Loading...
HomeMy WebLinkAbout20210694 Ver 1_B-6054A Wetland Permit Package -210511_May 18 2021 edits_20210518(Version 2.08; Released April 2018)49070.1.1TIP No.:B-6054ACounty(ies):HaywoodPage 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?NoDesign/Future:Year:2041Existing:Year:Aquatic T&E Species?NoComments:YesNoNoWetlands within Project Limits?Trout Waters (Tr) Hatchery Supported Trout WatersSupplemental Classification: Cold Springs Creek5-4510.60.79 milesProject DescriptionProposed ProjectFrench BroadCity/Town:3.5Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)Nosurrounding area on national forest land, mostly uncultivateddgmchenry@ncdot.govAddress:2/2/2021HaywoodHaywoodDavid McHenryRiver Basin(s): WBS Element:Joy Saddler, PE. BeneschNCDOT Contact:(828) 586-2141Contractor / Designer:(984) 221-8769North Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:Address:General Project InformationB-6054AWBS Element:Bridge Replacement49070.1.1Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)The project area is located in the Pisgah National forest and the area surrounding the project is largely forested. Bridge 57 over Cold Springs Creek and Harmon Den Road is a Reinforced Concrete Floor on I-Beams (3@65'1@50) and to be replaced with a Prestressed Concrete Girder Bridge (1@122' 54" PSCG/1@95' 36" PSCG). The proposed bridge is to be built in place of the existing bridge about 300' upstream of the Cold Springs Creek confluence with Pigeon River. A retaining wall is to be placed at the end bridge section. Class II rip rap is to be placed on both embankments to stabilize the stream bank after construction. In addition to the bridge replacement, wild life passages, fencing and wildlife guards are to be installed to better control wildlife movements along the I-40 corridor. All proposed outfalls are protected with Class B rip rap. 6" Deck drains are along the entire proposed bridge but do not discharge over Harmon Den Roador the waterway.N/ABuffer Rules in Effect:None28500Existing bridge is to be replaced with a Prestressed Concrete Girder Bridge (1@122' 54" PSCG/1@95' 36" PSCG) skewed at the same 76-degrees over Harmon Den Road and Cold Springs Creek. A wild life path will be added under the bridge to accommodate wildlife crossings. Waterbody Information2018NCDWR Stream Index No.:NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Bodyac.Existing bridge is a Reinforced Concrete Floor on I-Beams (3@65'1@50) at a 76-degree skew along I-40, skewed at 76-degrees, crosses Harmon Den Road as well as Cold Springs Creek. The existing bridge has a 54" Concrete barrier dividing the East and West bound lanes of I-40 near the Tennesse/North Carolina State Line.29800Jsaddler@Benesch.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?N/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)8000 Regency Parkway, Suite 175, Cary, NC 27518 253 Webster RoadSylva, NC 28779 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. THIS IS A CONTROLLED ACCESS FACILITY WITH ACCESS LIMITED TO INTERCHANGES. DESIGN EXCEPTION IS REQUIRED FOR MINIMUM RADIUS ON -L- SEAL NOT VALID UNLESS SIGNED AND DATEDPROFESSIONAL REENIGNENORTHCAROLIN A SEAL 030877L AURA C. FISHERSEAL NOT VALID UNLESS SIGNED AND DATEDPROFESS IO NAL REENIGNENORTHCAROLIN A SEAL 049357 J O Y M. SADDLER HAYWOOD COUNTY D T V = = = = = = % % MPH ADT ADT % * FUNC CLASS = DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED K 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA Prepared in the Office of: SIGNATURE: SIGNATURE: P.E. P.E. 2018 STANDARD SPECIFICATIONS PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 11-MAY-2021 17:57Y:\Charlotte\17000300S\17000306.10_B-6054A\Eng_Docs\NCDOT\Hydraulics\PERMITS_Environmental\Drawings\B-6054A_hyd_prm_wet_tsh.dgnjsaddler AT NC2020-08-L4CONTRACT:TIP PROJECT:ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NASee Sheet 1A For Index of Sheets LAURA C. FISHER, PETO TENNESSEENCDOT CONTACT 50 25 50 TO CLYDESR 1101 (COLD SPRINGS CREEK RD)BRIDGE NO.57 ON I-40 OVER SR 1101 (HARMON DEN RD / 60 2018 28,500 * TTST =31 DUAL=3 23 PI GEON RI VERCREEKSPRINGCOLDVICINITY MAP