Loading...
HomeMy WebLinkAbout20201540 Ver 2_Shoreline Stabilization_20210519Shoreline Stabilization Application Form 15ANCAC 02H .0500 — Water QualityCertification, Shoreline Stabilization FORM SSGP 10-2013 DRAFT -NOT FOR USE AT THIS TINE Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request here: Pre -Submittal Meeting Request .pdf 1.13MB Pre -fling Meeting or Request Date 4/18/2021 ID# 20201540 I. Applicant Information [15A NCAC 02H .0502(a)] Version 1 Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * Owner Information: Name:* Email: * Phone Number:* Mailing Address:* miguel@miguelpaludo.com Rease provide an email address for payrrent and requests for pore information here. Miguel Paludo miguel@miguelpaludo.com (704)380-7618 (xxx)xxx-xxxx Street Address 154 Hopkinton Drive Address Line 2 CitY Mooresville Rbstal / Zip Code 28117-7349 State / Rovince / Region NC Country US Is there an agent working on the project? * Agent/Consultant Information ....................................................................................................... Name:* Company Affiliation: * Email:* Phone Number:* • Yes ✓ No Janice Estep CBC Stone & Recycling. LLC info@ebestoneandrecycling.com (704)660-5111 ( )m- Mailing Address:* Street Address 638 Oakridge Farm Hwy Address Line 2 City State / Province / Legion Mooresville NC Fbstal / Zip Code Country 28115 United States Asigned and dated copy of the Agent Authorization letter:* Auth. Form.pdf 556.73KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Paludo Dredge If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* ✓ Upload File ✓ Look up address Upload Map: Latitude:* Survey.pdf 1.43MB Vicinity Maps.pdf 6.28MB Directions.pdf 808.04KB 35.511899 Longitude:* -80.928329 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Site P1an.pdf 1.07MB Buffer Form.pdf 1023.55KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Dredge Area Pics.pdf 5.79MB 4. Location of the property (where work is to be conducted) Nearest Town:* County: * Lake/ river/ ocean adjacent to property: Mooresville Iredell Norman Subdivisions name or site address:* 115 Saylors Watch Ln. Mooresville, NC 28117 Lot 5 Saylors Watch hclude phase/lot number Directions to site:* 610 E Center Ave Mooresville, NC 28115 Head south on Evergreen St toward E Center Ave 20 s (197 ft) Take NC-1100 to Torrence Chapel Rd 22 min (11.3 mi) Turn right onto E Center Ave 0.5 mi Turn left onto S Church St 0.4 mi Turn right onto E Wilson Ave 1.5 mi Continue onto NC-1100/Brawley School Rd 1.0 mi Continue straight to stay on NC-1100/Brawley School Rd 6.4 mi At the traffic circle, take the 2nd exit onto NC-1100 1.6 mi Turn left onto Torrence Chapel Rd 42 s (0.3 mi) Torrence Chapel Rd North Carolina 28117 Rease include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Undeveloped lot Residential, undeveloped, etc. 6. Property Size 1.488 acres Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Dredge a 67' x 40' area for new dock. Dredge by barge haul material off by land 8. How will the work be done?* 17 From Land rJ From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 297.77 cubic yards below square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 0' above dredge 10' x 50' access corridor (500 sf temp. impact) square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nurrber of trees, for instance) Grass buffer, no trees removed, minimal disturbance to buffer Sketch: Dredge Application.pdf 11.43MB Dredge Spoils Info.pdf 6.63MB Sketch.pdf 473.41KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Signature: Janice Estep Ez%xc 'recu r { '.Pavel er Initial Review Is this accepted into the review fr Yes 0 No process?* Project Number:* 20201540 Select Reviewer:* Select Reviewing Office: Has payment been received?* What amount is owed?* Version:* 2 Alan Johnson:eads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received C' Need Fee - send electronic notification C' $240.00 r $570.00 AGENT AiJTHORIZATION FARM PROPERTY LEGAL DESCRIPTION: STREET ADDRESS: Pease print; Property Owner: Property Owner: PLAN NO. PARCEL ID: C•-• QCt the undersigned, registered property owners of the above :noted property, do hereby authorize (Contractor / Agent) , of ....C.13(1 (Name of consuitin6 fir to act on my behalf and take ail actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attaehecL Property Owner's Address (if different than property above): le G a81l� Telephone: We hereby certify the above information submitted in this app•iication is true and accurate to the best of our knowledge. Authorized Sigriature Authorized Signature Date: D / 0 5.? / D%dc Date: SAYLQPS RWATCI��g 4-5' pR}V .72, ��• 12i 1-5 C12 .� � °Nti� 1. NO NCGS MOMENT RECOVE D WTTIIN 20001, OFF SITE TIF_S SOLI HERIED• 2, PROPERTY MAY BE SUBJECT TO OTHER COVENANTS. RESTRICTIONS, EASEMENTs OR RIGHTS -OF -WAY THAT MAY BE OF RECORD, 3. ALL DISTANCES SHOWN ARE SURFACE HORIZONTAL DIS'i"ANCES, 4. IRON PINS FOUND OR SET A.T ALL PROPERTY CORN'ERS UNLESS OTHERWISE NOTED, 5. ALL AREAS SHOWN HEREON WERE COMPUTED USING THE COORDINATE COMPUTATION METHOD_ 6, THE SETBACKS SHOWN ARE 1 ER MAP ROOK 72, PG 12. 7, PORTION OF SUBJECT PR.OPERTY 1S LOCATED WITHIN A SPECIAL FLOOD 1-1201ZARD AREA ACCOR.DrNG TO FEMA FLOOD INSURANCE RATE MAP - ? NEL 11371441 .4OOK EFFECTIVE DATE: 3/01i2009. E. LOT S'�I IALL HAVE A 10" DRAINAGE AND UTFLITV EASEMENT ALONG ALL LOT LINES_ 9, PRIVATE LOAD, EASEM 7 : 'O ALL CC -LID : OPMq SPACES TO BE MAL TAI ED WiF SAYLOR'S WATCH SUBDIVISION. HO I'1'EOWV'E 'S ASSO TATION. 10. CONSULT WITH GOVERNING AGENCY FOR PRE MtJNG LAND DEVELOPMENT NT AND ZONING R,E UIREMTE'NTS PRIOR TO DESIGN OR CONSTRUCTION OF ANY IMPI OWJ E TS. 50 r Graphic Scale 0 7 50 Scale or Drawing I Inch 50 Feet 4624-568-888 BI PART DEVELOPMENT, OPME T, LL DB 2666, PG 2249 100 YEAR FLOOD LINE PER FEMA FLOOD COMMUNITY PANEL NUMBER 7104624001 . EFFECTIVE DATE: 3/02/2009. KID LOCATED 7GO" LAKE CONTOUR Professional Property Inc.Property of: 18335 Old Statesville Road Ste. A Cornelius, N.C. 2 031 Bi Part }Jevelopment, 74-Phone/Fax Firrn License: C-3666 I up ClI (TIE ONLY) T. R P) co // • # ' " W 1 { .71 rn . _ 1-1 • • . . =. . . . . . . . . . . . . ENUER.ONMENTAL PROTECTED AREA PER DUKE ENERGY AND THE LAKE COMMISSION (1%0 PIER/COCK BUILD NE) rri.> Pc' Po �Irn m z • i co 9) ■q rRplil SETBACK ; 2 OT 64,837 Q. FT. 1.488 ACRES "VACANT" so' LAKE BuFFER jEkIZVE713110( • Z2,91?.. rr 94:5), • RIC CLEIERI P.L.S. 1.8 5 OLD STATESVILLE SUITE A CORNELIUS N.C. 28031 7 7 - 134 ,' . • o, e oq-#### *# * /,,i;I'P 7N5 _ *L SEA °Q. 411 if:13b‘mr 4it1*jO �'47 tal*.4:9 stiR\11.--4neall- ae CURVE 1 cif LENGTH 50.54' , . 0' RADIUS 252.501 252.507 CHORD CHORD BRG • .1 ' N 29'45'282' E 60.401 38.57' N 17'38' " E 0624 '00H 'J \\ 11, Ll'\ • \ r1:;1 kZ3i) 01. C2PA •, -3 1 IP �x AKE NOR MA 2V .11 40 . 1- LL- . i 0 - L12 rr LINE BEARING DISTANCE L18 6.' L19 'D °' 15.001 L20 .' L21 E .00' L22 ' '1 "' ! . 