Loading...
HomeMy WebLinkAbout20130195 Ver 1_CAMA Permit Application_201302262013Q 195 rc6VER '�' North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis John E. Skvarla, III Governor Director Secretary February 22, 2013 MEMORANDUM: TO: Karen Higgins 401 Oversight DWQ - Surface Water Protection FROM: Doug Huggett, NC DENR -DCM Major Permits Co 400 Commerce Ave., Morehead City, NC 28557 (Courier 11- 12 -09) SUBJECT: CAMA / D & F Major Permit Application Review Applicant: Paul Casey Project Location: 314 S. Lumina Ave., adjacent to Banks Channel, in Wrightsville Beach, NH Co. Proposed Project: construction of bulkhead and replacement of existing docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Dou4 HUQQett at the address above by March 20, 2013. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796 -7215, when appropriate, in -depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. SIGNED This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910 - 796 -7215 \ FAX: 910 - 395 -3964 Internet: www.nccoastalmanaaement.net An Equal Opportunity \ Affirmative Action Employer FEB 2 6 2013 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Paul Casey Go Ed Flynn 2. LOCATION OF PROJECT SITE: The project site is located at 314 S. Lumina Avenue adjacent to Banks Channel, in Wrightsville Beach, New Hanover County. Photo Index — 2006: 24 -7412: K, 9 2000: 24 -307: M, 17 1995: 24 -288: Q, 19 State Plane Coordinates — X: 2362811 Y: 167039 GPS File: 0- 011110A Lat:34 012'10.52499 "N Long: 77048'00.59837"W 3. INVESTIGATION TYPE: CAMA/ D & F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit— 01/11/2012 Was Applicant Present — Yes (agent) 5. PROCESSING PROCEDURE: Application Received — 02/07/2013 (completed) Office — Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan — Town of Wrightsville Beach Classification From LUP — Developed (B) AEC(s) Involved: EW, PT, ES (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing — N/A Planned — N/A (F) Type of Structures: Existing Access pier, double deck platform, floating dock and boatlift Planned — New private docking facility and timber bulkhead (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non - Vegetated Wetlands (Open water 1,360 ft2 (incorporated (C) Other (Highground) 2,320 ft2 (D) Total Area Disturbed: 3,680 ft2 (0.08 acres) (E) Primary Nursery Area: No (F) Water Classification: SB Open: No 8. PROJECT SUMMARY: The applicant is proposing to construct a new timber bulkhead and replace an existing private docking facility into Banks Channel. Paul Casey Page Two 9. PROJECT DESCRIPTION: The project site is located at 314 So. Lumina Ave., adjacent to Banks Channel in Wrightsville Beach, New Hanover County. To locate the property of interest from the Wilmington Regional Office (WiRO) travel east approximately 3.0 miles on Eastwood Rd. towards Wrightsville Beach. Cross the drawbridge and continue on Causeway Drive to Waynick Blvd. Take a right onto Waynick Blvd. and travel approximately 0.5 miles until you reach the property of interest which will be located on the right. The applicant is currently in the process of the construction of a single - family residence on the east side of So. Lumina Ave/Waynick Blvd., which does not appear to be located within an Area of Environmental Concem (AEC) and therefore not subject to a CAMA Permit. Existing structures on the west side of the property which is the project site consists of an existing elevated wooden walkway which spans across the lot from Waynick Blvd. to an existing docking facility. The property has current elevations of approximately 5' to 8' above normal high water (NHW). The highground vegetation of the property consists primarily of wild grasses and there are currently no Coastal Wetlands present along the shoreline of the property. There are currently existing timber bulkheads located on the adjacent properties to the north and