Loading...
HomeMy WebLinkAbout20130073 Ver 1_More Info Requested_20130218NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P.E. John E. Skvarla III Governor Director Secretary February 18, 2013 DWQ Project # 13 -0073 Pitt County CERTIFIED MAIL: RETURN RECEIPT REQUESTED 7011 1150 0000 4206 5384 Christ Covenant School Mr. Mark Barton 4889 Old Tar Road Winterville, NC 28590 Subject Property: Christ Covenant School, Worthington Road (SR 1711), Winterville Neuse River Basin, Fork Swamp [NEU 09, 27 -97 -4; NSW, C, Sw] REQUEST FOR ADDITIONAL INFORMATION Dear Mr. Barton: On January 29, 2013, the Division of Water Quality (DWQ) received your application dated January 25, 2013 to impact 0.061 acres of wetlands, 15 linear feet of stream, and 11,036 square feet of riparian buffers for the proposed school construction with ancillary facilities. The DWQ has determined that your application is incomplete and /or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected isolated wetlands and /or streams on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0502 and 15A NCAC 2B .0201 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: Avoidance and Minimization of stream impacts - • It is required to demonstrate avoidance and minimization of impacts from proposed construction of stormwater bypass outfall structure. Outfall channel should enter the existing stream at 45 degree angle and proposed riprap removed from stream and placed North Carolina Division of Water Quality Internet: www.ncwaterqualit 943 Washington Square Mall Phone: 252- 946 -6481 One Washington, NC 27889 FAX 252- 946 -9215 NorthCarofiina An Equal Opportunity /Affirmative Action Employer — 50% Recycled /10% Post Consumer Paper Natmally Page 2 of 2 in discharge channel. Riprap should be place upon GeoTextile fabric to reduce erosion under riprap. Reduction of Riparian Buffer impacts - • Parking lot and football field should be moved to the east to reduce impacts from football field on riparian buffers. Project Description on PCN form insufficient - • On page 3 of 10, Item 3e. project should be described in detail. Plans indicate that proposed project is to be phased. There should be a clear narrative describing each phase of proposed construction including buildings, parking lots, and sports fields. Please respond in writing to the DWQ within 30 days of the date of this letter with the requested information. If we do not hear from you within 30 days, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Roberto Scheller of the Washington Regional Office at 252 - 948 -3940 or Karen Higgins of the DWQ Central Office at 919- 807 -6360 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, For Amy Adams, Supervisor Surface Water Protection Section cc: Andy Monday, Stroud Engineering, PA, 1076 Commerce St.,Greenville, NC 27858 William Wescott, USACE, Washington Regulatory Field Office DWQ Webscape Unit File Copy