Loading...
HomeMy WebLinkAbout20121146 Ver 1_Paper Copy_20130312CWS CarailmWeiland Services March 8, 2013 550 E WESTINGHOUSE BLVD. CHARLOTTE, NC 28273 704 - 527 -1177 (v) 704 - 527 -1133 (fax) Ms. Karen Higgins NCDWQ — Wetlands and Storm Water Branch 512 N Salisbury St 9th Floor Archdale Building Raleigh NC 27603 Subject: Response to Request for Additional Information Parkwood Storm Drainage Improvement Project Charlotte, North Carolina Carolina Wetland Services Project No. 2011 -2877 USACE Action ID. No. SAW- 2012 -01562 DWQ #: 12 -1146 Dear Ms. Higgins: Thank you for your letter dated February 22, 2013 requesting additional information regarding the Parkwood Storm Drainage Improvement Project (SDIP). A copy of your letter is attached for your reference. Your questions /requests have been addressed in the same the order they were presented in your letter. 1. Provide documentation from an appropriate mitigation bank indicating willingness to accept your request to purchase 195 linear feet of stream credits. Charlotte Mecklenburg Storm Water Services will utilize 195 stream mitigation credits from the City of Charlotte Umbrella Stream and Wetland Mitigation Bank ( "Umbrella Bank "). A letter of acceptance from the Umbrella Bank is attached. 2. Provide a monitoring plan for the stream enhancement and stream relocation portions of the project. A monitoring plan has been prepared for the enhanced and relocated stream reaches. Monitoring shall consist of Level II Monitoring as required by the USACE and NCDWQ Stream Mitigation Guidelines for North Carolina. A copy of the Stream Enhancement Monitoring Plan is attached. 3. Provide a schedule for the work including measures that will be taken to ensure that all work in or adjacent to stream waters is conducted so that the flowing stream does not come in contact with the disturbed area. All channel work shall be conducted in the dry. Coffer dams and rock check dams shall be used to create a pump around so as to prevent flowing water from contacting work areas. An erosion control plan is included in the plan set for the project. Sheet EC -3 of the erosion control plan gives details of the proposed pump around. Copies of the erosion control plan sheets are attached. _ NORTH CAROLINA - SOUTH CAROLINA WWW.CWS- INC.NET