Korean in Mountains). During summer, the temporary seed mixture for general areas shall consist of 40 pounds per acre of German millet_ In the Piedmont and Mountains a small -stemmed Sudangrass may be substituted at a rate of 50 pounds per acre. During fall season, the temporary seed mixture for general areas shall consist of 120 pounds per acre of Rye (grain). 6. The permanent seed mixture for general areas shall consist of 50 pounds per acre of Pensacola Bahiagrass, 30 pounds per acre of Sericea lespedeza, 10 pounds per acre of Common Bermudagrass, and 10 pounds per acre of German Millet. Bermudagrass may be replaced with 5 pounds per acre of centipedegrass. The best seeding dates for this mixture are April I ' through July 15'. Other mixtures, as approved or recommended by the Soil Conservation Service or the North Carolina Agricultural Extension Office, may be used with Engineer's approval. 7. Mulch all seeded areas, except where jute mesh is required. Use undamaged, air-dried, threshed small grain straw free of undesirable weed seed. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. S. Use jute mesh on seeded areas where slope is steeper than two (2) horizontal to one (1) vertical (two (2) to one (1) slope). Use woven jute yarn weighing approximately 90 pounds per 100 square yards and having 0.75-inch openings. 9. Follow procedures set forth in the publication "Guide for Sediment Control on Construction Sites in North Carolina" by the Soil Conservation Service of the United States Department of Agriculture, and as specified herein. a. Spread a minimum, of four (4) inches of top soil over all disturbed areas to the finished grade as shown on the Contract Drawings. b. Remove all grass and weeds and shape the overall area to even out high and low spots. c. Scarify soil to a depth of three (3) inches and work into a satisfactory seed bed by discing or through the use of cultipackers, harrows, drags, or other approved means. d. The preparation outlined above shall not be done when the soil is frozen, wet, or otherwise in an unfavorable condition. e. Begin and complete seeding operations, as outlined below, as soon as possible after final or intermediate grading is completed. f. Distribute lime and fertilizer, as required, uniformly over the seed bed. Harrow rake or otherwise work these additions into the seed bed. g. Distribute seed uniformly over the established seed bed. Lightly rake the surface of the seed bed in order to cover seed to a maximum depth of 0.25 inch. h. Compact the seed bed with an approved roller or drag, after covering the seed. Alan & Anne Campbell Conversion to EZ Treat System MacConnell & Associates, P.C. Project No.: A88201.00 i. No lime, fertilizer, or seed shall be applied during a strong wind, when the soil is wet, or when the soil is otherwise unworkable. Should rain follow seeding before rolling is initiated, the seed bed shall not be rolled. Septic, Recirculation, and Field Dosing Tank Installation and Testing 1. Septic tanks shall conform to criteria in 15A NCAC 18A .1952-.1954. The septic, recirculation/ field dosing tanks should be installed on a 6-inch minimum layer of No. 57 washed stone aggregate. 2. Place bell ends of pre -cast sections or the groove end of the concrete facing down_ In preparation for making joints, all surfaces of the portion of the section to be jointed and the factory -made jointing materials shall be clean and dry. Each joint, seam, and pipe penetration inside and outside of joints shall receive liberal applications of non -shrink grout as well as liberal amounts of bitumastic waterproof sealant. 3. Lifting holes and other penetrations of the pre -cast structure wall shall be sealed with nonshrinking grout. Pipe connections shall be made so that the pipe does not project beyond the inside wall of the structure_ Grout connections as necessary to make smooth and uniform surfaces on the inside of the structure. 4. Before placing any tank into operation, remove any dropped grout, sand or other imperfections and obstructions from the interior of the structure. Specifically, the inside walls of the tank shall be smooth and uniform. Smooth -finish inverts so that wastewater flow is confined and directed through the inlet and outlet pipes with easy transition. 5. Tanks shall be backfilled in accordance with the applicable specifications herein before described. 6. All pipe penetrations shall be through Press -Seal Cast -A -Seal 402 rubber connectors or approved equal. 7. All joints (mid -seam, top -seam) shall be sealed using Concrete Sealants butyl sealant #CS-102 meeting ASTM C-990. 8. All service access openings will be a minimum of 24 inches. Exceptions may be made on a case by case basis with E-Z Treat's and engineer's prior written approval. All access openings shall be fitted with E-Z Set riser assemblies. E-Z Set riser assemblies shall be secured via screws per manufacturer specifications. 9. A 24-hour static water test, in accordance with ASTM standards, shall be performed on all precast tanks in order to insure they are water tight. a. The testing shall be performed in the presence of the engineer or his representative. Alan & ,Anne Campbell Convention to EZ Treat System AlacConnell & Associates, P.C. Project No.: A88201.00 b. Each tank shall be filled with water and the initial water Ievel shall be measured. c. At the end of the 24-hour period, the level of the water shall be measured again. d. The engineer shall pass the tank if the water level did not drop more than 0.5 inches or if the total volume of the displaced water is less than 1 percent of the total effective liquid capacity of the tank. e. Tanks may also be leak -tested by applying a vacuum of 5-inches of Hg with riser assemblies in place. f Each failed tank shall be tested again. In the event that the tank does not pass the second test, the Contractor shall remove and replace the tank at no additional cost to the owner. 