4' L23 31.651 LEGEND: REBAR FOUND COMPUTED POINT SUBJECT PROPERTY LINE ADJOINER PROPERTY LINE BUILDING SETBACK EASEMENT LAKE BUFFER PEER PROJECTION PIER PROJECTION BUFFER 4624-579-069 BI PART DEVELOPMENT, T, LLC B 2566, P2249 FIELD LOCATED 760' LAKE CONTOUR Physical Survey of Lot 5 of Saylors Watch 061720-04 Job No. C Prepared By _ 1:10,000 r'0r of Closure Drawing Scale As Recorded in: Map Book 72, Pg 12 Deed Book 2, Pg 2249 424-9 99 Tax Parcel Number LOT 5 1 of 1 17 2 2 } Drawing File Name Sheet Number Date l 0 10' BUFFER DUPPER Site Address: 115 Saylors Watch Lane Mooresville_ NC 2 117 Itedeil Count -•• •••••••47454414444.444144.4.4•4••• ••••.• •••,14-44.44...444-14444•144 ,;•p••p„,' .liwiL.4ppip, • nom p; • •••• • `•: - ' • . • : . • : • WIWIR v • A .1\ 1. 1 , 44.1114ninaitmle. • Aeankl• •-•'• • • • •••-• • • • .:9•111.Plid".PMIMPIIIW.110.1.• '.4::••••1" f•••• ; • e • Jt re, 4.1 11. • vliftibrIftwilip FL • ."•••-• '4•4• • amilwalmillaPPIAlliwr • • • • Rm44449E, 1 4 — 6 ...•••-, • 11,1. ,•0110 r`• g-r •• -um, • r• a., a a, ra. . • N. 1 • • •'; ‘I4 t'7•_ ...I \2146.F94•• - ..'.- .4ff • •F, . . 1"Ni.;•:.- Ni4"...5ilr • ur- .• .„. ..4.• No, -.1%_. .N. ._,..• , *IN% •e- A 1r imii 1.4Nrupp .,, . 'l-brPwr• if r • . •••., •-• 1 • 1 $ 1 • 1 1 1 =.- ewr-rid.A.5 1 4 1 47. ..' t.2:1 *I i f A N3 i ik ,.., e ) I e I 1 .0. 01 I 111 JP l• its • JUIR, ppp *so' 1 rreL. „pi: IN I "Ot6 • 1 1 1 ti i • •■•••••Irel" • N., 0\k‘ LE. • T 4 44. 1.1.444-41•14•41,-441414. • •or . :4-••• W... • • N. • !fr.. . . .• 4Mr4.416- • ••••4' •"" Uri • 10" :we r 113.1PeS • at A 1 A . .,174 :47 k_of -r? .4 =1.4 $ 1 • ,,,,...." i 11 , 6(177/ .# lililY i 1.• \ .. • - •'%• �.ay.�.iWtl+ryt•VY.t•Y.rF.{.w.'1'iy.y.y..,wir,..rtiwrf t.iwilYN':^`+ix't1F-'fr.Yr.�y/.kY'Mt"M'*hrrt`i+*YY`: i':'r'h4i5., ..Il :mw'rit.Af+ .._...• 5{I'n94 MM'Wr' i:�. 44 r-a•w..�w�WroY�rt+q•' •....ir.. ..t•4.a.: 4'r�.ww •-i+YrlN2atHMYtt ttti.J.j'SY+...rY�.L45r.�a�NH A'VYI}+l+fM.1•.•Y•.rl+..•..rttiti+i�_4 .� yr 1A,Fili Y'4WIV'VN••.MY•.•M.4,l.s 45.,.`.'.rw�l.r q3Jesi q • • CO i i 1 CD • i I .cp • .Z. - :-.,xi-. •{ �-• � � t• k -ti'•+ s�-�� .i-_-r• ..,.0 T= 1`'�*Y��`�_- {; -, +Y _�i_•-.'a 2,_±i .'i+�y�- _ -�• '.i'��.x', -•1 •• •. • ••.• - - - • , • - - • • • '.i 1 • S . f 01 Cr) 0 0) 0 0) CD 1 CD to 0 •_Y • - AlrEfentae 1 1 his:llwww. acglecorn/reaps/dirt lO+East+Center+Avenue,+Mooresville,+I /Torrence+ hap l+F +North+Carolina+ 1171@ . 7577 5 -80.8 7?... https:il w goo 1e. om/ ap ldirl 1 O+East+Center+Avenu ,+ hoar sville,+ J-iorren e+ hapel+F d,+North+ arolina+ 8117/@ 5.57577 ,-8 , 7 , , , 3 At the traffic circle, take the 2nd exit onto NC-11 0 ON 0 0 ✓ 0 0 E tom* 0 0 2 0 CO Y,) 0 c 0 0 z C i 0 0 0 0 0 0 cD Turn right onto E Center Ave 'n i, Lein Take NC-1100 to Torrence Chapel Rd E:1 a n• (ito 44- 0 n (N, ,c) n O•--15 u\ D°w- UN (-to (f) •D"wCl`L.2 ,3 0 Head south on Evergreen St toward E Center Ave -f- L L8Z ON '@IllAst9JooyN envJ U OI0 L9 t o wtnp d e b FSf 1 • •+.' . .5 i • • , - 2' • • • 0 co fc 3o, o [D fir+ D co (Di - t __, o a -0 ID CD Ccr rn O- S�? C Ed O. lz cp rD 0 0 r ri r. • 17. 0 PZI ti z 0 st N.) 0) C0 Tura left onto Torrence Chapel Rd LD 0 1 0 CD ID 0 vo 0 0 0 0 co il/ 4J 610 East Center Avenue, Mooresville, NC to Torrence Chapel Rd, North Carolina 28117 - Google Maps Full Pond/ N•ormai_Water_Levet imp mum wow um um Shoreline Lake (At Full Pond/Normal WaterLevel) iol Sot EEO INN* INN INS No ¥ree5 exncsied (TI' rn o 5-1-t:PirScaric it) boeA2.... Please approximately sketch the fallowing information on this plan, length of shoreline (provide dimensions for each item, such as 10 ft x loOfij*: 1. Al! proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining wars, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: Wa+ch L tY Owner; M L.,Q4;-"0 Print Contractor/agent: CT?C Skne _ 11) Print C County: 5ignatu re ature r� The approval is for the purpose and desigr. described in yo•ur application. Inp.a•s not [ndicated in the application is a violation af the Buffer Rule. Site specific work should be provider in the application. [15A NCAC 02H .0506 and ISA NCAC 0213 .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the fuJi pond elevation), unless approved. Exception, these trees that are severely undermined along the immediate shoreline can be removed. Mi.fll:fl:ai shaping and sloping along the im:mediate shoreline is allowed. [15A NCAC 028 O243(6)) Benching, grading in the buffer is not allowed Excessive disturbance of ground cover. [15A NCAC 0213 .0243 (6)] Beache.s, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. il5A •NfAC 02B ,O2434) and (611 Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H O5O2 and 15A NCAC 02B O243 (4), (6), ($)j Stormvater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet ffow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowiedgement of Notsfkntion �herebystate that 1 have been inform:ed of the Catawba Riparian Bufr Rule. Anywork canduct�d in �h� buffer not s � specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rues, the approved plan(s) and specification(s), and other supporting materials.. Signature (owner): - '' — Date: (C)y /(D3 Dude Energy_ Excavation Permit Application Form FOR DIKE ENERGY USE ONLY Duke File No. Application Fee $ Security Deposit $______ Check # � Date Recv' d Initials Date of Duke Energy Lake Services, applicant and/or contractor on-site inspections Date Z initials � ate..1 ( Date Final Protection/Avoidance Area Markings Field - Verified Initials Approved to Start Work By * : Date (Print) (Sign) Date Completion Required _ _ Date of Any Approved Extension Initials _ Date Passed Closeout Inspection* Initials _ Any Stop Work Orders or SMG Violations*? (check one) EYes E1No (If Yes, explain in PART V) Date Deposit Refunded Initials Date Permit Database Updated _ Initials * Forward copy of approved application (all pages, plus any attachments that Duke Energy changed) back to applicant with Approval Letter and highlight any changes. File copies of Approval and Close-out Checklists and any Stop Work Orders with application. Part I. Applicant Information (Please Print) Name Miguel Paludo Telephone 7O4380-761 8 Email address: migueImigue1pa1udo . com Lake Address Mailing Address (if different) 115 Saylors Watch Ln. 110A Mint Ave. Mooresville , NC 28117 Mooresville , NC 28117 Contractor Company CBC Stone & Recycling , LLC Contractor Contact Person Janice Estep Telephone 704-660-5111 Contractor Email Address : i @ c b csto n ea n d re cyci I n g . co m LAKE LOT NFORMATIQN :Lake Borman County Iredell City Mooresville State NC Tax Map No. Subdivision Saylors Watch Lot Section No. Lot 5 Lot Size 488 Acres Duke Energy Page 4 of 13 rev 10/1 /2019 Excavation Program Duke Energy Excavation Permit Application Form Are these any CoApp1icants*? (check one) • Yes @No (If Yes, include names, street addresses or lot numbers, pier numbers, phone numbers, and email addresses in Part V Additional Information) * Co-Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project, and is done to benefit multiple owners / lease holders of Project-front properties within a single development. There can be no more than 4 co-applicants in addition to the lead applicant on any application. Do not continue the application until an on-site inspection has been conducted between a Duke Energy Lake Representative