HomeMy WebLinkAbout20120127 Ver 1_Certification of Completion_20130219Hanging Rock Equestrian Trail Crossing
DWQ# 12.0127
March 1, 2012
Page 3
DWQ Project No.: 1',) -- 0 -�*7 County
Applicant: . X� c•.l l�y�'y! tires i 1p-tt�
Project Name: M7n i rt . t Qesrtt S.61
Date of Issuance of 401 Water Quality Certification:
Certdtleate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,
and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit,
North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699 -1621. This form
may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certi cation
I, DMWA L X04 , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporting materials.
Signature: OA-aW4O&- Date: Z't�'�A�1
Agent's Certi ication
I, , hereby state that to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporting materials.
Signature:
Date:
Engineer's Certl ccation
Partial Final
1, ' as a duly registered Professional Engineer in the State of
North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the
project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials. _
Signature
Date
Registration No.
D
FEB 1 9 2013
D NR - wA =R AUN
J