10. Septic Tank and E-Z Treat Recirculation Tank shall meet the following additional criteria: a. Minimum liquid depth of 36 inches. b. Minimum airspace of 9 inches. c. Length shall be at least twice as long as the width. d. Septic tank shall be constructed with a baffle wall dividing the tank interior 2/3rd to 1/3`d The baffle wall shall be constructed to permit passage of effluent through a slot or holes located between 45 and 55 percent of the interior depth. 11. Septic tank shall be fitted with a Sim Tech STF-110, Polylok PL — 68, or Engineer approved effluent filter that extends down to 50 percent of the liquid depth of the tank. 12. Septic tank shall be as specified on the constructions drawings. Piping Installation and Testing 1. Piping shall be PVC and of type and size as shown on the construction drawings. Piping shall be installed with a minimum of three (3) feet of cover unless shown otherwise on the construction drawings. 2. Piping shall be installed to be able to meet a pressure test whereby the pressure remains constant for a minimum of two hours, and the allowable leakage is not more than 10 gpd/inch of pipe diameter/mile. 3. Any line installed under a driveway shall be sleeved in Class 52 Ductile Iron Pipe or encased in concrete and extend a minimum of 5 feet on either side and unless shown otherwise on the construction drawings. Alan & Anne Campbell Conversion to EZ Treat System MacConnell & Associates, P.C. Project No.: A$$201.00 4. Forcemains installed under streams and driveways shall be sleeved in Class 52 Ductile Iron Pipe. E-Z Treat Dosing Pump and Control Panel The E-Z Treat dosing pumps shall be one(l) Sta-Rite Step 30 1/2 horsepower multi -stage submersible pump for operation on a single phase, 115 Volt service. 2. The control panel shall be an E-Z Treat provided simplex panel. The panel shall have a recirculation pump load sensor/alarm, two on/off timers, discharge pump alarm, high/low water alarm, and low water level/run dry pump protection. The control panel shall be in a NEMA 4X enclosure, installed in accordance with the manufacturer's recommendations, and within 10 feet of the E-Z Treat treatment unit. The control panel enclosure shall have lockable latches. 4. No splices may be placed in the pump tank or riser. All splices shall be made above ground in a NEMA 4x junction box. 5. Control and alarm circuits shall be on separate circuits. 6. RMSYS telemetry control panel or equal shall be connected to a phone line. If the local health department does not have access to the RMSYS website, a direct interface must be provided. System operator must be able to access the panel directly on site and shall be available with a 24 hour notice to the county in the event a direct connection is necessary. 7. The audible/visual alarms shall be external to any structure. E-Z Treat Treatment Unit Installation The E-Z Treat Treatment Units shall be installed in accordance with the manufacturer's recommendations and as shown on the contract drawings. 2. The lid of the E-Z Treat Unit shall be secured with screws per manufacturer's specifications. Effluent Bypass Valve 1. The effluent bypass valve shall be by E-Z Treat and shall be installed in accordance with the manufacturer's recommendations and as shown on the contract drawings. Alan & Anne Campbell Conversion to EZ Treat System MacConnell & Associates, P.C. Project No.: A88201.00 Denitrification Assembly 1. Valves and piping back to the front of the septic tank shall be integral with the pod dosing system_ Ultraviolet Disinfection Unit 1. The ultraviolet unit shall be installed in accordance with the manufacturer's recommendations and as shown on the contract drawings. The unit shall be by E-Z Treat (Model E-Z UV 102) or approved equal by engineer. 2. A visual alarm shall be provided that alerts the homeowner when the primary bulb fails. After primary bulb failure, the backup bulb shall be good for 10,000 hours. Alarm panel shall be mounted within 6 feet of ultraviolet casing. 3. Casing shall be filled with water prior to powering up lamps. Alan & Anne Campbell Conversion to EZ Treat System MacConnell & Associates, P.C. Project No.. A88201.00 E Q 0 N 0 N r m 75 COPYRIGHT 0 2021 w F- ALAN & ANNE CAMPBELLLU Lu CONVERSION TO E-Z TREAT SYSTEM V I C IN IT Y M A P PROJECT No. A88201.00 501 LOST WAY HURDLE MILLS, NC 27541 PIN #: 9970229912 SCHEDULE OF DRAWINGS: C-100 COVER SHEET C-101 GENERAL NOTES C-102 SYSTEM SCHEMATICS & MAINTENANCE SCHEDULE C-103 EXISTING OVERALL SITE PLAN C-104 EXISTING SYSTEM LAYOUT C-105 PROPOSED SYSTEM LAYOUT C-106 TREATMENT SYSTEM DETAIL KEY C-107 DOSING CALCULATIONS D-101 DETAILS 1 OF 7 D-102 DETAILS 2 OF 7 D-103 DETAILS 3 OF 7 D-104 DETAILS 4 OF 7 D-105 DETAILS 5 OF 7 D-106 DETAILS 6 OF 7 D-107 DETAILS 7 OF 7 SITE o,rov c�nc e. QBlue Rock Farm y\� Stone Pond a,& 1 I 1 0 LOCATIO N M A P W H N } N CO a Z 1:Z 'Z � z yJ W O _ U OJ OF w of z z w O x w z O U Q N �a c N U)mN 00 oa m � o iy O O O � � � M W � N Z J T Q J N Q JO -VX WAX Q LL Z L) a��z WQDd W CO Z J Q J co Q COT UV o Ow �F- U W � C� 0 U � C� �y E Q N 0 N GENERAL NOTES SITE RESTORATION 1. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL TRADES AND SUBCONTRACTORS. CONTRACTOR IS ALSO RESPONSIBLE FOR FIELD VERIFYING DIMENSIONS, ELEVATIONS, AND LOCATIONS OF 1. BACKFILL WITH SUITABLE LOOSE MATERIAL (SANDY LOAM TO SANDY CLAY LOAM) FREE OF LARGE OR ALL EXISTING CONDITIONS AND UTILITIES. DAMAGING OBJECTS, SEED AND STRAW BACKFILLED AREAS (OR SOD WHEN REQUIRED). 