NOT TO SCALEB-6054AB-6054A (984) 275-2490 CARY, NC 27518 8000 REGENCY PARKWAY, STE 175 NC FIRM LICENSE No: F-1320 INTERSTATE STATEWIDE TIER BRIDGE 57 END PROJECT BEGIN PROJECT COLD SPRINGS CREEK RD) AND COLD SPRING CREEK -L- I-40-Y-CREEK COLD SPRING $40 $40 PI G EON RI V ERSEPTEMBER 2021 GREG A. STEWART, PE JOSHUA B. DEYTON, PE-L- I-40-RAMP B- -RAMP C-FOREST SERVI CE RD-RA MP A- -RAMP D--Y1- -L- I-40 100 05025 50 100 05 52.5 10 6 5 4 49070.1.1 49070.2.1 49070.3.1 LENGTH ROADWAY TIP PROJECT B-6054A = 0.749 MI LENGTH STRUCTURE TIP PROJECT B-6054A = 0.041 MI TOTAL LENGTH TIP PROJECT B-6054A = 0.790 MI CLEANUP AREA "COTTON PATCH" DETOUR PE R/W & UTILITIES CONSTRUCTION 2041 29,800 10 55 GRADING, RETAINING WALL, DRAINAGE, PAVING, AND STRUCTURE APRIL 2021 -Y- STA 16+40.00 END CONSTRUCTION BEGIN CONSTRUCTION -Y1- STA 11+14.00 -L- STA. 51+68.20 END TIP PROJECT B-6054A -L- STA. 10+00.00 BEGIN TIP PROJECT B-6054A -L- STA. 28+91+/- BEGIN BRIDGE -L- STA. 31+06+/- END BRIDGE BEGIN CONSTRUCTION -Y1- STA 12+41.59 -Y- STA 10+00.00= ENGINEER HYDRAULICS MAY 27, 2021 90% FINAL PLANS JOY M. SADDLER WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET 1 OF 13 PERMIT DRAWING SA SB SD NAD 83/ 2011 MATCH LINE -L- STA. 24+00 SEE SHEET 54 NAD 83FOR -RPCD- PROFILE SEE SHEET 10 FOR -RPBA- PROFILE SEE SHEET 9 FOR -L- PROFILE SEE SHEET 7 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SHEET 2 OF 13 PERMIT DRAWING 11-MAY-2021 17:57B-6054A_hyd_prm wet psh04.dgnjsaddlerHYDRAULICSROADWAY DESIGN ENGINEER ENGINEER5/14/99SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED B-6054A DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION GRAPHIC SCALE 0'100'100' INV=1878.75' 15" R CP 15" R C P 24" CMP2 4 " CMP24" RCP 24" RCP 18" CMP18" CMP18" CMP24" CMPCONC BARRIER CONC BARRIER 132" CHLK ROCK BARRIER 132" CHLK ROCK BARRIER CB DI US FOREST SERVICE UNITED STATES OF AMERICA DB A05 PG 301 54" CMB 54" CMB 54" CMB MTLMTL MTL MTL I-40 EBL 59.9' BSTI-40 WBL 38.1' BST I-40 WBL 42.1' BST I-40 EBL 58.2' BST 36" C&G 36" C&G 48" CMB 48" CMB 48" CMB -EL- D IDI DI DI INV=1886.08' INV=1880.61' INV=1880.65' ANCHOR CB INV=1879.20' INV=1877.67'30" CMP SIGN SIGN ANCHOR 18" CMP 18" CMPDI INV=1880.88' INV=1885.16'18" RCP ANCHOR DI DI INV=1878.46' 24" RCP INV=1878.15' INV=1882.21' INV=1882.14' US FOREST SERVICE UNITED STATES OF AMERICA DB A05 PG 301 SIGN SIGN SIGN S IGN SIGN CB DI CB RIPRAP RETAINING WALL RIPRAP CB CB SIGN TOP=1888.36' TOP=1889.85' TOP=1892.19' 18" C MP 15" CMPDIRECTION ONLY DIRECTION ONLY ABANDONEDDIRECTION ONLY DIRECTION ONLY C O N C D IT C H CONC DITCH CONC DITCH 18" RCP 15" R C P 15" R C P INV=1879.62' INV=1880.11' INV=1879.76' INV=1886.96'INV=1886.38' 260.00' EXISTING R/W EXISTING R/W US FOREST SERVICE UNITED STATES OF AMERICA DB A05 PG 301 US FOREST SERVICE UNITED STATES OF AMERICA DB A05 PG 301 CONC BARRIER BEGIN TIP PROJECT B-6054A -R PBA --RPCD- -L- I-40 BEGIN MILL & RESURFACE -L- STA. 10+00.00 BARRIER CONC. MEDIAN 2' DOUBLE FACED -L- +05.18 TIE TO EXIST. RETAINING WALL BEG. FENCE -L- +43.10 BEG. NEW CONC. BARRIER 120' TAPER +90.00+19.00200' TAPER 200' TAPER +86.00+80.00-L- +16.54 BEG. FENCE TIE TO ROCK FACE PAVED SHOULDER 2' TO 4' MEDIAN 120' TAPER 18'MAINTAINING EXIST. EOP 120' TAPER TO 4' FDPS EXI STEXI ST3 0 " RCP-I V24" RCP-IV18" R C P-I V R CP-IV 24" GRADE TO DRAIN WHERE POSSIBLE GRADE TO DRAIN WHERE POSSIBLE GRADE TO DRAIN WHERE POSSIBLE 18" RCP-IV18" RCP-IV 18" RCP-IV 24" RCP- I V30" RCP-IV 3 0 " RCP- I V30" RCP-IV 30" RCP-IV 18" RCP-IV 24 " RCP -IV 18" RCP-IV 2GI 2GI 2GI 2GI TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED OTCB SB TEMPORARY STREAM IMPACT EXISTING PIPE REPLACEMENT SITE 4 MATCH LINE -L- STA. 24+00 SEE SHEET 54 NAD 83FOR -RPCD- PROFILE SEE SHEET 10 FOR -RPBA- PROFILE SEE SHEET 9 FOR -L- PROFILE SEE SHEET 7 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SHEET 3 OF 13 PERMIT DRAWING 11-MAY-2021 17:57B-6054A_hyd_prm wet psh04a.dgnjsaddlerHYDRAULICSROADWAY DESIGN ENGINEER ENGINEER5/14/99SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED B-6054A DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 1845 1845 18 4 5 184518451845184518501850185018501850 