south, which appear to have been constructed in the 1980's. The intertidal strip of sand located waterward of the structures appears to have accreted over the decades, which locate the normal high water (NHW) /mean high water boundary (MHW) boundary approximately 10' waterward. These boundaries appear to be the same based on the attached riparian survey and a 1/11/2013 on -site visit. The existing docking facility which currently exists on the property was maintained by the previous property owner. An access pier, measuring approximately 130' in length by Vin width extends to the west into Banks Channel. The pier terminates onto a double -deck "L- shaped" platform, measuring approximately 18' in length by 18' in width, which is oriented towards the south. An access ramp leads onto a floating dock, measuring approximately 8' in length by Fin width, which then turns 90° to the south a distance of approximately'l 8' in length by 8' in width running parallel to the channel and shoreline. There is also an existing boatlift, measuring approximately 13' in length by 13' in width located on the southern side of the access pier, just landward of the double -deck platform. The existing facility appears to accommodate up to three (3) vessels (See Sheet 2 of 2). The Town of Wrightsville Beach Land Use Plan classifies the upland areas of this project as Developed. The waters of the project site are classified as SB by the NC Division of Water Quality. The NC Division of Marine Fisheries has Not designated this area of Banks Channel as a Primary Nursery Area, and the waters adjacent to the proposed project are Closed to the harvesting of shellfish. PROPOSED PROJECT: The applicant is proposing to construct a new timber bulkhead and replace an existing private docking facility into Banks Channel. Once the existing docking facility is entirely removed a new timber bulkhead, measuring approximately 58 linear feet would be constructed along the NHW/MHW line. The bulkhead would have approximately 14' returns on each end of the property to tie into the adjacent timber bulkheads to the north and south. A new access pier, measuring approximately 84' in length by Vin width would extend from the new timber bulkhead towards the west into Banks Channel. The pier would terminate onto a new partially covered "L-shaped" platform, measuring approximately 21' in length by 20' in width, which would be oriented towards the north. An access ramp would then lead onto a new floating dock, measuring approximately 40' in length by 6' in width running perpendicular to the channel and shoreline, in the same alignment as the access pier. A new boatlift, measuring approximately 14' in length by 14' in width would be located on the northern side, and at the most landward end of the proposed floating dock. The application states that the existing water depth at the location of the docking structures is approximately -4.0' to -6.0' @ normal low water. The application states that the proposed structures would accommodate up to four (4) vessels at this location. The applicant also proposes an elevated walkway over the highground of the property, measuring approximately 42' in length by 6' in width, which would extend from the proposed access pier to the waterward edge of the curbing along Waynick Blvd (See Sheets 1 of 2 and 2 of 2). Paul Casey Page Three 10. ANTICIPATED IMPACTS The proposed new timber bulkhead and elevated walkway would disturb approximately 2,320 sq. ft. of Estuarine Shoreline and highground for the associated backfill and tie -back anchor system. The proposed docking facility construction would incorporate an additional 1,360 sq. ft. of Estuarine Waters and Pubic Trust Area, essentially within an area currently usurped by the existing docking facility. The proposed structures would extend approximately 135' into a waterbody, which measures approximately 1,400' across. This