2. CONTRACTOR IS RESPONSIBLE FOR INSTALLING SYSTEM IN ACCORDANCE WITH ALL STATE & LOCAL REGULATIONS & POLICIES. 2. PROVIDE EROSION PROTECTION FOR BACKFILL MATERIAL IN ACCORDANCE WITH STATE AND COUNTY 3. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE SOIL EROSION AND SEDIMENTATION CONTROL REQUIREMENTS. STANDARDS AND MAINTAIN UNTIL PERMANENT PROTECTION IS ESTABLISHED. 4. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE OSHA, NCDOT AND LOCAL SAFETY REQUIREMENTS. 3. BACKFILL SHOULD BE GRADED TO PREVENT THE INFILTRATION OF SURFACE WATER AND DIVERT STORM 5. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL CONSTRUCTION DAMAGE EXPEDITIOUSLY AND AT NO ADDITIONAL COST TO THE OWNER. WATER RUN-OFF AWAY FROM THE SYSTEM. WHEN ADDITIONAL FILL IS REQUIRED, IT SHOULD BE PLACED 6. LOCATION OF DRIPPER LINES AS SHOWN ARE APPROXIMATE. LINES SHALL LAY PARALLEL TO CONTOURS ® ±24". AFTER SYSTEM IS INSTALLED FROM THE EDGES CROWNED IN THE MIDDLE AND FEATHERED OUT 10' 7. SUPPLY AND RETURN LINES MAY BE LAID IN SAME TRENCH. SEPARATION IS FOR ILLUSTRATION PURPOSES ONLY. BEYOND THE DISPERSAL AREA. FILL SHOULD BE TEXTURE GROUP II OR III AND FREE OF LARGE STONES 8. LAYOUT OF THE APPLICATION AREA IS BASED ON FIELD DELINEATION OF SOILS AREA BY A LICENSED SOILS CONSULTANT. ANY CHANGE IN LAYOUT BY THE CONTRACTOR OUTSIDE THE AND ORGANIC DEBRIS. TOP 2" SHOULD BE SUITABLE FOR ESTABLISHMENT OF LAWN. DELINEATED AREA SHALL BE APPROVED BY THE SOILS CONSULTANT, COUNTY HEALTH DEPARTMENT, AND THE ENGINEER. 9. DRAIN ALL ROOF AND TOE DRAINS AWAY FROM DRIP FIELD AND TREATMENT UNITS. TREATMENT UNITS 10. PROVIDE MINIMUM 100 FEET OF SEPARATION FROM ANY WELL TO WASTEWATER TREATMENT UNITS AND DISPOSAL SYSTEMS IF APPLICABLE. 11. WASTEWATER AND IRRIGATION SYSTEMS SHALL COMPLY WITH IWWS-2015-3-R2 1. SAMPLING CHAMBER OR MEANS OF COLLECTING A FRESH SAMPLE SHALL BE PROVIDED FOR ALL TS-1 & 12. ALL PIPE SHALL BE SCHEDULE 40 PVC UNLESS OTHERWISE NOTED. TS-2 SYSTEMS. IT IS PREFERRED THAT THE INLET OF THE PUMP CHAMBER BE USED AS THE SAMPLING 13. VORTEX FILTER IN HYDRAULIC UNIT SHALL BE INSPECTED UPON EACH REGULARLY SCHEDULED MAINTENANCE VISIT. LOCATION WHEN A PUMP IS REQUIRED. 14. INSTALLER IS RESPONSIBLE FOR ENSURING DISPERSAL AREA WAS PROPERLY CLEARED & SOIL MOISTURE CONDITIONS ARE CONDUCIVE FOR INSTALLATION PRIOR TO BEGINNING INSTALLATION. 2. SYSTEM INSTALLATION MUST COMPLY WITH ALL LOCAL ORDINANCES AND POLICIES. 15. EJECTOR PUMP MAY BE REQUIRED FOR BASEMENT FIXTURES. INSTALLER IS RESPONSIBLE FOR VERIFICATION. 3. ALL TREATMENT UNIT RISERS AND LIDS SHALL BE SECURED VIA SCREWS PER MANUFACTURERS 16. KEEP ALL EXCAVATIONS 20' FROM INSTALLATION AND RESERVE AREA. SPECIFICATIONS. 17. KEEP WELL AND SEPTIC SYSTEM OUT OF ANY UTILITY EASEMENTS AND AT LEAST 10' FROM UTILITY LINES. OPERATING REGIME FOR IRRIGATION SYSTEM 18. DO NOT INSTALL LAWN IRRIGATION SYSTEMS WITHIN 20 FEET OF DISPERSAL AREA. 19. DO NOT CONNECT WATER TREATMENT SYSTEMS, CONDENSATIONS DRAINS OR SUMP PUMPS TO ONSITE SYSTEM. 1. SYSTEM IS DESIGNED AND CONTROLS (MICROPROCESSORS) ARE PROVIDED TO DOSE THE E-Z TREAT 20. IF A PRE-CONSTRCTION MEETING REQUIRED BY PERMIT, PLEASE CALL TO SCHEDULE. TREATMENT UNITS. SEE SHEET C-106 FOR "ON" AND "OFF" TIME SETTINGS. PUMPED IRRIGATION FLOW 21. ANY DEVIATION FROM THIS DESIGN MUST BE APPROVED BY THE LOCAL HEALTH DEPARTMENT AND THE ENGINEER PRIOR TO INSTALLATION. 22. ELECTRICAL WIRING SHOULD BE INSTALLED BY A LICENSED ELECTRICAL CONTRACTOR, ACCORDING TO NEC, STATE AND LOCAL ELECTRICAL CODES, AS APPLICABLE. SHALL PASS THROUGH A FLOW METER. WHEN THE PREPROGRAMMED VOLUME IS REACHED THE ACTIVE 23. CONTRACTOR IS TO INSTALL TANKS ON UNIFORMLY FIRM AND STABLE COMPACTED GROUND, CRUSHED STONE IS RECOMMENDED TO PROVIDE UNIFORM SUPPORT TO TANK BOTTOM ESPECIALLY IN PUMP WILL BE DE -ENERGIZED. THE PUMP WILL ALSO DE -ENERGIZE IF THE LOW WATER LEVEL "PUMP POOR, WET OR ROCKY SOILS. OFF" SWITCH IS ACTIVATED. SEE SHEET C-106 FOR FIELD DOSING INFORMATION. 24. ALL TANKS MUST BE WATER -TIGHT AND CONFORM TO APPLICABLE LOCAL AND STATE REGULATIONS AND POLICIES. 2. IF THE HIGH WATER LEVEL "ALARM" FLOAT SWITCH IS ACTIVATED, THE SYSTEM WILL BEGIN ITS OPERATION 25. ALL PVC JOINTS SHALL BE PRIMED AND CHEMICALLY FUSED UNLESS THREADED. OF DELIVERING THE PREDETERMINED DOSE VOLUME, AND SHALL ALSO ENERGIZE THE AUDIBLE AND FLASHING 26. MAXIMUM COVER OVER TANKS AND DISTRIBUTION BOXES VARIES BY MANUFACTURER AND COUNTY. ALARM FIXTURES (ONCE ENERGIZED, THE FLASHING AND AUDIBLE ALARM UNITS WILL ONLY BE RESET 27. DISPERSAL FIELD CORNERS OR PROPERTY CORNERS SHOULD BE MARKED BY A LICENSED SURVEYOR PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR VERIFYING LOCATIONS MATCH MANUALLY OR BY REACHING LOW LEVEL CONDITIONS). THE CONSTRUCTION DRAWING. 28. SHALLOW PLACED SYSTEMS (LESS THAN 18") MUST BE HAND CLEARED AND STUMPS GREATER THAN 6" IN DIAMETER MUST BE GROUND OUT. STUMPS LESS THAN 6" MAY BE CAREFULLY 3. THE MICROPROCESSOR WILL ALSO CONTROL THE PERIODIC BACK WASHING OF THE VORTEX FILTER. FILTER BACK WASHING SHALL OCCUR AT THE END OF EACH DOSE CYCLE. THE SYSTEM SHALL BE CONFIGURED TO REMOVED ON THE DAY OF INSTALLATION. 29. REFER TO SITE DRAWING FOR ANY SPECIAL REQUIREMENTS. ALLOW FOR MANUAL INITIATION OF BACK WASHING FILTERS. 30. MACHINERY SHOULD AVOID PERCOLATION AREA. 4. THE CONTROL PANEL SHALL INCLUDE, BUT NOT BE LIMITED TO, AN "AUTO/MANUAL" SYSTEM CONTROL 31. MACHINERY SHOULD NOT TRAVERSE EXCAVATED/EXPOSED PERCOLATION AREA. SWITCH, STOP/START SWITCH FOR EACH PUMP, NON-RESETTABLE ELAPSED TIME RECORDER FOR EACH 32. ALL SUPPLY AND RETURN LINES NOT DESIGNED TO DRAIN BACK SHOULD BE PROTECTED FROM FREEZING. PUMP, AND INDIVIDUAL PUMP RUN LIGHTS. 