and the applicant and/or the excavation contractor. NOTE: Initialling this portion of the application by a Lake Representative in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. Date of on-site inspcctionO Initials (Duke Energy) la( {applicant/contractor} Duke Energy Page 5 of 13 rev 0ni20l9 Excavation Program Duke Energy Excavation Permit Application Form Part II. Description of Project A. Basic Information 1 . Type of excavation : (check one) Ig New excavation 17 Maintenance excavation 2. .Purpose of excavation: (check one) 0 Boat Access Channel 0 Water Intake Channel 0 Wastewater Discharge Channel 151 Other (spec?fj,) : new dock 3 . Lake user category : (check one) al Private ■ Residential Marina DCommercial Marina I Public • Other (specify) : 4. Max . Excavation Area Dimensions (ft) : Length 67' Width 4°' Depth 3` (Note: include additional area dimensions if necessary so response to ft5 below equals max. area dimensions in 44) 5 . Volume of Excavated Material (TOTAL for the project) : 297.77 _ Cubic yards 6. Type of material removed (applicant determines by field sample jfpractical : Dirt/Silt 7. Excavation Site area: 0-184 Acre (s) Disposal Site area : 2.29 _ Acre(s) 8 . Total Disturbed Area (including equipment staging area) : 0 . 195 Acre (s) 9. Does the project meet the requirements of the applicable General Permit? (check one) ✓ {es \To 10. Do you claim title to the disposal area? (check one) I Yes ✓ No I 1 . Do you claim title to the equipment staging area? (check one) o Yes \to 12. Are there any water-treatment facilities within 50 feet of the proposed excavation area? (check one) Yes ✓ \To (If Yes, spec�} 13 . How will the excavated material be entrapped and the erosion controlled? (e. g see attached erosion control plan and disposal area design) : Dredge by barge . Material to be hauled out by land and taken to disposal site at 638 Oakridge Farm Hwy. Mooresville , NC 28115 Duke Energy Page 6 of 13 rev 10/1 /2019 Excavation Program Duke Energy Excavation Permit A i lication Form 14 . Type(s) of excavation equipment to be used : Long reach excavator 15 . Will waters or wetlands be crossed in transporting equipment to or from the site? (check one) 1:21 Yes ONo (Ifyes, explain) By barge 16 . Will return water re-enter the reservoir? (Check one) ElYes ONo ON/A If Yes, sped points) of re-entry and show on Excavation Area Drawing) 17. Is there an existing facility (e. g, pier) that access is being maintained to by conducting the excavation? DYes WNo (If Yes, provide the existing permit number. If No, include a scaled drawing clf the proposed facility). Permit # customer has dock permit for new dock 18. Total planned duration of the work (Include first equipment mobilization, excavation through final mitigation measures complete) : S TART 7 / 21 IF LNJ S H 7 / 21 (Month) (Yeai) (Month) (Year) Duke Energy Page 7 of 13 rev I0/1/2019 Excavation Program x = .%. it.... _ x h~....:\ 13.6? • Ca) tcs /-1; col rinit P r71 : sk...e, . 171 : * M '—` a . 1:$ 0 CD i 1 'b.:* a t-.--;. i z .„.., , __.., ap o ...1 1-t r4-4 tet, 0., ircc; r) ' MI Cr T---.., n :tiz 4 (1 .- 4'16- r-ri t) 1 r 1 ril I 1-1 1 I Iv 0 rib) =I Z ka< r1.1 51) m 0.1.i rita 0 i cip Po '• . ' E C P 0 1—t. : P—t . 1—i W Aln ° w kg -.-1..) 1-t c- ...._ .......14, pa i 0 CD " tlz .-i z---4 ,, 0 -,,, 0 ; — 1 � �"� , �"' .....� -cs > . 0 N � - ›- r :1 - • Po zi P F7‘) = CD . i C R 'CD I 0.1 0 '. :i Z i cl) ft--4' : a -0 i g : , ,,,, 71, 1 P Crl —. c, 1 .....4 1 i a > , —• (- ! Li) CI P2, = \.5.,.. I — • no can a ' P.-" TZ: ra.i 61 :14' CD ,----% \\.,52 cr (..) P c fr" I ` ; Cl) n ; — . ci) • D CD L-1 ai CD 1 . ‘5.._: -Pw1 I n 1 CM 1-t ir-+- = . - - : ir,- = taw, ni iit- t: tIll i lig :mil ' CD ci) [iv Z Z 11 Z Z 0 CI Z , ill )--• • M > . IP- > > r—t- cp > =a ... . Cr a ft C 1 TID CrCi' = cr cLk imi• 0 0 cL i< . . 1_, . ct cx) i o- ; 1-0 ; : 0 i 1 , i < co R IN; -,,,, I 74: -1 oTi 619.1 : ,... ,, CD ft 1Al:12.1 0=4 I E P . 3 pa 0 t< . 7:5 c : = . . . $= 4r ,..... 3 . • c8* , o 01) , 1 . • , e-l- Mk CI . . -- C ; ci) 5 1 3 Ell i r 4 cr in! CD I b.-1 i i . • 1 1 - i i , ' t : : i r "r..r. I [ Om I .. 1Z e 1 k I 4 tt * < " a . ezt. . n . P h'i th-4 GP wilmi Po �--i - ii-4._ 5 •.c ) . 0 (1) : = = 63 CD ,--"N •-, c,..1 6, . P re c"- ' F'd w(:)" r /-1Z1 t- = up CI l'it 1-gs I,Q' .t< • t1:1 .P1 0 le?,4, =m a ' g = 0 P t-P- am PEI t"n i CD 4 1=. 0 vp rto 5 . ,._,0 ,ici , ,, ' +a. P r) 8 twi) rn 4 (11 CM 12' • NEk • CD CD CM ig 1=IF del ' , i P° r 1 ,, . 0 . t?. --#:i Ei,. 7 . = tz.:, cfp -..-L ,.., —a = I IN P -6 4—% a ,5* n) (i) = o cL cLi 15" m? /----N nd 0 ...... „.1.1 \N.._ IP- Pi-.7' 4- - ,-ci 0.i ; t-Ti Em'i (7) cr %--' Ah: ti) et CD CD 1 I ; 1=1 o 1 r __1,_ 0-ci t:t eD, T_._ _IN , 4ii- 0 i (P IZZ tit c) or ft z a 1.9 •In ( .1,, 40v t-4 tii; eiD tt z.-* rt cp > CD AD u CD o CD ,— . 0-+) C4 cr) illl eD 0.4. Le.) g:i-i R ,..‘ . Z . Z 1 H'(= "I: immilL.1 . :imi g 0 . i irD > > . .III :2 1747 1-1 • C.11 .%1 r Lt 1.4 In 0 mb 4'1' • P P.-% < . n Pi: Pi' .. c) 11P : I l 'i C • I g i • PI leii IN Ci) , r IC-1 0 P 1 1 Gtql io ...,1 5-D ;;%- E.GrQ ni El tz •ii 6 F rt) t-z--_-) zz cl e# z5 1:ib 4 -- Duke Ener Excavation Permit A 1 dicatioo Form C . Applicant' s Signatures . ' - \ Cac1n Comments: �� 1 �� `� � , 1• � 7 ko1"(� ~, �. 'i ` 6r \ �cc �� , '0: ' *--- X: 1 ( i J a 9 or5 Watich Lc) . Or\ 00 ries u it Ii e , 11C. as I ri CD,__ __, . a v 1 . 'A \ ‘r. Ik1) % ne-n \oed,j C•7 ? F.;& e _ 13 SaLiiors LOoLich L - ni t encoresv' ) lit , NtL ' SII1 Applicant Name (print,i1"\ I CLRt_ _ tUfcJ Applicant Signature* 'G¢� 7/..., ------ Date 011 / 6 8 falca- L. Co-Applicant Name (print) __ ____ _ _ _ Co-Applicant Signature* _ _ Date _ _ , _ _ _ Co-Applicant Name (print) __ __ _ _ _ _ __ Co-Applicant Signature's Date ___ _ __ _ _ _ _ _ _ ________ Ca-Applicant Name (print) ___ __ _ __ Co- Applicant Signature* Date .__ Co-Applicant Name (print) Co-Applicant Signature* Date _ _ _ __ *per my signature, the information provided in this application is correct to the best of my knowledge. Duke Energy Page 10 of 13 rev 101112019 Excavation Program Excavation Project User's Agreement Letter (Please fill in the blanks. Please Print) Date I g 1 ?.i • TO : Duke Energy c/o Lake Services - EC12Q 526 S . Church Street Charlotte, NC 28202 RE : Excavation For (Subdivision and Lot 4 's or Other Project Name) __ I i Sca lo (k.'