distance would conform with the 1/4 width rule and the established pier lengths. The structure would not encroach into the adjacent 15' riparian corridor setback requirements. As proposed, the applicant's proposal would not extend beyond the Town of Wrightsville Beach Pierhead Line. Minor increases in turbidity should be expected during construction. Submitted by: Robb Mairs Date: February 21, 2013 Office: Wilmington a i�u6AneM for or Be �9 Pinentpefm1t two issx! •�3�17`fQBj : ` Worth Carolina DIVISION OF CO'ASUL 1. Primary Appikaht! Landowner Information Agent/ Contractor 1: First Name MI Business Name Agentl Contractor 2. First Name Project Name (if applicable) Last Name Applicant 1: First Name MI Last Name %� cm C� l llc6 )it fGwft� Applicant 2: First Name MI Last Name FAX No. %) -af& If additional applicants, please attach an additional page(s) with names listed. Street Address (if different from above) Mailing Address /is /� State PO Box City St to C ZIP /� )"7511 Country Use Phone No WIN7 ext. FAX No. . Street Address (if different from above) City State ZIP Email e 0 U i I 2. Agent/Contractor Information Business Name f Agent/ Contractor 1: First Name MI Last Name Agentl Contractor 2. First Name MI Last Name Mailing Address P X 6 C� l llc6 )it fGwft� State J�C ZIP Phone No. 1 Phone No, No, 2 ext ext. FAX No. %) -af& Contractor # Street Address (if different from above) City State ZIP Email f�yGmsw,cant BECi RIED DCM WILMINGTON, NC . <Form continues on back> FEB 0 7 2013 Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can multiple) hiai f 10►r),Dwyu Street Address /q So. LfIAVJY19 /1W State Rd. fi Subdivision Name City State Zip Phone No Lot No.(s) (if many, attach additional page with list) ab a. In which NC river basin is the projed located? b Name of body of water nearest to proposed protect Pill C. Is a water body identified in (b) above. natural or manmade? d. Name the closest major water body to the proposed project site. Natural ❑Manmade ❑Unknown k. Has a professional archaeological assessment been done for the tracts It yes, attach a copy. ❑Yes No C3NA e. Is pfiposed work within city limits or planning jurisdiction? I. If applicable, list the planning jurisdiction or city limit the proposed L� s ❑No work falls with VtW1► Ale—, 4. Site Description a. Total length of shoreline on the tract (ft.) b Size of entire tract (sq.ft.) 5641 0 91 Y p), c. Size of individual lot(s) -d/Approximate elevation of tract a e NHW (normal high water) or QK )JI1 W O NWL (normal water level) I (If many lot sizes, please attach additional page with a list) ❑NHW or NWL S� e. on tract //Vegetation f. Man -made features and uses now on tract g. Identify and describe the existing land uses adiacent to the proposed protect site. 4-110 ) h. How does local government zone the tract? i Is the proposed project consistent with the applicable zoning? �elwr, (Alt h zoning compliance certificate, it appl ble) A I Yes ❑No ONA 1. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes I'l/l k. Has a professional archaeological assessment been done for the tracts It yes, attach a copy. ❑Yes No C3NA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a []Yes Uko []NA NaNenal Renister listed or eligible property? <Fornt continues on next page> RECEIVED DCM WILMINGTON, NC FEB 0 7 20113 Major Development Permit m. (f) Are there wetlands on the site? ❑Yes VN (ii) Are there coastal wetlands on the site? Oyes o (ill) If yes to either (1) or (if) above, has a delineation been conducted? ❑Yes ❑No (Attach documentation, it'avallable) n. Describe existing wastewater treatment facifitles. 6 o. Descrbe a sling drinking water supply source. 