5. THE CONTROL PANEL SHALL BE A NEMA 4X ENCLOSURE. ALL SUPPORTING CONTROL UNITS, IF NOT HOUSED WITHIN THE CONTROL PANEL, SHALL BE IN A SEPARATE NEMA 4X ENCLOSURE. ELECTRICAL NOTES 1. THREE DIFFERENT CONTROL PANELS WILL CONTROL THE WASTEWATER SYSTEM. ONE CONTROLS THE PRETREATMENT, ONE CONTROLS THE FINAL DISPERSAL, AND ONE CONTROLS THE ULTRAVIOLET DISINFECTION. 2. EACH PANEL SHALL BE APPROXIMATELY 13" WIDE X 15" HIGH AND IS A NEMA 4X, UL RATED ENCLOSURE WITH LOCKABLE LATCHES. THE PANELS SHALL BE SUPPLIED BY THE SYSTEM DISTRIBUTOR. 3. THE PANELS SHALL BE MOUNTED BY THE ELECTRICIAN WITHIN 10' OF THE TANK UNITS. THEY SHALL BE MOUNTED NEXT TO EACH OTHER AND 48" - 60" OFF THE FINISHED GRADE TO THE BOTTOM OF THE ENCLOSURE. 4. THE INSTALLER'S ELECTRICIAN SHALL MAKE THE INTERNAL PANEL CONNECTIONS OF THE PUMP/UV AND CONTROL CORDS. EACH CONTROL PANEL SHALL CONTAIN A WIRING SCHEMATIC IDENTIFYING ALL TERMINAL CONNECTIONS. THE SYSTEM INSTALLER SHALL BUNDLE AND MARK EACH CORD WITH THE APPROPRIATE IDENTIFICATION AND SECURE IN THE ACCESS RISER AT THE DIFFERENT PUMP/UV POINTS. 5. THE PRETREATMENT CONTROL PANEL REQUIRES A DEDICATED CIRCUIT OF 20 AMPS, 115 VOLTS, SINGLE PHASE SUPPLIED FOR THE PUMP. 6. THE PRETREATMENT CONTROL PANEL REQUIRES A DEDICATED CIRCUIT OF 15 AMPS, 115 VOLTS SUPPLIED FOR THE ALARM / CONTROL SIDE OF THE PANEL. 7. THE FINAL DISPERSAL CONTROL (DRIP) PANEL REQUIRES A DEDICATED CIRCUIT OF 20 AMPS, 115 VOLTS, SINGLE PHASE SUPPLIED FOR THE PUMPS. 8. THE FINAL DISPERSAL CONTROL PANEL REQUIRES A DEDICATED CIRCUIT OF 15 AMPS, 115 VOLTS SUPPLIED FOR THE ALARM / CONTROL SIDE OF THE PANEL. 9. THE ULTRAVIOLET DISINFECTION UNIT REQUIRES A DEDICATED CIRCUIT OF 20 AMPS, 115 VOLTS. 10. A MINIMUM CONDUIT SIZE OF 1 36" SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICIAN AS A CONNECTION BETWEEN EACH CONTROL PANEL AND THEIR RESPECTIVE TERMINATION POINTS OUT IN THE TANK AREA. 11. ALL OPEN CONDUIT ENDS SHALL HAVE REMOVABLE CLAY TYPE DUCT SEAL EMBEDDED TO PREVENT GASSES AND MOISTURE FROM ENTERING THE CONTROL PANELS. DO NOT USE PERMANENT SILICONE OR EXPANDABLE FOAM PRODUCTS. 12. ALL PUMP AND FLOAT CONTROL CORDS SHALL BE SUPPLIED WITH EITHER 30' OR 50' LEADS. THIS WILL HELP KEEP SPLICES TO A MINIMUM AND SHOULD BE AVOIDED IF AT ALL POSSIBLE. IF A SPLICE MUST BE USED, IT MUST BE MADE ABOVE GRADE IN A PLASTIC NEMA 4X JUNCTION BOX. 13. ALARMS SHALL BE AUDIBLE AND VISUAL. 14. AUDIBLE/VISIBLE ALARMS SHALL BE EXTERNAL TO ANY STRUCTURE. 5 w U) to J a NJ W � F } (Nj W ¢ az w I.-� M a ° o 06 p J z z in p O a = w z O U U z z O U W 0 z O MAINTENANCE SCHEDULE ITEM FREQUENCY SEPTIC TANK 3 - 6 MONTHS 12 MONTHS RECIRCULATION TANK WEEKLY FIELD DOSING TANK 3-6 MONTHS 12 MONTHS SUPPLY LINES, FORCE MAINS 6-12 MONTHS DISTRIBUTION FIELDS 2-4 WEEKS 3-6 MONTHS PUMPS, FILTER SYSTEM, MONTHLY & DISTRIBUTION PIPING QUARTERLY SEMIANNUALLY ANNUALLY E-Z TREAT TREATMENT MONTHLY SYSTEM ANNUALLY ULTRAVIOLET DISINFECTION 3-6 MONTHS UNIT ANNUALLY TASK CHECK FOR SOLIDS ACCUMULATION, BLOCKAGES, OR BAFFLE DAMAGE, IN/EXFILTRATION, PUMP SEPTAGE. CLEAN EFFLUENT FILTER. PUMP OUT ACCUMULATED SOLIDS IF NECESSARY. REPLACE EFFLUENT FILTER EACH TIME SEPTIC TANK IS PUMPED. CHECK PUMPS, CONTROLS, ALARMS, ELAPSED TIME METERS. CHECK FOR SOLIDS ACCUMULATION, IN/EXFILTRATION. PUMP OUT ACCUMULATED SOLIDS IF NECESSARY. CHECK FOR EXPOSED PIPE AND LEAKAGE. MOW VEGETATIVE COVER IF APPLICABLE. CHECK FOR EROSION, OR PONDING OF EFFLUENT. CHECK FLOW METER READOUT AND COMPARE TO RECORDED FLOWS, CHECK PUMPS AND FILTER SYSTEM FOR LEAKS. REMOVE FILTER COVERS AND INSPECT FOR ACCUMULATION OF DEBRIS. CHECK DIFFERENTIAL PRESSURE GAUGE BEFORE AND AFTER FLUSHING (D.P. SHOULD RETURN TO ORIGINAL OPERATING D.P.) CHECK PUMPS FOR ABNORMAL VIBRATION, TEST THE ALARM FUNCTIONS. REMOVE AND LUBRICATE O-RINGS ON FILTER CANISTER, REPLACE IF DAMAGED, CLEAN 1-1/2" FILTER SCREEN AT HYDRAULIC UNIT. REMOVE FILTER SCREEN AND REPLACE, CLEAN USED FILTER SCREEN IN MILD ACID SOLUTION AND STORE FOR NEXT ANNUAL REPLACEMENT, FLUSH FIELD SUPPLY AND RETURN MANIFOLDS BY REMOVING (UNSCREWING) AIR/VACUUM BREAKERS. INSPECT CONTROL/ALARM PANEL, PUMPING SYSTEM EFFLUENT FILTERS/PUMP SCREENS, RECIRCULATION TANK, AND E-Z TREAT POD FILTER. (TREATMENT UNIT) CHECK AND/OR REPLACE BATTERIES IN FLOW METER. (IF APPLICABLE) WIPE (CLEAN) UV LAMPS. CHECK INTENSITY AND REPLACE LAMP WHEN REQUIRED. CHANGE BULB. - DWELLING - 4" SCH. 40 PVC 15'-0" MIN. EXISTING 1,200 GALLON SEPTIC TANK 2� MIN. E-Z TREAT POD FILTER TREATMENT SYSTEM PLAN SCHEMATIC NTS - DWELLING - GROUND EL. t658.8' F.F.E. t659.8' — 4" SCH. 40 VC ® 2.00% MIN. INV. IN. t656.3' INV. OUT. t657.8' (DWELLING) EXISTING t656.1' 1,200 GALLON SEPTIC TANK NOTES: 1. TANK LOCATIONS ARE NOT TO SCALE SO AS TO SHOW EACH TREATMENT ITEM. 2. ALL GRAVITY LINES SHALL BE 2% SLOPE MIN. CP CP CP EXISTING 3,000 O GALLON FIELD DOSING TANK E-Z TREAT POD FILTER INV.EL. t656.4' GROUND EL. t658.8' INV. IN YPA INV. IN t655.9' O INV.EL. t655.5' t655.7 EXISTING 3,000 1, -Z GALLON GALLON FIELD E-Z TREAT DOSING TANK RECIRCULATION TANK 4" SCH. 40 PVC 4" SCH. 40 PVC TREATMENT SYSTEM PROFILE SCHEMATIC FORCE MAIN GROUND GRAVITY LINE FLOW DIRECTION ad W U N Z J W a Z Q cn=ZU Say 5 W U) to J J W i cn z 1-1/2" SCH. 40 PVC SUPPLY TO SPRAY FIELD a U -V a z W M W yJ > O U a o2W FO 06 z o J �o Z o Z a a = w o z O U o 0 cm �a co N (� co W I- m> m co a o� o iy O O O W W N T co N Z J z z 0)M = <Oa 04X -12XVa LL zL)co Oa~Oz04 D 0 LLf Z J a J �rn a� U U CD Ow � H u W� ► n4 O 0 U SAL 7069 y ............ 