Loading...
HomeMy WebLinkAbout20130241 Ver 1_401 Application_20130313i March 5, 2013 Ms. Karen Higgins NCDENR - DWQ - Webscape Unit 512 N. Salisbury Street Raleigh, NC 27604 RE: Coachman's HOA Site Improvements Raleigh, North Carolina Dear Ms. Higgins: 20 130 24 1 U9D0@U9@d_ ENGINEERING 9@_ �on� MAR 1 1 2013 The intent of this transmittal letter is to help outline applicable details regarding the submittal of a PCN for Buffer Authorization for the site improvement plans for the Coachman's HOA Site located at 16211 Trottenham Street in Raleigh, NC. The site in question is an existing recreation site containing dilapidated tennis courts, two benches, and a gravel parking area. The general intent of the site improvements is to bring the site into a much more functional and attractive state of use by removing the tennis courts and adding a shade structure and eventually a kayak launch. A repositioning of the parking area and addition of a path will also help make the site more user - friendly. In addition, the removal of the courts and repositioning of the parking will greatly reduce the environmental impact on the site by reducing the amount of existing impervious surface from about 0.41 ac to 0.18 ac., some of which exists in the buffer. Once the courts are removed, the intent is to lay sod on the site to create a well vegetated lawn area. In order to improve the existing condition of the slope (some of which is within the existing buffer) the HOA would like to re- vegetate the entire area. The buffer impacts outlined in the attached Plans and Impact Map are the net difference in the existing buffer impacts and those proposed with this project. The temporary impacts are those associated with the removal of the existing courts and re- vegetating of the area, which are exempt uses per the Table of Uses found in 15A NCAC 02B .0233. The permanent impacts are those that would be associated with the installation of a hard - surface path leading to a floating kayak launch structure, which are allowable without mitigation per the Table of Uses found in 15A NCAC 02B .0233. The HOA most likely will not install the path and kayak launch immediately due to funding, but would like to get the impacts permitted now (along with the other site work) so that they are ready to go if and when they decide to install the path and kayak launch. I spoke with James Lastinger at the USACE and he mentioned that due to the nature of the type of kayak launch being used (the floating sections simply slip over 2.25 inch steel poles stuck in the ground) that the USACE did not have a need for any permitting. I have P.O. Box 37781 MIA GUM VV O l�0 O Raleigh, NC 27627 919.576.9733 ENGINEERING Page I 1 also had correspondence with Ms. Amy Chapman and Mr. Shelton Sullivan, both of NC DENR - DWQ to gain assistance in preparing the attached PCN for Buffer Authorization. I appreciate your time and look forward to gaining approval of this PCN. If you have any questions or require additional information, please contact me directly at 919.244.0494 or IovelaceQunderfootenaineering.com. Respectfully submitted: Landon Lovelace, PE, LEED AP -ND, NCLID Principal P.O. Box 37781 Raleigh, NC 27627 919.576.9733 ENGINEERING t1 Page 1 2 Version 1.4 January 9, 2009 401 OversightlExpress Permitting PCN Submittal Checklist ® The application fee (Checks may be made out to "N.C. Division of Water Quality" NA - $240.00 for 401 Water Quality Certification with minor impacts $570.00 for 401 Water Quality Certification with major impacts Express Review Fee (Amount requested on Acceptance Letter) © Fi vJ5)-complete and collated copies of the PCN Application and supporting documentation (instead of providing 5 copies of the full size plans you may provide two copies of full size plans along with three copies of 11 X 17 plans) © Stormwater Management Plan (if applicable — see PCN Form Help File Section E) P A 1) Please provide three (3) copies of the stormwater management plans along with all supporting information pertaining to this project including the following: a. Entire site development/layout plans delineating all drainage areas; b. Design calculation sheets for all proposed BMP(s) sized for both on -site and off -site drainage; c. BMP supplements for each proposed BMP and Required Items Check List (hftp: / /h2o.enr.state.nc.us /su /bmp forms.htm) along with all required items; d. A Notarized Operation & Maintenance Agreement for each stormwater management facility; e. Detailed construction drawing sheets shall include (i) Erosion and sediment control plans; (ii) Installation and planting schedules for the proposed BMPs; (iii) Appropriately scaled plan views and cross sectional details of all BMPs and associated components — inlet and outlet structures, forebay, respective zones and pertinent elevations. M If your project is located within a State implemented Riparian Buffer Rule Area, submit the pa following along with site plans and PCN form: 1) Three (3) copies of the details for on -site diffuse flow provisions, (refer to hftp://h2o.enr.state.nc.us/su/bmpjorms.htm). © DWQ Stream Determination Forms for streams on property and DWQ determination M� letter for wetlands or streams (if applicable). The following is the most critical of all the information that you must provide. The quality and detail of the information will often determine the expeditiousness of the review. The following is a checklist of the types of pertinent information required at a minimum: Maps and Plans: (� The most recent version of the 1:24,000 USGS Topographic Map - Please cleanly draw or delineate the site boundaries on the topographic map. ® The most recent version of the bound and published County NRCS Soil Survey Map - (required for projects within the Neuse River Basin, Tar - Pamlico River Basin, Randleman Lake Watershed and the Catawba River Basin, also recommended for all projects) - Please clearly delineate the site boundaries, etc. on the map. If the delineation obscures any of the features, it is recommended that a clean copy be provided. Copies of the Version 1.4 January 9, 2009 current soil survey and /or soil survey map sheets can be obtained from the local NRCS County Office (http: / /www.nc.nres.usda.gov /). GIS soil layers are not acceptable. ® Vicinity map - Please clearly mark the location and approximate boundaries of the property and project on the map. Please indicate north arrow and scale. Please include applicable road names or State Road numbers. j The Site Plan - The most critical map to be provided is the site plan. You must provide full sized plans. The following is the minimum list of plans that are typically needed. R3 Pre - construction /Pre- existing conditions - This sheet (or sheets) must include: • All jurisdictional and non jurisdictional wetland, stream, water features, State regulated buffers (delineated into Zones 1 and 2) • Topographic contours with elevations • Any existing structures and impervious areas • Existing utility lines and easements • Existing roads, culverts, and other pertinent features • North arrow and the scale (1 °:50' scale is recommended). [y� Proposed conditions - This sheet (or sheets) must include: • All jurisdictional and non jurisdictional wetland, stream, water features, State regulated buffers (delineated into Zones 1 and 2) • Lot layout (if a subdivision or commercial development is proposed) - lots must be developable without further impacts to jurisdictional and non - jurisdictional wetlands streams, water features. and State regulated buffers Building envelopes must be provided when streams, wetlands, riparian buffers, or water features exist on a lot • All built -out structures and impervious cover • Final grading contours with elevations • All utilities and easements (including septic fields on all lots within 100 feet of stream, wetland, or water features - if applicable) • Impacted areas — these should correspond with the Impact numbers listed on your PCN form. © Drainage Plans - Final drainage plans must include the following: • Locations and pertinent elevations and sizes of the stormwater collection system and drainage ways • All inlets and outlets must also be shown with pertinent elevations (All outlets to wetlands must be at a non - erosive velocity, generally less than 2 ft/sec during the peak flow from the 10 -vr storm) • Scaled stormwater BMPs must also be indicated as required by DWQ rules and policies • In certain cases (see Section E of PCN form), final stormwater management plans must also be provided (see Stormwater Management Plan Checklist) ® Proposed Impacts - All impacts to jurisdictional and non jurisdictional wetland, stream, water features, and State regulated buffers must be shown and labeled on the site plans at a scale no smaller than 1" = 50'. All excavation, fill, flooding, stabilization, and other impacts that will be conducted in or near jurisdictional and non jurisdictional wetland, stream, water features, and State regulated buffers must be indicated. Please provide cross sectional details showing the provisions for aquatic life passage (burial of culvert 20% for culverts s 48 inches, and 1 -foot for culverts > 48 inches). Version 1.4 January 9, 2009 Wetland Impacts: PIA ❑ Precise grading and final elevation contours must be provided. Existing vegetation and any clearing must be specked. ❑ All subsurface utility lines must indicate the location of anti -seep collars. Construction detail for anti -seep collars must be provided. ❑ Roadway or other crossings of riparian wetlands may require floodway culverts to maintain existing hydrological conditions. ❑ Plans should show that the hydrology of remaining wetlands on the site will be maintained. Stream Impacts: Nig ❑ Stream impacts must be clearly shown on the plans. The centerline as well as the banks of the stream must be surveyed or located by GPS for the portion of the stream to be impacted. ❑ The Inlet and the outlet of all culverts should be aligned with the stream as much as possible. Inlet and outlet elevations and streambed elevations should be indicated. Any inlet or outlet protection must be shown and enumerated on the impact map(s). ❑ For bottomless culverts or other spans, a vertical cross section should be provided that shows the minimum distance from each span to each stream bank, the stream cross section, the height of the span above the stream and the minimum distance from the edge of each footer to each stream bank. Additionally, please provide a signed and sealed geotechnical report of subsurface soils at the proposed bottomless culvert location. The report must comply with the Division of Highways — Guidelines for Drainage Studies and Hydraulic Design, prepared by A. L. Hankins, Jr., State Hydraulics Engineer - 1999. ❑ Multiple culverts or sectioned box culverts typically require the use of sills, off- setting or other means to match the cross section of the existing stream (in order to maintain stream stability and provide aquatic life passage). A vertical cross section of the culverts should be shown overlain with the up and downstream stream cross section including the stream flood -prone area. ❑ Impacts associated with dam construction must indicate and enumerate all fill associated with the dam footprint, spillway and any bank stream bank stabilization. The length of stream impounded must also be indicated and enumerated. 