40, "M p. Descri existing storm water management or treatment systems. aa�� 15. Activities and Impacts _ , r"Tmimm"Orrinr b. Give a brief description of purpose, use, and daily operations of the project when complete. s�»�t . � Soliarf P/Msn6owr J /2LS1�L tp-1 c. Describe the proposed c nstruchon methodology, types of construction equipment to be used during construction, the number of each type Of a w he pment and wre it is to be stored. � � �i�I1�n J� Gf spa wU G� kal p� TP bra p" 6, )J le d. LiSt all development activities you propose. t,,� 'J - 5 1 ' 1141A" , �L-x �1 M 7 � s��s e Are the proposed activities maintenance of an existing project. new work. or both? Na 41,0A L What is the approximate total disturbed land area resulting from the proposed project? —0—/ ❑Sq -Ft or ❑Acres g. Will the proposed protect encroach on any public easement, public accessway or other,,area ❑Yes fZNo that the public has established use of? DNA h. Describe location and type of existing and proposed discharges to waters of the state. HDYGI 1. Will wastewater or stormwater be discharged Into a wetland? ❑Yes IgNo If yes, will this discharged water be of the same salinity as the receiving water? Oyes ❑ DNA DNA j, fs there arii j itlftigAtion proposed? Ely es If yes, attach a mitigatlon proposal. Q , ❑HA <Formcontinues on back> RECEIVED DCM WILMINGTON; NC 2013 Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, d applicable, must be submitted in order for the application package to be complete: Items (a) — (Q are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish batwem t-vnkK-oornottdLrwkrproposdu. c. A site or location map that Is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. I. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mad. Such landowners must be advised that they have 30 days to which to submit comments on the proposed project to the Division of Coastal Management. Name /f,/ Jk /- / /, �Al v�/ Phone No. Address J /.J Joy �.04J0 i / W-. �l/11t ,(f!/l y f� & JD yeti Name 1� it ,L'•tly Phone No. Address Ao&(55 l J I lsyjii,L3.H.I. - Name / Phone No Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers. permittee, and issuing dates h Signed consultant or agent authorization form, it applicable. Wetland delineation, it necessary. i .Alsinopd AFC. haaarrl rinira-for nmiarre in nroanfr nit_ �a�ulg !,?tBas.- ;A!s6t�36sgae���i4�^ "" ^» k. A statement of compliance with the N.C. Environmental Policy Act (N C.G S. 113A 140). if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Garotina Environmental Policy Act: 7. Certint6don and Permission to Enter on Land J 1 understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. 1 certify that 1 am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned_ lands in connection with evaluating info_ rmation related to this permit application and follow -up . monitoring of the prdjedt. I further ce 'fy that the information provided in this application is truthful to the best of my knowledge. Date S �• �it3 Print Name Signature Xse indicate application attachments pertaining to'your proposed. project. M MP -2 Excavation and Fill Information (]DCM MP -5 Bridges and Culverts 01?6M MP -3 Upland Development CM MP-4 Structures Information RECEIVED DCM WILMINGTON, NC FEB 0 7 1013 Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental information. 1. DOCKING FACILITY /MARINA CHARACTERISTICS QThis section not applica, a. (i) Is the docking facility/marina- b. (i) Will the tacit' be open to the general public? QCommercial QPublictGovernment Private /Gemmamt� ❑Yes o c. (i) Dock(s) and/or pier(s) d (i) Are Finger Piers included? Yes ❑No (ii) Number If yes: (iii) Length U, IT (u) Number (Iv) Width P , / (iii) Length (v) Floating QYes LINO (iv) Width T (v) Floating es ❑N e. (i) Are Platforms included? vyes QNo f (i) Are Boattifts included? ON ❑No If yes- If yes: (ii) Number (ii) Number (iii) Length (111) Length .�.