18501 8501850 1850 1850 1850 1850 1850 1855 1855 1855 1855 1855 1855 1855 185518551855185518551865 1865 1865 1865 1865 1865 1865186518 65 186518651865 18651870 1870 1870 1870 1870 1870 187 0 187018701870187018751875187518751875 1875 1875 1875 1875 1875 1875 1875 18851885188518851885 1885 1885 18851885 18851885 18851885 188518851885 1885 1885 1885 1885 1890 1890 1890 1890 1890 189018 9 0 1890 1890 189018901890189018901890 1890 1890 1890 18 9018901895 1895 1895 1895 1895 1895 1895 1895 1895 1895189518951905 1905 1905 1905 1905 1905 1 9 0 5 1905 1905190519051910 1910 1910 1910 1910 1910 1910 1 91 01910191019101915 1915 1915 1915 1915 1915 1915 1915 1915191519151925 1925 1925 1925 1925 1925 1925 1925 1925192519251930 1930 1930 1930 1930 1930 1930 1930 19301930193019351935 1935 1935 1935 193 5 19351935 193519351935194519451945 1945 1945 1945 1945 19451945 19451945194519501950 1950 1950 1950 1950 1950 19501950195019501955 1955 1955 1955 1955 1955 1955 1955 1955 1955195519551 9 6 5 1965 1965 1965 1965 1965 1965 19651965 196519651970 1970 19 7 0 1970 1970 1970 1970 1970 1970197019701 9 7 5 1975 1975 1975 1975 1975 1975 19751975 19751975198519851985 1985 1985 1985 1985 19851985 198519851 9 9 01990 1990 19901990 1990 1990 19901990 1990199019951995 19 9 51995 1995 1995 19951995 199519952005 2005 2005 2005 2005 2005 20052 0 0 5 200520052010 2010 2010 2010 2010 2010 2010 2010 201020102015 2015 20152015 2015 2015 2015 2 01 5 20152025 20252025 20252025 2025 20252025 20252030 2030 2030 2030 2030 20302030 2030 2035 2035 2035 2035 2035 20352035 2035 2045 2045 2045 2045 2045 2045 2045 2045 2050 20502050 2050 2050 2050 20502055 20552055 2055 2055 20552055 2065 20652065 2065 20652065 2065 20702070 20 70 2070 20702 0 7 0 2070 2075 2075 2 07 5 20752075 2 0 7 5 20752075 20852085 2085 2085 20852085 2085 2090 20902 0 9 0 2090 209020902090 2095 20952095 2095 2095 2095 2095 2095 21052105 2105210 52 10 521052105 2110 2110 21102110 21102110 21102115 21152115 21152 11 5 21152115 2125 21252125 212521252125 2125 2130213021302130213021302130 21352135 2135 2 1 3 5 21352135 2145 2145 21452145 21452 1 4 5 2145 2150 2150 2150 2150 2 15 0 21552155 21552 15 5 21552155 216521652165 2165217021702170217521752175 2185218521852190 2190 2195 2205 2210 2215GRAPHIC SCALE 0'100'100' INV=1878.75' 15" R CP 15" R C P 24" CMP2 4 " CMP24" RCP 24" RCP 18" CMP18" CMP18" CMP24" CMPCONC BARRIER CONC BARRIER 132" CHLK ROCK BARRIER 132" CHLK ROCK BARRIER CB DI US FOREST SERVICE UNITED STATES OF AMERICA DB A05 PG 301 54" CMB 54" CMB 54" CMB MTLMTL MTL MTL I-40 EBL 59.9' BSTI-40 WBL 38.1' BST I-40 WBL 42.1' BST I-40 EBL 58.2' BST 36" C&G 36" C&G 48" CMB 48" CMB 48" CMB -EL- D IDI DI DI INV=1886.08' INV=1880.61' INV=1880.65' ANCHOR CB INV=1879.20' INV=1877.67'30" CMP SIGN SIGN ANCHOR 18" CMP 18" CMPDI INV=1880.88' INV=1885.16'18" RCP ANCHOR DI DI INV=1878.46' 24" RCP INV=1878.15' INV=1882.21' INV=1882.14' US FOREST SERVICE UNITED STATES OF AMERICA DB A05 PG 301 SIGN SIGN SIGN S IGN SIGN CB DI CB RIPRAP RETAINING WALL RIPRAP CB CB SIGN TOP=1888.36' TOP=1889.85' TOP=1892.19' 18" C MP 15" CMPDIRECTION ONLY DIRECTION ONLY ABANDONEDDIRECTION ONLY DIRECTION ONLY C O N C D IT C H CONC DITCH CONC DITCH 18" RCP 15" R C P 15" R C P INV=1879.62' INV=1880.11' INV=1879.76' INV=1886.96'INV=1886.38' 260.00' EXISTING R/W EXISTING R/W US FOREST SERVICE UNITED STATES OF AMERICA DB A05 PG 301 US FOREST SERVICE UNITED STATES OF AMERICA DB A05 PG 301 CONC BARRIER BEGIN TIP PROJECT B-6054A -R PBA --RPCD- -L- I-40 BEGIN MILL & RESURFACE -L- STA. 10+00.00 BARRIER CONC. MEDIAN 2' DOUBLE FACED -L- +05.18 TIE TO EXIST. RETAINING WALL BEG. FENCE -L- +43.10 BEG. NEW CONC. BARRIER 120' TAPER +90.00+19.00200' TAPER 200' TAPER +86.00+80.00-L- +16.54 BEG. FENCE TIE TO ROCK FACE PAVED SHOULDER 2' TO 4' MEDIAN 120' TAPER 18'MAINTAINING EXIST. EOP 120' TAPER TO 4' FDPS EXI STEXI ST3 0 " RCP-I V24" RCP-IV18" R C P-I V R CP-IV 24" GRADE TO DRAIN WHERE POSSIBLE GRADE TO DRAIN WHERE POSSIBLE GRADE TO DRAIN WHERE POSSIBLE 18" RCP-IV18" RCP-IV 18" RCP-IV 24" RCP- I V30" RCP-IV 3 0 " RCP- I V30" RCP-IV 30" RCP-IV 18" RCP-IV 24 " RCP -IV 