318113 Underfoot Engineering Mail - RE: Coachnrarr's Trail HOA Site (UNCLASSIFIED) VUL 9 O O ENGINEERING RE: Coachman's Trail HOA Site (UNCLASSIFIED) Lasdnger, James C SAW < James .C.Lastinger@usace.army.mil> Fri, Mar 8, 2013 at 2:46 PM To: Landon Lovelace <Ilo %lace @underfootengineedng.com> Classification: UNCLASSIFIED Caveats: NONE Landon, I reviewed the plans, for the floating dock. Per our phone conversation, installation of the dock would not be considered fill and would not require a 404 permit. If you have any other questions feel free to give me a call. James Lastinger Regulatory Specialist Raleigh Regulatory Field Office US Army Corps of Engineers, Wilmington District ADDRESS: 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Tel: (919) 554 -4884, x32 Fax: (919) 562-0421 Regulatory Homepage: http:// www.saw.usace.army.mil/WETLANDS Please help us better serve youl Take our brief online Customer Service Survey. (htto: / /www.saw.usace,army. mil /scripts /rws3.pl ?FORM = regulatory) — Original Message From: Landon Lovelace ( mailto: lowlace @underfootengineering.com] Sent: Friday, March 08, 2013 1:10 PM To: Lastinger, James C SAW Subject: Re: Coachman's Trail HOA Site Good afternoon James. Have you had an opportunity to view the plans and verify the permitting requirements. Sorry to be a bother, I'm just trying to wrap up the PCN submittal and would like to offer clear guidance on the dock. Any info you have is greatly appreciated. Thanks in advence and have a great weekend. Inline image 1 On Wed, Mar 6, 2013 at 1:51 PM, Landon Lovelace <Ilo %lace @underfootengineering.com> wrote: Good afternoon James. Thanks for speaking with me earlier, I appreciate your time. Ke attached a pdf copy of the approved plans and the EZ -Dock literature for your reference. Please verify that there are no permitting requirements (404) as far as the Corps is concerned. rd like to convey that in the PCN for buffer authorization. If you have any trouble with WsJhreil.gwgle oan*nailkakdOrMi= 2&k- -08b 3dWM% 4e%- ptSsew &Flnbmdtti= 130158a4a85efges 1n W13 Underfoot Engineering Mail - RE Coachman's Trail HOA Site (UNCLASSIFIED) the attachments or have any questions, please don't hesitate to call. Thank -you in advance. Inline image 1 Classification: UNCLASSIFIED Caveats: NONE h tmJ/mail.google.cmlrrudi/calul M =2&IF 8,ue Fpt&earcl--inboodth=13d4bsa4a8sa gee w Oa(A %NA7fgpG � r a Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number. 1c. Has the NWP or GP number been verified by the Corps? i ❑ Yes ❑ No 1 d. Type(s)Aof approval sought from the DWQ (check all that apply): NN401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes 14 No For the record only for Corps Permit: ❑ Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes No 1 h, Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes No 2. Project Information 2a. Name of project: C 2b. County: 2c. Nearest municipality / town: R 1 N 2d. Subdivision name: G o 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: L r,r►►M ,�,, S I R .Q 7 L R N9 ng I 4 a 3 b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 1013 CAN iL-T r& S ,-�►� 1..� Y 1%904 P j e.j i- 3 L U F f C- r AZ ,,. 4,. i- r - ri N Z -7 9-11 ^ch 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 110 l 0 17 7 1 3g. Fax no.: N A 3h. Email address: c,.� 5 good @ a b, oc ... •� Page 1 of 10 PCN Form - Version 1.4 January 2009 4. Applicant Information (If different from owner) 4a. Applicant is: [a Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): C'- o s+�•w.•� •� , i 1t v+4 t� 14V A 4d. Street address: 100 4 P L u r" Cr 4e. City, state, zip: , -7 i 4f. Telephone no.: °1 . 0 10 . b,4-1 1 4g. Fax no.: N- w 4h. Email address: tr- ^ 2 5. AgentlConsuttant information (if applicable) 5a. Name: L tow •-) c,... i . Lov ;-t- bj� F� 5b. Business name (if applicable): iv �, , 1N �• - 5c. Street address: VC Y t -S-7-7 g i 5d. City, state, zip: ,mot G o- N(- '1-7%.-1,-7 5e. Telephone no.: `t `i . S '7 t.. `i -7 33 5f. Fax no.: N A 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): I 1709 - 78 - 412,77 1b. Site coordinates (in decimal degrees): I Latitude: 35, G, k Z �, Longitude: •- 7 V • k: ; 7 -f 1 c. Property size: � acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: �; � �, i1 C 2b. Water Quality Classification of nearest receiving water. 2c. River basin: FauS i.a�iL (J�aF rz Nay+ �i+., 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: C of 1�cr►'t I It, s . A-c ( i +f L u x % C c ca+a �.e ► S v►v�n u o ' s+ . i1 � 1 . 3b. List the total estimated acreage of all existing wetlands on the property: N A 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: loo 3d. Explain the purpose of the proposed projectyTc, c�ew.�.� -c 'y' -e, -xts-t1r, -r64- '%'-V cv .w+-> r►,,.�jy -. 5T. 11 Shi IAK � AA-r M,\ l,. r— k i11� ,CkAs'1%C� • \ V� '%'-V �L W�'."d.nfTi 164- COVE � 3e. Describe the oveMll project in detail, includin the type of equipment to be u�8d 'fj 1�. �•� v-1 �•M+ -at ,.,1 b M'Qv -&l JP.., r�1� .� �-, O.ry► 11� b v-F-�C r rc - 5 . "i-c. 4--A !w w t �1 �sr •.w i ,,,' w.., l r v .. F . 1+ S owh a .'�..� -c.�t �1�� �- l ( 5 • k...a o : 4. w 1t1 b e c ..-,e L-A-A w q B LA, C ",+ �y 1 � - J 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ro'ect (including all prior phases) in the st? Yes ❑ No ® Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (f known): Agency /Consultant Company: Other 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes ❑ No ® Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? Yes �) No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams — tributaries Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear fit) S1 - Choose one S2 - Choose one - S3 - Choose one S4 - Choose one S5 - Choose one S6 - Choose one 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indiv, ually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Temporary 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water Impacts 4g. Comments: 6. Pond or Lake Construction If Pond or lake oonstruction oroposed, the complete the chart below. 5a. 5b. 5c. 5d. 5e, Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer impacts (for DWO) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba []Randleman ❑ Other. 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number— Permanent (P) or mitigation _ impact impact Temporary M required? (square (square B1 hh�*•�•- by r Yes feet ) feet B2 - v= \l� Yes& B3 - Yes/No B4 Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 8i. Comments: 1-age 5 of 1 u D. Impact Justification and Mitigation 1. Avoidance and Minimisation 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. -T'6.4. 4r--A 4-b AA,.Q. `u - \ CA--nS — % s ?IX- . C_-A� -6 k: u k-+MC �w..E q ��rA .� % S Inn �n 1 r� I�.a.i 'fv `c.y42.v► kw.PLx14_ . t�+..,..��Ilk t!`e *1 >1h-I �NA•S G:,.,rt-S IVI111WI1VC5 �vInIsu'vl i__.'C.4 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. C�treti 1 ",A —,A N. �vo -1�- i E t . �. s a r-�� w '-k-xx S, 1 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes] No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Pennittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑Yes P No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. 5 i k `,` •� d , ,.•L \�av � d'-vc •F►o...+ c..�\ 1 Gc.w- t�o.,y c: � i �� ® Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2 % 2b. Does this project require a Stormwater Management Plan? ❑ Yes © No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 'iha Pr. �LJ 1v ; c � v . r..� sfi, t,Ke..'. eK� � � �.+Z..► c v..31 rc - vcr }r.'h , j \-. k g ra ss - �,,rc.L+.�} kw• ?;y�.r� -rUi- si{� TL: 1� < N -c s. U A - L� e A t '+i.rx s A O.► 8 a....`t S. «viv. t'1vc.c 2d. if this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? fir. 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? 0 Phase II 3b. Which of the following locally - implemented stormwater management programs ❑"NSW USMP apply (check all that apply): ® Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been O�es ❑ No attached? 4. DWQ Stormwater Program Review OCoastal counties ❑HQW 4a. Which of the following state - implemented stormwater management programs apply ORW (check all that apply): H Session Law 2006 -246 []Other 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes 0 No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State " ❑Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) - ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DVVQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetand Standards, ❑Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. is this an after - the -fad permit application? ❑Yes No 2c. If you answered °yes" to one or both of the above questions, provide an explanation of the violabon(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? [--]Yes ® No 3b. if you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWO policy. if you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 I o. enaangereci species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes 10 No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes Q No 5c. if yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 'v S i'w 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in ❑Yes ®No North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 1kea W c!6 Gl S 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA - designated 100 -year floodplain? ❑ Yes No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? ,nom �` S Jeo ar�.i c ctn1eL Applicant/Agent's Printed Name AV ApplicanUAgent's Signature ( ent's signature is valid only if an authorization letter from the a licant is provided.) Date ate Page 10 of 10 I 1 � EXISW— GRAVEL \ (IMPACT LEGEND] 30' ZONE 1 BUFFER -NRB EXISTING 20' ZONE 2 El BUFFER -NRB EXISTING 1( , PARKING LOT �XLST�N FFENC; 'I•' 111 I h 1 1 '*: III I ` EXISTING III 1 1 1 1 1 1 COURTS TENNIS OU I I 1 �JII11 I1 1 1 � P IIII I 1 X11 I I p 10 I f l - -� - -------------------------------- � W -2499 W IMPACT NEUSE RIVER