Loading...
HomeMy WebLinkAbout20210957 Ver 1_Meeting Request Review_20210517 DWR Pre-Filing Meeting Request Form NORTH CAROLINA Environmental Quafity ID#* 20210957 Version* 1 Regional Office* Central Office-(919)707-9000 Reviewer List* Rob Ridings Pre-Filing Meeting Request submitted 5/17/2021 ........................................................................................................................................................................................................................................................................................................................................................................................................................................................ Contact Name* Jason Dilday Contact Email Address* jldilday@ncdot.gov Project Name* Bridge 36 on NC561 over Fishing Creek Project Owner* NCDOT Project County* Halifax Owner Address: Street Address 1000 Birch Ridge Drive Address Line 2 City State/Bovine/Region Raleigh NC Fbstal/Zip Code Country 27610 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: i7 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification 1 Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Rob Ridings Please give a brief project description below and include location information.* Replacement of Bridge 36 on NC 561 over Fishing Creek. Please attach the documentation you would like to have the meeting about. BR-0090_and_B-5947_Prefilingcomments.pdf 367.97KB pol only By digitally signing below,I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature ait.feor Submittal Date 5/17/2021 Reviewer Meeting Request Decision ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Is a meeting required or is there more info needed?* r Yes r No If more information is needed,please add con II ents for the email notification below.