.toL h 4L- js' (Lake/Counlyl/City) tbrmcLnI T& eddt (Applicant 's full name) ( ) , ', r � , Oclo hereby agrees to comply with all recommendations, requirements and/or conditions of Duke Energy, General Permit(s) (if applicable) and other federal, state and local agency requirements pertaining to the application to excavate for the purpose of a In addition, I/we have read and agree to comply with Duke Energy' s current Shoreline Management Plan (SMP) or other applicable guidelines, much of which is repeated herein, and understand that written authorization must be obtained from Duke Energy prior to beginning any activity within the Federal Energy Regulatory Commission (FERC) project boundary or on Duke Energy property associated with a reservoir, collectively referred to as Project Boundary. The excavation will be completed as described in the approved application and within eighteen ( 18 ) months from the date of written approval by Duke Energy, unless specifically noted otherwise in the application or unless I/we obtain approval for a single, time extension (maximum of one year) in writing from Duke Energy. Ave understand that if the SMP or other applicable guidelines or rules change during any extension period, I/we will be expected to comply with the new requirements to the maximum extent practicable. i/we also recognize that failure to complete the excavation within this build-out period will require the filing of a new application within the then- current SMP or other applicable guidelines and the new application must include any applicable fees and security deposits . I/we attest to be the owner(s) or lease holder(s) of the land immediately adjoining the Project Boundary where the excavation activity is to take place, or if not the owner or lease holder, I/we have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the proposal within the Project Boundary adjacent to their land. I/we attest to be the owner(s) or lease holder(s) of the land that will be used for equipment staging and disposal of excavated material or if not the owner or lease holder, Ave have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the work on their hand. Duke Energy PageRev: 4!6/2U20 I/we understand that all excavation work must be done directly in front of my/our property and as specified in Duke Energy ' s approval.. I/we also understand that access channels must run perpendicular to the shoreline while within the third of the cove area that is nearest my/our property . i/we understand that for proposed excavations, I/we must notify the appropriate local, state and federal agencies in advance of the activity by sending them a completed copy of Duke Energy ' s Excavation Permit Application Form and other required information. I/we understand that written authorization and/or other permits may be required by some of these agencies and such required authorizations must be obtained before I/we submit the final application to Duke Energy. At FERC-licensed reservoirs, I/we understand that except for maintenance excavations, any excavation exceeding 2000 cubic yards of material removed or any excavation or shoreline stabilization work needed to support an application that requires FERC review does itself require specific review and approval by the FERC before Duke Energy can issue any approvals. I/we agree that unless specifically approved otherwise in the application, explosives will not be used as part of this excavation activity. I/we understand that every reasonable effort must be made to minimize any adverse impact on fish, wildlife and other natural resources. I/we understand that applicants in South Carolina proposing excavations that are not covered under the General Permit, or are greater than 150 cubic yards, must receive prior written authorization from the South Carolina Department of Health and Environmental Control (SCDI-IEC) or the US Army Corps of Engineers (as applicable) before submitting the completed application to Duke Energy . I/we agree that excavation activities will not occur during the months of March, April, May and June because of the potential impacts to fish spawning areas. I/we understand that trees and vegetation growing within or adjoining the lake play an important role in its overall environmental condition, and the ecological benefit the vegetation has on fish and wildlife habitat directly supports a sound and healthy lake environment. I/we also understand that unauthorized removal of shoreline vegetation (e. g, button bushes, willows, cattails, etc.) and/or disturbance of the shoreline buffer may result in suspension or denial of lake use permitting requests, forfeiture of security deposits and require re-establishment of vegetation at my/our expense, particularly if the disturbance is found to be in violation of state or local ordinances or impacts FERC project buffers. I/we agree all excavated material will be placed in upland areas, landward of the Project Boundary, and confined to prevent erosion and sedimentation back into the lake or nearby streams. Duke Energy Page 2 Rev: 4/6/2020 I/we agree to adequately stabilize all excavated material and all disturbed shoreline to prevent erosion and runoff into the Take . Ave understand that the double handling of excavated material will not be allowed ; therefore, all excavated material must be placed above the Project Boundary in one handling. I/we have designed the hydraulic excavation process (if any will be used) so that return water re- enters the lake in the same general vicinity and cove as the excavation, to the maximum extent practicable. I/we agree that the proposed excavation will not be for the purpose of creating additional shoreline, will not alter the Project Boundary or the full pond contour, and will not impact threatened or endangered species, historic properties, or environmentally-important areas, unless special public entity provisions were made in the application. kwe recognize that it is my/our responsibility to clearly locate in the field and label on my/our work area drawings any areas that require specific protection or avoidance during this excavation work. Examples of these protection1avoidance areas include but are not limited to, any Environmental Areas, Natural Areas or Impact Minimization Zones as identified by Duke Energy; jurisdictional wetlands; historic properties ; rare or threatened species; and buried gas, water, sewer, electric or communications lines. I/we agree to provide my/our contractor with a copy of these work area drawings showing these areas to stress the necessary protection measures. I/we agree that if any archaeological resources (e. g. pottery shards, Indian artifacts, etc.) are discovered during the excavation, work shall be halted immediately. I/we will then notify Duke Energy and the State Historic Preservation Office to determine what measures, if any, I/we must pursue to protect or salvage the archaeological resources. I/we agree that any excavation from within the Project Boundary will not exceed the volume as outlined in the application and will remove and disturb only what is absolutel necessar to achieve the project' s stated purpose. I/we agree to be fully responsible for the permitted lake use and I/we understand that this responsibility is considered to transfer automatically along with ownership and leases of the adjoining tract. Fwe understand Duke Energy representatives may issue Stop Work Directives for violations of the SMP or other applicable guidelines and other consequences may result from such violations, including but not limited to suspension or cancellation of approved permits, increases in fees, modification or removal of non-complying structures and restoration of disturbed areas at my/our own expense or loss of any consideration for future lake use permits. I/we agree to immediately comply with any Stop Work Directives, to fully cooperate with Duke Energy and other agencies as necessary, and to perform the necessary remedial actions within the specified time frame. Duke Energy Page 3 Rev: 416i'2020 Ilwe agree to develop any required mitigation plans and to complete any required ittitigation activities at mylour own expense within the specified thne frames. ifwe recognize that the excavation work is not considered complete and deposits will not be refunded until the mitigation requirements (if any) have been satisfactorily fulfilled. 