BUFFER IMPACT ZONE 1 ZONE 2 EXISTING 456 SF 3,047 SF SUBMITTAL: DRAWN BY: CHECKED BY: DATE: IstSUBMITTAL APL LML 2013.02.13 QDUD94M ENGINEERING 'PO BOX 37781 RALEIGH, NC 27627 P:919.576.9733 NORTH 30 15 o .0 Ell ■ EXISTING IMPACTS COACHMAN'S TRAIL HOA SITE CONSTRUCTION PLANS RALEIGH, NC 35" 56'54" 35" 56 14" Soil Map —Wake County, North Carolina Map Scale: 1:6,110 if printed on B size (11" x 17') sheet. N 'D N Meters m A ^ 0 100 200 400 600 Feet 0 400 800 1,600 2,400 USDA Natural Resources W-� Conservation Service Web Soil Survey National Cooperative Soil Survey 3/8/2013 Page 1 of 3 35° 56' Sr 35° 56' 12" Soil Map –Wake County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest (AOI) Very Stony Spot Map Scale: 1:6,110 if printed on B size (11" X 17 ") sheet. Area of Interest (AOI) w Wet Spot The soil our surveys that comprise AOI were y p y mapped at 1:15,840. Soils Other Soil Map Units Warning: Soil Map may not be valid at this scale. Special Line Features Special Point Features Gully Enlargement of maps beyond the scale of mapping can cause Blowout misunderstanding of the detail of mapping and accuracy of soil line Short Steep Slope placement. The maps do not show the small areas of contrasting ® Borrow Pit soils that could have been shown at a more detailed scale. r, r Other }{ Clay Spot Political Features Please rely on the bar scale on each map sheet for accurate map Closed Depression O Cities measurements. Gravel Pit Water Features Source of Map: Natural Resources Conservation Service Gravelly Spot Streams and Canals Web Soil Survey URL: http :ltwebsoilsurvey.nres.usda.gov Coordinate System: UTM Zone 17N NAD83 4,) Landfill Transportation This product is generated from the USDA -NRCS certified data as of +. Lava Flow +++ Rails the version date(s) listed below. , jf, Marsh or swamp Interstate Highways Soil Survey Area: Wake County, North Carolina k Mine or Quarry US Routes Survey Area Data: Version 10, Jul 13, 2012 O Miscellaneous Water Major Roads Date(s) aerial images were photographed: 6/18/2006 q Perennial Water ^ Local Roads The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background Rock Outcrop imagery displayed on these maps. As a result, some minor shifting + Saline Spot of map unit boundaries may be evident. Sandy Spot Severely Eroded Spot 0 Sinkhole Slide or Slip # Sodic Spot _ Spoil Area ? Stony Spot USDA Natural Resources Web Soil Survey 3/8/2013 iii—M Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map -Wake County, North Carolina Map Unit Legend Wake County, North Carolina (NC183) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI AgB2 Appling gravelly sandy loam, 2 to 6 percent slopes, moderately eroded 18.0 4.3% AgC2 Appling gravelly sandy loam, 6 to 10 percent slopes, moderately eroded 3.0 0.7% ApB Appling sandy loam, 2 to 6 percent slopes 41.6 10.0% ApB2 Appling sandy loam, 2 to 6 percent slopes, moderately eroded 34.8 8.4% ApC Appling sandy loam, 6 to 10 percent slopes 13.0 3.1 % ApC2 Appling sandy loam, 6 to 10 percent slopes, moderately eroded 47.6 11.4% ApD Appling sandy loam, 10 to 15 percent slopes 21.1 5.1% CeB2 Cecil sandy loam, 2 to 6 percent slopes, moderately eroded 41.8 10.0% CeC Cecil sandy loam, 6 to 10 percent slopes 4.4 1.1% CeC2 Cecil sandy loam, 6 to 10 percent slopes, moderately eroded 51.8 12.4% CeD Cecil sandy loam, 10 to 15 percent slopes 62.8 15.1% CgB2 Cecil gravelly sandy loam, 2 to 6 percent slopes, moderately eroded 7.9 1.9% CgC2 Cecil gravelly sandy loam, 6 to 10 percent slopes, moderately eroded 12.2 2.9% CmA Chewada sandy loam, 0 to 2 percent slopes, frequently flooded 6.6 1.6% CnA Colfax sandy loam, 0 to 3 percent slopes 0.7 0.2% LoD Louisburg loamy sand, 10 to 15 percent slopes 2.2 0.5% MeA Mantachie sandy loam, 0 to 2 percent slopes, rarely flooded 6.7 1.6% W Water 11.4 2.7% WkE Wake - Wateree complex, 10 to 25 percent slopes, very rocky 0.1 0.0% WmE Wedowee sandy loam, 15 to 25 percent slopes 11.5 2.8% WoA Wehadkee and Bibb soils, 0 to 2 percent slopes, frequently flooded 10.3 2.5% WxE Wilkes cobbly loam, 15 to 25 percent slopes, very stony 0.1 0.0°x6 WyA Worsham sandy loam, 0 to 3 percent slopes 6.5 1.6% Totals for Area of Interest 416.1 100.0% USDA Natural Resources Web Soil Survey 3/8/2013 Conservation Service National Cooperative Soil Survey Page 3 of 3 7S. Environmental Services Tm 919 856 7400 Fax 919 743 4772 Water Quality Division 336 Fayetteville Street • Raleigh, NC 27602 www.wakegovcom STORM-WATER PERMIT Project Name: Coachman's Trail HOA Site SW Permit #: S2978 Owner /Applicant: Name Coachmans Trail Homeowner Address 410 Glenwood Ave Ste 130 Raleig ,NC, 27603 Contact (Name & Phone #) Pete Sullivan 919- 856 -1983 :i 9 -30 Party Responsible for Completion of Improvements The developer is responsible for completing all stormwater improvements in accordance with the requirements of this article and other applicable ordinances and laws. 9 -32 -6 Documents Required Before Plat Approval or Building Permit All maintenance documents required by this article must be submitted to the Subdivision Administrator or Stormwater Engineer before record plat approval, and such documents must be referenced on the record plat, or, in the case of single -lot developments not requiring record plats, documentation must be submitted to the Zoning Administrator or Stormwater Engineer before building permit issuance. Watershed Manager: Kathryn Hobby Cell #: 919 - 369 -4190 Permit issuance date: 02/28/2013 Name EPrinit): Signature: Date: Ze 1:3 . 02. -2,9 Phone and Email: 9/9. 244 0f9f l%ivclaw 'WAKE Environmental COUNT' Services Landon Lovelace Underfoot Engineering RE: Letter of Conditional Approval, February 7, 2013 91985, 7400 919 743 4772 Water Quality Division +so Fayettevfle Streo• Rxe,ch NC 27602 :rti .v .vakegov Corr Project Name: Coachman's Trail HOA site Submitted By: Underfoot Engineering Stormwater Permit #: S -2978 PO Box 37781 Date Received: 12 -21 -12 Raleigh. NC 27627 Date Processing Initiated: 12 -21 -12 Phone #: 919 - 782 -9677 Disturbed Acres: 0.06 Submittal Z Revision Plan Review Fee: $250 PAID 1. Stormwater reement: n/a Plan Permit Fee: $ 250 PENDING 2. Maintenance Plan: (n /a Nitrogen Offset Fee n/a 3. As -built Plans and Certification:(Re uird Prior to C.O.) Watershed: Neuse River Basin. 03020201 14. Annual Inspections Report: (n /a) Dear Mr. Lovelace- The above - referenced stormwater management plan has been reviewed and conditionally approved. As a condition of approval you are required to submit an as-built survey to Wake County prior to final signoff of the Certificate of Occupancy (C.O.) for your building permit, #0131442. It is very important that your contractor, engineer and yourself be aware of these additional provisions to insure that the outstanding stormwater management requirements are submitted, reviewed, approved and installed, such that these conditions are satisfied. See below, for Ordinance specific wording on requirements. This request for Wake County to evaluate a stormwater management plan does not relieve the applicant from their responsibility to meet all applicable State and Federal Laws, including. but not limited to necessary approvals from Federal Emergency Management Area Flood regulations /requirements, Division of Water Quality stormwater or other water quality regulations /requirements. U.S. Army Corps of Engineers Article 404/401 (Wetlands /Streams) jurisdiction/requirements, and/or any Federal, State, County and Local municipal regulations or permit requirements. The approval issued in this letter cannot supersede any other required permit or approval. Thank you for your patience during the review period on this project. If you have any questions about this approval please call me at (919) 856 -7341. Sincerely, Kathryn Hobby Environmental Services Cn rn m + r� tom rrt iF 3> Z °y -0 �n-n�.x. r .k Co 0 o 003%O N rm -'i 4 v --grrn N 4* - �� m ONOT O vt' O CD c:, pCOCo a- 0 0 04 C� LLJ O O O 04 0 N 1� CL Ln z C4 f -, __', . .......... _ ( A #6 s f ,, f S , &/. � ,/, , �,, , j u/ el,"'; i ,,.,,, £ / ' f ::,, { ! t i f if i I j ;` # f' . ' , { ,t { fj '' Jf {fl 1 11 11 f f { f f , {{ { f ;f S F £ { , # { f 1 f/ f f / ff S { f{ f f -° ', f f t I { f h /' , /r, f' i EXISTING 36" RCP r'' INV IN = 363.60 ' f INV OUT = 362.20 , f EXISTING 36" RCP <f INV IN = 359,00 ` s' € INV OUT = 357.97 'I � %� % / �'", - , 'f' ASSUMED LOCATION OF // / I I I I 1 I I 1 l '� "µ : %'r EXISTING DRAINAGE %/ i I j/ FEATURE , •` ; ., I , 4 f' s s o 6' �r'% / . { F '%' z Ig �i; O 5 O z '` p � ,'/ I , °s O � - i 1, j ,j £ Qy 5R 1. a-: ° ® - Q O a - ,�- - s i f 9 O� 2 .,, 1` /2"-, -� M" cx of - f-_ _ 41z O f/4 O _. „_,� Q f ✓/ �� . 91 , m { , r ¢ 3 // f f' `` f s/ '' ' < f �2 `...... Rio /tf , t ' - - - - - S 79 °48'33" E - 100.00' � �" -& r- ------ - - -r -- -� -- .'.._.... -01 , `� I :. # _ ERIE -TBEJ DINE (TYP) ( pJ� '' ` f EXIS4ING WATER VALVE - , Q5 ' �E ,� _ _ I 11 I XISJING PUMP HOUSE :, , ' I ' 1 , j' `:,,. EAS -ING GRAVEL DRIVEWAY / # ,/ .,.,.,.>.._. ............ ��'" I ` 1. i PP c. LOCATION, OF., „., ".., r °�.., �,,.,_ . °_....... ... IXISTING`40' A;CE.SS_' q < -EXIST IN.G. WATERLINF „ Q - / J EASEMENT "° ,.i/ _o° � / ^, i { N i / • r / ,r ,,, w, .. N I { .... i f , I o ,... II ,......�,,.,; I , `` /., �c. ,% 1.. :,a r .<: > <•. 1. a< f.. EXI T N A "'-. S 20' C E G SS /. J. y...., ✓` !. :,1. ,'h /... / / 1: A / -/ rr E SE�ENT _ ./' '/ % r �'i r / a: '- i / . ` 4 r EM STING STEPS A #2 '. '�� EXISTING POND EXISTING GRAVEL TO BE REMOVED AND RE -USED i:. FOR NEW RAVEL PARKING G LOT ON -SITE (TYP OF , , ' °, HATCHED AREA) Sr # // � 11 " .;' ` ~' '::? EXISTING BOLLARD TO BE .f ,.,, /` i i f V �° REM ED TYP F 1. f `% f s�" O O 8 ;' J D"'.,; -. t" / I / EXISTING GRAVEL NF' l ,t . :. . . '. PARKIN N I G LOT ...... I l r,., %., i 19 fi'` . .`' f' ' ,.. . i I /••. °::'; " 11. .: ' f:` ,a !`: f` •.. r / ". ,:. f ..,. a r.., '';;,.. ;. I. N "Z9 48'33" Vi/ - ,, / , / ' / / / . '`/ 100.00' :, /, : / '/ °``' .. :' �" ;/ ? '/'. j %- / ' /' r/ ' /� I/;;,,"_ / /' ,. /. / f' /'' r' s� % _.;>; , , / // / / s l- .1 s �'' /` /'' / / ,.,.///."",/``.,.." '/ / / / . //' t % . / / , i /. / 4 I / /. <' -- . t/ /f / , /,/ . /' ' / , . / , OF //, /, /, / :, / //„ ter, / / , ^/- , . , / / : / /// // , / / /`.' °/'/j I %; // ` ,/° w 9 , '- - + j ,/� , // /.; ! /: /` Ef(�,_ I yaNl$ Tsr / / !' . , / // ,11 ' / / ^ °' // % // /// stJJi � U ?0 ' I /N/ / , / r / ; , . / . '', / // t// / j N / / ,/ / S % ,' ! J / /// ° /L1Nlf N TC BE REM>43 tFD '. , /I j' /' / . "I /,:'.r 11 € s t S /`'' / / �/ /// /i , 11 / /' / / //' ' // , //' /, . , , r; / N N 0 m t P, EXISTING CHAIN LINK FENCE EXISTING BENCH EXISTING PINE TREE EXISTING BENCH I ,,�/ rV .." / '/ /, /t �' /, // / /" / �''...../ I %/'. % EXISTING PINE TREE i. '� / %,,,/ . ,// `/r `/ /;,, j .: i , : ": / /'Jtt. // ,/ F /•, //i / , //,/''.: ' ".!i.'