0 Q Co N O N LEGEND J BOUNDARY (PROPERTY) Z a J O CONTOURS - INDEX N d U STONE POND �� 65 W W CONTOURS - INTERMEDIATE X -n. H o� ___ — 10 PROPERTY S00'02 55.37 "50 0 '31�� R DRAIN FIELD (SEPTIC) AREA W y A A5 — — SETBACKS \ ELECTRIC LINE \ �a APPROX. EXISTING SPRAY \A EXISTING FENCE IRRIGATION SYSTEM- ��0 / / EDGE OF PAVEMENT w - 656 EXISTING SEWER U) J rn \ \ INITIAL DRIP LINES (FLAGGED) m Z o — — — — "` 58---------- INITIAL DRIP LINES FLAGG 6 (UNFLAGGED Y V W r — - Q Q Z Z Lu EXISTING TREE AREA REPAIR LINES (FLAGGED) U t-U > DWELLING =;; \ — 660 --- REPAIR LINES (UNFLAGGED) Z OJ W O / Q � o w / LINE SEGMENTS (NOT USED) W 662 °tfo _j Z Z RETURN LINES Z p O Q --- - EXISTING 1SUPPLY LINES Q = W 0 SCH40 PVC / > h — W WATER LINE Z \ \ O /':,<.'.{I' / APPROX. LOCATION OF / TREE LINE U EXISTING x EXISTING FENCE / FENCE LINE DRIVEWAY / — — X RETURN MANIFOLD O � � � Q O N SUPPLY MANIFOLD Co041 p N i CO EXISTING CLEAN OUT �� Co Ld CID EXISTING CONTROL PANEL m 0 Q 0 670 EZRT E-Z TREAT RECIRC. TANK APPROX. EXISTING Cl) c c SPRING RISER n E-Z E-Z TREAT TREATMENT UNIT to to FDT EXISTING FIELD DOSING TANK H N / ST EXISTING SEPTIC TANK co N Z J HU HYDRAULIC UNIT Z Z a; UV ULTRAVIOLET DISINFECTION O U X EXISTING BAIL VALVE AND M METER � Q O Z LL `• A (,., A BLOW -OFF ASSEMBLY F_ Z U 0! rn w V A ZV ZONE VALVE O Z O00 N Eli a m- 60, rl)�� V �� A s° A �; V A �Q00 z _jv N� 1lr \ \ \ \ \ V ¢ rn a- \ CDU 0 H 666, ° " \ \ \ \ GRAPHIC SCALE: 1 = 100' ~ a n--<.-- t _ - �`� :�'''�� � � � � \ 0 50 100 200 300 ct JT83d0ild O l � ' � a� O U — 674 /4. 5l�l�D \ _ 654 ----- - 656 \ SOB•30 33.45_ '11-a3d02 \ \ 658 Y I I I I I II EXISTING 1 }" SCH 40 PVC I 0a 0 M1 W E L7 O 0 1 EXISTING 3,000 GAL. PUMP TANK I EXISTING PEAT BIOFILTER TO BE REMOVED EXISTING 1,200 GAL. SEPTIC TANK EXISTING CONTROL PANEL EXISTING SCH 40 PVC FROM DWELLING I I I I I I I I \ I \ I \ V A V A � A � A / I I I I I � Ie + .d • d • EXISTING • -• 1{ • /\: . DRIVEWAY EXISTING DWELLING _�'• LEGEND BOUNDARY (PROPERTY) CONTOURS - INDEX CONTOURS -INTERMEDIATE DRAIN FIELD (SEPTIC) AREA ELECTRIC LINE EXISTING FENCE — — — — — EDGE OF PAVEMENT EXISTING SEWER INITIAL DRIP LINES (FLAGGED) - - - - - - ---- INITIAL DRIP LINES (UNFLAGGED) REPAIR LINES (FLAGGED) REPAIR LINES (UNFLAGGED) LINE SEGMENTS (NOT USED) RETURN LINES SUPPLY LINES W WATER LINE TREE LINE ■ FENCE LINE RETURN MANIFOLD ® SUPPLY MANIFOLD co EXISTING CLEAN OUT CP EXISTING CONTROL PANEL EZRT E-Z TREAT RECIRC. TANK E-Z E-Z TREAT TREATMENT UNIT FDT EXISTING FIELD DOSING TANK ST EXISTING SEPTIC TANK HU HYDRAULIC UNIT UV ULTRAVIOLET DISINFECTION M METER ZV ZONE VALVE GRAPHIC SCALE: 1 " = 30' 0 15 30 60 120 yyyyLLlIF ��r EN- 7069 ' 'S,���lll�}1151J! HwO 0 y>-�X coW O � d O 04 co 0 N (� co W m> m co O0 a 0 M O O O Lu M n W � N T co N Z J T z z rn 2 3o04ax W2XVQ zL)LL do d ~ O Z 04 coaW z Jco Q J Q � O T U U FX CD Ow F- V a W � .ct O O U � Ct �y r� "C� > / / �� �I LEGEND w BOUNDARY (PROPERTY) O W 0 Q >� CONTOURS - INDEX d co > V > CONTOURS -INTERMEDIATE N > DRAIN FIELD (SEPTIC) AREA ELECTRIC LINE EXISTING FENCE > i EDGE OF PAVEMENT w > \ EXISTING SEWER W \ INITIAL DRIP LINES (FLAGGED) m N cn a Z ---------- �� cps E-Z �� :� \ \ \ INITIAL DRIP LINES (UNFLAGGED) a aZ F p m I �"' . .s ". • . y ) ( j \ REPAIR LINES FLAGGEDW Fy � > I dQ 1 d \ Lu a EZRT �., •� , �:.._ . �` �� \ REPAIR LINES (UNFLAGGED) J O FDT > Z OJ LU 0 O CO , J � W O 00 >. •�'j : d ;` / • d ` •� \ LINE SEGMENTS (NOT USED) 06 c W Z RETURN LINES Z �a 0 Q Uv (INSIDE EZRT) ST y •'/ \ �; d /• SUPPLY LINES Q = W O /.e.• d ''.'. > •"' / \ \ W WATER LINE Z ,. O �.' \ I • ` TREE LINE EXISTING SCH 40 PVC ,I •e \ ■ FENCE LINE FROM DWELLING * �; RETURN MANIFOLD �d O C i SUPPLY MANIFOLD y2 N f� co EXISTING CLEAN OUT �� m 00 00 Ld I• CP EXISTING CONTROL PANEL m a p .d d \ •. , a EZRT E-Z TREAT RECIRC. TANK c) o ��+ d E-Z E-Z TREAT TREATMENT UNIT oD •s' S r EXISTING ., Lu L N �D \`DRIVEWAY d .. Y FDT EXISTING FIELD DOSING TANK H EXISTING `\ •'' ST EXISTING SEPTIC TANK W w J o > DWELLING / HU HYDRAULIC UNIT z Z o R e 04 I I UV ULTRAVIOLET DISINFECTION Q V X > W X LL Q M METER zUmFo IZV ZONE VALVE a 0 z 04 _ — LU 0 a Lj I I O z -j L D a J a� aEL GRAPHIC SCALE: 1 " = 30' > \ V 0 15 30 60 120 Uj > A \ Ct ,`S�y1LLlIF ��r • r� o a4 " I � o BEN- - c 117069 : � llll}I1%! I I I E-Z TREAT POD FILTER I I I I DETP'' 1, D-105 I 4" SCH. 40 PVC EXISTING EXISTING E-Z TREAT DETAIL 2, I I I r 7 FROM DWELLING SEPTIC TANK RECIRCULATION TANK I I D-104 DETAIL 1, D-102 — DETAIL 1, D-101 J_ UV DETAIL 2, L D-106 _ TREATMENT SYSTEM DETAIL KEY DETAIL 1, ^-108 CP CP CP � r I FIELD DOSING TANK DETAIL 1, D-103 LEGEND FORCE MAIN GRAVITY LINE FLOW DIRECTION NOTES: 1. SEE DETAIL SHEETS FOR TANKS SIZES. O 1-1/2" SCH. 40 PVC SUPPLY TO SPRAY FIELD I 17069 F- >- w Ww Y C Q N Q V Lu N W H 0 5 w cn J i J m N Q Z U �Z w cn- o U a o w 06 o J Z Z J x O a x w Z O U 0 �a o N co L;.i m> m co 0 Q 0 iy O O O Lu M ^ O Lu Q 0) N Z LL a J ZZTma% 3o-aX w M x U Q LL z L) d ~ z 04 pOaw� Q z J Q < T U U o Ow V W� ct C) v0 U � Ct �y r� "C� N W Z Z z O a F o cA_jwa U O�px p J p U aZ �a w U) J } J cn Lu coN Q Z U ?uJ w U)_ O U a o2 FO w o2j oLu J Z z z Loa O Q a = w o z O U 0 �a o N (� cco 0 o W m> m co O0 a 0 ry O O O M n W � N � N Z J Z z rn 2 = �O—aX w � X U Q LL zu a�0z04 DOaWm Q z J Q � U U 2 o Ow V W� ``trtitirrir ��, Ct A U 1 DOSING CALCULATIONS = 17° �' ` `� C-107 NTS = 0 [lilt BASIS OF DESIGN BEDROOMS GPD/BR INITIAL DESIGN FLOW FINAL DESIGN FLOW (GPD) REDUCTION FLOW (GPD) 4 120 480 0� 480 EFFLUENT LIMITS PER 15A NCAC 02T .0605 CARBONACEOUS BIOCHEMICAL OXYGEN DEMAND (CBOD): <30 MG/L TOTAL SUSPENDED SOLIDS (TSS): <30 MG/L AMMONIA NITROGEN - NH3-N <15 MG/L FECAL COLIFORM: <200 /100 ML TREATMENT TABLE EZ TREAT PODS REQUIRED: 1 PODS EZ TREAT RECIRCULATION RATIO: 5 TIMES AIDE TOTAL EZ TREAT FLOW PER DAY: 2967 GALLONS EZ TREAT RECIRCULATION CYCLES PER DAY: 87 CYCLES EZ TREAT VOLUME PER DOSE: 34 GALLONS RECIRCULATION TIMER ON: 2.5 MINUTES RECIRCULATION TIMER OFF: 12 MINUTES RECIRCULATION DOSE CYCLE: 14.5 MINUTES DENITRIEICATION