Loading...
HomeMy WebLinkAbout20210694 Ver 1_ePCN Application_20210518 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form April 4,2021 Ver 4 Initial Review Has this project met the requirements for acceptance in to the review process?* 6 Yes ✓ No Is this project a public transportation project?* 0 Yes r No Change only if needed. BIMS#Assigned* Version#* 20210694 1 Is a payment required for this project?* ✓ No payment required G Fee received Reviewing Office* ✓ Fee needed-send electronic notification Asheville Regional Office-(828)296-4500 Select Project Reviewer* Kevin Mitchell:eads\rkmitchell Information for Initial Review fa.Name of project: Bridge No.430057 Replacement la.Who is the Primary Contact?* Dave McHenry lb.Primary Contact Email:* 1c.Primary Contact Phone:* dgmchenry@ncdot.gov (828)586-2141 Date Submitted 5/18/2021 Nearest Body of Water Cold Springs Creek Basin French Broad Water Classification C Tr Site Coordinates Latitude: Longitude: 35.737255 -83.023882 A. Processing Information County(or Counties)where the project is located: Haywood Is this a NCDMS Project ✓ Yes G No Is this project a public transportation project?* 6 Yes r No Is this a NCDOT Project?* 6 Yes r No (NCDOT only)T.I.P.or state project number: B-6054A WBS#(?) 49070.1.1 Pre-Filing Meeting Information Is this a courtesy copy notification?* ✓ Yes G No ID# Version Pre-fling Meeting or Request Date 4/5/2021 Attach documentation of Pre-Filing Meeting Request here: Click the upload button or drag and drop files here to attach docurrent B-6054A_DWR Pre-Filing Meeting Request_OK.pdf 365.02KB Pie type mast be FCF 1a.Type(s)of approval sought from the Corps: [7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) f-Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes ✓ No lb.What type(s)of permit(s)do you wish to seek authorization? f-Nationwide Permit(NWP) f7 Regional General Permit(RGP) f-Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? ✓ Yes 6 No Regional General Permit(RGP)Number: 201902350-Work associated with bridge construction,widening,replacement,and interchanges RGP Numbers(for multiple RGPS): ld.Type(s)of approval sought from the DWR: I7 401 Water Quality Certification-Regular 1 401 Water Quality Certification-Express f-Non-404 Jurisdictional General Permit f- Riparian Buffer Authorization n Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes t No For the record only for Corps Permit: r Yes r No If.Is this an after-the-fact permit application?* ✓ Yes ( No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes f No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo Acceptance Letter Attachment I h.Is the project located in any of NC's twenty coastal counties? ✓ Yes r No 1j.Is the project located in a designated trout watershed? O Yes r No B.Applicant Information U Id.Who is applying for the permit? )7 Owner )—Applicant(other than owner) le.Is there an Agent/Consultant for this project?* C Yes e No 2. Owner Information 2a.Name(s)on recorded deed: NCDOT 2b.Deed book and page no.: 2c.Contact Person: Dave McHenry 2d.Address Street Address 253 Webster Road Address Line 2 ctty State/Bovine/Region Sylva NC Fbstal/ZZp Code Country 28779 USA 2e.Telephone Number: 2f.Fax Number: (828)586-2141 2g.Email Address:* dgmchenry@ncdot.gov � I C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Clyde 2. Project Identification 2a.Property Identification Number: 2b.Property size: 96 2c.Project Address Street Address 1-40 at Exit 7. Address Line 2 City State/Bovine/Region Postal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Cold Springs Creek 3b.Water Resources Classification of nearest receiving water:* C Tr 3c. What river basin(s)is your project located in?* French Broad 3d.Please provide the 12-digit HUC in which the project is located. 060101060200 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The existing conditions are an interstate interchange with a bridge over creek in the middle of National Forest 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* C Yes f No 6' Unknown 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) Bridge 57 Topo maps.pdf 2.69MB 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) B-6054A_Soils.pdf 654.29KB 4f.List the total estimated acreage of all existing wetlands on the property: 0 4g.List the total estimated linear feet of all existing streams on the property: 9150 4h.Explain the purpose of the proposed project:* The purpose of the project is to replace a badly deteriorated bridge carrying an interstate over a forest service road and creek. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* Heavy equipment including cranes,track hoes,dumps,graders,drill rigs will be used to demolish the existing bridge and replace it in place while diverting traffic on the ramps for temporary traffic management. 4j.Please upload project drawings for the proposed project. B-6054A Wetland Permit Package-210511_May 18 2021 edits.pdf 4.7MB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* ✓ Yes r No r Unknown Comments: A consultant did the delineation and reviewed by Dave McHenry May 18,2021 5b.If the Corps made a jurisdictional determination,what type of determination was made?