^ /' /// I 11 . r . //' r % / / , / //' ' / / % /', /, / // , •' / i r 1. / /.' / /. I / / i / , / i / / '. / / 1 14 / r % / / i , ., , 11 *1 I / /' / ..... ," - 11 l! U .. -._ - .. " ". ' ,,....�. : 5 ,�" . N / r: i PO BOAC `3ml RALEIGH, NC 27627 P:919.576.9733 COACHMAN'S TRAIL CONSTRUCTION PLANS RALEIGH, NC • • :0 ► I 110ILYATj ► f PROPERY OWNER j I f :• { ZONING I f { { { A #X f: f f s £ ; { , r i f I i A #5 ( { { . N ft R -80W f j EXISTING CONCRETE APRON A #1 IfiO BE REMOVED T P OF ( N1 i � ATCHED AREA) :EXISTING :EXISTING SIGN TO 8E RALEIGH, NC 27614 -9798 TO ACCOMODATE PROPOSED DRIVEWAY WIDENING IJ 1709 -78 -9173 XI ING L TRI ' E ST EEC G L RECREATION LAKE !TRANSFORMERS HOMEOWNERS ASSOC i i EXISTING TREE LIN14 (TYP)`' >•.< EXISTING FIRE HYDRANT A #2 C/O MICHAEL DUNNE V) 218 MILLBROOK ROAD ' `�,, ° I N Q w '•.. { = O R -80W Z N A #3 f O RAELIGH, INC 27614 -9629 W i A #4 I A #4 JONI K & RICKY L BROOKS 11613 TROTTENHAM ST 1709 -68 -9192 : SINGLE FAMILY RESIDENTIAL I , RALEIGH, NC 27614 -8430 , JOHN T & PAMELA B DOWD HEIRS , I I £:.. , f 1 1 /' , /r, f' i EXISTING 36" RCP r'' INV IN = 363.60 ' f INV OUT = 362.20 , f EXISTING 36" RCP <f INV IN = 359,00 ` s' € INV OUT = 357.97 'I � %� % / �'", - , 'f' ASSUMED LOCATION OF // / I I I I 1 I I 1 l '� "µ : %'r EXISTING DRAINAGE %/ i I j/ FEATURE , •` ; ., I , 4 f' s s o 6' �r'% / . { F '%' z Ig �i; O 5 O z '` p � ,'/ I , °s O � - i 1, j ,j £ Qy 5R 1. a-: ° ® - Q O a - ,�- - s i f 9 O� 2 .,, 1` /2"-, -� M" cx of - f-_ _ 41z O f/4 O _. „_,� Q f ✓/ �� . 91 , m { , r ¢ 3 // f f' `` f s/ '' ' < f �2 `...... Rio /tf , t ' - - - - - S 79 °48'33" E - 100.00' � �" -& r- ------ - - -r -- -� -- .'.._.... -01 , `� I :. # _ ERIE -TBEJ DINE (TYP) ( pJ� '' ` f EXIS4ING WATER VALVE - , Q5 ' �E ,� _ _ I 11 I XISJING PUMP HOUSE :, , ' I ' 1 , j' `:,,. EAS -ING GRAVEL DRIVEWAY / # ,/ .,.,.,.>.._. ............ ��'" I ` 1. i PP c. LOCATION, OF., „., ".., r °�.., �,,.,_ . °_....... ... IXISTING`40' A;CE.SS_' q < -EXIST IN.G. WATERLINF „ Q - / J EASEMENT "° ,.i/ _o° � / ^, i { N i / • r / ,r ,,, w, .. N I { .... i f , I o ,... II ,......�,,.,; I , `` /., �c. ,% 1.. :,a r .<: > <•. 1. a< f.. EXI T N A "'-. S 20' C E G SS /. J. y...., ✓` !. :,1. ,'h /... / / 1: A / -/ rr E SE�ENT _ ./' '/ % r �'i r / a: '- i / . ` 4 r EM STING STEPS A #2 '. '�� EXISTING POND EXISTING GRAVEL TO BE REMOVED AND RE -USED i:. FOR NEW RAVEL PARKING G LOT ON -SITE (TYP OF , , ' °, HATCHED AREA) Sr # // � 11 " .;' ` ~' '::? EXISTING BOLLARD TO BE .f ,.,, /` i i f V �° REM ED TYP F 1. f `% f s�" O O 8 ;' J D"'.,; -. t" / I / EXISTING GRAVEL NF' l ,t . :. . . '. PARKIN N I G LOT ...... I l r,., %., i 19 fi'` . .`' f' ' ,.. . i I /••. °::'; " 11. .: ' f:` ,a !`: f` •.. r / ". ,:. f ..,. a r.., '';;,.. ;. I. N "Z9 48'33" Vi/ - ,, / , / ' / / / . '`/ 100.00' :, /, : / '/ °``' .. :' �" ;/ ? '/'. j %- / ' /' r/ ' /� I/;;,,"_ / /' ,. /. / f' /'' r' s� % _.;>; , , / // / / s l- .1 s �'' /` /'' / / ,.,.///."",/``.,.." '/ / / / . //' t % . / / , i /. / 4 I / /. <' -- . t/ /f / , /,/ . /' ' / , . / , OF //, /, /, / :, / //„ ter, / / , ^/- , . , / / : / /// // , / / /`.' °/'/j I %; // ` ,/° w 9 , '- - + j ,/� , // /.; ! /: /` Ef(�,_ I yaNl$ Tsr / / !' . , / // ,11 ' / / ^ °' // % // /// stJJi � U ?0 ' I /N/ / , / r / ; , . / . '', / // t// / j N / / ,/ / S % ,' ! J / /// ° /L1Nlf N TC BE REM>43 tFD '. , /I j' /' / . "I /,:'.r 11 € s t S /`'' / / �/ /// /i , 11 / /' / / //' ' // , //' /, . , , r; / N N 0 m t P, EXISTING CHAIN LINK FENCE EXISTING BENCH EXISTING PINE TREE EXISTING BENCH I ,,�/ rV .." / '/ /, /t �' /, // / /" / �''...../ I %/'. % EXISTING PINE TREE i. '� / %,,,/ . ,// `/r `/ /;,, j .: i , : ": / /'Jtt. // ,/ F /•, //i / , //,/''.: ' ".!i.'^ /' /// I 11 . r . //' r % / / , / //' ' / / % /', /, / // , •' / i r 1. / /.' / /. I / / i / , / i / / '. / / 1 14 / r % / / i , ., , 11 *1 I / /' / ..... ," - 11 l! U .. -._ - .. " ". ' ,,....�. : 5 ,�" . N / r: i PO BOAC `3ml RALEIGH, NC 27627 P:919.576.9733 COACHMAN'S TRAIL CONSTRUCTION PLANS RALEIGH, NC • • :0 ► I 110ILYATj ► LEGEND X EXISTING CONTOUR (MAJOR) " ", ",,,,,,,,,,,,,,,,,,,,'. "' ;:-':< ".,,,,.. EXISTING CONTOUR (MINOR) ........................ .., ................ ............................... EXISTING FENCING 1111-111111111 ..... _­ ..... . : _...... EXISTING UNDERGROUND ELECTRIC _....._......_......_......... °•„ . ...._.-..._ ................. . .. EXISTING WATERLINE EXISTING FIRE HYDRANT EXISTING WATER VALVE GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH APPLICABLE MUNICIPAL, LOCAL, COUNTY, STATE, AND FEDERAL REGULATIONS AND STANDARDS. 2. EXISTING SURVEY AND TOPOGRAPHIC INFORMATION IS BASED ON FIELD SURVEY PROVIDED BY BATEMAN CIVIL SURVEY COMPANY TITLED "TOPOGRAPHIC & BOUNDARY SURVEY FOR COACHMAN'S TRAIL HOME OWNER'S ASSOCIATION ", DATED 2012.05.31. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICT. 3. PER FIRM PANEL 3720170900J, EFFECTIVE DATE MAY 2, 2006, NO FEMA FLOODPLAINS ARE LOCATED ON THIS SITE. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING, COORDINATING, AND PAYMENT FOR ALL NECESSARY LOCATING SERVICES INCLUDING INDEPENDENT LOCATING SERVICES. THE CONTRACTOR SHALL HAVE ALL EXISTING UTILITIES LOCATED AT LEAST 48 HOURS PRIOR TO BEGINNING DEMOLITION, EXCAVATION, OR ANY OTHER FORM OF CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. 5. ALL SUB - SURFACE UTILITIES IDENTIFIED ON THE CONSTRUCTION DOCUMENTS ARE SHOWN IN THEIR APPROXIIVATE LOCATION BASED ON SURVEY INFORMATION GATHERED FROM FIELD INSPECTION AND /OR ANY OTHER APPLICABLE RECORD DRAWINGS WHICH MAY BE AVAILABLE. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ACTUAL IN PLACE SUB- SURFACE UTILITY INFORMATION INCLUDING HORIZONTAL AND VERTICAL LOCATION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. 6. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED BY THE CONTRACTOR DURING CONSTRUCTION SHALL BE RESTORED OR REPLACED TO ORIGINAL CONDITION AND TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE AT THE CONTRACTOR'S EXPENSE. 7. THE CCa`NTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL PERMITS, INSPECTIONS, CERTIFICATIONS, AND OTHER REQUIREMENTS WHICH MUST BE MET UNDER THIS CONTRACT ARE OBTAINED.. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING "AS- BUILT" DRAWINGS TO RECORD THE ACTUAL LOCATION OF ALL PIPING PRIOR TO CONCEALMENT, DRAWINGS SHALL BE PROVIDED TO THE OWNER'S REPRESENTATIVE AT REGULAR INTERVALS THROUGHOUT THE PROJECT FOR RECORD KEEPING. 9. IF DEPARTURES FROM THE PROJECT DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREFOR SHALL BE SUBMITTED TO THE OWNER'S % EPRESENTATIVE FOR REVIEW PRIOR TO CONSTRUCTION. NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE EXPRESS WRITTEN PERMISSION OF THE OWNER'S REPRESENTATIVE. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE RELOCATION OF ANY EXISTING UTILITY INFRASTRUCTURE REQUIRED TO COMPLETE ANY PORTION OF CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE COORDINATION AND COSTS OR ASSOCIATED WORK. 1 1. THE ENGINEER AND /OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND /OR METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. 12. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND DETAILS ASSOCIATED WITH THE UTILITY STRUCTURE'. 1 B 3. ILDIF' U G SETBACKS ARE SHOWN IN A CCORD AN CE WITH APPROVED WAKE COUNTY STANDARDS. REFER TO THE WAKE COUNTY LAND DEVELOPMENT ORDINANCE FOR SETBACK REQUIREMENTS ASSOCIATED WITH PORCHES, DECKS, GARAGES, AND OTHER STRUCTURAL FEATURES. DEMOLITION NOTES 1. REFER TO GENERAL NOTES ON SHEET C -100. 2. ANY MATERIALS REMOVED LS EMO ED AS PART OF DEMOLITION FOR THIS PROJECT SHALL B JCS L E PROPERLY DISPOSED OF OFF -SITE IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL LAWS. 3. ANY MATERIALS REMOVED AS PART OF DEMOLITION FOR THIS PROJECT SHALL BE REMOVED _E COMPLEFELY. THE EXCAVATED AREA SHALL BE BA KFI LLED WITH CLEAN FILL MATERIAL. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF EXISTING TREES AND OTHER VEGETATION , ONLY AS NECESSARY FOR CONSTRUCTION OF THE PROPOSED IMPROVEMENTS. S. 5. WITH ANN CONCRETE SHOWN TO BE REMOVED, THE CONTRACTOR SHALL REMOVE THE CONCRETE TO THE NEAREST JOINT OR SAW CUT TO PROVIDE CLEAN EDGE, 6. WITH ANY ASPHALT SHOWN TO BE REMOVED, THE CONTRACTOR SHALL SAW CUT TO PROVIDE A CLEAN EDGE. 7. ALL UTILJIT IES TO BE REMOVED OR HALL RELOCATED C S BE COORDINATED WITH THE APPROPRIATE UTILITY PROVIDER PRIOR TO CONSTRUCTION. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL NECESSARY MEASURES ARE TAKEN, WHETHER TEMPORARY OR PERMANENT, TO ALLOW FOR PROPER FUNCTIONING OF EXISTING UTILITIES. N SUBMITTAL: DRAWIN BY: CHECKED BY: DATE: SEALED BY: 1 st SUBMITTAL SAD LML 2012.12.18 % %,jj l "' l l j,,,, Per Wake County & Owner Comments APL LML 2012.02.1 ; �O�eoFv_ssip,�. 4 -- ,-; % , <Q� 9� e ly!j . ,° f, �UL/ ° - `.- °e ° o° F 8 Lt1 ,�2 NGINE��'°Q �9:,, . M ,, 11 PROPERY # PROPERY OWNER WAKE COUNTY PIN ZONING CURRENT USE A #X (NOW OR FORMERLY OWNED BY) ROBERTY H & MARY H MCMILLAN 1709 -78 -2566 R -80W SINGLE FAMILY RESIDENTIAL A #1 300 MOSS RUN RALEIGH, NC 27614 -9798 COACHMANS TRAIL 1709 -78 -9173 R -80W RECREATION LAKE HOMEOWNERS ASSOC A #2 C/O MICHAEL DUNNE 218 MILLBROOK ROAD RALEIGH, NC 27609 -4676 PHILIP A & DONNA J KREGOR 1709 -78 -2053 R -80W SINGLE FAMILY RESIDENTIAL A #3 1 1608 TROTTENHAM ST RAELIGH, INC 27614 -9629 A #4 JONI K & RICKY L BROOKS 11613 TROTTENHAM ST 1709 -68 -9192 R -80W SINGLE FAMILY RESIDENTIAL RALEIGH, NC 27614 -8430 JOHN T & PAMELA B DOWD HEIRS 1709 -78 -0316 R -80W SINGLE FAMILY RESIDENTIAL A #5 11617 TROTTENHAM ST RALEIGH, NC 27614 -8430 LEGEND X EXISTING CONTOUR (MAJOR) " ", ",,,,,,,,,,,,,,,,,,,,'. "' ;:-':< ".,,,,.. EXISTING CONTOUR (MINOR) ........................ .., ................ ............................... EXISTING FENCING 1111-111111111 ..... _­ ..... . : _...... EXISTING UNDERGROUND ELECTRIC _....._......_......_......... °•„ . ...._.-..._ ................. . .. EXISTING WATERLINE EXISTING FIRE HYDRANT EXISTING WATER VALVE GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH APPLICABLE MUNICIPAL, LOCAL, COUNTY, STATE, AND FEDERAL REGULATIONS AND STANDARDS. 2. EXISTING SURVEY AND TOPOGRAPHIC INFORMATION IS BASED ON FIELD SURVEY PROVIDED BY BATEMAN CIVIL SURVEY COMPANY TITLED "TOPOGRAPHIC & BOUNDARY SURVEY FOR COACHMAN'S TRAIL HOME OWNER'S ASSOCIATION ", DATED 2012.05.31. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICT. 3. PER FIRM PANEL 3720170900J, EFFECTIVE DATE MAY 2, 2006, NO FEMA FLOODPLAINS ARE LOCATED ON THIS SITE. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING, COORDINATING, AND PAYMENT FOR ALL NECESSARY LOCATING SERVICES INCLUDING INDEPENDENT LOCATING SERVICES. THE CONTRACTOR SHALL HAVE ALL EXISTING UTILITIES LOCATED AT LEAST 48 HOURS PRIOR TO BEGINNING DEMOLITION, EXCAVATION, OR ANY OTHER FORM OF CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. 5. ALL SUB - SURFACE UTILITIES IDENTIFIED ON THE CONSTRUCTION DOCUMENTS ARE SHOWN IN THEIR APPROXIIVATE LOCATION BASED ON SURVEY INFORMATION GATHERED FROM FIELD INSPECTION AND /OR ANY OTHER APPLICABLE RECORD DRAWINGS WHICH MAY BE AVAILABLE. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ACTUAL IN PLACE SUB- SURFACE UTILITY INFORMATION INCLUDING HORIZONTAL AND VERTICAL LOCATION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. 6. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED BY THE CONTRACTOR DURING CONSTRUCTION SHALL BE RESTORED OR REPLACED TO ORIGINAL CONDITION AND TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE AT THE CONTRACTOR'S EXPENSE. 7. THE CCa`NTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL PERMITS, INSPECTIONS, CERTIFICATIONS, AND OTHER REQUIREMENTS WHICH MUST BE MET UNDER THIS CONTRACT ARE OBTAINED.. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING "AS- BUILT" DRAWINGS TO RECORD THE ACTUAL LOCATION OF ALL PIPING PRIOR TO CONCEALMENT, DRAWINGS SHALL BE PROVIDED TO THE OWNER'S REPRESENTATIVE AT REGULAR INTERVALS THROUGHOUT THE PROJECT FOR RECORD KEEPING. 9. IF DEPARTURES FROM THE PROJECT DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREFOR SHALL BE SUBMITTED TO THE OWNER'S % EPRESENTATIVE FOR REVIEW PRIOR TO CONSTRUCTION. NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE EXPRESS WRITTEN PERMISSION OF THE OWNER'S REPRESENTATIVE. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE RELOCATION OF ANY EXISTING UTILITY INFRASTRUCTURE REQUIRED TO COMPLETE ANY PORTION OF CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE COORDINATION AND COSTS OR ASSOCIATED WORK. 1 1. THE ENGINEER AND /OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND /OR METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. 12. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND DETAILS ASSOCIATED WITH THE UTILITY STRUCTURE'. 1 B 3. ILDIF' U G SETBACKS ARE SHOWN IN A CCORD AN CE WITH APPROVED WAKE COUNTY STANDARDS. REFER TO THE WAKE COUNTY LAND DEVELOPMENT ORDINANCE FOR SETBACK REQUIREMENTS ASSOCIATED WITH PORCHES, DECKS, GARAGES, AND OTHER STRUCTURAL FEATURES. DEMOLITION NOTES 1. REFER TO GENERAL NOTES ON SHEET C -100. 2. ANY MATERIALS REMOVED LS EMO ED AS PART OF DEMOLITION FOR THIS PROJECT SHALL B JCS L E PROPERLY DISPOSED OF OFF -SITE IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL LAWS. 3. ANY MATERIALS REMOVED AS PART OF DEMOLITION FOR THIS PROJECT SHALL BE REMOVED _E COMPLEFELY. THE EXCAVATED AREA SHALL BE BA KFI LLED WITH CLEAN FILL MATERIAL. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF EXISTING TREES AND OTHER VEGETATION , ONLY AS NECESSARY FOR CONSTRUCTION OF THE PROPOSED IMPROVEMENTS. S. 5. WITH ANN CONCRETE SHOWN TO BE REMOVED, THE CONTRACTOR SHALL REMOVE THE CONCRETE TO THE NEAREST JOINT OR SAW CUT TO PROVIDE CLEAN EDGE, 6. WITH ANY ASPHALT SHOWN TO BE REMOVED, THE CONTRACTOR SHALL SAW CUT TO PROVIDE A CLEAN EDGE. 7. ALL UTILJIT IES TO BE REMOVED OR HALL RELOCATED C S BE COORDINATED WITH THE APPROPRIATE UTILITY PROVIDER PRIOR TO CONSTRUCTION. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL NECESSARY MEASURES ARE TAKEN, WHETHER TEMPORARY OR PERMANENT, TO ALLOW FOR PROPER FUNCTIONING OF EXISTING UTILITIES. N SUBMITTAL: DRAWIN BY: CHECKED BY: DATE: SEALED BY: 1 st SUBMITTAL SAD LML 2012.12.18 % %,jj l "' l l j,,,, Per Wake County & Owner Comments APL LML 2012.02.1 ; �O�eoFv_ssip,�. 4 -- ,-; % , <Q� 9� e ly!j . ,° f, �UL/ ° - `.- °e ° o° F 8 Lt1 ,�2 NGINE��'°Q �9:,, . M ,, 11 R CL 10 M M (V A." Off Ml s{ . s iS J/ f f f f s fs s' s £' s ff Y f f { S { 4 f { f { t ; I r ff f f £ PROPOSED CONCRETE APRON t t EXISTING ELECTRICAL .. TkANSFORMERS i f EXISTING FIRE HYDRANT ' N N -- UJ ry LL.1 V) C W C LU i Z O i f i i s £ { f 1 i 3 ` r t E I f I 1 1 k N J jibe ' 0 42 3 X Q / ' O� zui O Qo N Ox Q ` . h `b 1 w ��`' % aoo" -- CL Sp /', I £ - i _ S 79 °48'33-' E - 100.00' ASL1hED LOCATION OFI t - EXI T,qG WATERLIN>~ I i _ o(D {APF >'6XIMATE LOCATIOr t ,,, _; "s `I `•,� OF Y,r TER SERVICE TXP .•J I "'s 'i .. I I /..... ...�.. .. �f ,•� ''.':. PRC' ?QSED'"W�T`�R•- 3vIETE�... .. `: ... ..' `� .. o XISTING''' 0' ACC SS�" � i/2 ..f E EASEMENT � - -•--�' oo ��,..,, - ,..� .... ...... .. ...... 'I.....`...... ,. f „ I .., EXISTING POND 1 U >33 > ":' ' if >a ' UUNUR t PAU I-UR i f G s, r: TEMP �A1R�'��RTABLE Old O � I G E TOILET""` I ,I I i FIROPOtED 1 ",WATER ERVICIE �CF R x z 3 O ' 5 P P ED GRAVEL � - RO dS GR 48' a3� 3" 1N 1 .. PROPOSED "NO I . ;ARK( - SURFA(tE r' 1 I N TY F SG PO 2 f } f f EXI TIN R` T O BE ' S GG VEL � A r RE SHAVED AND RE- GRADED PROPOSED GRA TURN URN i f IN A RDAN E WITH ,s. CCFO C > ;�. ; ».; r- �� �.'' `'I ><: <. <II<<: < ; "'::::' >:: "i.,: ND F _R EN Y E • --AROUND OR n G C °"'�'AkR h : .. PRnP(iSF(7 G`;RA171NC. PI AN m ADJAENT LOADING ARFfI .� -, rn •s:•o %:':':f: >: >. „'. I PROPOSED 15'X 1i.:5' n w " " {TYP F HATCHED AREA) OI UTILITY STRUCTURE: (225 SF) I 5 c� I 6 ' . f : € z® + z r' PROPOSED. CONCRETE o : 'z £ +ALKWAY ' I_ cu , PROPOSED 5' WIDiE 30'R R : ' I I e 1 0 r° AP RmXIMATE.LOCATION TRAIL PROPOSED 6 xb' OF RIOPOSED'ELECTRICAL N EXISTING POND 1 U >33 > ":' ' if >a ' UUNUR t PAU I-UR i f G s, r: TEMP �A1R�'��RTABLE Old O � I G E TOILET""` I ,I I i FIROPOtED 1 ",WATER ERVICIE �CF R x z 3 O ' 5 P P ED GRAVEL � - RO dS GR 48' a3� 3" 1N 1 .. PROPOSED "NO I . ;ARK( - SURFA(tE r' 1 I N TY F SG PO 2 f } f f EXI TIN R` T O BE ' S GG VEL � A r RE SHAVED AND RE- GRADED PROPOSED GRA TURN URN i f IN A RDAN E WITH ,s. CCFO C > ;�. ; ».; r- �� �.'' `'I ><: <. <II<<: < ; "'::::' >:: "i.,: ND F _R EN Y E • --AROUND OR n G C °"'�'AkR h : .. PRnP(iSF(7 G`;RA171NC. PI AN W. i PO 130n 7`781 RALEIGH, NC 27627 P:919.576.9733 COACHMAN'S TRAIL HOA SITE CONSTRUCTION PLANS RALEIGH, NC 7f] m ADJAENT LOADING ARFfI .� -, rn •s:•o %:':':f: >: >. „'. I PROPOSED 15'X 1i.:5' n w " " {TYP F HATCHED AREA) OI UTILITY STRUCTURE: (225 SF) I 5 c� I 6 ' € z® + z PROPOSED. CONCRETE o 'z £ +ALKWAY ' PROPOSED 5' WIDiE : ' I HARD- SURFACE WALKING o N AP RmXIMATE.LOCATION TRAIL OF RIOPOSED'ELECTRICAL `.. / SERCE 1 'f 6 j PROPOSED YARD HYDRANT � F r i ' I 6 •. ,I .. BUILNGSETBACK LINE (TYP) i -- - -- - ®-- ®-- - - - - -- ------------------------- t /` \ ,,,,:,, / r i l 1 79 048'33" W 249.00' f q / .N - „ W. i PO 130n 7`781 RALEIGH, NC 27627 P:919.576.9733 COACHMAN'S TRAIL HOA SITE CONSTRUCTION PLANS RALEIGH, NC 7f] PROPOSED GANGWAY PROPOSED FLOATING DOCK SITE LAYOUT AND UTILITY Pl�kij REQUIRED COUNTY NOTES 1. FINAL ZONING AND SITE IMPROVEMENT INSPECTION SHALL BE REQUIRED TO VERIFY SITE PLAN COMPLIANCE BE DONE BEFORE A CERTIFICATE OF COMPLIANCE IS ISSUED BY WAKE COUNTY BUILDING INSPECTIONS. 2. DETERIORATED O R DEAD SCREENING SHALL BE REPAIRED OR REPLACED WITHIN SIX MONTHS. 3. NO PERMANENT CONSTRUCTION CAN OCCUR WITHIN BUFFER YARDS. 4. SEPTIC TANKS, SEPTIC DRAIN LINES ARE PROHIBITED IN REQUIRED BUFFERYARDS, STORMWATER RETENTION AND DETENTION FACILITIES, STORAGE TANKS FOR ANY PURPOSE, UTILITY SUBSTATION, AND BUILDINGS HOUSING UTILITY SUBSTATIONS AND BUILDINGS HOUSING UTILITY COMMODOTIES OR EQUIPMENT ARE ALSO PROHIBITED IN REQUIRED BUFFERYARDS. UTILITY NOTES 1. REFER TO GENERAL NOTES ON SHEET -100. 2. THE WATER SERVICE SHALL BE TYPE K COPPER. 3. THE PROPOSED YARD HYDRANT SHALL BE THE NON - FREEZE TYPE. 4. THE CONTRACTOR IS SPECIFICALLY NOTIFIED THAT THE LOCATION AND /OR ELEVATION OF EXISTING UTILITIES SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD, THE INFORMATION IS APPROXIMATE AND SHOULD NOT BE RELIED ON AS BEING EXACT OR COMPLETE. 5. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS. NOTE: CONTRACTOR MAY UTILIZE EXISTING GRAVEL TO MIX WITH NEW GRAVEL. CONTRACTOR SHALL VERIFY MINIMUM 8" DEPTH. 8" GRAVEL (ABC) COMPACTED SUBGRADE GRAVEL PAVEMENT SECTION N.T.S. 8" CONCRETE (3,000 PSI) COMPACTED SUBGRADE CONCRETE PAVEMENT SECTION N.T.S. ( .f" STRAIGHT CONCRETE CURB EDGING 8 "GRAVEL ABC GRAVEL ( ABC) q a N 0 0 0 •. 'e COMPACTED ��H r 1 I -� SUBGRADE CONCRETE CURB EDGING SECTION N.T.S. SUBMITTAL: 1 st SUBMITTAL Per Wake County & Owner Comments GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH APPLICABLE MUNICIPAL, LOCAL, COUNTY, STATE, Ah41iD FEDERAL REGULATIONS AND STANDARDS. 2. EXISTING SURVEY AND TOPOGRAPHIC INFORMATION IS BASED ON FIELD SURVEY PROVIDED BY BATEMAN CIVIL SURVEY COMPANY TITLED "TOPOGRAPHIC &BOUNDARY SURVEY FOR COACHMAN'S TRAIL HOME OWNER'S ASSOCIATION ", DATED 2012.05.31. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS, 3. A PORTION OF THIS SITE APPEARS TO LIE WITHIN ZONE'X' OF A FEMA FLOODPLAIN AS SHOWN ON FIRM PANEL 3720170900J, EFFECTIVE DATE MAY 2, 2006. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING, COORDINATING, AND PAYMENT FOR ALL NECESSARY LOCATING SERVICES INCLUDING INDEPENDENT LOCATING SERVICES. THE CONTRACTOR SHALL HAVE ALL EXISTING UTILITIES LOCATED AT LEAST 48 HOURS PRIOR TO BEGINNING DEMOLITION, EXCAVATION, OR ANY OTHER FORM OF CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. 5. ALL SUB- SURFACE UTILITIES IDENTIFIED ON THE CONSTRUCTION DOCUMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATION BASED ON SURVEY INFORMATION GATHERED FROM FIELD INSPECTION AND /OR ANY OTHER APPLICABLE RECORD DRAWINGS WHICH MAY BE AVAILABLE. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ACTUAL IN PLACE SUB - SURFACE UTILITY INFORMATION INCLUDING HORIZONTAL AND VERTICAL LOCATION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. 6. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED BY THE CONTRACTOR DURING CONSTRUCTION SHALL BE RESTORED OR REPLACED TO ORIGINAL CONDITION AND TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE AT THE CONTRACTOR'S EXPENSE. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL PERMITS, INSPECTIONS, CERTIFICATIONS, AND OTHER REQUIREMENTS WHICH MUST BE MET UNDER THIS CONTRACT ARE OBTAINED, 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING "AS- BUILT" DRAWINGS TO RECORD THE ACTUAL LOCATION OF ALL PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE PROVIDED TO THE OWNER'S (REPRESENTATIVE AT REGULAR INTERVALS THROUGHOUT THE PROJECT FOR RECORD KEEPING. 9. IF DEPARTURES FROM THE PROJECT DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREFOR SHALL BE SUBMITTED TO THE OWNER'S (REPRESENTATIVE FOR REVIEW PRIOR TO CONSTRUCTION. NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE EXPRESS WRITTEN PERMISSION OF THE OWNER'S REPRESENTATIVE. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE RELOCATION OF ANY EXISTING UTILITY INFRASTRUCTURE REQUIRED TO COMPLETE ANY PORTION OF CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE RESPONS13LE FOR THE COORDINATION AND COSTS OR ASSOCIATED WORK. 11. THE ENGINEER AND /OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND /OR METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. 12. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND DETAILS ASSOCIATED WITH THE UTILITY STRUCTURE. 13. BUILDING SETBACKS ARE SHOWN IN ACCORDANCE WITH APPROVED WAKE COUNTY STANDARDS. REFER TO THE WAKE COUNTY LAND DEVELOPMENT ORDINANCE FOR SETBACK REQUIREMENTS ASSOCIAT-D WITH PORCHES, DECKS, GARAGES, AND OTHER STRUCTURAL FEATURES. 14. THE GRAVEL DRIVE SURFACE SHALL BE DESIGNED TO ACCOMODATE FIRE TRUCK LOADING (WB40). 15. THIS SITE IS NOT REQUIRED TO INCLUDE ON-SITE RES OO Q I TR M FACILITIES. USERS OF THE SITE WILL HAVE ACCESS TO THE NEIGHBORHOOD L CLUBHOUSE RESTROOMS WHICH ARE LOCATED LESS THAN 500 METERS RS A ".,,W AY FROM THIS SITE AND WILL BE OPEN DURING NORMAL DAYTIME HOURS. 16. THE PATHWAY FROM THE UTILITY STRUCTURE TO THE FLOATING DOCK SHALL COMPLY WITH ADA STANDARDS. PER SECTION 1005.1.2 OF THE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN, WHERE THE TOTAL. LENGTH OF GANGWAY OR SERIES OF GANGWAYS SERVING AS PART OF A REQUIRED ACCESSIBLE ROUTE IS 30 FEET MINIMUM, GANGWAYS SHALL NOT BE REQUIRED TO COMPLY WITH THE REQUIREMENT THAT RAMP RUNS SHALL HAVE A RUNNING SLOPE NOT STEEPER THAN 1:12. 17. ALL CONCRETE SHALL BE AT LEAST 3,000 PSI. 18. PROPOSED UTILITY STRUCTURE SHALL BE 1 'xl ' " TIMB RLA D" MO D EL B Y E NWOOD STRUCTURES. ARCHITECTURAL AND STRUCTURAL PLANS WILL BE SUBMITTED AT TIME OF BUILDING PERMIT APPLICATION. O . 19. FLOATING DOCK AND GANGWAY SHALL BE EZ -DOCK PRODUCTS OR SIMILAR. PLANS SHALL BE SUBMITTED AT TIME OF BUILDING PERMIT, IF REQUIRED. 20. THIS SITE IS IN COMPLIANCE WITH CHAPTER 15 OF THE WAKE COUNTY LIDO. THE NUMBER OF EXISTING SPACES ARE PRESERVED. 21. NO ADDITIONAL PLANTINGS FOR VEHICULAR SURFACE AREA OR BUFFERYARD ARE REQUIRED PER CHAPTER ?6 OF THE WAKE COUNTY LIDO. 22. TRAIL MAY BE IMPERVIOUS MATERIAL. OWNER TO SELECT MATERIAL AT TIME OF CONSTRUCTION. 23. PER CLARIFICATION BY BARRY M N Y A E 00 E H M, DIRECTOR OF WAKE COUNTY INSPECTIONS, NO BATHROOM FACILITIES WILL BE REQUIRED FOR THIS SITE SINCE THE UTILITY STRUCTURE IS UNDER 250 SF. DRAWIN BY: CHECKED BY: DATE: I. I 1 � SEALED BY: SAD LML 2012.12.18 CA R APL LML 2012.02.13 ee p� o eeeeeeeepe e i , 2 1FtiSs/% %'>%y r OF q� �e o ;'bae F� l °'ee GIN6 -" `Q M ee.����R��' " , �W 1� m n € o v : o N PROPOSED GANGWAY PROPOSED FLOATING DOCK SITE LAYOUT AND UTILITY Pl�kij REQUIRED COUNTY NOTES 1. FINAL ZONING AND SITE IMPROVEMENT INSPECTION SHALL BE REQUIRED TO VERIFY SITE PLAN COMPLIANCE BE DONE BEFORE A CERTIFICATE OF COMPLIANCE IS ISSUED BY WAKE COUNTY BUILDING INSPECTIONS. 2. DETERIORATED O R DEAD SCREENING SHALL BE REPAIRED OR REPLACED WITHIN SIX MONTHS. 3. NO PERMANENT CONSTRUCTION CAN OCCUR WITHIN BUFFER YARDS. 4. SEPTIC TANKS, SEPTIC DRAIN LINES ARE PROHIBITED IN REQUIRED BUFFERYARDS, STORMWATER RETENTION AND DETENTION FACILITIES, STORAGE TANKS FOR ANY PURPOSE, UTILITY SUBSTATION, AND BUILDINGS HOUSING UTILITY SUBSTATIONS AND BUILDINGS HOUSING UTILITY COMMODOTIES OR EQUIPMENT ARE ALSO PROHIBITED IN REQUIRED BUFFERYARDS. UTILITY NOTES 1. REFER TO GENERAL NOTES ON SHEET -100. 2. THE WATER SERVICE SHALL BE TYPE K COPPER. 3. THE PROPOSED YARD HYDRANT SHALL BE THE NON - FREEZE TYPE. 4. THE CONTRACTOR IS SPECIFICALLY NOTIFIED THAT THE LOCATION AND /OR ELEVATION OF EXISTING UTILITIES SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD, THE INFORMATION IS APPROXIMATE AND SHOULD NOT BE RELIED ON AS BEING EXACT OR COMPLETE. 5. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS. NOTE: CONTRACTOR MAY UTILIZE EXISTING GRAVEL TO MIX WITH NEW GRAVEL. CONTRACTOR SHALL VERIFY MINIMUM 8" DEPTH. 8" GRAVEL (ABC) COMPACTED SUBGRADE GRAVEL PAVEMENT SECTION N.T.S. 8" CONCRETE (3,000 PSI) COMPACTED SUBGRADE CONCRETE PAVEMENT SECTION N.T.S. ( .f" STRAIGHT CONCRETE CURB EDGING 8 "GRAVEL ABC GRAVEL ( ABC) q a N 0 0 0 •. 'e COMPACTED ��H r 1 I -� SUBGRADE CONCRETE CURB EDGING SECTION N.T.S. SUBMITTAL: 1 st SUBMITTAL Per Wake County & Owner Comments GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH APPLICABLE MUNICIPAL, LOCAL, COUNTY, STATE, Ah41iD FEDERAL REGULATIONS AND STANDARDS. 2. EXISTING SURVEY AND TOPOGRAPHIC INFORMATION IS BASED ON FIELD SURVEY PROVIDED BY BATEMAN CIVIL SURVEY COMPANY TITLED "TOPOGRAPHIC &BOUNDARY SURVEY FOR COACHMAN'S TRAIL HOME OWNER'S ASSOCIATION ", DATED 2012.05.31. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS, 3. A PORTION OF THIS SITE APPEARS TO LIE WITHIN ZONE'X' OF A FEMA FLOODPLAIN AS SHOWN ON FIRM PANEL 3720170900J, EFFECTIVE DATE MAY 2, 2006. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING, COORDINATING, AND PAYMENT FOR ALL NECESSARY LOCATING SERVICES INCLUDING INDEPENDENT LOCATING SERVICES. THE CONTRACTOR SHALL HAVE ALL EXISTING UTILITIES LOCATED AT LEAST 48 HOURS PRIOR TO BEGINNING DEMOLITION, EXCAVATION, OR ANY OTHER FORM OF CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. 5. ALL SUB- SURFACE UTILITIES IDENTIFIED ON THE CONSTRUCTION DOCUMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATION BASED ON SURVEY INFORMATION GATHERED FROM FIELD INSPECTION AND /OR ANY OTHER APPLICABLE RECORD DRAWINGS WHICH MAY BE AVAILABLE. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ACTUAL IN PLACE SUB - SURFACE UTILITY INFORMATION INCLUDING HORIZONTAL AND VERTICAL LOCATION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. 6. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED BY THE CONTRACTOR DURING CONSTRUCTION SHALL BE RESTORED OR REPLACED TO ORIGINAL CONDITION AND TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE AT THE CONTRACTOR'S EXPENSE. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL PERMITS, INSPECTIONS, CERTIFICATIONS, AND OTHER REQUIREMENTS WHICH MUST BE MET UNDER THIS CONTRACT ARE OBTAINED, 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING "AS- BUILT" DRAWINGS TO RECORD THE ACTUAL LOCATION OF ALL PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE PROVIDED TO THE OWNER'S (REPRESENTATIVE AT REGULAR INTERVALS THROUGHOUT THE PROJECT FOR RECORD KEEPING. 9. IF DEPARTURES FROM THE PROJECT DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREFOR SHALL BE SUBMITTED TO THE OWNER'S (REPRESENTATIVE FOR REVIEW PRIOR TO CONSTRUCTION. NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE EXPRESS WRITTEN PERMISSION OF THE OWNER'S REPRESENTATIVE. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE RELOCATION OF ANY EXISTING UTILITY INFRASTRUCTURE REQUIRED TO COMPLETE ANY PORTION OF CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE RESPONS13LE FOR THE COORDINATION AND COSTS OR ASSOCIATED WORK. 11. THE ENGINEER AND /OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND /OR METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. 12. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND DETAILS ASSOCIATED WITH THE UTILITY STRUCTURE. 13. BUILDING SETBACKS ARE SHOWN IN ACCORDANCE WITH APPROVED WAKE COUNTY STANDARDS. REFER TO THE WAKE COUNTY LAND DEVELOPMENT ORDINANCE FOR SETBACK REQUIREMENTS ASSOCIAT-D WITH PORCHES, DECKS, GARAGES, AND OTHER STRUCTURAL FEATURES. 14. THE GRAVEL DRIVE SURFACE SHALL BE DESIGNED TO ACCOMODATE FIRE TRUCK LOADING (WB40). 15. THIS SITE IS NOT REQUIRED TO INCLUDE ON-SITE RES OO Q I TR M FACILITIES. USERS OF THE SITE WILL HAVE ACCESS TO THE NEIGHBORHOOD L CLUBHOUSE RESTROOMS WHICH ARE LOCATED LESS THAN 500 METERS RS A ".,,W AY FROM THIS SITE AND WILL BE OPEN DURING NORMAL DAYTIME HOURS. 16. THE PATHWAY FROM THE UTILITY STRUCTURE TO THE FLOATING DOCK SHALL COMPLY WITH ADA STANDARDS. PER SECTION 1005.1.2 OF THE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN, WHERE THE TOTAL. LENGTH OF GANGWAY OR SERIES OF GANGWAYS SERVING AS PART OF A REQUIRED ACCESSIBLE ROUTE IS 30 FEET MINIMUM, GANGWAYS SHALL NOT BE REQUIRED TO COMPLY WITH THE REQUIREMENT THAT RAMP RUNS SHALL HAVE A RUNNING SLOPE NOT STEEPER THAN 1:12. 17. ALL CONCRETE SHALL BE AT LEAST 3,000 PSI. 18. PROPOSED UTILITY STRUCTURE SHALL BE 1 'xl ' " TIMB RLA D" MO D EL B Y E NWOOD STRUCTURES. ARCHITECTURAL AND STRUCTURAL PLANS WILL BE SUBMITTED AT TIME OF BUILDING PERMIT APPLICATION. O . 19. FLOATING DOCK AND GANGWAY SHALL BE EZ -DOCK PRODUCTS OR SIMILAR. PLANS SHALL BE SUBMITTED AT TIME OF BUILDING PERMIT, IF REQUIRED. 20. THIS SITE IS IN COMPLIANCE WITH CHAPTER 15 OF THE WAKE COUNTY LIDO. THE NUMBER OF EXISTING SPACES ARE PRESERVED. 21. NO ADDITIONAL PLANTINGS FOR VEHICULAR SURFACE AREA OR BUFFERYARD ARE REQUIRED PER CHAPTER ?6 OF THE WAKE COUNTY LIDO. 22. TRAIL MAY BE IMPERVIOUS MATERIAL. OWNER TO SELECT MATERIAL AT TIME OF CONSTRUCTION. 23. PER CLARIFICATION BY BARRY M N Y A E 00 E H M, DIRECTOR OF WAKE COUNTY INSPECTIONS, NO BATHROOM FACILITIES WILL BE REQUIRED FOR THIS SITE SINCE THE UTILITY STRUCTURE IS UNDER 250 SF. DRAWIN BY: CHECKED BY: DATE: I. I 1 � SEALED BY: SAD LML 2012.12.18 CA R APL LML 2012.02.13 ee p� o eeeeeeeepe e i , 2 1FtiSs/% %'>%y r OF q� �e o ;'bae F� l °'ee GIN6 -" `Q M ee.����R��' " , �W 1� CL m M N m ki s f( % S J i f # f i f t r f t F f f i i f I 3 , 5 ;PROPOSED LIMITS 6F DISTURBANCE (TYP) EXISTING GRAVEL SHALL BE -- # USED AS CONSTRUCTION ENTRANCE fRANSFORMEI PROTECTED Al € ",,DURING 1 O .l f i S N V) uj W Q W , = O W N ' O t i i i , I .. I i i PO B05M 7781 RALEIGH, NC 27627 P:919.576.9733 d. ss4o764s „F EXISTING POND PROPOSED GRAVEL SILT FENCE OUTLET (TYP) PROPOSED LIMITS OF DISTURBANCE (TYP) PROPOSED TEMPORARY SILT FENCE (TYP) PROPOSED GRAVEL SILT FENCE OUTLET (TYP) to F F f f All t o i PO B05M 7781 RALEIGH, NC 27627 P:919.576.9733 d. ss4o764s „F EXISTING POND PROPOSED GRAVEL SILT FENCE OUTLET (TYP) PROPOSED LIMITS OF DISTURBANCE (TYP) PROPOSED TEMPORARY SILT FENCE (TYP) PROPOSED GRAVEL SILT FENCE OUTLET (TYP) e 1. CONTRACTOR SHALL SCHEDULE A PRE - CONSTRUCTION MEETING ON -SITE WITH THE OWNER'S REPRESENTATIVE, SITE ENGINEER, AND CONTRACTOR'S REPRESENTATIVE IN ATTENDANCE. 2. INSTALL SILT FENCE AND TREE PROTECTION FENCE, CLEARING ONLY AS NECESSARY TO INSTALL FENCING. 3. CONTACT THE OWNER'S REPRESENTATIVE OR SITE ENGINEER FOR INSPECTION AND CERTIFICATION OF COMPLIANCE. 4. BEGIN CLEARING AND GRUBBING. 5. BEGIN ON -SITE DEMOLITION AND REMOVAL OF DEBRIS. 6. STABILIZE SITE AS AREAS ARE BROUGHT TO GRADE. 7. WHEN CONSTRUCTION IS COMPLETE AND ALL AREA AREAS ARE STABILIZED, CONTACT THE OWNER'S REPRESENTATIVE OR SITE ENGINEERR FOR INSPECTION. 8. WHEN THE INSPECTOR APPROVES THE SITE, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND COMPLETE ALL PERMANENT EROSION CONTROL MEASURES. 