18" RCP-IV 2GI 2GI 2GI 2GI TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED OTCB SB TEMPORARY STREAM IMPACT EXISTING PIPE REPLACEMENT SITE 4 2030" CMP30" CMP24" CMP 36" CMP 24" CMP 18" CMP18" CMP18" CMP18" CMPMTLM TLMTL MTL MTLMTLMTLMTLMTL MTL MTL MTL MTL PI GEON RI VERCOLD SPRI NGS CREEKUS FOREST SERVICE UNITED STATES OF AMERICA 54" CMB 54" CMB 54" CMBMTL M TLMTLMTLMTL MTL I-40 WBL 35.4' BST I-40 EBL 36.3' BST ON RAMP TO I-40 WBL 24.4' BST OFF RAMP FROM I-40 EBL 25.2' BST I-4 0 WBL 3 1.7' B STOFF R AMP F R OM I-40 WB L 24.9' BS T ON RAM P TO I-40 EBL 24.7' BSTI-40 WBL 43.7' BS T I-40 E BL 34.7' BS T -EL- -EL- - E L- -EY-DI I NV= 19 0 4.2 9'TOP=19 0 9.0 0'CBTOP=19 0 6.0 9' MTL CB INV=1899 .37' TOP=1903 .09' INV=1878.74' CB TOP=1882.17' INV=1874.49' INV=1873.61' TOP=1879.07'IN V =1895.42' CB INV=1870.63' TOP=1896.12' INV=1896.16' INV=1896.14' INV=1892.40' INV=1875.05'INV=1877.82' US FOREST SERVICE UNITED STATES OF AMERICA I NV=18 8 3. 4 4'I NV=18 7 6. 12' I NV=18 7 2. 6 9' INV=1874.53' INV=1879.31' CB 18" CMPINV=1878.38' PAVED DITCH DI RECTI ON ONLYDI RECTI ON ONL YCONC DITCH CONC DITCHCOLD SPRI NGS CREEKCONC WW CONC WW CONC WW CONC WW 100.00'EXISTING R/WEXISTING R/WEXIS TI NG VARI ABLE R/WEXI STI NG VARI ABLE R/WEXISTING VARIABLE R/W EXISTING VARIABLE R/W US FOREST SERVICE UNITED STATES OF AMERICA US FOREST SERVICE UNITED STATES OF AMERICA 31.4' BSTHARMON DEN RD14.8' BSTFOREST SERVI CE RD 28829.8' BSTCOLD SPRI NGS CREEK RDDITCH PAVED35 18'15 1515 25203042" R C P-I V 42" R C P-I V 24" RCP-III 18" RCP-IV30" RCP-IV REMOVE 15" RCP-III 18" RCP- I V18 " RCP -IV 18" RCP-I V1 8" RCP-I V18" RCP- I V18" RCP- I V18" RCP-IV18" RCP- I V24" RCP-IV 24" RCP-III24" RCP-IV24" RCP-IV18" RCP-IVFS FS FS FS TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED 30" RCP-III2GI TB TB 2GI BOLTED MAT C H LINE -L- ST A. 24+00 SEE S HEET 4 SEE SHEET 6-L- STA. 38+00MATCH LINENAD 83FOR -RPCD- PROFILE SEE SHEET 10 & 11 FOR -RPBA- PROFILE SEE SHEET 9 & 10 FOR -Y1- PROFILE SEE SHEET 9 FOR -Y- PROFILE SEE SHEET 8 FOR -L- PROFILE SEE SHEET 7 DESIGN EXCEPTION IS REQUIRED FOR MINIMUM RADIUS ON -L- EXISTING PIPE REPLACEMENT SITE 2 STABILIZATION STREAMBANK BRIDGE SITE 1 SHEET 4 OF 13 PERMIT DRAWING EXISTING PIPE REPLACEMENT SITE 2 5 MAT C H LINE -L- ST A. 24+00 SEE S HEET 4 SEE SHEET 6-L- STA. 38+00MATCH LINENAD 83FOR -RPCD- PROFILE SEE SHEET 10 & 11 FOR -RPBA- PROFILE SEE SHEET 9 & 10 FOR -Y1- PROFILE SEE SHEET 9 FOR -Y- PROFILE SEE SHEET 8 FOR -L- PROFILE SEE SHEET 7 PAVEMENT REMOVALDESIGN EXCEPTION IS REQUIRED FOR MINIMUM RADIUS ON -L-11-MAY-2021 18:38B-6054A_hyd_prm_wet_psh05.dgnjsaddlerHYDRAULICSROADWAY DESIGN ENGINEER ENGINEER5/14/99SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED B-6054A DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION SEE SHEET 3 FOR ENLARGMENT F F F FC CCCCCCCCCCFCFFF FC C C C C C F F F F F FFF F C F F F F F F FFF C CCF F F F CCCCC F CTS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN SA SE GRAPHIC SCALE 0'100'100' 30" CMP30" CMP36" CMP 24" CMP 18" CMPM TLMTL MTLMTLMTLMTL MTL MTL MTL MTL US FOREST SERVICE UNITED STATES OF AMERICA 54" CMB 54" CMB MTL MTLMTL MTL I-40 WBL 35.4' BST I-40 EBL 36.3' BST ON RAMP TO I-40 WBL 24.4' BST OFF RAMP FROM I-40 EBL 25.2' BST I-4 0 W B L 3 1. 7' B S TOFF R AMP F R OM I-40 WB L 24.9' BS T -EL- M T L CB INV=1899 .37' TOP=1903 .09' INV=1878.74' CB TOP=1882.17' INV=1874.49' INV=1873.61' TOP=1879.07' CB INV=1870.63' TOP=1896.12' INV=1896.16' INV=1896.14' INV=1892.40' INV=1874.53' INV=1879.31' CB 18" CMPINV=1878.38' PAVED DITCH CONC DITCH CONC DITCHCOLD SPRI NGS CREEKCONC WW CONC WW CONC WW CONC WW EXISTING VARIABLE R/W EXISTING VARIABLE R/W 31.4' BSTHARMON DEN RD15 3042" R C P-I V 42" R C P-I V 18" RCP-IV30" RCP-IV REMOVE 15" RCP-III 18" RCP- I V18 " RCP -IV 18" RCP- I V18" RCP-IV18" RCP- I V18" RCP-IVFS TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED 30" RCP-III2GI TB TB 2GI BOLTED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY B-6054A SHEET 5 OF 13 PERMIT DRAWING S S SURFACE WATER DENOTES IMPACTS IN DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.11-MAY-2021 