17.we a• ee to noti Duke Ener • b shone when the excavation is initiated and. to enswe that during the excavation _ semi Ifw? willwil.1 ss : Duke Ener 5d ' oval letter in a. clear wate , rf ba at the _*di) site and visible from the water' s ed e. 1/we agree to notify Duke energy injg when the excavation is completed (including any required mitigation measures) and that the excavation was completed per the .approved application, so a close-out inspection can be performed. (Me recognize security deposits will not be refunded if any violations of the SMP, other applicable videlims, OT this user' s agreement occur. I/we understand there will be no change in hydro project operations as a result of the excavation and/or utilization of the excavated area. -we agree to maintain the work area in a safe condition and: to fully indemnif ' and save Duke Energy harmless from .any and all claims, liability, loss or damage that may arise from this excavation project. I/we understand that: this user' s agreement does not, in any way, constitute the transfer of any rights in real property and that my/our use and enjoyment of FERC project and Duke Energy lands and waters shall not Wider the general public's lawful use and enjoyment of the same. Sincerely, ---Ael-7).1_480 ApIint' s Name (Prmt) Applicant's Sig .atwe _ _ Ci>Applicant's Name (Print) CoApp1icanVs Signature _ _ _ _ Co-Applicant' s Name (Print) Ca-.Applicant' s Signature CApp1icaflt's Name (Print) Co-Applicant' s Signature Ca-Applicant's Name (Print) CoApp1icant's Signature Duke Energy Pan 4 Rev: 4l6f2020 Type: CONSOLIDATED 1lEottiL PROPERTY Remirdiql 49,917020 7: 34t47 PM Ft* Ann . $1462C.00 Page I at 7 Revenue Tax: $1.*600./.00 fredett County, NC RI:111131d hi. Wyatt Riser of Deeds 13K 2732 PG 2207 2208 lilrioadT,dsWeir9;06Fill511 • - • -- -- adge Tax 16OCI-OCI Recordloq Trion arrokeed. :Y, POIcel hiftereKir Nix 4624676 I SO Vt :' , Itad by Frodell County on he day Of . by • .,, . MOH ttiCtrding tO Great a at MOON addrests thavel tiekm This. 1114trivraen1 pc-”are4 by J:c41n -Cleinionts1 Aram.'" at Law, 118 Mmiake Dr#i Ste. 10-0A, macirstvik4 NC 2B1I7 See desTiptfon r the !Oda Tit vtkieuppizt crtmr.r. eirloge# Nos ? . WIV,r4 - -,—tr-iimoweJohy.kweo. - . - 111' Amillowliftimmodiamdm",400 NORT_ Fri CAROLINA GENERAL WARRANTY DEED ot440A, TmsDFFT) rade this the cr4 S : 20 bx.Fiw botwoort • (wNroR MANTEE Bi Part Devin4cipment Lie, a Now Carafina Limited miguei Niftwo 1.1thiity Company ord wiffal Patricia Silveira do Souza 410611 Stastreetit Drive Cornelius: NC 28031 Proiperty Addrass: 1 ii$ Saybars Watch L3110 . litettesvitletA NC 2817 !4irop(etyi riot ptirntsay reetilicyatz ill' Granter' 1 rAort :rvandola Ivrea/I putt NM% 17,53re44, bett ccumilijortor portneekel. Thedc.::7't ration Gr3ntOr Graritoc as used Nrain. shall include s..;44i p4riets, tivfr hoirzt sUCCOSOrS, and assOns sod sha *Attie Sirtalett pktrati melatine, fen*** or rittasAer ot% requirrit-d COriteXti 8:bitAime. F4t?!'s No. 3* VoriAli Fite 4) 177 submi tted electrortically by 'Pluittitught SE cieffeeit-a_s PLLC suoresivi le in complidnte with. North Carolina 6;tatute4.4, govern inc recordable document and the terms of the submitter Agreement with thc iredell County RegiStef or %ow 7riv Know at 2 IMTNESSETH, that tte G=0E, for .a valuable .cc. rmitiemitiont poild •by -Om Granule the reokft of which 1$ bereW -acknowledged , has and by thme .presents does gam, bovin, fieti and convey tato the Grantee in 'ree simpiev. all that eartain 101 or proof of land sfta1 -7. * in the I awnship of City 0 4iloitkWAn,41,, 4oia. IrOett County! North Cwoira and more particularly de$critsed as follatta: BEINC taA of Lot St Sayiors Watcl-t :a&•• sttlawr: on Plat Map 721i Page 12 in tho RegiMer of Deeds, hula. County, .N-orth Carorm Parcel No.: OUT .OF 462.46.479 and 42457--61:03 ProPertY Mdress: 11- 5 Salficirs Watch Lone, Moloresvitt NC 28117 The property herein above descrbed was acquired by Grantor by instrument roctilix: erl ii Book 26663 Pao 224g and in Book 2666 RN°. 2245, A map -tillorrovin te :above f_teziled px).wty is rocorded in Plat Book 72, Pai)a: 41Z TO HAVE MD TO HOLD "oe 4fores.ak! lot or rr:, ,*kceel of iLnd and .z44 prvilegas and appurtenances thereto( bLoictrOng to the Grantee in feL .iir-ripiic.. And the Grantor covenants with the Grantees that C Tart:I L-11 seized of Una premising in fee simples has the right to convey the 3rne in fee sirnplie that title is tnarketabtia- and free ard clear of ail cancvm.bra ices and that Grantor %Ivui virbarai, zuld dfr4 the title against the lawfili claims °fait persons whomsoever excopt for tho exceptions hereinafter stilted. Titio to the prowl,/ heminabove described ka sub*at to the following: excptions:. Aii such. v*cl and entioeable easem 1 :s: restrictions_ and rights of way of record arrd liv lien of ad valorem taxes for the current year which the trantR3R herein assumes and asgree5 :o poy. IN WITNESS WHEREOF, :he Grantor has hereunto set his Nand and set 1 or Fi corporate, has caustoxi this inszurnerti to be sigrwirl in its ocirpiki&..rate marne by its duly authorized officers ;Ind its seal to be fir-Kinto affixed by atilthOrtif of its Bawd of Diroctom the day ar4 yeartirst above writtem Bi Pad Development? ri a North Carolina Limited Liability Cortotriy 13; I-Corpora Narriell- i / . - - -- --- - 7 ; - • Title: ' ilk - i*. - _ .:: , it )k•Va.ww-- .,... . . , 1 Lip ....i.p.___.,5,..0.-.1.-,,-......• .,,-.,., . _ ..:_k_.,.„...„p.....,., ri L . . • • •• , • . .,.... ..F ,appiqmoiromowmaiiii/R*WWWWIMPOiariklieeUriitafaii10•-P .- - -. L i SEAL-STAMP NORM CAROLINA, tileckle4thur County., 4 .. t 'the undersigno , ik Notary P.sle :Ai; of (00:111 :, t . ,i , ..':: .:. :1,44,„„.,„..,._ Countyr State of North Dii44_iv . t.... e : i Carolina I certify trot . v. . t LiigLii...if.,.,......... .,_ person,* crone before fre this day nti At-71. acikngiviedged that tgicitAho is. flXii-y of B Part Development, LLC4 a Nortn Carolina LimAed Liability Corpany, a cc potratibMintititod libity-compwylgenorai partners* i. (strike through ft inappiicablo)4 and that by authority duly given and as the act of such entity, 1.. heishe sit -led the fonagraim instrumert in its name ori its tet. .i :: If pis its act arid deeds Witness. , -' ' 2: 1 41/4.4:11F1 E LED my ie%rid and official stamp Or seal. this the :1: 1WAL. day offl, . ., . 1agars,.. ....._.*i..4_,.,„... . . : V , RLY ,11 117' My cominzston expiile ; : -: :: 417-1 . i‘ -1 -'r ::::.wilt ''ilC11 1 f NOTARy piusuc _ .,-....-. i : :, . - • - - -- - - 1 / .1; . ' - ... --:,,..., eC3k leiliOcx ag. - / f I _ ..