9. WHEN VEGETATION IS ESTABLISHED, CONTACT THE OWNER'S REPRESENTATIVE OR SITE ENGINEER FOR FINAL INSPECTION AND ACCEPTANCE. FINAL PAYMENT SFOR WORK SHALL NOT BE PAID UNTIL THE SITE IS ACCEPTED BY THE OWNER'S REPRESENTATIVE OR THE SITE ENGINEER.. LEGEND x EXISTING CONTOUR (MAJOR) xxX -­­ -- - -- EXISTING CONTOUR (MINOR) / /// // - a ^` m ``� = m PROPOSED LIMITS OF DISTURBANCE TSF PROPOSED SILT FENCE TPF PROPOSED TREE PROTECTION FENCE XXX PROPOSED CONTOUR (MAJOR) XXX PROPOSED CONTOUR (MINOR) ® PROPOSED SILT FENCE OUTLET ®XXX.X SPOT ELEVATION GRADING & DRAINAGE NOTES 1. REFER TO GENERAL NOTES ON SHEET C -100. 2. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS REFLECT FINISHED GRADES. 3. ALL ELEVATIONS ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUND BREAKING. 4. THE CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE. 5. ALL FILL SHALL BE COMPACTED IN ACCORDANCE WITH RECOMMENDATIONS OF GEOTECHNICAL ENGINEER, OR TO A MINIMUM OF 95% OF THE MODIFIED PROCTOR VALUE. 6. THE PROPOSED CONTOURS SHOWN IN DRIVES, PARKING LOTS, AND SIDWALKS ARE FINISHED ELEVATIONS. REFER TO PAVEMENT CROSS SECTION DATA TO ESTABLISH CORRECT SUBBASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 7. THE CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE SUCH THAT ALL RUNOFF WILL DRAIN BY GRAVITY FLOW ACROSS NEW PAVEMENT AREAS AND LAWN AREA. THE MINIMUM CROSS SLOPE ON THE SITE _SHALL BE 2 %. 8. ALL Uh'SURFACED AREAS DISTURBED BY GRADING OPERATIONS SHALL RECEIVE A MINIMUM OF 4 INCHES OF TOPSOIL PRIOR TO PLANTING OR GRASSING, 9. THE CONTRACTOR SHALL GRASS ALL DISTURBED AREAS UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. 10. THE MAXIMUM SLOPE ACROSS ANY PORTION OF A HANDICAP PARKING SPACE AND ANY DEDICATED HANDICAP LOADING AREA SHALL NOT EXCEED 2.0% IN ANY DIRECTION. 11. THE 14-AXIMUM SLOPE ALONG ANY HANDICAP ACCESSIBLE PATH SHALL NOT EXCEED 5% IN THE DIRECTION OF TRAVEL WITH A MAXIMUM CROSS SLOPE OF 2 %. 12. THE PATHWAY FROM THE UTILITY STRUCTURE TO THE FLOATING DOCK SHALL COMPLY WITH ADA STANDARDS. PER SECTION 1005.1.2 OF THE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN, WHERE THE TOTAL LENGTH OF GANGWAY OR SERIES OF GANGWAYS SERVING AS PART OF A REQUIRED ACCES&ALE ROUTE IS 30 FEET MINIMUM, GANGWAYS SHALL NOT BE REQUIRED TO COMPLY WITH THE REQUIREMENT THAT RAMP RUNS SHALL HAVE A RUNNING SLOPE NOT STEEPER THAN 1:12. EROSION CONTROL_ NOTES 1. REFER TO GENERAL NOTES ON SHEET C -100. 2. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES THROUGHOUT THE DURATION OF THE PROJECT AND UNTIL AUTHORIZED APPROVAL HAS BEEN GIVEN TO HAVE THEM REMOVED. 3. THE CONTRACTOR SHALL BE REPONSIBLE FOR CONDUCTING GRADING OPERATIONS IN A MANNER WHICH ENSURES NO SEDIMENT IS ALLOWED OFF -SITE. 4. ALL STREETS ADJACENT TO PROJECT SHALL BE KEPT CLEAN AT ALL TIMES OR A WASH STATION MAY BE REQUIRED AT THE CONTRACTOR'S EXPENSE. 5. GROUND COVER SHALL BE ESTABLISHED WITHIN 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING; PERMANENT GROUNDCOVER WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 6. THE CONTRACTOR SHALL PROTECT ALL TREES AND SHRUBS OUTSIDE OF THE CUT /FILL LINES, IN ADDITION1 TO THOSE THAT RECEIVE TREE PROTECTION FENCING. THE CONTRACTOR IS ALSO REQUESTED TO SAVE ALL OTHER EXISTING TREES AND SHRUBS WHERE POSSIBLE. 7. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED IN BEST LOCATION BASED ON FIELD CONDITIONS. e Ike 0 MM111 g 5111 ii THE PURPOSE OF THIS PROJECT IS TO REMOVE EXISTING TENNIS COURTS AND GRADE THE SITE IN PREPARATION FOR INSTALLATION OF A UTILITY STRUCTURE AND MODIFICATIONS TO THE GRAVEL PARKING AREA. THE IMPERVIOUS AREA IS BEING DECREASED. THEREFORE, NO ADDITIONAL STORMWATER CONTROLS (QUANTITY OR QUALITY) ARE REQUIRED. THE SITE SHALL BE PROTECTED, FOR THE DURATION OF CONSTRUCTION, FROM ANY SEDIMENTATION OR EROSION. TOTAL DISTURBED AREA = 27,794 SF = 0.64 AC. TOTAL IMPERVIOUS AREA = 7,717 SF = 0.18 AC. STORMWATER CALCULATIONS PRE Q`10 = 4.97 CFS POST Q10 = 3.96 CFS NO INCREASE IN RUNOFF DUE TO DECREASE IN IMPERVIOUS AREA RALEIGH, NC SEALED BY: `ttittt111i11 //' �R04 i�'�, sioti9 o'yy ....... N Al 11 to ; All o e 1. CONTRACTOR SHALL SCHEDULE A PRE - CONSTRUCTION MEETING ON -SITE WITH THE OWNER'S REPRESENTATIVE, SITE ENGINEER, AND CONTRACTOR'S REPRESENTATIVE IN ATTENDANCE. 2. INSTALL SILT FENCE AND TREE PROTECTION FENCE, CLEARING ONLY AS NECESSARY TO INSTALL FENCING. 3. CONTACT THE OWNER'S REPRESENTATIVE OR SITE ENGINEER FOR INSPECTION AND CERTIFICATION OF COMPLIANCE. 4. BEGIN CLEARING AND GRUBBING. 5. BEGIN ON -SITE DEMOLITION AND REMOVAL OF DEBRIS. 6. STABILIZE SITE AS AREAS ARE BROUGHT TO GRADE. 7. WHEN CONSTRUCTION IS COMPLETE AND ALL AREA AREAS ARE STABILIZED, CONTACT THE OWNER'S REPRESENTATIVE OR SITE ENGINEERR FOR INSPECTION. 8. WHEN THE INSPECTOR APPROVES THE SITE, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND COMPLETE ALL PERMANENT EROSION CONTROL MEASURES. 9. WHEN VEGETATION IS ESTABLISHED, CONTACT THE OWNER'S REPRESENTATIVE OR SITE ENGINEER FOR FINAL INSPECTION AND ACCEPTANCE. FINAL PAYMENT SFOR WORK SHALL NOT BE PAID UNTIL THE SITE IS ACCEPTED BY THE OWNER'S REPRESENTATIVE OR THE SITE ENGINEER.. LEGEND x EXISTING CONTOUR (MAJOR) xxX -­­ -- - -- EXISTING CONTOUR (MINOR) / /// // - a ^` m ``� = m PROPOSED LIMITS OF DISTURBANCE TSF PROPOSED SILT FENCE TPF PROPOSED TREE PROTECTION FENCE XXX PROPOSED CONTOUR (MAJOR) XXX PROPOSED CONTOUR (MINOR) ® PROPOSED SILT FENCE OUTLET ®XXX.X SPOT ELEVATION GRADING & DRAINAGE NOTES 1. REFER TO GENERAL NOTES ON SHEET C -100. 2. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS REFLECT FINISHED GRADES. 3. ALL ELEVATIONS ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUND BREAKING. 4. THE CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE. 5. ALL FILL SHALL BE COMPACTED IN ACCORDANCE WITH RECOMMENDATIONS OF GEOTECHNICAL ENGINEER, OR TO A MINIMUM OF 95% OF THE MODIFIED PROCTOR VALUE. 6. THE PROPOSED CONTOURS SHOWN IN DRIVES, PARKING LOTS, AND SIDWALKS ARE FINISHED ELEVATIONS. REFER TO PAVEMENT CROSS SECTION DATA TO ESTABLISH CORRECT SUBBASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 7. THE CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE SUCH THAT ALL RUNOFF WILL DRAIN BY GRAVITY FLOW ACROSS NEW PAVEMENT AREAS AND LAWN AREA. THE MINIMUM CROSS SLOPE ON THE SITE _SHALL BE 2 %. 8. ALL Uh'SURFACED AREAS DISTURBED BY GRADING OPERATIONS SHALL RECEIVE A MINIMUM OF 4 INCHES OF TOPSOIL PRIOR TO PLANTING OR GRASSING, 9. THE CONTRACTOR SHALL GRASS ALL DISTURBED AREAS UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. 10. THE MAXIMUM SLOPE ACROSS ANY PORTION OF A HANDICAP PARKING SPACE AND ANY DEDICATED HANDICAP LOADING AREA SHALL NOT EXCEED 2.0% IN ANY DIRECTION. 11. THE 14-AXIMUM SLOPE ALONG ANY HANDICAP ACCESSIBLE PATH SHALL NOT EXCEED 5% IN THE DIRECTION OF TRAVEL WITH A MAXIMUM CROSS SLOPE OF 2 %. 12. THE PATHWAY FROM THE UTILITY STRUCTURE TO THE FLOATING DOCK SHALL COMPLY WITH ADA STANDARDS. PER SECTION 1005.1.2 OF THE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN, WHERE THE TOTAL LENGTH OF GANGWAY OR SERIES OF GANGWAYS SERVING AS PART OF A REQUIRED ACCES&ALE ROUTE IS 30 FEET MINIMUM, GANGWAYS SHALL NOT BE REQUIRED TO COMPLY WITH THE REQUIREMENT THAT RAMP RUNS SHALL HAVE A RUNNING SLOPE NOT STEEPER THAN 1:12. EROSION CONTROL_ NOTES 1. REFER TO GENERAL NOTES ON SHEET C -100. 2. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES THROUGHOUT THE DURATION OF THE PROJECT AND UNTIL AUTHORIZED APPROVAL HAS BEEN GIVEN TO HAVE THEM REMOVED. 3. THE CONTRACTOR SHALL BE REPONSIBLE FOR CONDUCTING GRADING OPERATIONS IN A MANNER WHICH ENSURES NO SEDIMENT IS ALLOWED OFF -SITE. 4. ALL STREETS ADJACENT TO PROJECT SHALL BE KEPT CLEAN AT ALL TIMES OR A WASH STATION MAY BE REQUIRED AT THE CONTRACTOR'S EXPENSE. 5. GROUND COVER SHALL BE ESTABLISHED WITHIN 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING; PERMANENT GROUNDCOVER WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 6. THE CONTRACTOR SHALL PROTECT ALL TREES AND SHRUBS OUTSIDE OF THE CUT /FILL LINES, IN ADDITION1 TO THOSE THAT RECEIVE TREE PROTECTION FENCING. THE CONTRACTOR IS ALSO REQUESTED TO SAVE ALL OTHER EXISTING TREES AND SHRUBS WHERE POSSIBLE. 7. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED IN BEST LOCATION BASED ON FIELD CONDITIONS. e Ike 0 MM111 g 5111 ii THE PURPOSE OF THIS PROJECT IS TO REMOVE EXISTING TENNIS COURTS AND GRADE THE SITE IN PREPARATION FOR INSTALLATION OF A UTILITY STRUCTURE AND MODIFICATIONS TO THE GRAVEL PARKING AREA. THE IMPERVIOUS AREA IS BEING DECREASED. THEREFORE, NO ADDITIONAL STORMWATER CONTROLS (QUANTITY OR QUALITY) ARE REQUIRED. THE SITE SHALL BE PROTECTED, FOR THE DURATION OF CONSTRUCTION, FROM ANY SEDIMENTATION OR EROSION. TOTAL DISTURBED AREA = 27,794 SF = 0.64 AC. TOTAL IMPERVIOUS AREA = 7,717 SF = 0.18 AC. STORMWATER CALCULATIONS PRE Q`10 = 4.97 CFS POST Q10 = 3.96 CFS NO INCREASE IN RUNOFF DUE TO DECREASE IN IMPERVIOUS AREA RALEIGH, NC SEALED BY: `ttittt111i11 //' �R04 i�'�, sioti9 o'yy ....... N Al 11 12 a a LR (V 1 MIN. 10 G LINE WIRES = 11111- W MAX. MIN. 12 -1/2 GA. INTERMEDIATE WIRES GRADE III all' NOTES: - END OF SILT FENCE SHOULD BE TURNED UPHILL TOP OF VALVE NEEDS TO STEEL ''?OST WONCN WIRE FABRIC IS ALWAYS REQUIRED FOR REPAIR OF SILT IIII - SEE N.C. STATE DENR PRACTICE STANDARDS & SPECIFICATIONS METER BOX LID. S;LT FENCE GEOTEXTILE FABRIC FENCE FAILURES, USE ONE TALL FESCUE No. 57 WASHED STONE. PLANNING CONSIDERATIONS & DESIGN CRITERIA (HOWEVER FLOW SIDEWALK FOR ANCHOR WHEN SILT N w PROTECTING !III III,♦ o FENCE IS FILL SLOPE CATCH BASIN. IN EACH ►.... /l■■.■■■■. to t� CASE THE SILT FENCE 10' -0" SOUGHNUM -SUDAN HYBRID IS TO BE PROPERLY _Z ENTRENCHED & THE :../ .. ► IN 1........•. 11• 10' x 3.5" x 1.5" RAILS WITH 3.5" TAPERED TIPS TO MEET SLOTS ►•/►A►• 50 LBS /ACRE �� .�- =1ilp— �0M,1 -II111 _— — c DIRECTION OF FLOW 6" MIN. COVER* & BETWEEN 60 - 45 ....•'ll ►••••• T_ - III `•• ►.•••.■ .ANCOR SKIRT AS IIIII 25 LBS /ACRE ♦•• :•• /.•• ►li SEP. 1 - MAR. 1 ERICEA LESEDESCA AND 70 LBS /ACRE V. 120 LBS /ACRE NOV. 1 - MAR. 1 POST (TYPICAL) 25 LBS /ACRE �IJ r �III�FRONT YIEW - Ii -I Ii- •I -- I j " MIN. 12 -1/2 GA. INTERMEDIATE WIRES GRADE III all' NOTES: - END OF SILT FENCE SHOULD BE TURNED UPHILL TOP OF VALVE NEEDS TO STEEL ''?OST WONCN WIRE FABRIC IS ALWAYS REQUIRED FOR REPAIR OF SILT BE 12' BENEATH TOP OF, - SEE N.C. STATE DENR PRACTICE STANDARDS & SPECIFICATIONS METER BOX LID. S;LT FENCE GEOTEXTILE FABRIC FENCE FAILURES, USE SEDIMENT FENCE SET FOR CONDITIONS WHERE PRACTICE APPLIES; TALL FESCUE No. 57 WASHED STONE. PLANNING CONSIDERATIONS & DESIGN CRITERIA (HOWEVER FLOW SIDEWALK FOR ANCHOR WHEN SILT SHALL NOT RUN PARRALLEL WITH THE TOE OF THE FENCE). w PROTECTING 0 Tn o FENCE IS FILL SLOPE CATCH BASIN. IN EACH T"T to t� CASE THE SILT FENCE 10' -0" SOUGHNUM -SUDAN HYBRID IS TO BE PROPERLY _Z ENTRENCHED & THE SHOULDERS, SIDE DITCHES, SLOPES (3:1 TO 2:1) 1ft STONE SHALL BE AT I - 10' x 3.5" x 1.5" RAILS WITH 3.5" TAPERED TIPS TO MEET SLOTS TN,T GRADE A MINIMUM OF 16" 50 LBS /ACRE II =1111 - ABOVE GRADE AT THE =1ilp— — -II111 _— — c DIRECTION OF FLOW 6" MIN. COVER* & BETWEEN 60 - 45 10 LBS /ACRE T_ - III- OVER SKIRT DEGREES. N II�II .ANCOR SKIRT AS IIIII 25 LBS /ACRE ;DIRECTED BY ENGINEER. SIDE VIEW STANDARD TEMPORARY SILT FENCE I 450 7 CONCRETE BRICK UNDER \\ MAIN CORPORATION COCK FOR SUPPORT NOTES: CORPORATION COCK 1. WATER METER AS MANUFACTURED BY SENSUS, OR SCHLUMBERGER. 