17:57B-6054A_hyd_prm_wet_psh05a.dgnjsaddler8/17/99 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 5(ENLARGED) GRAPHIC SCALE 0'50'50' F F F C CCCCCCCCFF FC C C C C C F F F F F F F F F F F FF C CCF F F F F STABILIZATION STREAMBANK BRIDGE SITE 1 EXISTING PIPE REPLACEMENT SITE 2 EXISTING PIPE REPLACEMENT SITE 2 2030" CMP30" CMP24" CMP 36" CMP 24" CMP 18" CMP18" CMP18" CMP18" CMPMTLM TLMTL MTL MTLMTLMTLMTLMTL MTL MTL MTL MTL PI GEON RI VERCOLD SPRI NGS CREEKUS FOREST SERVICE UNITED STATES OF AMERICA 54" CMB 54" CMB 54" CMBMTL M TLMTLMTLMTL MTL I-40 WBL 35.4' BST I-40 EBL 36.3' BST ON RAMP TO I-40 WBL 24.4' BST OFF RAMP FROM I-40 EBL 25.2' BST I-4 0 WBL 3 1.7' B STOFF R AMP F R OM I-40 WB L 24.9' BS T ON RAM P TO I-40 EBL 24.7' BSTI-40 WBL 43.7' BS T I-40 E BL 34.7' BS T -EL- -EL- - E L- -EY-DI I NV= 19 0 4.2 9'TOP=19 0 9.0 0'CBTOP=19 0 6.0 9' MTL CB INV=1899 .37' TOP=1903 .09' INV=1878.74' CB TOP=1882.17' INV=1874.49' INV=1873.61' TOP=1879.07'IN V =1895.42' CB INV=1870.63' TOP=1896.12' INV=1896.16' INV=1896.14' INV=1892.40' INV=1875.05'INV=1877.82' US FOREST SERVICE UNITED STATES OF AMERICA I NV=18 8 3. 4 4'I NV=18 7 6. 12' I NV=18 7 2. 6 9' INV=1874.53' INV=1879.31' CB 18" CMPINV=1878.38' PAVED DITCH DI RECTI ON ONLYDI RECTI ON ONL YCONC DITCH CONC DITCHCOLD SPRI NGS CREEKCONC WW CONC WW CONC WW CONC WW 100.00'EXISTING R/WEXISTING R/WEXIS TI NG VARI ABLE R/WEXI STI NG VARI ABLE R/WEXISTING VARIABLE R/W EXISTING VARIABLE R/W US FOREST SERVICE UNITED STATES OF AMERICA US FOREST SERVICE UNITED STATES OF AMERICA 31.4' BSTHARMON DEN RD14.8' BSTFOREST SERVI CE RD 28829.8' BSTCOLD SPRI NGS CREEK RDDITCH PAVED35 18'15 1515 25203042" R C P-I V 42" R C P-I V 24" RCP-III 18" RCP-IV30" RCP-IV REMOVE 15" RCP-III 18" RCP- I V18 " RCP -IV 18" RCP-I V1 8" RCP-I V18" RCP- I V18" RCP- I V18" RCP-IV18" RCP- I V24" RCP-IV 24" RCP-III24" RCP-IV24" RCP-IV18" RCP-IVFS FS FS FS TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED 30" RCP-III2GI TB TB 2GI BOLTED MAT C H LINE -L- ST A. 24+00 SEE S HEET 4 SEE SHEET 6-L- STA. 38+00MATCH LINENAD 83FOR -RPCD- PROFILE SEE SHEET 10 & 11 FOR -RPBA- PROFILE SEE SHEET 9 & 10 FOR -Y1- PROFILE SEE SHEET 9 FOR -Y- PROFILE SEE SHEET 8 FOR -L- PROFILE SEE SHEET 7 PAVEMENT REMOVALDESIGN EXCEPTION IS REQUIRED FOR MINIMUM RADIUS ON -L- SHEET 6 OF 13 PERMIT DRAWING EXISTING PIPE REPLACEMENT SITE 2 EXISTING PIPE REPLACEMENT SITE 2 STABILIZATION STREAMBANK BRIDGE SITE 1 5 MAT C H LINE -L- ST A. 24+00 SEE S HEET 4 SEE SHEET 6-L- STA. 38+00MATCH LINENAD 8311-MAY-2021 18:38B-6054A_hyd_prm_wet_psh05b.dgnjsaddlerHYDRAULICSROADWAY DESIGN ENGINEER ENGINEER5/14/99SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED B-6054A DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 18501850 18501850185018501850 1855 1855 1855 1 8 5 5 1855 185518551855185518551855 185518551865 1865 1865 186 518 6 5 1865 186518651865186518 6 5 186518651870 1870 1870 18 7 0 18 7 0 18701870187018701 8 7 0 18701870187518751875 1875 1875 187518751875187518751875187518751875187518851885 188518851885188518 8 51885188518851885 18851885 18851885 1885 1885 1 8 8 518851885 18851890 18901890 189018901890189018901890189018901890 1890 189018 9018901890189018901890189018951895 1895 1895189518951895 1895 1895189518 9518951895 1895189518951895 18951 895 189518951895189518951905 1905 190519051905 1 9 05 1905 1905 1905190519 0 5 1905 1905 1905190519051905190519101910 19101910 19101910 1910 1910 1910 19101910 1910 191019101915 1915 1915 1915191519151915 1915 1915 1915 1915 191519251925 1925 1925192519251925 1925 1925 1925 1925 1930 1930 1930 193019301 9 3 0 1 9 3 0 1930 19301930 1930 1935 1935 1935 193519351935 1935 1935 1935 193519451945 1945 1945194519451945 1945 1945 1945 1945 1950 195019501950 195019501950 19501950195019501955 195519551955 195519551955 19551955 1955 1955196519 6 5 1 9 6 5 1965 19651965196519651965 1965 19651965 196519 7 0 197019701970 19701970 1970 197019701970 19701 975 197519751975 19 7 51975 1975197519751975 1975 1985 1 985 1 9 8 5 1985 1985198519851985 19851985198 51990 1990 1990 1990 1990 1990199019901 99 01990 1995 199519951995 19951995199519951995 19951 9 9 5 2005 2005 2005 2005 2 0 0 