HomeMy WebLinkAbout20110794 Ver 1_Emails_20120124Euliss, Amy
From:
Wrenn, Brian
Sent:
Tuesday, January 24, 2012 2.11 PM
To:
Hilary Rauch
Cc:
Euliss, Amy
Subject:
RE, Guilford College Road Widening - U -2913B in Guilford County
Mr. Rauch,
We have received NCDOT's formal letter detailing the actions to be taken to correct the dissipator pad adjacent to your property and the timeline on which the
repairs will be based. However, we have not received the final design of the dissipator pad. As to your request for NCDOT's response regarding your review of
their design, they have made no response. When we receive a copy of the design, I will forward the design to you for your records. However, the review and
approval process of the design is NCDWQ's responsibility. You may provide comments to us regarding the design, but ultimately we will approve a design that
satisfies our regulations regarding the Randleman Buffer Rules. Any further actions you feel are necessary regarding the damage to your property will have to be
resolved via NCDOT's tort claim process. If you have additional questions, please let me know. thanks.
Brian
Brian Wrenn
Transportation Permitting Unit, Supervisor
NC Division of Water Quality
brian.wrenn @ncdenr.gov
585 Waughtown Street
Winston - Salem, NC 27107 -2241
336 - 771 -4952 (Winston -Salem no.)
336- 771 -4631 (Fax)
or
1650 Mail Service Center
Raleigh, NC 27699 -1650
919 -807 -6365
919 - 807 -6494 (Fax)
From: Hilary Rauch [mailto:hrauch @infionline.net]
Sent: Tuesday, January 24, 2012 1:38 PM
To: Wrenn, Brian
Cc: Euliss, Amy
Subject: Guilford College Road Widening - U -2913B in Guilford County
Mr. Wrenn:
In my December 20, 2011 email to you (copy forwarded herewith for your convenience), I asked that you provide me with NCDOT's response to
your request that I be given an opportunity by NCDOT to comment on their proposed repair to their 24" drainage pipe outlet protection. Could you
please let me know what NCDOT's response was to your request? Thank you.
Also in my December 20, 2011 email to you, I requested that DWQ provide me a with a copy of the proposed final design of the outlet protection
repair before DWQ provides its comment(s) and /or approval to NCDOT so that I can provide comments to DWQ before DWQ takes any final action
on the proposed final design. Could you please tell me whether or not you intend to do so? Thank you.
Hilary Rauch
- - - -- Original Message - - - --
, :,,
�.�:�
Hila
To: Wrenn, Brian
Cc: Lauffer, Matthew S, Mills, James M: Euliss, Amy
Sent:'Tuesday, December 20, 2011 12:20 PM
Subject: Re: Guilford College Road Widening - U- 2913B -in Guilford County
Mr. Wrenn:
Thank you for your reply.
I am certainly pleased that DWQ will maintain review and approval control over NCDOT's final design. And, while I can understand that DWQ has
no authority to require NCDOT to allow me to review the dissipater design, I hereby pecifically request that DWQ provide me with a copy of
proposed final design BEFORE DWQ provides its comment(s) and /or approval so that I may have an opportunity to review it with my advisors and
provide any comment(s) to, DWQ before DWQ takes any final action with respect to the proposed final design. It seems absolutely unconscionable
to me to think that the property owner whose property is clearly most vulnerable to damage by NCDOT's outlet protection is not being given an
opportunity by NCDOT to review their proposed repair! I also specifically request that you provide me with NCDOT's response to your request that
I be given an opportunity by NCDOT to comment on it.
I am also pleased to see that you confirm DWQ's position that the drainage pipe outlet protection is and was subject to the Randleman buffer
rules. I cannot fault your desire to focus efforts on bringing the outlet into compliance, etc. rather than to continue to debate the point with NCDOT.
I will take care of contesting NCDOT's unfounded position as I pursue other action against NCDOT.
Hilary Rauch