„ , Norttame Csi tOJla /- /i ,, .2L . Now , 4101EPir , Uu nneti.4t'i'8 6,. - . 2021 I I , , '' F . - .. /re •ft NC. 6or ifisslor,,, form No. 3 2 igilli. licwhd it Ign '\1., • -*.f.4 ihi•pqffirobA,• "`' E *Iedia.~..., Lake SeNices DUKE Duke Energy 441e P‘'. ENERGY, 526 Church Street ECial Charlotte, NC 28202 February 08, 2021 Miguel Paludo 154 Hopkinton Drive Morresville, NC 28117 RE: Private Facilities Permit Application Approval Norman - Pier- 115 Saylors Watch Lane Dear Sir/Madame : This office has reviewed your Private Facilities permit application(s) and is authorizing the building of the structure(s) subject to the following conditions: • The construction of the facility must be completed as described in the approved application and within twelve ( 12) months from the date of this approval. • Lake Services must be notified upon completion of the structure(s) so the lake use permitting process can be completed; a permit tag will be attached at final inspection (if one is not already present on an existing structure) . • Please place a copy of this letter in a watertight plastic bag and post it along the shoreline where you are implementing your approved activity. • New, expanded or rebuilt facilities or mooring buoys must be situated or constructed in size, dimension, or design such that an average-size ( 10 foot minimum) moored watercraft will not interfere with access to other facilities and not obstruct ingress and egress of watercraft. • Although DE-LS has reviewed and approved your Private Facilities Permit Application, because not all applications are submitted with plans that are drawn to scale, the applicant must ensure that ( 1 ) the structure described in the Application does not extend beyond 1 /3 the distance of the cove or one hundred and twenty feet (including any moored watercraft); (2) facilities must be situated or constructed in size, dimension, or design such that an average-size moored watercraft will not interfere with access to other permitted facilities and not obstruct ingress and egress of watercraft or extend across projected property lines; (3 ) facilities must provide a clear maneuvering area between the farthermost portion of the facility (including any moored watercraft) and the opposite shoreline or any existing permitted facility, and: (4) the structure does not exceed the total square footage listed on the application. Note: Permitees must immediately notify Duke and stop all work if historical or archeological resource are discovered during the implementation of an authorized project. Please note: This approval does not approve electrical service on dock or piers. Lot owners should contact their county Buildings and Codes office for electrical service requirements and/or restrictions. Some counties may restrict submersible pumps in the lakes. Thank you for your cooperation with this program. If you propose to build any additions, make any modifications, including maintenance, or have any further questions, please contact me at 704-382-. 7506 . You may also email 1akeservicesduke-energy.com or you may call 1 -800-443 -5193 and select the appropriate option. Sincerely, C.__24R- (, ------.. ----Y-iirct.AAA4t-1 — -_ _ tx$4,1r-leet Joseph R. Klutz, III Lake Services Representative Duke Energy Lake Services Enclosure(s) JRKIdpg !. Efit GE Pf# 01. WPISP * SAL Rit [1'1, j % ;-1 Project Name/address: t Si _2t ILA') • T •iat t‘ip _N C County: Dr_esia.... Location Address:Th 084%1 - 1.11 Oda • er yft rexp%Llie÷_t\IC , a61 Parcel #: oi • I • - Parcel/1ot size Disposal area required (sq ft and/or acreage) I no 1 Y‘, LOO _ Acknowledgement of Notification i) - +Le � r i 401 s e -Tr _gt __ . am aware that the site must adhere to all state regulations and rules regarding sedi ent and erosion control and water quality. And givepermission for g - Name of lndMdw. and Company �. _ - ---.----. -.-_- -- - _ to disease of their dredge material at the above stated 'ocation Owner: � �r g v���~e �-' �� a� ram - - - --- � � ,.�,� � �6 ,� - r4' cJ ` -- Print Signature - - Date: 0 5= II Along with form, phase provide; Aerial of parcel/lot { County GIS) Photo of proposed spoil site Identified proposed spoil site • - . . e' .- •1 • • n, %. '_ • 44' P\r . ."-"4.-- IM .- a A.. • •-•' al . • • • • 4 + • a . . :f, .. ' tea •1 1" . # , . , .. • • f 0 • • - 011 • • • • + ,.- f' ' . �' '` , ^ * •i • r`' i r. x•' y* •~yid { ' - • * • �' , • • • • • • N. 0 li•_ 4 lir) • • • T nKi 4 ' # . • ' „ ' - • a ` + �ti k* • -• ', +` + - - 3' L. " #lYY�I+iF� • + Y ' • ` t ' # }. • _# • -.L.' r • ' + .- #• Y a * iF/ • + - ` r L •;'' yam=+r..T. • • • • • • • • • • • • • # j ' �l�xR rt • r -• uCrE i' `�• Y a - .- • 1.- r _•• r • • � _{ 44.4=4 • • • .. ' -• }, _ • r• a: FYI + .iT •aj y' ' _ - +, + • . - • J 1.0_.,.•. ne.11., 4. • 217 4. r 4-'..": • _£-,�••*� _ '_ r_;-7-`fir r .•:-' R w+-a•+IA r -- ''#F a• _ . ' _ • • A - ci" i'. ice; }- 'r~ ". t •.f !{ • * 5.� r "',} • 11 ♦ _ _ • • f _ *fri+i`J_w - rK` ti� ' • • • _ _ .y .. # ''s}`* rr _ - - { '• • -�: 'Pr * I f9 r - - , 5 - ' - • .12: 0 • t ' - •� ,. • - s-T_ •- 'i- .. -' ' - -_s ' -* - { . .fit. ' . .1- _ ' .. .. - - '- • . �_ �Y. • - -" ;ry ; � t a J r Cla • T• '17°. • ' • ....j " ..-, ..-.4Y Mr: .._ .- 0 . - - - -�.+;. , - . •r "+, • : qr V ,�w a, ' rtsT" •.'_a•.� ' `, ' . 'h .;• `. ' " - _ - , ' •• 4 • Y f • • • CIO • • .* }. i1* ' ;; i * ' � P +r •;±• ;+'.; - - • • iIlle ' d , a. • . it r = _ • ' • ., ". • • f, _ ` ?s_ r'• '+ '�'-#ft• • STi. 4 fir: {� '-ti4 #� • � . 1. illi • ,�y rY ♦,wry . •• •. ;: :y ++ •_ - - 9° 74P(' . • • • 4 *• ;'':` 'ram .... 41' ' ' ` * - L '� r • ' ■,� '. • ,• • ry �•'Y+ +'Y .. , ..k iS'�i� ' • Jf ' 1 r''. r' ' T • 1 .. ' �, 4 ' 1AhLf .a�! ' _5 r 4y a ti _ • ti + 'L ti.� �' • Y ••.k • _ • •-1, Y. .may. s I AY {• - * ' • +ti'; 4,�F.• r r. ,r j;,- '• ` - }4 *�- }� .. " 1` z 'sr 4 - .• '# • -1 111 02•Ir •-•/• -• . . 1 ..-...4iiii . * 7:11 . • , -•. ': • i 2N•3••••--I,-.. i-4,0 .' Yj } '} .. `4 y *1 . rr;• _ ,+ . i *.'J•-_ - t, • • ** i +4 • t. • • # {• - '.'' - 'f _ • J ',. ".x > j *, ` L `ram } `' t 4+ +i.a • • 1y '[ 7 #}- ' ai . K ;..... ' r 's '_ # ;• , ;'. � T y s�L11�f immit It • IP ._, co .211*. • • • • a r _ • '' ' 'LL'••• . ' _ • µ .1 it ;- : . " '.' 7"" j_ - _ _ .3. • 110 _ •F _* a Y: " • 0 f. {t _ + -• C4 ♦ r `y _ f - - .. i _ _ r -+ r' r -r tom. • " • . } `'�--,w F _ ,^� .. •rt u " F - ' 1 am - Sq - - m - `•+`y* . l � � - s :rg1y .,'wa '4r;rk- lti ..t �Y +{•yam +-•�Y•y . * ' • � r •r. .. - y ; ..•:." 1 # } ■ • • • + R :.r r= s •+ tip ' *-Y T = _ • ' • # ' r �//. '� yF „t .. r. �* ''�• ; �' dry• ' • 1ilk ' T :r ?yam- r �5+ • '� ' • � Lr +T a • 1•P• re • } ;" i-ti! * �j keitir ' ' i„_,,, .S :r ," y -y Yam. • .4' - - , ■ ' �r' -r'4 - _ : 7..f.' " - _ am • ..,.. .... •_ . -.... ._...: • • r, • lb 7 - .4....... „; , . 711111114. .--; -I.- -.... :••• , • '‘..1.' Erbil.I''....: . 40 t • . . _. ...4. ..... ...t...eir,..... . • _ rdICI • - 4 ._it .. ,. • • • .0 , . •.. ... Cr • ill ' ~ 1 ! ` kR } - r * _ • of .• • l *} • • •••., .• l''•.:4 '.• 1.•` I .1.. ; • ..... • , .••.....,--- .•: . -- .