� (iv) Width x uy (iv) Width i (v) Floating Oyes do l� Note: Roofed areas are calculated from dnpline dimensions g. (i) Number of slips proposed h Check all the types of services to be provided. - ❑ Full service, including travel lift and /or rail. repair or (ii) umber of slips existing maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ( "wet slips ") only, number of slips- 0 Dry storage, number of boats: ❑ oat ramp(s): number of boat ramps- & —they, please describe: i. Check the proposed type of siting. rOpeen cut and access channel water; dredging for basin and/or channel water; no dredging required QOther; please describe. k. Typical boat length. A 1` m. (i) Will the fa ity have tie pilings? ❑Yes No (it) It yes number of be pilings? i Describe the typical boats lobe served (e.g , open runabout. charter boats, sail boats. mixed types) optot /Aor (i) Will the fa tit be open to the general public? QYes No RECEIVED DCM WILMINGTON, NC FEB 0 7 2013 2. DOCKING FACIUTY /MARINA OPERATIONS //71 VMS section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. (] Office Toilets ❑ Toilets for patrons; Number. ; location: ❑ Showers Boatholding tank pumpout: Give type and location b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How wit overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of 'No Sewage Discharge' signs proposed. (ii) Give the location and number of 'Pumpout Available signs proposed. I Describe the special design, it applicable. for containing industrial type pollutants. such as paint, sandblasting waste and petroleum products. g Where will residue from vessel maintenance be disposed of? h Give the number of channel markers and 'No Wake" signs proposed i Give the location of fue"andling facilities. and describe the safety measures planned to protect area water quality. I What will be the marina policy on overnight and live- aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina. what types of services are currently provided? DCM WILMINGTON, NC FEB 0 7 263 m. Is the madna/docking facility proposed within a primary or secondary nursery area? OYes ONo n. Is the manna/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ONo o. Is the marina/docking facility proposed wittfin or adjacent to coastal wedands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SS), or other wedands (WL)? If any boxes ere checked. provide the number of square feet affected. OCW OSAV OSS OWL QNone p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ONo If yes.-give the name and address of the lesseholder(s), and give the proximity to the lease 3. BOATHOUSE (including covered lifts ( 9 ) his section not applicabi a. (i) Is the boathouse structure(s)- OCommercial OPublic/Government ❑Private /Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions / 4. GROIN (e.g., wood, sheetpile, etc. if a rock groin, use MP-2, Excavation and Fill.) his section not applicabr a (r) Number (it) Length Vu) Width AU 5. BREAKWATER (e.g., wood. sheetptle, etc.) b6ts section not applicabi a- Length c. Maximum distance beyond NHW. NWL or wetlands o Average distance from NHW. NWL. or wetlands 16. MOORING PILINGS and BUOYS % This section notapplicabl a. Is the structure(s): OCommerciai OPubtic/Govemment ❑Private/Community C. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present e Arr, of the swing b. Number d. Description of buoy (color. inscription, size, anchor. etc.) RECEIVED ' DCM WILMINGTON, NC FEB 0 7 2013 7. GENERAL a. Proximity of structures) to adjacent riparian property lines /Sr/ Note' For buoy or mooring piling. use arc of swing including length of vessel. c. Width of water body � Od1 e. (i) Will navig onai aids be required as a result of the projects ❑Yes No ❑NA (ii) If yes, explain what type and how they will be implemented b. Proximity of structure(s) to adjacent docking facilities. d Water d th at waterward end of structure at NLW or NWL -G' I& OTHER [:1 This section not applicabl a. Give complete description sf� %J Date Project Name J I� Ap Cant N /a e/y Applicant Sigftature RECEIVED DCM WILMINGTON, NC FEB 0 7 2013 • Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) Attach