GALLONS RETURNED: 873 GALLONS/DAY DENITRIEICATION RETURN SETTING: 4 GPM EZ TREAT SURFACE AREA: 29 SQUARE FEET EZ TREAT LOADING RATE: 21 GPD/SQUARE FOOT NOTES E sz N O N r m 75 3/4" GATE VALVE (FIELD ADJUST TO 4 GPM FOR E-Z TREAT SPIN FILTER RETURN FLOW) r — — — — — — — — — — — — — — — — — — IT — — — — — — — 3/4" SCH. 40 PVC RECIRC. LINE II OUTI � -�\ 4" SCH. D- 01 FLOW FROMSEPTICHOUSE / EXISTING 1,200 GALLON SEPTIC TANK I I I 40 PVC STAY -RIGHT STB-175EFFLUENT (SEE D-102 FOR FILTER _ _ I CONTINUATION) LTER I I I SIERVCE SCH. 40 PVCI 24"0 E-Z SET RISER W/COVER I I HANDLE EDRIVEWAYRWISE IFF BELOW OR PARKING) LOT THEN USE ONLY H-20 TRAFFIC RATED DEVICES il" L— — — — — — — — — — — — — — — — — — I-L — — — — — — — — J 4" X 1-1/2 REDUCER X 1-1/2" 138" SCH 40 PVC RETURN FROM FIELD EXISTING SEPTIC TANK PLAN 1 D-101 I NTS 24"0 E-Z SET RISER W/COVER (TYP. UNLESS OTHERWISE NOTED) NOTE: FIELD VERIFY PRIOR FLEX TO ORDERING RISERS za PVC tO X GROUND EL. t268.7' iv .�i3/4" PVC INV. IN MIN. 18" BELOW LOWEST F.F.E. WITH WATER FIXTURE ±12" MIN. z c� N I Aimium -I 2" VENT u 0 I 00 WATERLINE e� oo LL I p Ln y` o 4 � » I M J TANK FLOOR a a� EXISTING SEPTIC TANK SECTION NTS WATER TIGHT SEAL ON RISER ASSEMBLY 3/4" SCH. 40 PVC RECIRCULATION LINE FROM E-Z TREAT TEE `4" SCH. 40 PVC i(SEE D-102 FOR CONTINUATION) l NV. OUT "-2" BELOW INVERT IN J CAST -A -SEAL 1 402 RUBBER BOOT (TYP.) ZABEL EFFLUENT FILTER MODEL A300-BX18-VC 1. ALL PIPING SHALL BE SCH 40 PVC UNLESS OTHERWISE NOTED ON PLANS. ALL PVC PIPES SHALL BE BURIED A MINIMUM OF 3 FEET UNLESS SHOWN OTHERW SE. 2. ALL TANKS SHALL HAVE A MINIMUM 28-DAY CONCRETE STRENGTH OF 4500 PSI. 3. TANKS SHALL MEET REINFORCING REQUIREMENTS TO ACCOMMODATE 300 POUNDS PER SQUARE FOOT. EITHER STEEL REINFORCING WIRE, REBAR OR APPROVED FIBER MAY BE USED. 4. ALL SERVICE ACCESS OPENINGS WILL BE A MINIMUM OF 24 INCHES. EXCEPTIONS MAY BE MADE ON A CASE BY CASE BASIS WITH E-Z TREAT'S PRIOR WRITTEN APPROVAL. ALL ACCESS OPENINGS SHALL BE FITTED WITH E-Z SET RISER ASSEMBLIES. SERVICE ACCESS OPENINGS FOR THE RECIRCULATION CYLINDER SHALL BE A 30-INCH OPENING AND FITTED WITH AN E-Z SET 30-INCH RISER ASSEMBLY. TRAFFIC RATED TANKS SHALL HAVE CONCRETE RISERS. 5. ALL JOINTS (TOP -SEAM) SHALL BE SEALED USING CONCRETE SEALANTS BUTYL SEALANT # CS-102 MEETING ASTM C-990. 6. TANKS SHALL BE LEAK -TESTED PRIOR TO SYSTEM START UP BY APPLYING A VACUUM OF 4-INCHES OF MERCURY WITH RISER ASSEMBLIES IN PLACE OR WITH APPROVAL BY E-Z TREAT, A 24-HOUR STATIC WATER TEST, IN ACCORDANCE WITH ASTM STANDARDS. 7. NON -CONCRETE TANKS SHALL NOT BE USED IN CONJUNCTION WITH THE E-Z TREAT SYSTEM WITHOUT PRIOR WRITTEN APPROVAL BY E-Z TREAT. 8. ALL PIPE PENETRATIONS THROUGH PRECAST CONCRETE TANKS SHALL BE PRESS -SEAL CAST -A -SEAL 402 RUBBER BOOTS AND GROUTED. 9. THE FILTER POD INVERT OUT SHALL BE A MINIMUM OF 6" ABOVE THE INVERT IN OF THE RECIRCULATION TANK OR 1/4-INCH PER FOOT SLOPE, WHICHEVER IS GREATER. 10. CONTRACTOR MAY USE LARGER TANKS. 11. MAXIMUM COVER OVER NON H-20 TANKS SHALL BE 30" OR AS SPECIFIED BY MANUFACTURER. 12. SYSTEM INFLUENT SAMPLE SHOULD BE TAKEN FROM INLET TEE IN SEPTIC TANK RISER 13. SEE C-101 FOR GENERAL NOTES. 14. LENGTH, WIDTH, AND DEPTH OF TANKS WILL VARY PER MANUFACTURER. 15. MAY USE COMBINATION SEPTIC TANKS AND RECIRCULATION TANKS RATHER THAN SEPARATE IF NECESSARY OR DESIRED BY OWNER. 15. IN AREAS WITH LOW ALKALINITY WATER, INSTALL ±55 LBS. OF MARBLE ROCK (1 "-3" DIAMETER) IN 24"x24" MESH BAGS. USE 1 BAG PER E-Z TREAT POD. PLACE MARBLE ABOVE "BEAD" PILLOWS. O aL H O p W p m W F } N Q Z Z X F Z 7 y_ W U O OJm 0 w of Z Z Ir1 G O Q ir m O 2 ul Z O fU Ma O N � O > N f� m00 F- m O a Q� iy O O o CO M ^ c D W N N Z J � z?a,0°: ! o104 W �X2lai zUmrn 0. ~ O Z pOaw� Z J CO Q J Q < m UV o OW � � H O 0 E Q N 0 N r co 75 (SEE D-105 FOR III TO E-Z CONTINUATION) I TOCAT onn CLEAN - OUT (SEE D-101 FOR CONTINUATION) O FLOW 1" SCH. 40 PVC 30"0 E-Z SET RISER W/COVER (TYP) f3 4" SCH. 40 PVC RECIRC. LINE TO SEPTIC ------------------------------ 12" MIN. LENGTH FLEX PVC 1,000 GALLON RECIRCULATION/PUMP TANK BY DAVID BRANTLEY & SONS 1,000 PT 237 TURBINE PUMP SPIN FILTER FROM E-Z TREAT POD y ti LL 0 W N N O 0 EFFLUENT BYPASS VALVE W/FLOW RESTRICTOR TO 10 GPM II A / 4" X 2" REDUCER UV UNIT II I I 4" X 2" REDUCER L— — — — — — — — — — — — — — — — — — — — — — — — —� TO FIELD DOSING 95" CHAMBER PROPOSED RECIRCULATION TANK D-102 NTS z PRECAST CONCRETE "DONUT" (OPTIONAL) (TYP.) 21=0i! CAST -A -SEAL 402 RUBBER BOOT (TYP.) INVERT 1"-2" BELOW SEPTIC TAIL OUTLET INVERT 4" SCH. 40 PVC DROP TEE (TYP.) 3" 3/4" SCH. 40 PVC RECIRC. LINE 30"0 E-Z SET RISER W/COVER (TYP) 3/4" BALL VALVE 3/4" UNION GROUND EL. t268.3' %N! FLOAT TREE BRACKET 00 SECONDARY TIMER- 42 ABOVE FLOOR L a HIGH WATER ALAR 40" ABOVE FLOOR 00 DOSE ENABLE= 22" ABOVE FLOOR a PUMP OFF= r ro 1-1/2" SCH. 40 PVC FLOAT TREE ALARM LIGHT CONTROL PANEL (LOCATED WITHIN 10-FEET OF TANKS) DIRECT BURY CABLE TO PANEL 1-1/2" PVC CHECK VALVEvey7 -- - - 1-1/2" SCH. 40 PVC + FULL UNION (TYP.) f1 1" SCH. 40 PVC LINE (SEE D-105 FOR TO FILTER POD CONTINUATION) NOTE: UV UNIT NOT SHOWN FOR CLARITY. SEE DETAIL 2, D-107 I I EFFLUENT BYPASS VALVE BY E-Z TREAT SEEIEVALVE SECTION BYPASS VALVE SECTION A, D-104 3/16" ANTI -SIPHON \ HOLE (TYP) MERCURY FLOAT 3" SWITCHES (4) 3" PVC STAND ^A 11 f +, m w F to J } J JJ n H Z aZ w ~ z J 0 OJ! OF w O J Z Z z 'n 0 O Q = W O Z O fU Ma O N O 0 , N f� m a00 W m o a o� iy O O 0 w M N N Z J T zz�,�� 3o-QX w it X U Q LL zUm, d � O Z 04 pOaw� Q Z J co UV o OW H W� O 0 c E Q N O N r T m 75 00 W EXISTING FIELD DOSING TANK PLAN NTS f0� (SEE D-102 FOR CONTINUATION) 6" j uo TYP PUMP SETTING n (SEE ORIGINAL PERMIT) 1-1/2" SCH. 40 PVC FULL UNION FLOAT TREE BRACKET I 3/16"ANTI-SIPHON HOLE (TYP.) HIGH