HomeMy WebLinkAboutSW3201201_Plan (SCM Detail)_20210317PERFORATION SQ-IIE UL,E
,FOR, ''QUMROMIN PIP
114,u nib& d U r �rA rn Raws Reequ ilr 5
1
(Maxi rn m Spacing_" ,t,D Ft)
Tate,l Length U dardrai In
118
Ft
Number,of Ubderdrain F'e ,yeti ns _
'15,15
Ides
50 % of F°edwadons _
Ffniss
Agee 0rR, F f eti n•n _
.00,0' 77
Ft*
Capacitv d0m, Role; =
0 . t10 55
Ft�' ec
TbtsICapsciblof Peffixadans _
1.5
Ft",n' ec
Ili°
DETENTMI STRUCTUREi
0 1
M,kkFW*?,1JW n
\ I I I I I I
I I I I I I I I
I I I I
I I I I I
II IIII 'I
I I I I I I I
DCO - (448;
I
RIM:534.00
I I 6" INV. OUT: 532.1 (SDCO - (44
I II
I
32.13 LF OF 6" P RF PVC @ .5 /o
I 11 1 SD (449)
RIM:534.00.00
6" INV. IN: 531.98 (SDCO - (448))
CD 1 I 1 1 I 6" INV. OUT: 531.98 (RISER-1)
� I I
45.04 LF OF E" PER PVC @ 0.
Q /
RISER-1
RIM: 537.35
6" INV. IN: 531.75 (SDCO - (449))
24" INV. OUT: 531.75 (SDMH - (427)]
\
\
\ 533
\ \ Off= O
PROP. RIP RAP
21.13 LFOF24" RCP @0.50
FES - (420)
550
545
540
EME
PROP.
535
530
525
�+wil
BMP SAND FILTER
PLAN VIEW
HORIZONTAL SCALE: 1" = 20' i
,.,.,.,.,.. 534
535
\
............. \ ,......., , ,..., 535
PROFILE-BMP
SCALE: 1"=40' H & 1"=4'V
0+00 0+50 1+00 1+50 2+00
550
545
M15I%
MO&7
530
525
Mwel
1 " = 20' 1&
0 10 20 40
OVERALL SITE BUA SUMMARY:
SITE: 33.44 AC
PARCEL: 09057010
EXISTING IMPERVIOUS
ASPHALT =
131,249 SF
= 3.013 AC
CONCRETE =
41,061 SF
= 0.943 AC
GRAVEL =
10,209 SF
= 0.234 AC
BUILDINGS =
92,561 SF
= 2.125 AC
TOTAL =
275,080 SF
= 6.315 AC
EXISTING IMPERVIOUS TO BE REMOVED:
TOTAL =
31,102 SF
= 0.714 AC
PROPOSED IMPERVIOUS:
ASPHALT =
152,910 SF
= 3.510 AC
CONCRETE =
22,780 SF
= 0.523 AC
BUILDINGS =
36, 513 SF
= 0.838 AC
TOTAL =
212,094 SF
= 4.871 AC
1r.11r1I&9rr:1:111_B:�lb11IM0XAG=R:1/A8lox, rf►xT.
INCREASED BUA FOR THIS DEVELOPMENT
= 4.871 AC - 0.714 AC
= 4.157 AC
NOTE: BUA AS -BUILT SHALL BE PROVIDED PRIOR TO THE
ISSUANCE OF BMP AS -BUILT APPROVAL
SAND FILTER BMP BUA SUMMARY CHART
ROADS/PARKING
123,289 SF
SIDEWALK/CONCRETE
21,280 SF
BUILDINGS
36,513 SF
DRAINAGE AREA
6.86 AC
SAND FILTER MAX
ALLOWABLE BUA
181,082 SF = 4.157 AC (60.6 %)
ABOVE GROUND SAND FILTER BMP SUMMARY CHART
PEAK CONTROL
PRE -DEVELOPMENT
POST -DEVELOPMENT POST -ROUTING
STORM EVENTS
RUNOFF (CFS)
RUNOFF (CFS) RUNOFF (CFS)
ELEVATION
TOP OF DAM
539.00
25Y R - 24 H R
30.66
58.11 29.57
537.90
10 YR - 24 HR
23.42
47.31 11.97
537.53
2YR - 24HR
12.24
29.64 5.37
536.32
1 IN - 6HR
0.20
8.82 0.17
534.88
BOTTOM OF BASIN
534.00
SAND FILTER MAX ALLOWABLE BUA (INCREASED BUA)
4.157 AC = 181,082 SF
0
0
s00,�
BMP RISER SCHEMATIC
NTS
io a
o
CKEECH 0AS.30CIATES
1000 W. Morehead St.
Suite 120
Charlotte, NC 28208
p 704.376.6000
www.creech-design.com
THESE DOCUMENTS PROVIDED BY CREECH & ASSOCIATES, PA ARE SUBJECT TO
THE ARCHITECTURAL WORKS COPYRIGHT PROTECTION ACT AS INTELLECTUAL
PROPERTY. SIMILAR PROTECTION IS ALSO APPLICABLE TO ELECTRONIC
INFORMATION IN ANY FORM. THE USE OF THESE DOCUMENTS OR THE
ELECTRONIC INFORMATION THAT PRODUCED THEM IS PROHIBITED UNLESS
OTHERWISE PROVIDED IN WRITING BY AND COMPENSATION TO THE ARCHITECT.
LandDeq,m.
223 NORTH GRAHAM STREET
CHARLOTTE, NC 28202
704.333.0325
WWW.LANDDESIGN.COM
NC ENG. FIRM LICENSE # C-0658
C-0653
SEAL J,�,
' 0
4 11111i�i�
1 �
SEAL
033804
FNGINEE�`
16 Mar 202'1"fli,,,,,,,,����`
IIIIIIIIIIIIII� IIIIIIIIIIIIIIII�
qqV
�)VIIIIIIIIIIIIIIIIIIII
I
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIp IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII� n ....... ......... ...........
IIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
gOgllllllllllullll
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
gOgllllllllllullll
qqu I
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII� IIIIIIIIIIIIII� IIIIIIIIIIIIIIIIIIIIIII
I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIIIIII� IIIIIIIIIIIIIIIIIIIIIII
gOgllllllllllullll
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII�
I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII� IIIIIIIIIIIIIIII�
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
I
Project Number: ,6
Date: 01 /18/2020
01LTA I,WONr_1II
C3-05