this fort to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. t. EXCAVATION Mis section not applicable a Amount of material to be excavated from below NtiW or NWL M b. Type of matanai to be excavated. cubic yards G (,) Does the area to be excavated include coastal wetlandslmarsh (CW). submerged aquatic vegatattao (SAV), shell bottom (Sft or other wetlands (Wt.)7 If any boxes are checked, provide the number of square feet affected. QCW ❑SAV 13SO [3WL ❑None (ii) Desiree the purpose of the excavation in these areas d. Hqh- ground excavator in cubic yards 2 DISPOSAL OF EXCA VA TED MATERIAL M 'f7Vs section not app icabble a. Location of disposal area b. 0unenswris of disposal area. c. tr') 00 you claim title to disposal area? OYes ❑No ONA (6) it no, attach a better granting permission from the owner e (1) 0M he disposal area include any coastal weuands/marsh (CW), submerged aquatic vegetation bottom ( he or other wetlands (WL) Y b s pro number of square feet affected. 0Cw []$AV pse OWL ONO" (h) Describe the purpose of disposal m these areas: d (i) Wig a disposal area be available for future (111aintenance? OYes ONO ONA (u) If yes, where') I. (i) Does the disposal Include any area in the water? OYes ONO ONA (a) If yes, how much water area is affected? RECEIVED DCM WILMINGTON, NC FEB 0 7 2013 - Access Other N Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWLJ stabilization Length Width Avg. Existing NA NA Depth Final Project NA NA Depth t. EXCAVATION Mis section not applicable a Amount of material to be excavated from below NtiW or NWL M b. Type of matanai to be excavated. cubic yards G (,) Does the area to be excavated include coastal wetlandslmarsh (CW). submerged aquatic vegatattao (SAV), shell bottom (Sft or other wetlands (Wt.)7 If any boxes are checked, provide the number of square feet affected. QCW ❑SAV 13SO [3WL ❑None (ii) Desiree the purpose of the excavation in these areas d. Hqh- ground excavator in cubic yards 2 DISPOSAL OF EXCA VA TED MATERIAL M 'f7Vs section not app icabble a. Location of disposal area b. 0unenswris of disposal area. c. tr') 00 you claim title to disposal area? OYes ❑No ONA (6) it no, attach a better granting permission from the owner e (1) 0M he disposal area include any coastal weuands/marsh (CW), submerged aquatic vegetation bottom ( he or other wetlands (WL) Y b s pro number of square feet affected. 0Cw []$AV pse OWL ONO" (h) Describe the purpose of disposal m these areas: d (i) Wig a disposal area be available for future (111aintenance? OYes ONO ONA (u) If yes, where') I. (i) Does the disposal Include any area in the water? OYes ONO ONA (a) If yes, how much water area is affected? RECEIVED DCM WILMINGTON, NC FEB 0 7 2013 - 3. SHORELINE STABILIZATION 0 7W section notapprrcable (it devrebpmrit Is a wood groin. use MP-4 — Structures) a. T of shoreline stabilization: b. Length: , S Typo ❑ftrap 08reakwaled8li (]other. Wes: c. Average distance watenvard of NNW or NWL: d Maximum distance watenward of NHW or NWL. e. Tyge of steW5oo r matenat: g. Number of square feet of fill to be placed below water level. &dkhead bacA(A1 Piprap 6reakwalartSUi Other i. Source of fill material -�;hth '� —0— I. (i) Has re been shoreline erosion during p mcedatg Q X X m 1 " [314o []NA (d) U yes. state amount of erosion and source of erosion amount information. , rbinog an mio 2-r06 OA,0177LW h. T �l of fill matenal M 5�m—d-_ 4. OTHER FILL ACTIVITIES Mtn section not awcabte (Excluding Shoreline Stabitizatron) s ra wm rm matenai ha nrouam to the site'► OYes ONO ONA -b----.0) Will fat material be placed m coastal wetiandstmarsh (M). It yes, (6) Amoum of material to be placed in the water (di) Dimensions of N area (iv) Propose of fill S. