HomeMy WebLinkAbout20130193 Ver 1_401 Application_20130213O� WATf9
O `f
2 ®1 3® 1 9 3
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a. Typs(s) of approval sought from the Corps:
❑ Section 404 Permit ❑ Section 10 Permit
1b. Specify Nationwide Permit (NWP) number. or General Permit (GP) number.
1c. Has the NWP or GP number been verified by the Corps?
❑ Yes ❑ No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
❑ 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification - Express Riparian Buffer Authorization I
Is. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes ❑ No
For the record only for Corps Pemdt:
❑ Yes ❑ No
1f. is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or In -lieu fee program.
❑ Yes �No
1g. Is the project located in any of NC's twenty coastal counties. if yes, answer 1h
below.
❑Yes NO
1 h. is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes f j No
2. Project information
2a. Name of project:
` r` lh s e Ivese-
2b. County:
h �'
2c. Nearest municipality / town:
2d. Subdivision name:
j(
2e. NCDOT only, T.I.P. or state project no.
$. Owner information
3a. Name(s) on Recorded Deed:
j4& i S'
3b. Deed Book and Page No.
3c. Responsible Party (for LLC if
applicable):
' t
3d. Street address:
r a Ave r
3e. City, state, zip:
`
3f. Telephone no.:
3g. Fax no.:
&A ,. 776-6ffI2
3h. Email address:
'
/e
i
Page 1 of 10 i
PCN Form - Version 1.4 January 2009 ; t - -4 2013 t
4. Applicant Information (if different from owner)
4a. Applicant is:
❑ Agent Cj Other, specify:
4b. Name:
4c. Business name
Of applicable):_
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email addreade-
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email add .
Page 2 of 10
B. Project Information and Prior Project History
1. Property identification
1 a. Property identification no. (tax PIN or parcel ID):
e
1b. Site coordinates (In decimal degreeiYTLatftude:NS
in In n Longitude:
1c. Property size: 7
acres .YDD
2. Surface Waters
2a. Name of nearest body of water to proposed project:
4A
2b. Water Quality Classification of nearest receiving water:
Vic. River basin:
j
3. Project Description
3a Describe the existing oondidons on the site and the general land use in the vicinity of the project at the time of this
application: 1 _ f ro Glel4ndd N/� �1-l. no A&~ oO 4� ; -bize
"3b, List the total estimated acreage of all existing wetlands on the property:
3c. List the total estimated linear feet of all existing streams (intermittent and perenn1aQ on the property
3d. 'Explain the purpose of the proposed project: _L
,dLI�Fe
3e. Describe the overall project in detail, including the type of equipment to be used:
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
ro ect (Including all prior phases) in the past?
� Yes (:1 No ❑ Unknown
Comments:
4b. If the Corps made the Jurisdictional determination, what type
of determination was made?
❑ preliminary Final
4c. If yes, who delineated the jurisdictional areas?
Name Of known): 692s
Agency /Consultant Company:
Other.
4d, if yes, list the dates of the Corps Jurisd ctional determinations or State determinations and attach documentation.
Pei2 daps'Ve Zvi&AeeAs I f w +s ny�`!ed -s weep - J Is W
k r
Los
5. Project History
5a. Have permits or oerdfications been requested or obtained for
this project (Including all prior phases) in the past? •
Oyes XN ❑Unknown
I
—O
5b. If yes, explain in detail according to "help file' instructions. '
6. Future Project Plans
6a. Is this a phased project? ❑ Yes IYo
6b. If yes, explain.
C-4 2013 ! I
Page 3 of 10
PCN Form — Version 1.4 January 2009
e-
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
❑ Wetlands ❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area Impacted.
2a.
Wetland impact
number
Permanent (P) or
Tem
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
Impact
(acres)
W1 -
Choose one
Choose one
Yes/No
W2 -
Choose one
Choose one
Yes/No
W3 -
Choose one
Choose one
Yes/No
W4 -
Choose one
Choose one
Yes/No
W5 -
Choose one
Choose one
Yes/No
we -
Choose one
Choose one
Yeaft
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites Impacted.
3a.