2. DIRECT TAP ALLOWED ON MAINS NO LARGER THAN 16'. 3. METER BOX TO BE LOCATED IN R/W ADJACEN- TO PROPERTY LINE, OR IN APPROVED EASEMENT ADJACENT -0 R /W. 4. WHEN THE GRADE CHANGES, A COPPER RESETTER CAN BE USED TO ADJUST TO PROPER GRADE. 5. ADDITIONAL BACKFLOW PREVENTION DEVICE 10.1Y BE REQUIRED IF USED ON MORE THAN TWO RESIDENTIAL UNITS. SEE DETAIL W -22 F_ / FOR METER BOX R OI W r' 5/8' METER LOCK 4" THICK - NOTES: 1. REFER TO PLANS FOR ELEVATIONS, SLOPES, AND DIMENSIONS. 2. CONCRETE SHALL BE A MINIMUM OF 3000 PSI. CONCRETE SIDEWALK F O,I t ELVYKI N 1 < 1 ( SECTION 1: 1/2"=;I'-041 DUAL CHECK VALVE BACKFLOW PRE- VENTION DEVICE W fV w STANDARD 3/4' OR 1' SERVIICE SIZE ZBED SOIL CRIMP WATER' SERVICE AT PROPERTY LINE 5/8'x 12' COPPER SETTER METER YOKE SET BOX ON CONCRETE BLOCKS 3/4' OR 1' TYPE 'K' SOFT COPPER PIPE, NO JOINTS OR COUPLINGS PIPE, NO JOINTS OR COUPLINGS. SEALANT CUNT. ,,2„ DIA. STEEL_ DO E- 4' -0" O.I. CENTERED G: d °LENGTH OF W,` FEEL STOP AI.,. PAVING/BASE PER PAll PLAN SCALE; AS NOTE) r PO 130n7781 :,. RALEIGH, NC 27627 P:919.576.9733 5 OEM TOP OF VALVE NEEDS TO TYPE BE 12' BENEATH TOP OF, WOVEN WIRE FABRIC METER BOX LID. ROADWAY WARNING SIGN TALL FESCUE END POST ORANGE. UV RESISTANT SIDEWALK 25 LBS /ACRE LOCKABLE VALVE---- w 3' #67 STONE c Tn 3 BACKFILL, TAMPED IN z 6' LIFTS 10' -0" SOUGHNUM -SUDAN HYBRID 1T I 450 7 CONCRETE BRICK UNDER \\ MAIN CORPORATION COCK FOR SUPPORT NOTES: CORPORATION COCK 1. WATER METER AS MANUFACTURED BY SENSUS, OR SCHLUMBERGER. 2. DIRECT TAP ALLOWED ON MAINS NO LARGER THAN 16'. 3. METER BOX TO BE LOCATED IN R/W ADJACEN- TO PROPERTY LINE, OR IN APPROVED EASEMENT ADJACENT -0 R /W. 4. WHEN THE GRADE CHANGES, A COPPER RESETTER CAN BE USED TO ADJUST TO PROPER GRADE. 5. ADDITIONAL BACKFLOW PREVENTION DEVICE 10.1Y BE REQUIRED IF USED ON MORE THAN TWO RESIDENTIAL UNITS. SEE DETAIL W -22 F_ / FOR METER BOX R OI W r' 5/8' METER LOCK 4" THICK - NOTES: 1. REFER TO PLANS FOR ELEVATIONS, SLOPES, AND DIMENSIONS. 2. CONCRETE SHALL BE A MINIMUM OF 3000 PSI. CONCRETE SIDEWALK F O,I t ELVYKI N 1 < 1 ( SECTION 1: 1/2"=;I'-041 DUAL CHECK VALVE BACKFLOW PRE- VENTION DEVICE W fV w STANDARD 3/4' OR 1' SERVIICE SIZE ZBED SOIL CRIMP WATER' SERVICE AT PROPERTY LINE 5/8'x 12' COPPER SETTER METER YOKE SET BOX ON CONCRETE BLOCKS 3/4' OR 1' TYPE 'K' SOFT COPPER PIPE, NO JOINTS OR COUPLINGS PIPE, NO JOINTS OR COUPLINGS. SEALANT CUNT. ,,2„ DIA. STEEL_ DO E- 4' -0" O.I. CENTERED G: d °LENGTH OF W,` FEEL STOP AI.,. PAVING/BASE PER PAll PLAN SCALE; AS NOTE) r PO 130n7781 :,. RALEIGH, NC 27627 P:919.576.9733 5 OEM III ::❖ !'57s.I � I WWI oil ORANGE. UV'REBSTEN NRi - TEIPSiLE STRENGTH POLY BARRI AIDE FABRIC (TYPICAL) FRIDI!UT VIEW - AI a0 H v TREE PROTECTION AREA I v TS" [..l ON r WARNING SIGN DETAIL NOTES: WARNING SNTNS TO BE MADE OF DURABLE. REATHERPRG.DF MATERIAL LETTERS TO BE 3" NIGH MNWR,M. CLEARLY LEGIBLE AA'C %�SPACEO AS DETAILM SONS SNALL BE PLACED AT SO' MAIXULM INERVALS. PLACE A SIGN AT EACH END OF LWEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TREE PROTECTION AREAS LESS THIN 200' W PERT CMIL, PRONDE NO LESS THAN ONE SIGN PER PROTECTION AREA ATTACH SONS SECURELY TO FENCE POSTS AND FABNITC. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURARCNT OF PRO.ECT. AMRGNAL STCHS MAY BE REQUIRED BY CITY OF RALE'Ch11 INSPECTIONS DEPARTMENT BASED ON ACTUAL FEW CONDITIONS PLACE A STUN AT EACH END OF LINEAR TREE PROTECDr:AN AND 50' ON CENTER THEREAFTER. NOTE: FOR TREE PROTECTION ONLY STANDARD TREE PROTECTION DETAIL Y I- FREEZE YARD HYDRANT 1M ❑NS' MODEL SP813 APPROVED EQUAL, N YPE K, 100 COPPER WITH HREADED TO COMPRESSION FITTING R FLARE FITTING AT HYDRANT TO METER /BACKFLOW PREVENTER 57 WASHED STONE YARD HYDRANT (NON— FREEZE) OR<.::. FILTER OF # 57 WASHED SILT FENCEST❑NE FABRIC TO OVERLAP STEEL FENCtApp"RE CLOZT FLOW DIREC ION WIRE 1 INUHLS PLAN VIEW %STEEL FENCE POST HARDWARE CFLI NOTE: FILTER OF # 1. APPLICABLE FOR DRAINAGE AREAS NO MORE THAN 1/4 ACRE. 57 WASHED 2. USE AS A REPAIR OF SILT FENCE FAILURES. ,"FLOW 3. BURY WIRE FENCE, HARDWARE CLOTH, AND SILT FENCE FABRIC TONE 6 R 6 INCHES. ARDWARE CLOTH STEEL FENCE POST WIRE FENCE 12R nVFR AP l,f— MQx --., �12 ALE ,AP SIDE VIEW SILT FENCE F( FRONT VIEW TEMPORARY SILT FENCE OUTLET POST STEEL POST TYPE NOTES: 1) ALL WOOD FOR SPLIT RAIL FENCE TO BE PRESSURE TREATED. WOVEN WIRE FABRIC SLOT 300 LBS /ACRE WARNING SIGN TALL FESCUE END POST ORANGE. UV RESISTANT ABRUZZI RYE 25 LBS /ACRE HIGH - TENSILE STRENGTH POLY SARRCAOE FABRIC (TYPICAL) o � JUL. 1 -AUG. 15 Tn S * * *BROWNTOP MILLET OR 35 LBS /ACRE 10' -0" SOUGHNUM -SUDAN HYBRID 1T SIDE VIEW SHOULDERS, SIDE DITCHES, SLOPES (3:1 TO 2:1) III ::❖ !'57s.I � I WWI oil ORANGE. UV'REBSTEN NRi - TEIPSiLE STRENGTH POLY BARRI AIDE FABRIC (TYPICAL) FRIDI!UT VIEW - AI a0 H v TREE PROTECTION AREA I v TS" [..l ON r WARNING SIGN DETAIL NOTES: WARNING SNTNS TO BE MADE OF DURABLE. REATHERPRG.DF MATERIAL LETTERS TO BE 3" NIGH MNWR,M. CLEARLY LEGIBLE AA'C %�SPACEO AS DETAILM SONS SNALL BE PLACED AT SO' MAIXULM INERVALS. PLACE A SIGN AT EACH END OF LWEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TREE PROTECTION AREAS LESS THIN 200' W PERT CMIL, PRONDE NO LESS THAN ONE SIGN PER PROTECTION AREA ATTACH SONS SECURELY TO FENCE POSTS AND FABNITC. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURARCNT OF PRO.ECT. AMRGNAL STCHS MAY BE REQUIRED BY CITY OF RALE'Ch11 INSPECTIONS DEPARTMENT BASED ON ACTUAL FEW CONDITIONS PLACE A STUN AT EACH END OF LINEAR TREE PROTECDr:AN AND 50' ON CENTER THEREAFTER. NOTE: FOR TREE PROTECTION ONLY STANDARD TREE PROTECTION DETAIL Y I- FREEZE YARD HYDRANT 1M ❑NS' MODEL SP813 APPROVED EQUAL, N YPE K, 100 COPPER WITH HREADED TO COMPRESSION FITTING R FLARE FITTING AT HYDRANT TO METER /BACKFLOW PREVENTER 57 WASHED STONE YARD HYDRANT (NON— FREEZE) OR<.::. FILTER OF # 57 WASHED SILT FENCEST❑NE FABRIC TO OVERLAP STEEL FENCtApp"RE CLOZT FLOW DIREC ION WIRE 1 INUHLS PLAN VIEW %STEEL FENCE POST HARDWARE CFLI NOTE: FILTER OF # 1. APPLICABLE FOR DRAINAGE AREAS NO MORE THAN 1/4 ACRE. 57 WASHED 2. USE AS A REPAIR OF SILT FENCE FAILURES. ,"FLOW 3. BURY WIRE FENCE, HARDWARE CLOTH, AND SILT FENCE FABRIC TONE 6 R 6 INCHES. ARDWARE CLOTH STEEL FENCE POST WIRE FENCE 12R nVFR AP l,f— MQx --., �12 ALE ,AP SIDE VIEW SILT FENCE F( FRONT VIEW TEMPORARY SILT FENCE OUTLET POST DATE TYPE NOTES: 1) ALL WOOD FOR SPLIT RAIL FENCE TO BE PRESSURE TREATED. 6 SLOT 300 LBS /ACRE 2) END POST SHALL BE TERMINAL POST. TALL FESCUE END POST LML ABRUZZI RYE 25 LBS /ACRE MAR 1. - APR. 15 4.5" RAIL JUL. 1 -AUG. 15 TALL FESCUE AND 125 LBS /ACRE * * *BROWNTOP MILLET OR 35 LBS /ACRE 10' -0" SOUGHNUM -SUDAN HYBRID 10" SHOULDERS, SIDE DITCHES, SLOPES (3:1 TO 2:1) 1ft RAIL I - 10' x 3.5" x 1.5" RAILS WITH 3.5" TAPERED TIPS TO MEET SLOTS 6" 50 LBS /ACRE AND MAR 1. - APR. 15 4.5" SLOTS — OR MAR. 1 - JUN. 30 ADD WEEPING LOVEGRASS 10 LBS /ACRE T_ - ** *TALL FESCUE AND 10 * * *BROWNTOP MILLET OR 25 LBS /ACRE -,. 30 LBS /ACRE SEP. 1 - MAR. 1 ERICEA LESEDESCA AND 70 LBS /ACRE V. 120 LBS /ACRE NOV. 1 - MAR. 1 POST (TYPICAL) 25 LBS /ACRE �IJ r Nf - - EXISTING GRADE - - -- - _ Tfl- TfTf(��- �i1Ill ` -.- 1= �a rl I - Ii -I Ii- •I -- I j " PERSPECTIVE VIEW II TAF 1 ll -III I °I EXISTING SOIL -1 _ 1'_6 IIJ rI= pip III CONCRETE FOOTING FRONT VIEW STANDARD SPLIT -RAIL FENCE 5 a COACHMAN'S TRAIL HOA SITE CONSTRUCTION PLANS RALEIGH, NC 1 SEEDING SCHEDULE SHOULDERS, SIDE DITCHES, SLOPES (MAX. 3:1) DATE TYPE PLANTING RATE AUG. 15 - NOV. 1 TALL FESCUE 300 LBS /ACRE NOV. 1 - MAR. 1 TALL FESCUE 300 LBS /ACRE LML ABRUZZI RYE 25 LBS /ACRE MAR 1. - APR. 15 TALL FESCUE 300 LBS /ACRE JUL. 1 -AUG. 15 TALL FESCUE AND 125 LBS /ACRE * * *BROWNTOP MILLET OR 35 LBS /ACRE SOUGHNUM -SUDAN HYBRID 30 LBS /ACRE SHOULDERS, SIDE DITCHES, SLOPES (3:1 TO 2:1) DATE TYPE PLANTING RATE MAR 1. - JUN. 1 SERICEA LESPEDESA 50 LBS /ACRE AND MAR 1. - APR. 15 ADD TALL FESCUE 120 LBS /ACRE OR MAR. 1 - JUN. 30 ADD WEEPING LOVEGRASS 10 LBS /ACRE JUN. 1 -SEP. 1 ** *TALL FESCUE AND 120 LBS /ACRE * * *BROWNTOP MILLET OR 25 LBS /ACRE SOUGHNUM -SUDAN HYBRID 30 LBS /ACRE SEP. 1 - MAR. 1 ERICEA LESEDESCA AND 70 LBS /ACRE TALL FESCUE 120 LBS /ACRE NOV. 1 - MAR. 1 ADD ABRUZZI RYE. 25 LBS /ACRE CONSULT EROSION CONTROL ENGINEER OR SOIL CONSERVATION SERVICES FOR OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS. OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ** *TEMPORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROWN OVER 12- INCHES IN HEIGHT BEFORE MOWING. OTHERWISE FESCUE MAY BE SHADED OUT. 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF THEY OCCUR. AFTER ALL ROUGH GRADING IS COMPLETED, TILL SOIL AREAS TO BE SEEDED AND PLANTED TO A DEPTH OF FIVE INCHES. 2. REMOVE ALL LOOSE ROCKS, ROOTS, DIRT CLODS, AND OTHER OBSTRUCTIONS LEAVING GROUND SURFACE SMOOTH AND UNIFORM. 3. TO PREPARE UNIFORM SEEDBED, INCORPORATE AGRICULTURAL LIME FERTILIZER AND SUPERPHOSPHATE INTO SOIL AREAS TO BE VEGETATED. DISK NUTRIENTS INTO SOIL UNTIL WELL PULVERIZED. 4. SEED ON PREPARED SEEDBED AND COVER LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK. APPLY TEMPORARY SEEDING TO SOIL STOCKPILE AREAS THAT WILL BE DISTURBED WITHIN 30 DAYS. APPLY PERMANENT SEEDING TO WHERE FINISH GRADES ARE ESTABLISHED. 5. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR WITH LIQUID ASPHALT AT 400 GAL. /ACRE OR EMULSIFIED ASPHALT AT 300 GAL. /ACRE. 6. MULCH ALL SEEDED AREAS WITH SMALL GRAIN STRAW AT 90 LBS. /1000 SF AND SPREAD UNIFORMLY. GROUND SURFACE SHOULD BE VISIBLE TO ALLOW SUNLIGHT PENETRATION. 7. MULCH AROUND SHRUBBERY AND TREES WITH SHREDDED HARDWOOD TO A DEPTH OF 3 INCHES. 8. AFTER WORK IS COMPLETED AND AREAS ARE STABILIZED, CALL EROSION CONTROL OFFICER FOR SITE INSPECTION AND RECEIVE CERTIFICATE OF COMPLETION. REMOVE ALL TERMPORARY EROSION CONTROL MEASURES, INSTALL RIP -RAP, AND SEED AND MULCH ANY REMAINING BARE AREAS. FINAL PLANS APPROVED FOR CONSTRUCTION SUBMITTAL: DRAWIN BY: CHECKED BY: DATE: 1 st SUBMITTAL SAD LML 2012.12.18 Per Wake County SL Owner Comments APL LML 2012.02.13 SEALED BY: 111111111itNTW R-�N °° CARp� 0 4 ° °FNGINEl Q M`rs�vA' ,T7tit a 1111 Y1`L X11