5 200520052005 20052 0 05 201020102010 2010 2010 2010201020102010 2 01 0 2015 2015201520152015201520152015201520152 0 15 20252025202520252 0 25 2025202520252025 20302030 20302030 2 0 3 0 20302030 2030 2030 203520352035 2 03 520352035 20 352035 204520452045 2045 204520452045 20452045 205020502 050 2 0 5 0 20502050 20502055 205520552055 2055 2055 2065 206520652065 2065 2070 2070207020702070 2070 2075 2075 207520752075 2075 20852085208520852085209020 9020902090 2095 209520952095 2 1 0 5 210521052105 211021102110 21152115 2115 2115 21252125 21302130 2135 2 1 4 5 2150 2155 2165 217021752185 SEE SHEET 5 FOR ENLARGMENT F F F FC CCCCCCCCCCFCFFF FC C C C C C F F F F F FFF F C F F F F F F FFF C CCF F F F CCCCC F CTS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN SA SE GRAPHIC SCALE 0'100'100' 1855 1 8 5 51855 1865 1865 1865 1865186518 6 5 186518651870 1870 18 7 018701 8 7 0 18701875 1875 1875 18751875187518751875188518 8 518851885 18851885 18851885 1885 1885 1890 18901890 189018901890 18901895 1895 1895189518951895 1895 18951895189518951905 1905 190519051910 1910 1915 1915 1925 1925 1930 1930 1935 1935 1945 1945 19551955 1965 1965 197519751985203020352045 30" CMP30" CMP36" CMP 24" CMP 18" CMPM TLMTL MTLMTLMTLMTL MTL MTL MTL MTL US FOREST SERVICE UNITED STATES OF AMERICA 54" CMB 54" CMB MTL MTLMTL MTL I-40 WBL 35.4' BST I-40 EBL 36.3' BST ON RAMP TO I-40 WBL 24.4' BST OFF RAMP FROM I-40 EBL 25.2' BST I-4 0 W B L 3 1.7' B S TOFF R AMP F R OM I-40 WB L 24.9' BS T -EL- M T L CB INV=1899 .37' TOP=1903 .09' INV=1878.74' CB TOP=1882.17' INV=1874.49' INV=1873.61' TOP=1879.07' CB INV=1870.63' TOP=1896.12' INV=1896.16' INV=1896.14' INV=1892.40' INV=1874.53' INV=1879.31' CB 18" CMPINV=1878.38' PAVED DITCH CONC DITCH CONC DITCHCOLD SPRI NGS CREEKCONC WW CONC WW CONC WW CONC WW EXISTING VARIABLE R/W EXISTING VARIABLE R/W 31.4' BSTHARMON DEN RD3042" R C P-I V 42" R C P-I V 18" RCP-IV30" RCP-IV REMOVE 15" RCP-III 18" RCP- I V18 " RCP -IV 18" RCP- I V18" RCP-IV18" RCP- I V18" RCP-IVFS TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED 30" RCP-III2GI TB TB 2GI BOLTED DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS SHEET NO. TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY B-6054A SHEET 7 OF 13 PERMIT DRAWING S S SURFACE WATER DENOTES IMPACTS IN 11-MAY-2021 17:57B-6054A_hyd_prm_wet_psh05c.dgnjsaddlerPROJECT REFERENCE NO. 5(ENLARGED) GRAPHIC SCALE 0'50'50' F F F C CCCCCCCCFF FC C C C C C F F F F F F F F F F F FF C CCF F F F F STABILIZATION STREAMBANK BRIDGE SITE 1 EXISTING PIPE REPLACEMENT SITE 2 EXISTING PIPE REPLACEMENT SITE 2 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER B-6054A 11-MAY-2021 17:57B-6054A_hyd_prm_wet_psh05profile.dgnjsaddlerDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 1,850 1,860 1,870 1,880 1,890 1,900 1,910 1,920 1,930 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1,850 1,860 1,870 1,880 1,890 1,900 1,910 25 26 27 28 29 30 31 32 33 34 35 36 3724 1,850 1,860 1,870 1,880 1,890 1,900 1,910 1,920 1,930 1,850 1,860 1,870 1,880 1,890 1,900 1,910 1,920 1,930 07 FOR -L- PLAN VIEW SEE SHEET 4 & 5 SHEET 8 OF 13 PERMIT DRAWING SURVEY 2/2/20 WS EL=1859.6' WS EL=1873.5' PROP. 50 YR EL=1876.0' EFF. WS PIGEON RIVER WS EL=1876.1' PROP. 100 YR 1,886.07EL. 1885.94' Sta. 10+00.00 BEGIN MILL & RESURFACE 2: 1 DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 2300 = 50 = 1873.5 = 2800 = 100 = 1876.2 = 70000 = 500+ = 1901.7 = 02/02/2020 = 1859.6 EL. 1909.24' -L- 36+06.00 BEGIN MILL & RESURFACE END GRADE DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 2300 = 50 = 1873.5 = 2800 = 100 = 1876.2 = 70000 = 500+ = 1901.7 = 02/02/2020 = 1859.6 PI = 27+28.00 EL = 1,898.61' (+)1.3131%(+)1.2198% VC = 200' PI = 34+06.00 EL = 1,906.88' (+)1.2198%(+)1.1800% VC = 400' EL. 1895.80' -L- 25+14.00 BEGIN GRADE END MILL & RESURFACE K = 2143 DS = 80 MPH DS = 80 MPH K = 10060 -L- -L- -L- STA. 10+95.59 N = 748,013.76 BM-11 RIGHT 89.45' E = 804,650.71 EL = 1891.05' SPIKE SET IN 12" BIRCH BENCH MARK DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION CULVERT HYDRAULIC DATA = 47.1 = 50 = 1895.87 = 51.3 = 100 = 1896.23 = 63.3 = 500+ = 1897.38 