Stream Impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1 -
Choose one
82 -
Choose one
S3 -
Choose one
-
S4 -
Choose one
85 -
Choose one
S6 -
Choose one
3h. Total stream and tributary
impacts
31. Comments:
Page 4 of 10
PCN Form — Version 1.4 January 2009
t
4. Open Water Impacts
If there are proposed impacts to lakes, pondsoestuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then Ind ually list all open water im 'ac4s below.
4a.
Open water
Impact number
Permanent (P) or
Temporary
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01 -
Choose one
Choose
02 -
Choose one
Choose
03 -
Choose one
Choose
04 -
Choose one
Choose
4f. Total open water impacts
4g. Comments:
S. Pond or Lake Construction
If Pond or lake construction proposed, the complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
51. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
B. Buffer impacts (for DWQ)
If project will.impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any i cts re uire miti ation then MUST fill out Section D of this form.
6a. Project is in which protected basin?
❑ Neuse tar- Pamlico ❑ Catawba ❑ Randleman ❑ Other.
6b.
Buffer Impact
number—
Permanent (P) or
Temporary
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
feet )
69.
Zone 2
impact
(square
feet
B1 -
YM440
/
82 -
Yes/No
v
B3 -
Yes/No
64 -
Yes/NO.
B5 -
Yes/No
B6 -
Yes/No
6h. Total Buffer Impacts: r
6i. Comments:
/V t D 4& DAVAeA+v o WI
' - Page 5of10
i
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
2. Compensatory Motion for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
Impacts to Waters of the U.S. or Waters of the State?
❑ Yes Ajo
2b. If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c. If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type: Choose one
Type: Choose one
Type: Choose one
Quantity:
Quantity:
Quantity:
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
Choose one
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non - riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
41h. Comments:
6. Complete if Using a Permittes Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
�.. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the projeot result in an impact within a protected riparian buffer that requires
buffer mitigation?
[3 yes No
'
6b. if yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
ec. '
Reason for impact
6d.
Total Impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved In4ieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
❑ Yes ❑ No
1b. If yes, then is a diffuse flow plan Included? If no, explain why.
❑ Yes ❑ No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project?
%
2b. Does this project require a Stormwater Management Plan?
❑ Yes ❑ No
2c. If this project DOES NOT require a StormwateuManagement Plan, explain why:
2d. if this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e. Who will be responsible for the review of the Stormwater Management Plan?
3. Certified Local Government Stomnwater Review
3a. In which local government's Jurisdiction is this project?
3b. Which of the following locally- implemented stormwater management programs
apply (check all that apply):
❑ Phase II
❑ NSW
® USMP
Water Supply Watershed
❑ Other.
3c. Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ❑ No
4. DWQ Stormwater Program Review
4a. Which of the following state - implemented stomtwater management programs apply
(check all that apply):
OCoastal counties
❑ HQW
ORW
®Session Law 2006 -246
[]Other
4b. Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ❑ No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.4 January 2009
Page 9 of 10
PCN Form — Version 1.4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1i. Does the project involve an expenditure of public (federallstatellocaq funds or the
Yes
LgN0
use of public (federaUstate) land?
1b. If you answered *yes* to the above; does the project require preparation of an
❑ Yes
❑ No
environmental document pursuant to the requirements of the National or State
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
13 Yes
❑ No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑Yes
Po
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the -fact permit application?
❑ Yes
No
2c. If you answered `yes° to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
Oyes
NO
additional development, which could impact nearby downstream water quality?
3b. If you answered °yes° to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
m6st recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility. -
Page 9 of 10
PCN Form — Version 1.4 January 2009
S. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
habitat?
Yes %90
5b. Have you checked with the USFWS concerning Endangered Species Act
impacts?
Yes No
5c. if yes, Indicate the USFWS Field Office you have contacted.
5d. What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish Habitat (Corp Requirement)
ea. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
Yes kNo
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur In a FEMA- designated 100 -year floodplain?
❑ Yes ❑ No
8b. if yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
eefK A.4 j'
ApplicanVAgent's Printed Name
,AppiicantiAg ni's Signature
(Agent's signature is valid ony If an authorization
letter from the a Ocant is rovided.
1 Mr3P 13
Date '
Page 10 of 10