HomeMy WebLinkAboutNCC213005_ESC Approval Submitted_20210521ROY COOPER
Governor
DIONNE. DELLI-GATTI
Secretary
BRIAN WRENN
Director
Timespan, Inc.
ATTN: Ezra Menasche
159 Yelton Street
Spindale, NC 28160
NORTH CAROLINA
Environmentat Quality
May 6, 2021 ,
LETTER OF APPROVAL
RE: Project Name: Sparks Crossing - Phase 3
Acres Approved: 7.22
Project ID: RUTHE-2021-018
County. Rutherford
City: Spindale
Address: Grand Central Street
River Basin: Broad
Stream Classification: C
Submitted By: Mr. David Odom, P.E.
Date Originally Received by LQS: March 23, 2021
Date Revision Received by LQS: April 30, 2021
Plan Type: Residential
Dear Ezra Menasche,
This office has reviewed the subject revised erosion and sedimentation control plan.
We find the plan to be acceptable and hereby issue this Letter of Approval. This plan
shall expire three (3) years following the date of approval, if no Iand disturbing
activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and
submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage
(COC) under the NCG010000 Construction General Permit. After the form is reviewed
and found to be complete, you will receive a link with payment instructions for the
$100 annual permit fee. After the fee is received, you will receive the COC via email.
You MUST obtain the COC prior to commencement of any land disturbing activity.
The eNOI form maybe accessed atdeq.nc.gov/NCGOI. Please direct questions about
the eNOI form to Annette Lucas at Annette.lucas@ncdenE.gov or Paul Clark at
Paul. clark@ncdenr.gov. If the owner/operator of this project changes in the future,
the new responsible party is required to apply for his/her own COC.
North Carolina Department of Environmental Quality j Division of Energy, Mineral and Land Resources
E Q'§` Asheville Regional Office 1 2090 US. Highway 70 ! Swannanoa, North Carolina 28778
auNa a
eror+n+can
4epa tmentof Env¢onmenhl Quality 828.296.4500
Timespan, Inc.
ATTN: Ezra Menasche
May 6, 2021
Page 2 of 2
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the -job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1 (a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If,
following the commencement of this project, it is determined that the erosion and
sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-
51 through 66), this office may require revisions to the plan and implementation of
the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with
Federal and State water quality laws, regulations, and rules. In addition, local city or
county ordinances or rules may also apply to this land -disturbing activity. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information
provided in the Financial Responsibility Form, which you provided. You are
requested to file an amended form if there is any change in the information included
on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincer_al, �
Mi ael Smit
Assistant Regional Engineer
Division of Energy, Mineral, and land Resources
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCG01 Fact Sheet
ec: Mr. David Odom, P.E. davidodom@odomengineering.com
cc: Regional Office file