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? e. (t) Will navkjaArial aids be required as a result of the pfoiect? Oyes JgNo ONA (6) if yes, explain what type and flow they wilt be implemented. submergeo aquauc vegetarian ta,.vl, loll ow, in t-25l, w other wetlands (WL)? If any boxes are checked, provide me number of square feet affected 0CW OSAV 0335 Owl QNone (a) Describe the purpose of the fill in these areas: ? What type of construction equipment wdi be used (e g . drag6ne, backhoe, or hydraulic (1redge)? kbfl-rn Iler 1114�9 d (t) Will wetlands be ossed In transpo" equipment to project sites Oyes &No ONA (6) If yes. explain steps that vnU be taken to avail or minimize environmental impacts. Oale Apof ant Name Protect Name Applicant SlAsture D DCM WILMINGTON, NC FEB 0 7 2013 L 0 Lo \J019NIMIM AD I� 1EA1303H io _ IR ° W I cA Z 0 I ,n � r� rn I ro > I N u (R -� �� D 0 00C I 0 ;n lot c__ I � � a D I rnrn S I I rn I� PROPERTY UNE ENDD —2°22V 0.00 N52°2T29W ------------------ ____ — --m) 13G.5& ME) O -- - - - �J I i I I I II w ER s Z �$ - �N _ ' __ - - -- __ -- - _ - -_ -- I Q Z I ay i— -15 sB- - - - -- I— i S2 I p Ib N W NN =1W z? SEE PROPOSED PLAN cn , �o"o I _ Gj Q —� � _ I FOR NEW BULKHEAD, I OI - Zv I n rn D � ,n, I PIER, GAZEBO, AND 0 I u, I FLOATING DOCK. I Z N D "Ir ---------- - - - - -- - - - - - -- Its i z I O► � I 5' SB 1 55204MS I (Tiq 32.IT — L4 I — -- - - - - -- 136.03' -- ---- - - --�1 I " . §Eo 55249"03' 59.80' , (T1q 552 49"03'E I PROPERTY UNE I D • x I Z I I i EXTENDED I ,� z I I n IOW wa v I I � nD lyc� —n—n �� I � b .1 �Wc �N ,�jg4 i I i q i rn �° > > C Ipr� I I^J rn0 I rn ro I r o 'R x b c� �- n � -0 Pod �-'� rn I , I z o Loa o ! g ca ro y w I I I rzn NNVNIW N -1 mm NEW BULKHEAD BUILT LANDWARD OF THE ESTABLISHED MEAN HIGH WATER LINE (ELEV 1.4 PER SURVEY) AND LANDWARD OF THE NORTH BOAT LIFT (13K#) INSTALLED AND SOUTH PROPERTY LINES BY MARINE CONTRACTOR OUTLINE OF EXISTING PIER, BOAT LIFT, AND FLOATING DOCK TO BE DEMOLISHED 962'4�'� 186.0' 40' -0' FLOATING GOOK I , 12' -0' ZO' -8' GAZEBO DECK " -0' APPROX. PIER LENGTH o - - - - - 15T3EBGK ---------------- --- t79 - ------ - --------------------------------- - - - - -- - STE C - -- -- - - -�..- ---- - - - - -- - B H - -_ GAZEBO -- ROOF - -LIN - -- � --- ---- -- -' ::::; •:_: BUILT -IN BENCHES L . W ' FISH CLEANING SINK i AND COUNTER Ft.At11N :} BOI z DtiOK C -- - a - ------------- - - - - - - - - -- ------------- - - - - -- - - - -- C � ii I K Ir I 3FT WIDE ALUMINUM RAMP o Z + TO FLOATING DOCK. ;o T� m2w72" 1 Sam 3L 4- 1. HATTERAS" EXTENDED PEDISTAL UPr 1'IAATiN6 wWIP 3 M -d - --- -•---- - - - - -r r - - -- 552°49 IE _ 59.80 M _ --- H52°27'2M 456 olq ------ ' �. cnaMo PLAN SHOWING PROPOSED / Z) 4�11_ on ovic"llow BULKHEAD. PIER, GAZEBO 1 urarthow 01 AND BOAT DOCK PLAN 01.01 �w�►mm wm SCALE: I INCH =SOFT STEPS FROM + 1.40 MSL START OF PIER j CO2 ALUMINUM RAMP .i ;; APPROX. DOWN TO BEACH I (MEAN HIGH WATER) TO FLOATING BOTTOM LINE t 0.00 MSL DOCK D=v OAW ` 1 w rji tsol ra LOCATION MAP NOri+Dwm RECEIVED yfz,-f6 �vv DCM WILMINGTON, NC d#F(g FEB 0 7 1013 (,%) < CASEY SUMMER HOME BULKHEAD, PIER, WEBO, AND DOCK 314 SOUTH LUMINA AVE. WRIGHTSVILLE BEACH NEW HANOVER COUNTY, NC PROJ. NO. 09.14 I SCHEMATIC ELEVATION DATE: 1/29/2013 SHOWING PROPOSED BULKHEAD, SHEET PIER, GAZEBO, AND BOAT DOCK PLAN SCALE: 1INCH a 90FT clot PROPOSED GAZEBO WITH w Z HIPPED ROOF MHW LINE AND BULKHEAD LINE zIQ �I FLOATING DOCK ROOF PITCH 12 a PROPOSED PIER WITH RAILINGS. j (SEE PLAN AND SURVEY) PIER I Q�� =ia BOAT LIFT % c W SUPPORT PILINGS BY MARINE CONTRACTOR I PROPOSED BULKHEAD j FILL AS REQ'D STEPS FROM + 1.40 MSL START OF PIER j CO2 ALUMINUM RAMP .i ;; APPROX. DOWN TO BEACH I (MEAN HIGH WATER) TO FLOATING BOTTOM LINE t 0.00 MSL DOCK D=v OAW ` 1 w rji tsol ra LOCATION MAP NOri+Dwm RECEIVED yfz,-f6 �vv DCM WILMINGTON, NC d#F(g FEB 0 7 1013 (,%) < CASEY SUMMER HOME BULKHEAD, PIER, WEBO, AND DOCK 314 SOUTH LUMINA AVE. WRIGHTSVILLE BEACH NEW HANOVER COUNTY, NC PROJ. NO. 09.14 I SCHEMATIC ELEVATION DATE: 1/29/2013 SHOWING PROPOSED BULKHEAD, SHEET PIER, GAZEBO, AND BOAT DOCK PLAN SCALE: 1INCH a 90FT clot