42" RCP BURIED 1' DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION CULVERT HYDRAULIC DATA = 47.1 = 50 = 1895.87 = 51.3 = 100 = 1896.23 = 63.3 = 500+ = 1897.38 42" RCP BURIED 1' 1+501+6115" CMP15" CMP18" CMP18" CMP15" CMP54" CMP54" CMP54" CMB 54" CMB I-40 WBL 36.6' BST I-40 EBL 42.8' BST I-40 WBL 36.8' BST I-40 EBL 35.8' BST-EL- INV=1917.92' INV=1914.96' DI TOP=1920.13' INV=1913.81' INV=1909.79' INV=1912.13'CBI NV=1907.49'TOP=1909.77'TOP=1915.40'CBT OP =1912.58'I NV=1907.26' I NV=1902.92' I NV=1877.81' I NV=1872.45' I NV=1902.64' I NV=1876.42'I NV=1870.05'DI CB TOP=1920.87'18" CMPDI RECTI ON ONLYDI RECTI ON ONLYDIRECTION ONLYCONC DI TCHCONC DI TCHCONC DITCH 260.00'EXISTING R/W EXISTING R/W US FOREST SERVICE UNITED STATES OF AMERICA US FOREST SERVICE UNITED STATES OF AMERICA US FOREST SERVICE UNITED STATES OF AMERICA US FOREST SERVICE UNITED STATES OF AMERICA US FOREST SERVICE UNITED STATES OF AMERICA 18'4045502530" RCP-IV30" RCP-IV18" RCP-I V 1 8 " RC P -IV 18" RCP-IV 18" RCP-I V 1 8" RCP-I V 18" RCP-IV 18" RCP-IV 2GI 18" RCP-IVTB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTEDTB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED 2GIFS HW BEVELEDSEE SHEET 5-L- STA. 38+00MATCH LINE6 NAD 83FOR -RPCD- PROFILE SEE SHEET 11 FOR -RPBA- PROFILE SEE SHEET 10 FOR -L- PROFILE SEE SHEET 8 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SHEET 9 OF 13 PERMIT DRAWING SEE SHEET 8 FOR ENLARGEMENT REPLACEMENT AND LINING TEMPORARY STREAM IMPACT EXISTING PIPE SITE 3 11-MAY-2021 18:32B-6054A_hyd_prm_wet_psh06.dgnjsaddlerHYDRAULICSROADWAY DESIGN ENGINEER ENGINEER5/14/99SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED B-6054A DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION HHSD GRAPHIC SCALE 0'100'100' 15" CMP54" CMP54" CMPI-40 WBL 36.6' BST I-40 EBL 42.8' BST INV=1917.92' INV=1914.96' DI TOP=1920.13' INV=1913.81' INV=1909.79' CB TOP=1920.87' DIRECTION ONLY CONC DITCH O TB 2GI BOLTED HW BEVELED TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY 6 (ENLARGEMENT) DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED B-6054A SHEET 10 OF 13 PERMIT DRAWING DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 11-MAY-2021 18:32B-6054A_hyd_prm_wet_psh06a.dgnjsaddler8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION CAST IN PLACE PIPE TO LINE 54" CMP 60" RCP BURIED 1' AND HEADWALL TO BE ADDED. UPSTREAM SEGMENT OF PIPE TO BE REPLACED WITH EXISTING PIPE REPLACEMENT AND LINING TEMPORARY STREAM IMPACT SITE 3 GRAPHIC SCALE 0'25'25' 1855 18 5 5 1855 18551855 18551855185518551865 18651865 1865 1865 1865 1865 1865 186518651865186518651865186518651 8 7 0 1870 1870 1870 1870 1870 1870 1870 1870 18701870187018701870187018701870187018751 8 7 5 187518751875 1875 1875 1875 187518751875187518751875187518751875 18751875188518851885188518851885 1885 1885 18851885188518851890189018 90 1890 1890 1890 1890 18901890189018901890189518951895 1895 1895 1895 1895 1895 189518951895189518951 9 0 5 19051905 1905 1905 1905 1905 19051905190519051910 19 101910 19101910191019101910 1910 1910 1910 19101910191019101915 1915 1915 1915191519151915191519151915 1915 1915 1915 1915191519151925 1925 19 25 192519251925 19251925 1925 1925192519251925192519 2 5 19251930 1930 19301930 1930 1930 1930 1930 1930 1930193019301935 19351935 1935 19351935 1935 193519351945 1945 1945 194 51945 1945 1945 1945194519451950 19501950 1950 1950 19 5 019501950 19501955 19551955 19551955 19 5 5 1955 1955 195519551965 19651965 19651965196 51965 1965 19651970 1970 19701970 1970 197019701970 19701975 1975 1975 1975 1975 197 5 19 75 1975 1975 1985 1985 1985 1985 1985 1985 19 85 19851990 1990 1990 19901990 19 9 0 1990 1995 1995 1995 19951995 1995 19 9 5 19952005 2005 2 0 0 5 2005200520052005 201020102010 20102010 2010 2010 20102015 201520152015 201520152015 2015 2025 2025 2 0 2 52025 2025 2025 2 0 2 5 2 0252030 2030 203020302030 2030 2 0302030 2030 2035 2035 2 03 5203520352035203520352035 2045 204520452045 20452045 20 45 2045 2 045 2050 2050205020502050 2050 2050 2 0 5 0 2050 205020552055 2 0 5 5 20552055 2055 2055 2055 2055 2 0 5 5 2065 206520652065 2065 2065 2065 20652065 2 0 6 5 