Loading...
HomeMy WebLinkAbout20130091 Ver 1_Approval Letter_20130212if NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. John E. Skvada, III Governor Director Secretary February 12, 2013 DWQ# 13 -0091 Mecklenburg County Ms. Leslie Bing City of Charlotte 600 East Fourth St. Charlotte, NC 28202 Subject: APPROVAL of 401 Water Quality Certification with Additional Conditions Johnston - Oehler Road Improvement Project Dear Ms. Bing: You have our approval for the impacts listed below for the purpose described in your application dated January 21, 2013 and received by the Division of Water Quality (Division) on January 30, 2013. These impacts are covered by Water Quality General Certification Number 3886. This General Certification allows you to use Nationwide Permit Number 14 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This approval is valid for the purpose and design described in your application. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s) and is responsible for complying with all conditions. This approval requires you to follow the conditions listed in the enclosed certification(s) and the following additional conditions: 1) Approved Impacts: Wetland Impacts in the Yadkin -Pee Dee River Basin Wetland Site Temporary Fill ac Permanent Fill ac Total Wetland Impacts ac Mitigation Required ac W2 0.13 0.08 0.21 -- W3 0.03 0.11 0.41 -- W4 0.01 0.02 0.03 -- Total 0.44 0.21 0.65 0.0 Mooresville Regional Office Location- 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Phone: (704) 663- 1699\Fax (704) 663 -6040\ Customer Service 1- 877 - 623 -6748 Internet http: / /portal.ncdenr.org/webtwq An Equal Opportunity /Affirmative Action Employer— 50% Recycled /10% Post Consumer Paper Noe Carolina Naturally 2) Wetland WA1 shall be properly protected from failure of the adjacent sediment basin. Turbidity /sediment discharges shall be minimized to the greatest extent practicable. The Division shall be notified of any discharge in excess of 3 cubic feet of sediment. 3) During construction, diversion ditches shall be matted to prevent the erosion of the ditch. Additionally, fill slopes >/= 15 ft in height and within 50 ft of stream/wetlands shall be matted as they are completed. 4) Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 5) Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. 6) A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, all subsequent modifications, if any, shall be maintained with the Division Engineer and the on -site project manager. 7) Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify DWQ (and regional office) when all work included in the 401 Certification has been completed 8) The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If NCDWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, NCDWQ may reevaluate and modify this certification. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699 -6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of DWQ under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704 - 663 -1699. Sincerely, for Charles Wakild, P. E. Attachments cc: Army Corps of Engineers, Asheville Sonia Corrillo, Wetlands Transportation Unit Charles Benton, URS Corp., 1600 Perimeter Park Dr., Ste. 400, Morrisville, NC 27650 DWQ# 13 -0091