* ✓ Preliminary r Approved r Not Verified r Unknown F N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Ronald Johnson Agency/Consultant Company: AECOM Other: 5d1.Jurisdictional determination upload B-6054A_PjD Package.pdf 3.21MB 6. Future Project Plans 6a.Is this a phased project?* ✓ Yes f•No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la.Where are the impacts associated with your project?(check all that apply): r Wetlands 17 Streams-tributaries 1 Buffers r Open Waters (` Pond Construction 3.Stream Impacts 3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S1 bridge-site 1 Permanent Bank Stabilization Cold Springs Creek Perennial Both 30 100 Average(feet) (linear feet) S2 bridge-site 1 Temporary Dewatering Cold Springs Creek Perennial Both 30 53 Average(feet) (linear feet) S3 culvert replace_Site 2(SA) Permanent Fill UT Pigeon River Perennial Both 2 30 Average(feet) (linear feet) S4 culvert replace_Site 2(SA) Temporary Dewatering UT Pigeon River Perennial Both 2 20 Average(feet) (linear feet) S5 culvert reline_Site 3(SD) Temporary Dewatering UT Pigeon River Perennial Both 2 10 Average(feet) (linear feet) S6 culvert replace_Site 4(SB) Temporary Dewatering UT Pigeon River Perennial Both 1 10 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 130 93 3i.Total stream and ditch impacts: 223 3j.Comments: E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The project uses a minimum amount of impact.There will only be 20 feet of stream channel loss due to the culvert replacements. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Dewatering will be used to maintain dry work areas and avoid excavation in flowing water. 2.Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? r Yes a No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: This is a maintenance project with only 20 feet of channel loss.Rip rap placement is the only other impact and the stream and banks are already naturally rocky,so the impact will not be out of character from existing conditions. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes a No If no,explain why: This is not a protected buffer watershed. 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* 6 Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ( Yes (' No lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA)SEPA)?* (' Yes a No Comments:* This project qualified for a federal CE. 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* (' Yes allo 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes 6' 3b.If you answered"no,"provide a short narrative description. This project is a maintenance action with no capacity increase or increase service area associated. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes 6' No r N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* 6 Yes rNo 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* 6 Yes rNo 5c.If yes,indicate the USFWS Field Office you have contacted. Asheville 5d.Is another Federal agency involved?* 6 Yes r No r Unknown What Federal Agency is involved? FHWA 5e.Is this a DOT project located within Division's 1-8? ✓ Yes t No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? 6 Yes r No 5g.Does this project involve bridge maintenance or removal? ✓ Yes r No 5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.? 6 Yes r No If you answered"Yes"to 5g(1),did you discover any signs of bat use? ✓ Yes G No r Unknown 5h.Does this project involve the construction/installation of a wind turbine(s)?* ✓ Yes 6' No Si.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? ✓ Yes r No If yes,please provide details to include type of percussive activity,purpose,duration,and specific location of this activity on the property. B-6054A_Haywood Bridge 57 Replacement_USFWS Concurrence Request.pdf 1.11MB 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Site specific surveys by qualified personnel and available NHP data. Consultation Documentation Upload 20-137_Concurrence_I-40_Bridge 430057 replacement.pdf 162.23KB 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ yes 6' No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS website 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* ✓ Yes f No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* 106 PA review by NCDOT staff. 7c.Historic or Prehistoric Information Upload 19-04-0018NoSurveyReq_HA.pdf 615.11KB Bridge 57 No Archaeological Survey Required PA 19-04-0018.pdf 7.64MB Catawba Indian Nation Letter_I 40 CMGC_Comments.pdf 336.8KB Cherokee Nation emails_No response.pdf 66.43KB Example tribal letter sent_I-40CMGC.pdf 2.06MB 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* 6 Yes (" No 8b.If yes,explain how project meets FEMArequirements: The hydraulic model was run and accepted under the NC Floodplain Management and NCDOT's MOU.The bridge will have an increased hydraulic capacity compared to existing. 8c.What source(s)did you use to make the floodplain determination?* NC Floodmaps M iscel Ianeous Comments Miscellaneous attachments not previously requested. B-6054A Photos and Impact Site descriptions.pdf 918.11 KB WRC no moratorium comment on 57_HayB-6054AHarmonDenSC2020-08.pdf 113.06KB Signature () * 17 By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Dave McHenry Signature l � Date 5/18/2021