206520702070 2 0 7 0 2070207020702070 207020702070 2 0 7 0 2075207520752075207520752075 207520752075 2075 208520852085208520852085 20 8520852 0 8 5 2085 20902090209020902090209020902090 2 0 9 020902090 209020952095 209 520952 0 9 5 2095209520952 0 9 5 2095 210521052105 2105210521052105 2 1 0 5 2 10 5 2105 211021102110211021102110 21102110211021102110 211521152115211521152115 21152115211521152115 21252125212521252125212521252 1 2 52125 2130213021302130 213021 3 0 2 1 30 213021352135213521352135 2135213521352135 2145214521452145214521452145215021502150 2 1 5 0215021502150215521552 15521552155 21552165 2 1 6 5 2165 21652170 2 17 0 2170 2 17021752 1 7 5 2175 2175 2185 2185219021902195 21952205 2 2 1 0 22102 2 15 1+501+6115" CMP15" CMP18" CMP18" CMP15" CMP54" CMP54" CMP54" CMB 54" CMB I-40 WBL 36.6' BST I-40 EBL 42.8' BST I-40 WBL 36.8' BST I-40 EBL 35.8' BST-EL- INV=1917.92' INV=1914.96' DI TOP=1920.13' INV=1913.81' INV=1909.79' INV=1912.13'CBI NV=1907.49'TOP=1909.77'TOP=1915.40'CBT OP =1912.58'I NV=1907.26' I NV=1902.92' I NV=1877.81' I NV=1872.45' I NV=1902.64' I NV=1876.42'I NV=1870.05'DI CB TOP=1920.87'18" CMPDI RECTI ON ONLYDI RECTI ON ONLYDIRECTION ONLYCONC DI TCHCONC DI TCHCONC DITCH 260.00'EXISTING R/W EXISTING R/W US FOREST SERVICE UNITED STATES OF AMERICA US FOREST SERVICE UNITED STATES OF AMERICA US FOREST SERVICE UNITED STATES OF AMERICA US FOREST SERVICE UNITED STATES OF AMERICA US FOREST SERVICE UNITED STATES OF AMERICA 18'4045502530" RCP-IV30" RCP-IV18" RCP-I V 1 8 " RC P -IV 18" RCP-IV 18" RCP-I V 1 8" RCP-I V 18" RCP-IV 18" RCP-IV 2GI 18" RCP-IVTB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTEDTB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED TB 2GI BOLTED 2GIFS HW BEVELEDSEE SHEET 5-L- STA. 38+00MATCH LINE6 NAD 83FOR -RPCD- PROFILE SEE SHEET 11 FOR -RPBA- PROFILE SEE SHEET 10 FOR -L- PROFILE SEE SHEET 8 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SHEET 11 OF 13 PERMIT DRAWING SEE SHEET 10 FOR ENLARGEMENT REPLACEMENT AND LINING TEMPORARY STREAM IMPACT EXISTING PIPE SITE 3 11-MAY-2021 18:32B-6054A_hyd_prm_wet_psh06b.dgnjsaddlerHYDRAULICSROADWAY DESIGN ENGINEER ENGINEER5/14/99SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED B-6054A DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION HHSD GRAPHIC SCALE 0'100'100' 1905 1905192519251930 1930 1930 19 3 5 193519451945 19501950 1950 195519551955 196519651965197019701975 1975 1985 19901995 200520102015 2025 2030 2035 15" CMP54" CMP54" CMPI-40 WBL 36.6' BST I-40 EBL 42.8' BST INV=1917.92' INV=1914.96' DI TOP=1920.13' INV=1913.81' INV=1909.79' CB TOP=1920.87' DIRECTION ONLY CONC DITCH O TB 2GI BOLTED HW BEVELED TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SHEET 12 OF 13 PERMIT DRAWING 6 (ENLARGEMENT) DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED B-6054A DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS8/17/9911-MAY-2021 18:32B-6054A_hyd_prm_wet_psh06c.dgnjsaddlerDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 11-MAY-2021 18:32B-6054A_hyd_prm_wet_psh06c.dgnjsaddler8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION CAST IN PLACE PIPE TO LINE 54" CMP 60" RCP BURIED 1' AND HEADWALL TO BE ADDED. UPSTREAM SEGMENT OF PIPE TO BE REPLACED WITH EXISTING PIPE REPLACEMENT AND LINING TEMPORARY STREAM IMPACT SITE 3 GRAPHIC SCALE 0'25'25' Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 -L- 29+14/30+55 Bridge 0.055 0.028 100 53 2 (SA)-L- 25+17/25+71 42" RCP Construction 0.009 0.004 21 15 3 (SD)-L- 47+46/47+62 54" CMP Replacement 0.005 10 4 (SB)-L- 23+16/23+23 24" CMP Replacement 0.002 10 TOTALS*:0.00 0.00 0.00 0.00 0.00 0.1*0.04**121 88 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb SHEET 13 OF 13 49070.1.1 5/11/2021 HAYWOOD NC DEPARTMENT OF TRANSPORTATION B-6054A *Total Permanent SW impacts: 2764 sq. ft. **Total Temporary SW Impacts: 1670 sq. ft. WETLAND AND SURACE WATER IMPACTS SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS DIVISION OF HIGHWAYS all proposed outfalls are to match existing. Perched outfalls are avoided where possible, though due to topography, outfalls along the western ramp discharge along a steep slope.