HomeMy WebLinkAbout20121146 Ver 1_Paper Copy_20130312CWS
CarailmWeiland Services
March 8, 2013
550 E WESTINGHOUSE BLVD.
CHARLOTTE, NC 28273
704 - 527 -1177 (v)
704 - 527 -1133 (fax)
Ms. Karen Higgins
NCDWQ — Wetlands and Storm Water Branch
512 N Salisbury St
9th Floor Archdale Building
Raleigh NC 27603
Subject: Response to Request for Additional Information
Parkwood Storm Drainage Improvement Project
Charlotte, North Carolina
Carolina Wetland Services Project No. 2011 -2877
USACE Action ID. No. SAW- 2012 -01562
DWQ #: 12 -1146
Dear Ms. Higgins:
Thank you for your letter dated February 22, 2013 requesting additional information regarding the
Parkwood Storm Drainage Improvement Project (SDIP). A copy of your letter is attached for your
reference. Your questions /requests have been addressed in the same the order they were presented in
your letter.
1. Provide documentation from an appropriate mitigation bank indicating willingness to
accept your request to purchase 195 linear feet of stream credits.
Charlotte Mecklenburg Storm Water Services will utilize 195 stream mitigation credits from
the City of Charlotte Umbrella Stream and Wetland Mitigation Bank ( "Umbrella Bank "). A
letter of acceptance from the Umbrella Bank is attached.
2. Provide a monitoring plan for the stream enhancement and stream relocation portions of
the project.
A monitoring plan has been prepared for the enhanced and relocated stream reaches.
Monitoring shall consist of Level II Monitoring as required by the USACE and NCDWQ
Stream Mitigation Guidelines for North Carolina. A copy of the Stream Enhancement
Monitoring Plan is attached.
3.
Provide a schedule for the work including measures that will be taken to ensure that all
work in or adjacent to stream waters is conducted so that the flowing stream does not
come in contact with the disturbed area.
All channel work shall be conducted in the dry. Coffer dams and rock check dams shall be
used to create a pump around so as to prevent flowing water from contacting work areas. An
erosion control plan is included in the plan set for the project. Sheet EC -3 of the erosion
control plan gives details of the proposed pump around. Copies of the erosion control plan
sheets are attached. _
NORTH CAROLINA - SOUTH CAROLINA
WWW.CWS- INC.NET