ALARM t ABOVE FLOOR SECONDARY TIMER t ABOVE FLOOR DOSE ENABLE t ABOVE FLOOR ° PUMP OFF t ABOVE FLOOR MERCURY FLOAT SWITCHES (4) 6" � 1-1/2" SCH. 40 MIN PVC FLOAT TREE PUMP SHALL BE AS ORIGINALLY PERMITTED. '-- 3" PVC STAND FLOATS SHALL BE AS ORIGINALLY DESIGNED, SEE EXISTING PERMIT. EXISTING FIELD DOSING TANK SECTION NTS 1-1/2" PVC CHECK VALVE DIRECT BURY CABLE TO PANEL 1-1/2" SCH. 40 PVC TO HYDRAULIC UNIT (SEE D-108 FOR CONTINUATION) PRECAST CONCRETE "DONUT" (OPTIONAL) 4" 45' BEND NOTE - PIPING TO BE 4" SCH. 40 PVC 2 GRAVITY CLEANOUT D-103 NTS Jti M aL �O o W M 0 m W F J } J m N Q z U �z z F z Zy, W O J U Q OJ! Ow F wS CDJ z z z 'n G O Q Q = w O z O fU �� O CM O C7j N f- m a0 W m o a co o� yy O O M n Lu N T cl) N Z J T Zz rn �O—QX W X U Q L)mLL F- itrn a~OZ04 DOaWm Q Z J co U U it o it OW � � H W� :o•� r _ SFAS- 17069 : 'S' •' F!VGit�� zz • � s MAG % E Q N O N r m 75 EFFLUENT BYPASS VALVE BY E-Z TREAT ' 4" 90' BEND N07E L--_- 1. SEE SITE PLAN FOR ORIENTATION. 4" FROM FILTER POD 4" SCH. 40 PVC FLOW CONTROL CROSS (TYP.) WEIR 4" TO ULTRAVIOLET WATER LEVEL PLATE DISINFECTION UNIT 4" SCH. 40 PVC (FIELD ADJUST TO SHUT (IF APPLICABLE) OR DRIP FIELD RETURN LINE OFF RETURN FLOW TO FIELD DOSING TANK SITE PLAN FOR PIPE SIZI FLOAT BALL RECIRCULATION TANK AT 6" BELOW SECONDARY TIMER ELEVATION) e' \\` ,x REDUCER OGy� 4" x 1-1/2" CLEAN REDUCER OUT in z ��o �.. .. ol� z 4" PVC z TO SEPTIC MIN. TANK ALL TANKS REQUIRE A 6" PVC END CAP PVC 4" PVC THICK STONE BASE (TYP.) W YE TEE EFFLUENT BYPASS VALVE SECTION FIELD RETURN LINE DETAIL A 1 D-104 NTS D-104 NTS 1-1 /2"x 1-1 /2"x3/4" PVC REDUCING TEE 3/4" SCH. 40 PVC RECIRC LINE mp 30"0 RISER W/COVER SEE GEN. NOTES 1-1/2- ELBOW (TYP.) 1-1/2" SCH. 40 PVC FULL UNION (TYP.) 1-1/2"" PVC CHECK 3/4" PVC VALVE GATE VALVE 3/4" 1-1/2" SCH. 40 PVC LINE TO FROM UNION FILTER POD (TREATMENT POD) PUMP 3/4" 90• ELBOW RECIRCULATION TEE SECTION Di / NTS lilt ■ rF Jti aL �o 0 LU 0 W F } cn N Q Z �z X F Z 7 y- W O _ U OJ m OF ul of Z Z o? O 2 W Z O U O N O C7j N f.- m ago F- m 3 a o� iy O O L M n W � N � N Z J Z Z rn = �O-aX W X U Q LL - 0) d ~ z DOaW� Q z J Q < 9 UU o Ow W� O 0 U v E Q N O N r cz 2 2" X 6" BOARD WITH ALUMINUM BRACKETS ATTACHED TO POD WITH 7'-3-1/2" (TYP.) S.S. SCREWS TO ASSIST WITH fA SOIL STABILIZATION (TYP. OF 4) Q LL Q HO p W W) 4" CPP (SEE SITE PLAN FOR 0 o OUTLET) 0 3/4" CAP o 0 o W F J cn cn a o TO OUTLET Lu F- z o o a U LU az w SPRAY NOZZLE o U Lu � F z c-ni M O yOJ o (TYP.) o z W U O o Q wS J! 0 W o J Z z 0 o z 'n p 0 Q 0 o q Q ir = w O o PRESSURE GAUGE 1" BALL VALVE o D-105 z 0 o O U o o O N O o �� "> D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 4" SCH. 40 PVC m 00 0 a F-rn 90' ELBOW (TYP.) m p 1„ 4" iy C, O O � � � M F- N T cl) N Z J zKmRa% �O�VX E-Z TREAT TREATMENT UNIT PLAN S a o= LL 1 z U m rn D-105 NTS 0. 0 z � TOP OF POD 3' ALL AROUND W 0 d LLI o z J CO SELECT BACKFILL J U} E-Z TREAT POD FILTER SYSTEM FREE OF DEBRIS Q O � FINISHED o O W 1 1"0 SUPPLY GRADE 3,• F- LINE Of CC 1 ^ � 1 12 4"0 RETURN LIL MIN. �--� aC 4" CPP PERFORATED'*11-6- THICK #57 STONE �•' � / � TUBING (SLOTTED) BEDDING (NP.) AROUND POD (TYP.) SEE SHEET C-102 V FOR INVERT OUT (� ` E-Z TREAT TREATMENT UNIT SECTION = 70 q D-105 NTS '; �s �'•. �:• •. ��' ,, 5 MPG ,• ` az 0 ITWO #4 NOTESe 1. PROVIDE TANK BALLAST ON SITES WHERE SEASONAL HIGH GROUNDWATER IS WITHIN 6" OR ABOVE THE BOTTOM OF THE TANKS. 2. CABLES SHALL BE 3/16" STAINLESS STEEL, LENGTH VARIES PER TANK. 3. CONNECT CABLE TO REBAR EMBEDDED IN BALLAST WITH TWO (2) STAINLESS STEEL CLAMPS PER CONNECTION. 4. TIGHTEN MINIMUM 2 CABLES PER TANK. 5. EACH CABLE SHALL BE A MINIMUM OF 2' FROM END OF TANK. 6. REBAR SHALL BE NO. 4. 7. BALLAST MAY BE PRECAST OR POURED IN PLACE USING PLYWOOD FORMS. 8. TOTAL SEPTIC TANK BALLAST SHALL BE A MINIMUM OF TWO (2) CUBIC YARDS. 9. TOTAL RECIRCULATION/FIELD DOSING TANK BALLAST SHALL BE A MINIMUM OF TWO (2) CUBIC YARDS. 10. CONCRETE SHALL BE A MINIMUM OF 3,000 PSI. 11. CONTRACTOR MAY USE CONCRETE WHEEL STOPS WITH MINIMUM CONCRETE MASS PROVIDED WITH APPROVAL OF ENGINEER. 12. SEE BUOYANCY CALCULATIONS IN APPLICATION PACKAGE FOR BALLAST DIMENSIONS. NOTE 1 NOTE 2 I 5 TANK BALLAST DETAIL (OPTIONAL' NTS NOTES: co 1. ULTRAVIOLET LIGHT PURIFIER J ~ o UV-102 BY E-Z TREAT. < 0 100% 4" WELL CAP LU 2. PROVIDE DUAL GFI RECEPTACLE BACKUP DISCONNECT FOR UNIT AND HEAT TAPE. FIELD PRI RY LAMP LAMP UNION (TYP.) ROUTE 2-#12,1-#12G, IN 3/4" PVC CONDUIT TO 120 VOLT 4" 2" 2" 4" SINGLE PHASE 20 AMP BREAKER AT HOUSE. 11101 w H co 3. ORIENTATION PER SITE J v y REQUIREMENTS. 4" x 2" 17 4' x 2 w ti z REDUCER m N a 4. INSTALL 1/2" BALL VALVE FOR REDUCER 1/2" BALL <z M z SAMPLING DOWNSTREAM OF U.V. VALVE w LL Oo UNIT.J_ Q _Jm 0 W f CONTROL 06 oLu z z 5. MAY LOCATE IN RECIRCULATION TOP VIEW WITH ALARM z o a TANK IF ACCESS PROVIDED. J ? V o a x w z O U 2x2x1 2 �a o REDUCING TEE cn_ C N > 04 co W� m oa o� i /2 c to Ln Lu n m W N 1/2" BALL \•' co 04 z 4" x 2" ii//\//\//\//\//� / \/�/.\/�\�\\� �/, VALVE REDUCER M /i�%�%�. 