Loading...
HomeMy WebLinkAbout20210790 Ver 1_PreFiling 30-Day Clock Reached Email_20210515Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, May 15, 2021 12:03 AM To: Doliber, Brian C Cc: Ward, Garcy Subject: Pre -Filing Time Clock has been reached for Stumpy Point Dredging 21 - 20210790 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Stumpy Point Dredging 21 that you submitted on 4/14/2021. The ID number for that project is 20210790, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. For internal use only Transportation Project 1 DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210790 Version * 1 Washington Regional Office - (252) 946-6481 Garcy Ward Pre -Filing Meeting Request submitted 4/14/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Brian Doliber bcdoliber@ncdot.gov Stumpy Point Dredging 21 Brian Doliber Dare Street Address 159 Lucinda Lane Address Line 2 aty State / Rovince / Region Powells Point NC Fbstal / Zip Code Country 27948 Currituck Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Garcy Ward Please give a brief project description below and include location information. * An excavator and barge would be used to remove approximately 1500 cubic yards from the Stumpy Point emergency ferry terminal slips. The material that needs removed is located in the area closest to the shoreline/ramps and is within our permitted channel limits. Please attach the documentation you would like to have the meeting about. STUMPYPOINT_LS_SSG_03-09-2021.pdf 13.57MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature mz, Submittal Date 4/14/2021