Loading...
HomeMy WebLinkAboutSW3201201_Plan (SCM Detail)_20210317PERFORATION SQ-IIE UL,E ,FOR, ''QUMROMIN PIP 114,u nib& d U r �rA rn Raws Reequ ilr 5 1 (Maxi rn m Spacing_" ,t,D Ft) Tate,l Length U dardrai In 118 Ft Number,of Ubderdrain F'e ,yeti ns _ '15,15 Ides 50 % of F°edwadons _ Ffniss Agee 0rR, F f eti n•n _ .00,0' 77 Ft* Capacitv d0m, Role; = 0 . t10 55 Ft�' ec TbtsICapsciblof Peffixadans _ 1.5 Ft",n' ec Ili° DETENTMI STRUCTUREi 0 1 M,kkFW*?,1JW n \ I I I I I I I I I I I I I I I I I I I I I I I II IIII 'I I I I I I I I DCO - (448; I RIM:534.00 I I 6" INV. OUT: 532.1 (SDCO - (44 I II I 32.13 LF OF 6" P RF PVC @ .5 /o I 11 1 SD (449) RIM:534.00.00 6" INV. IN: 531.98 (SDCO - (448)) CD 1 I 1 1 I 6" INV. OUT: 531.98 (RISER-1) � I I 45.04 LF OF E" PER PVC @ 0. Q / RISER-1 RIM: 537.35 6" INV. IN: 531.75 (SDCO - (449)) 24" INV. OUT: 531.75 (SDMH - (427)] \ \ \ 533 \ \ Off= O PROP. RIP RAP 21.13 LFOF24" RCP @0.50 FES - (420) 550 545 540 EME PROP. 535 530 525 �+wil BMP SAND FILTER PLAN VIEW HORIZONTAL SCALE: 1" = 20' i ,.,.,.,.,.. 534 535 \ ............. \ ,......., , ,..., 535 PROFILE-BMP SCALE: 1"=40' H & 1"=4'V 0+00 0+50 1+00 1+50 2+00 550 545 M15I% MO&7 530 525 Mwel 1 " = 20' 1& 0 10 20 40 OVERALL SITE BUA SUMMARY: SITE: 33.44 AC PARCEL: 09057010 EXISTING IMPERVIOUS ASPHALT = 131,249 SF = 3.013 AC CONCRETE = 41,061 SF = 0.943 AC GRAVEL = 10,209 SF = 0.234 AC BUILDINGS = 92,561 SF = 2.125 AC TOTAL = 275,080 SF = 6.315 AC EXISTING IMPERVIOUS TO BE REMOVED: TOTAL = 31,102 SF = 0.714 AC PROPOSED IMPERVIOUS: ASPHALT = 152,910 SF = 3.510 AC CONCRETE = 22,780 SF = 0.523 AC BUILDINGS = 36, 513 SF = 0.838 AC TOTAL = 212,094 SF = 4.871 AC 1r.11r1I&9rr:1:111_B:�lb11IM0XAG=R:1/A8lox, rf►xT. INCREASED BUA FOR THIS DEVELOPMENT = 4.871 AC - 0.714 AC = 4.157 AC NOTE: BUA AS -BUILT SHALL BE PROVIDED PRIOR TO THE ISSUANCE OF BMP AS -BUILT APPROVAL SAND FILTER BMP BUA SUMMARY CHART ROADS/PARKING 123,289 SF SIDEWALK/CONCRETE 21,280 SF BUILDINGS 36,513 SF DRAINAGE AREA 6.86 AC SAND FILTER MAX ALLOWABLE BUA 181,082 SF = 4.157 AC (60.6 %) ABOVE GROUND SAND FILTER BMP SUMMARY CHART PEAK CONTROL PRE -DEVELOPMENT POST -DEVELOPMENT POST -ROUTING STORM EVENTS RUNOFF (CFS) RUNOFF (CFS) RUNOFF (CFS) ELEVATION TOP OF DAM 539.00 25Y R - 24 H R 30.66 58.11 29.57 537.90 10 YR - 24 HR 23.42 47.31 11.97 537.53 2YR - 24HR 12.24 29.64 5.37 536.32 1 IN - 6HR 0.20 8.82 0.17 534.88 BOTTOM OF BASIN 534.00 SAND FILTER MAX ALLOWABLE BUA (INCREASED BUA) 4.157 AC = 181,082 SF 0 0 s00,� BMP RISER SCHEMATIC NTS io a o CKEECH 0AS.30CIATES 1000 W. Morehead St. Suite 120 Charlotte, NC 28208 p 704.376.6000 www.creech-design.com THESE DOCUMENTS PROVIDED BY CREECH & ASSOCIATES, PA ARE SUBJECT TO THE ARCHITECTURAL WORKS COPYRIGHT PROTECTION ACT AS INTELLECTUAL PROPERTY. SIMILAR PROTECTION IS ALSO APPLICABLE TO ELECTRONIC INFORMATION IN ANY FORM. THE USE OF THESE DOCUMENTS OR THE ELECTRONIC INFORMATION THAT PRODUCED THEM IS PROHIBITED UNLESS OTHERWISE PROVIDED IN WRITING BY AND COMPENSATION TO THE ARCHITECT. LandDeq,m. 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 C-0653 SEAL J,�, ' 0 4 11111i�i� 1 � SEAL 033804 FNGINEE�` 16 Mar 202'1"fli,,,,,,,,����` IIIIIIIIIIIIII� IIIIIIIIIIIIIIII� qqV �)VIIIIIIIIIIIIIIIIIIII I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIp IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII� n ....... ......... ........... IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII gOgllllllllllullll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII gOgllllllllllullll qqu I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII� IIIIIIIIIIIIII� IIIIIIIIIIIIIIIIIIIIIII I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII� IIIIIIIIIIIIIIIIIIIIIII gOgllllllllllullll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII� I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII� IIIIIIIIIIIIIIII� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I Project Number: ,6 Date: 01 /18/2020 01LTA I,WONr_1II C3-05