4 x 2' z z rn z a, 30" DIA. = DISCONNECT REDUCER g JO 04 v X E-Z SET UNION (TYP.) z v m `1 RISER - HEAT PAD °' PRIMARY = 04 100% om co a I z La LAMP G---+--- BACKUP a z a v L) J JKLAMP O Va Via: R + CD CD 0 H G NON -CORROSIVE WASHED #57 � l REFLECTIVE AND STONE V PROTECTIVE SLEEVE SECTION VIEW W N C� 2 ULTRAVIOLET DISINFECTION UNIT 04'► Q o D-106 NTS 170 9 51�1 E Q N 0 N r Cz 75 Branch Circuit Protectlon Device/Disconnect Means Field Provided - PUMP size per manufacturing specifications for pump/motor Incoming Power 120/230 VAC, 50/60HZ PUMP LOAD G L1 L2/N 120/230 VAC, 0-16 AMPS, 50/60 HZ I I I PUMPS MUST CONTAIN INTEGRAL THERMAL OVERLOAD PROTECTION! GL T2 /T\ L2 Tj 2 n C tG OAM1OUND TO OUND LUG CONTROL Incoming Power 120 VAC, 50/60HZ L1 N I I F1, 12 FUSE MUST BE REPLACED WITH AMP 5mmX20mm TYPE FAST ACTING 250 V MAX. This control panel is for timed dosing applications. When the timer enable float is up, the timer will start timing for the duration of the "Off' time and when complete, the pump will start for the duration of the "On" time. Both Off and On times are adjustable. This pattern repeats until the timer enable float lowers and turns off. The Low float acts as a redundant of and will also activate the alarm. If the level reaches the High float switch, the alarm will activate. TB1 TB2 TB3 TB4 TB5 TB6 Q 44ghpl4 44I FS3 High FS1-LOW FS2- Level Level Timer Enable Float Switch Field Wiring *FS1 - Normally Open, Narrow Angle *FS2 - Normally Open, Wide Angle *FS3 - Normally Open, Narrow Angle --- FIELD WIRING FIELD SUPPLIED ® TERMINAL BLOCK TB Power Wiring = BLK t20VAC Control W nng = RED Neutral = WHT Ground = GRIN TIGXIENING AWC✓OR TORDUEININCX CIRCULAR PWN0.4 MILLS- SCREW EXhRNAL LEGEND CR CONTROL RELAY CB CIRCUIT BREAID:R GL GROUND LUG SWl IqA SNRiQI SW2 TEsr/SIIENCES ONI R AI.WA BEACON B AUNM a=ER 141 MAGNETIC CONTACTOR GI PUMP RUN INDICATOR GL I GROUND LIIG Off Hrs On t= 0 6 8 Off 1 12 Scale Min ® G - Off R- On It To set the timer, use a screwdriver to change timer Scale (0-12 most common). Use a screwdriver to change the "On" time increments (minutes most common). Use a screwdriver to change the "off' time increments (hours most common). Turn the dial with the Red line to the desired "On" time (this example is 2 minutes). Turn the dial with the Green line to the desired "Oft' time (this example is 4 Hours). Notes: 1. WARNING! Electrical Shock Hazardl Disconnect power before servicing this product. A qualified service person must install and service this product according to applicable electrical and plumbing codes. 2. Install in accordance with National Electric Code, NFPA 70, Seal all boxes, fittings and conduit with appropriate seal devices to prevent moisture and gases from entering enclosure. 3. Connect all grounds to a good ground. 4. Dashed lines represent field wiring - Use minimum 60 deg C Copper Wire 5. Branch Circuit Protection Device/Disconnect Means Field Provided. Terminal Connections CONTROL PUMP Incoming Power Incoming Power 120 VAC, 50/60HZ 120/230 VAC, 50/60HZ L1 N L1 L2M T TT rrj���j L�J `WJ I I RP T IPI� "al F53 - High FS1 - Low FS2- Level Level Timer Enable Float Switch Field Wiring *FSl - Normally Open, Narrow Angle *FS2 - Normally Open, Wide Angle *FS3 - Normally Open, Narrow Angle E-Z TREAT SIMPLEX CONTROL PANEL PUMP Connection NOTES: 1. SEE SHEET C-101 & D-101 FOR ALL GENERAL NOTES. 2. PROVIDE JUMPER WIRE OR EQUAL METHOD TO DISABLE RAIN SENSOR TERMINALS ON SUBSURFACE INSTALLATION. 3. PANEL SHALL HAVE PROVISIONS FOR SECONDARY TIMER/HIGH WATER ALARM, DOSE (TIMER) ENABLE, AND LOW WATER ALARM (REDUNDANT OFF). 4. PANEL BY ALDERON, OR EQUAL. 5. PANEL TO BE SUPPLIED BY E-Z TREAT. 6. CONTRACTOR MAY USE COMBINED E-Z TREAT / FIELD DOSING PANEL WITH LIKE FUNCTIONS. U) J I- LL �o LU o U) r` n } N QV �Z H to in J J O2 CDW � J G Ir 2 M W F } N Q W I— W O Z 0 N IX W Z O fU O N r O 0j /fir 00 04 ej f� W F— r m O a Q� Cl) CD CD CD � M h CIDD W N N Z J � Zz0)M �O�aX W X U Q L) LL KED d ~ O z ULI IX 04 aZ � ID Q J Q Cl) L) CD Ow W) 2H i` u DWR Division of Water Resources Permit No. WQ00 29792 State of North Carolina Department of Environmental Quality Division of Water Resources SINGLE-FAMILY RESIDENCE WASTEWATER IRRIGATION SYSTEM OPERATION AND MAINTENANCE AGREEMENT FORM: SFRWWIS-O&M 09-18 County: Orange Permittee: J. Alan and Anne L Campbell (i.e., all deeded property owners) The Permittee agrees to operate and maintain the single-family residence wastewater treatment and irrigation system as follows: 1. Inspect the septic tank annually, and pump out solids as needed. 2. Inspect and clean the septic tank effluent filter annually. (if applicable) 3. Inspect the tablet chlorinator weekly. Add wastewater grade chlorine tablets (e.g., calcium hypochlorite) as needed. Swimming pool grade chlorine tablets are not acceptable. (if applicable) 4. Inspect the ultraviolet disinfection unit weekly. Clean or replace the lamps and quartz sleeves as needed. (if applicable) 5. Inspect all storage tanks, pumps, and alarms monthly. Remove the floating scum layer in all pump/storage tanks when pumping the septic tank solids out. 6. Inspect the spray irrigation system monthly to verify: proper operation of the spray heads; that there are no leaks; that vegetative growth does not obstruct the spray heads; that the irrigated wastewater is not ponding in or running off the designated irrigation area; and that there are no objectionable odors. (if applicable) 7. Inspect the drip irrigation system monthly to verify: proper operation of the drip lines; that there are no leaks; that vegetative growth does not obstruct the drip emitters; that the irrigated wastewater is not ponding in or running off the designated irrigation area; and that there are no objectionable odors. (if applicable) 8. Maintain a set of Division -approved engineering plans and specifications. 9. Pay the required annual fee. 10. Request renewal of this permit on Division -approved forms no later than 180 days prior to expiration. 11. Sign and provide a Change of Ownership application to any future owner of the single-family residence wastewater treatment and irrigation system for their completion and submission to the Division of Water Resources. We understand thNabove requirements and Signature: Signature: Signature: Signature: to these terms as part of the issued permit. Date: sln_ Date: E / n ' l Date: Date: All deeded Property owners shall sign this Operation and Maintenance Agreement