• , _. _ . ..... . ... .I. .-. 0 .., .2 ..i,I, •••a . • . • -.-17i • P. "! a . • .e- . ) ..• .. ... .... ._-,%. ..„..,.- . _.7...r.........„,-..r...c.„...; . •. . _ IP- 11 .Yl, ' I' '*• f • '� i # • ;� • i a'+7G" • '�`� ''+. Z art • , CI . all -16 .9 Ititl • • 4- 166 II It'll':IP . d„. „lit • - • -.ra.' •: • , . ,i•frei. ••""-..: P .1ffir• 1•111i:'-i aa els kl:111111b6.111127. ....w ... .....: r rif.,:....4... .....1.1_.., .....-..-). . L.r.:_•-.... . _ :: . . r iinPri JIIIP 1.1:1)1." • •••••II. 1.% • a a li . - .. F liChl dil .., ,....• . _,. :......7 717„..i .7 .. .; • 4. • �" - rY„ '�' u - i �' Y. '# }� . • * '. 4- 5• r ' -Mr - + L +.r vr` .. ��,- �� J ,' om . v,- • OM 140 113 IIIIIII.ilP . • . : •.•. • t. 4:;if 1;•"'.. 41.'- ._: ..A. .-.7,-..._;E..,...•.....- ._._:_i_.,.. I.. • - ., .. ___ . . -. ......-._4400. : •-••-•.-__t_41,,... iiir_....„...... .. .1: "..;9- o _. _ ,,_ „..• , ,_.... .7.1....:-.-....:::•-.I. ... .. :4-7.: 1.1. ...:1-....:4r as 7,-- ..i.s1.4 i. !.•_1. p:4 ...•.•..•..•A . 4le,...•-. 0: y _ip ++ice.-iI#r i s- •�, # - i+'s y +-`{ ' -- •_ •- " - * :a:: 1t .... -': f - 'j - _ •- a- 'ter " a '�. } " ''J • ". ` r .:)r.- r. ......w- • • • 7�f +-- 4 F rt --',-.........1.:::...--.r { + ` f Y4• '• i'.* , ` } '"` }'� T - liiiino a • iE il • • 1111. -w""T.i • : + ' : M l4 `2 • t * • • k ate. + * . f _ , 211; 1.11Z4- • li + ' ;4' 44 *C *{yam#' - ;• , ...I. y.w. aF +i.•• .rt .a ••r err•+ r 4 ' , a. ...*. - . • • I r • t,,,�• 7r . . • � ,Y , i rt ti r• v + ai 4 ' ' .. y let ems • L - " a ; - ' +e �1 ' ' �" ' - - W�' .1 • 11 9. • • • 11. K ...t........,•... .•...- iv,: . : _ _ .. .. .. .. . . . .. • . . _ .. ..._ . . . .. . . . • • _. . ..:... ... - _ e • fir''. ,}+ •-• - i . - • r. • Y * '. ' • • 11. 1 •jr,. ... . . )-. • 11. • - - lb • • - { • } . Y • t "ram' - .+ '* •ter" # ' f *, ' -#`{J • # ' ' • • • • • IP xi • • • .,,,,r,„ . .6 11 • • • - - '� •. - # . } L 4 . • -•L Air L!".: •-, 4, li " ` y# r } 1 +• .A F.. -'• - r+ • , •- +• _ - • - _ •. 4 _ - " r '' •• A. r I f' Y • • ' _L 4 , l � e • _ + •rr • • • mp • • • � + k •• � - • 4v-+ �- .Y•. rto... =kV r 'y y#; i• •. • • i r } • *' .*r "rt - - �- 4. .....• `mow _ L r a #. .-r� _ •� 1..a.r...rt�w+r-Y+'-Dui"�rt�r+�^'.'!`-*.•�.�...•F�..r.rw_ � _. � _-__•- w" ter.--•. ....w..........��_,LL.. -�rt ,. . ampt di 111 i„,..„ r-I .... .. _ __ . . ......_.. S .. ( L. . . ....,...._:.... , ... .......... .... ,,, : iir li it 0 § tity, ill 1 irk '� •+toe./ _ •-.1%11. -:" ''.:7 i vil T it iq, .... •Slik. Li- r;$ it 0 irli z . telkimP i tAimit ��, i : 4',. -.: z ill .'l T i [ + R 14 5 ..... F ■ liPit.... .! .t. ......... ".... 4:'.. CA. .'' Agra:'4- 1111:1&17,4„„. 'fir lirt It �. 'pis, fv -....i.. _ - �*ti 'E' r gralik at t 'CP) r'it 0 OthLit Or Air it 7 Je UMW colh E. *If , "`: +. in 44. �. I } * �. F F % . . tAIN. - - - ir * . 44 P-ZYP m ink ....r. 4. yLt. M r gl:Iii :6It .1.- III IL 1g• AU 51. - 13) ....t 4 re ir • • }. ME 74 li hch. i 4 .7` yk R 1114. 64. %PA f } _ . 0 r. NIL # ,� *meµ h •� # �} Pe" • 144. Fr • 46. N. PM -.1.. 44 •• .. J. • .{ r le, -. f ". _ r *; . _ _ .. - f i T. f #v w•F ; • ; r�Y 'fir - i. 'MP wy. . • t 4 ''�.-t - # � % '..IF " y - r • s CD}* ir #F�r T r f 470 } j ell 1. 0 OPIEL G r AGCID • 'Viir •Nlipr # # �`�Fr NNW Ali.MID ; *01 � dl, W.Ma %gip • I P. OP - r • •i tP.., '''—P. # ."UPI' `s s y, •it.. i • R. y— 'wk_, 1r ., +Wa - '* • # I .. kft f. Ar - W. ?ll— ; ' eM `� R F } Fhi. r r 41 Ile '. ., +1y I -mow .... r' i ' • am , ! *f., i IN L � irs t r J.w -. -, X 5 w - t • r • 3. pi.'+ t �.�..; '* STATE OF NORTH R N 3 4 OM Aiiimeinnii 1REDELL COUNTY I r 't # i , \ t 21 • . I ,certify that. . i Mop vas (Irwin from survey. made underV( 1 supervision tirtiutjusteti ratio of precision es cciltutated :i 1• : TP,000± 1 ili , . C, i , . Boundaries tiot surei if any, are noted. Deed descriptiorm ore redordeif in 0 N\ p Page shown _Witness bond d seal this th day f JUNK 11 , � Ibirsoi4111" 1 L ,. , L fit _ ,. # Val , ly, ., illii analessioir y ,. .z.,f. Sri} .rai � c ..---\\‘‘ -,,,A‘ t lx"' C,,IAI ttRi, € * * _ � S14: t 150 tioits; 7: taLt j.1'12 rii - tid tirveyor :: 0 ;it. I, ,.... , E:: . ' ''. ' ,k s ..„ :,-.2., 11'1 r 4114, tit- iitilto;#\--- -, = SE t.- 7 .."- Ilk Vrillitdi *,. -- -..,-.-71 ri)Z- ::: NOTES: ir• I Neltillalkill N*1 (Z- \\‘" E S S Ili f !..ir 1.-370.3 .NreAg"it sfr I :11////1 till t VON\ 4Cbr : HORIZONTALGROUND UNLESS OTHERS re � UNE S N AREA BYCOORDINATE COMPUTATION. 1LOCATION MAP NOT TOSCALE TABLE S � ►1, PROPERTY' SUBJECT TOANYVALID ENFORCEABLE R ABL -- E E 1 &c RIGHTS F WAY RECORD_ . 0 SURVEY IS RASED ON PHYSICAL EVIDENCE AND EXISTING LINE 1 BEARING. I DISTANCE MONUMENT FOUND DURING THE SURVEY. L PROPERTY11.1 CORNER PIPE E ASSHOWN ARE NOMINAL 1 DIAMETER, L2 I N . . $ . 3 40, 80 . L4 i 3` * # EGEN LS I ' x' 170. 16 LINES SURVEYED L7 --- ' 1 'E , . 2 UNESNOT SURVEY i..4.,. — — — — TIE LIMES — , - — - �, . VHD DISTRIBUTION .ENE - ---- � � -- O • (OVERHEAD) AGE STORAGE, LLC- -- / R/WUNITS , .- - - .. .�,. - Ma. 1 P , 033 raj TRANsmissloN0 NO MONUMENTATION .fr / POD POLE UNLESS OTHERWISE CENTERLINENOTED / / PROPERTY UNE F) DENOTES "FOu 't E ST* PIN 4-6 - 20 - 1 / RIDE ERAS, NTS DENOTES 'NOT TO ALE" 36 PG. 150 / r CONCRETE MONUMENT (F) ` N 679940.48 FT E . * 44 FT B3( 1 0 ' I i , i \ , , , ,.., (4,, Y ti - 8. itS PIN 4687-29-6642 BRIDGES PROPERTIES, D.e. 1602 PG. 1912 PcN)4 43 EL 2016ARGOSUSA . - LLC .86P . 4 1 1/ / STAGING AREA .227 ACRE - - -- DUKE ENERGY T ANiN LINE �rt . "` ' to - E: . ` �` QV-- iRyw NAIL ' eEN .� 679337.77FT T • 1 5T ..-_,53 E '..%. ,i„. . i NAD 83(2011) 1y 1y - ,„ 5?/.73, P,3,i4 1:::, i st� -- -- *PAie-* --- - i 1 1 , , ,/ , , 1 f -- --' ' ' , - - , GRAPHIC SCALE PIN 445 {-- - 304 FOSS HOLDINGS, LLC D.B. 2180 PG. 1029 Q LOT -P. r 26 PG. 73 MS Fll E NO.: SI905071 DWG NO. : 51905071 . ! SURVEYED miTLE. . v IN FEET DRAWN BY: N.D. WAS 1 k CHECK ED - O r ii TAX ID: 4 — - FOR SOURCE TITLE REFER D. . 1602 . 1912 Il PROP EFL OWNED BYfr. ,..�. .4.- --.) MUD GES PROPERTIES, LL C ii SURVEY AND MAP PREPARED • SURVEY SHOWING LOCATION OF II• LAKE NORMAN SURVEYING 1 STAGING AREA 11 & MAPPING PJ ' CODDLE CREEK TOWNSHIPCOUNTY,IREDELL N .C. : 137 Jennings gs Rood, Suite Statesville, North a o i 5251} BOOK: DATE MAPPING: JUKE 3. 2019 '--�DATE OF SURVEY: JUNE 3, 3019 ;1 (704) �, — . -. • - P .9) Doc 00 800 DO R CRP Accorded : 113 2004 at 01 : 28 : 00 Pm Fee Amt : $674 , 00 Page Excise Tax : $654 . 00 Count NC Brenda Bell Ficizister of Deeds B14602 PG19 49i2- 19i4 Excise Tax $654.00 Tax Lot No. Parcel Identifier No - - 642 and4668-20-8185 -4.34 Verified by Cow theday of ■ait;+ii. *34ary.. w, r *. � } •rr ...■ F + +ttalfl � byF} M#IL ►+l i.a'Ef M,'■4s7rtadf4 ti .a r. rrt•. 7s•! E# rtrt*i}**FwJ /r*##.s♦#tom#■*■*tK#r* rt#tfM* x .##** ##f,r# F•* #iF fs ■. r •# i +■ 4 ' i' � _--_- - / . - Mailrecording to: Grantee This instrument preps by: Lull, Gandy Broadway., PLLC Brief Description for the Index - NORTH CAROLINA GENERAL WARRANTY DEED Tms DEED made this 22nd4 . t. Hof November , byand between . . GRANTOR GRANTEE Donald Ray Snyder and wife, Bridges Properties, C Victoria A. Snyder, 2 Oak Ridge Farm Hwy aka Mooresville, NC 28115 Vicotira A, Snyder Enter in appropriate block for each party; name, address, and, if appropriate3 character of entity, e.g. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successofs,. . and shall include .sin.gulat, plural, masculine., feminine or neuter as required context WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt f which is hereby acknowledged, has and by these presents does , grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of , . . * . . . . . . . . . . .. Township, Ire dell North Carolina and more particularly described as follows: See Exhibit " ached hereto and made a part hereof all y • 7!�Tr The proper hereii0ove descries was acquired .rirantor by instrument reporded in.Book „„..... .,, ...,,. Page ., , . .„ „... A map showing.the above described proper is.recorcted in Plat Book ,.. ,. . . ..., . ...: TO HAVE AND 'O HOLD the aforesaid Jot or parcelof land andall privileges Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, that title is. marketable and free and clear of all encumbrances, that Grantor will warrant e title against the lawful claims of all, persons whomsoeveT except for the exceptions hereinafter stated. Title t;yam* the property herein- above described is subject to th following exceptions: Ali easements, restrictions and its of *ay of record. Ad valorem taxes for the year 2005 and subsequent years not yet and payable. AU matters revealed by and accurate survey of the property. IN WITNESS WHEREOF, the Grantor has hereunto set his hand and seat, or if . int � hascausedthis stet tosigned its corporate name its duly authorized officer(s) authority of its Board of Directors, the day and year first above written. 04 I /1 _ado jOr di '4111.1111.111r.11W Mr 4 ill 4 i . AL) (Corporate Name) . a # a . ■ . . . , DOna48RaYSrLYd • is * * + .1 By- 4114 4if • rtr # . s ■+ ** : * 4 1ii`it 3 E c President (— i ,. . : ^mil. # F #ii+k# [wt> iFts�rY w f. *�# S EAL) i4#•4fy ��fit�y ,'Fr. ., ,4Ff# Attest: 04 Victoria A Snyder I J f .t.w f 4 ■ #r* ■+ (SEAL) ft#IR*0*##4*4ii*yle#FV,4..#4f• Secretary t l4 (SEAL) >t 0, tsik „ NORTH CAR IN T ,g, likr=1/4 • HOAD,'''..., ••••.., .A.... 14, I, a Notary Public of the County and State aforesaid, certify 1 . is ; i g . Snyder and Victoria A. ,z.''s <ea.". %es .4. 0,..:. AR , . SNyder, Grantor, personally appeared before ' -. acknowledged of the foregoing instrument. Witness my a . and o ial s . rp ol.eal this 22nd. ! a ' • • vernber12004, % '13 • 46 U B LIG 1 Clb ;7: !e 44110-060Pr...411111.111ww- 41. , si M Cotes sion Expires: . 1 #.�. a tt - ` . Notary_. f ste47 VC14 1 NOS% re*if44 11 i taIn Itt 1 . ...... '.L . MP■. .1M■ lM.y4.0....1 �1�-- --' I _ (SEAL) NORTH CAROLINA, �. r_#, . ... COUNTY. I, a Notary Public of the County and State aforesaid, certify that � • # * 4 ! a . i _ 4 • fia • � # f • i . ■ � . i1 Grantor, personally agar ed before me this day and acknowledged that heishe is f F a- � i i • } * is 4'!v+ ■ a s t� 1+• #f W � ���4 4 +l —* k. ■ i * i a i .• . fa aa . i f .#f A. . . . . w . r At' 3., i * 4 ■ a.# • . fs. corporation, and that he/she a a . . r . . .'. . ..., being authorized exe- cuted the foregoing instrument on behalf of the corporation} Witness my hand and official stamp or seal this My Commission Expires _ tary Public cometOPT, 7 New wftworrimisiggir The foregoing . ! • st ♦ t �f * a at � ar # �• �isF sir 4 # .f ..* t ilixt ; .ta a3t . i. . w riiti• r -• is i W Y�� V f{y ' This instrument this certificate i .E,1 i y ii. 111111k4Aleist ■.. t R##}■ !M i-�f k I M * #f .F f! T VAlliv �1 ' Deeds o YI # ■ t . a t a Ri y 4 it 14 .;a._ wftviriii .�,r■ ..._ _ DeputrytAsisitoteet—Register of Deeds at. Si4 EXHIBIT "A" TRACT I: .BEING all of that ttaa n 6.49 acre tract located, in. C :k1;I:e Creek Township, Irde1i. County1, North'. Carolina on NC Hwy 150 By-pass; being more particularly described as follows: BEGINNING at a point in the centerline of the 100 ft_ right of way for NC Hwy 150 Fly-pass, said point being located North 36- 17-36 East 2,458.39 R. (Ground) from NCGS Monument "Run In" N: 206,463.354 meters E: 445,2S0.693 meters Dated: 1993 NAD 83; thence continuing ftf said point of Btginning and along the ccinterline of the right away for NC Hwy 150, North 6* 22- 16 East �61.38 ft, to a point; thence leaving said right of wayand running with the line of Whitmai pr rty (now or formerly) South 54-06-48 East 49,80 ft. to an existing #4 rebar in the eastern margin of the right of way for NC Hwy 150; thence South 64O6-48 East 246.91 ft. to an existing 2 1 /2" pipe; thence continuing with another line of Whitman property North 40- 19-43 East 305.82 ft. to an existing 1 " pipe; thence North ? 1 -18-U7 East 121 .51 to an existing angle iron in the line of Evelyn Brown (See Deed Book 308, Page 337, lrde11 County Registry)> thence a new line of Johu W. Gaffey, et al (see Deed Book 6O.'I� Page 538, Ireddll County Registry). South 42- 31 -26 West 221 2 ft.. to an existing concrete monument; thence another new line of Coffey, of al South 3 5-D4-41 West 614,81 ft, to an existing #2 rebar; thence with the northern line of Lot 2, Scott D. Burton Property (see Plat Book 26, page 73, Iredcli County Registry) North 7459- 1 7 West 572.00 ft. to an existing 44 rebar in the eastern margin of the right of way for NC Hwy 150; thence North 74-59- 17 West 5164 ft. to the point and place of Beginning. TRACT II BEING all and the fii1 contents of Lot No. I as shown on plat of Minor Subdivision for William Wallace Whitman estate and recorded in Fiat Book 36, Page 150, fredeil County Registry, to which plat reference is made for a more fill and compete description of said lot by metes and bounds. • • ' l3 .. +'• ' � - - '. - - ~� ♦ - a r - - t-mks - ...r f} ~fit*:y - ��— - - _T • * �'4 �, w. ,F.t`. # - s ;F - - a - - . 'iR- T • • #. r• �Y- sty - a . . - . �'=i+ } ��t 4. �� 7h f �� y •� F T. r E. .1. li�. .-.. •44 7 4 s K ... - - - _� • - �� Y.• =ma y_- t � .�. • �LL.� .#. �+ _ 4ti • „ �_ 4= `# 3t + i ti� •t •46▪ rt ti�+�� -.5 t= ti • �. •�tf _ ir .• .� b�4-i }-r 'k•�` • - - . ti • • .• * :l+;i'�' # s':'# �_ '- _ i, *ji r`�iir•' i w! '� W i•a + '„" 4+IC ;+f + +•' •. .• . : + w t•7 ..w ..4.'A * xt.}V.4r*� - .' -... =.;+ems • �- =1� mp fly a • • • #• 1` * • - .�;` ;T' • : .*4 Mw `.'` •-�"r � - L ..�N •' •t 4 - i54. *� ` t ± {"•• � � ry ;.51 w +t+y�yaris + .� I�} #. + ' i -* '_ }R: + ti#*��1.#f 4r* +' �•; �_' �' .}}* • = #* i•a ��'+-.yam • + +�. �• •...�.��+Y�ww} +■ '� atef'*#' .'- .,. *; .....• ", +;+�,`� `F' i#• F ';; ti. .# r'5; �.�L +`' *- - • t - r f�TT E. z �� !' r�}'7h: l • him 1 •` `• + a . •+ �.. _ 4 , „ "I. ' I Ili • ...... + YII: - ' ., y5_+i + •'J � 14 # '.: _S t. ;w.# +iw • • • 4. • • • • • r i , a • • • • ' T - - - . - lille..1. - T• • • • Erie • • - - - _ t ; -L. } • . #.E. _• R. • • 5. 6. IIZ -`, , .+rtr +. ` - : 0 i • • • 6. . .. .... • . • ir brii. R + • 17 L• a 4•f + i • • 4 isi . r R. .17 4116 • Alit= ti a 4. . . , E. • • • • • . - _ _ ` t ' JL • • • ir i II • • i i I t . . iii.7.g ` . f - 1 '"--Q, I i a _. rii • /II A It ! _ i = - II i (.1 • • . • i Ifi Pr IL(if • 711 1.1 tJ+/ {/ } 1Sb } y t t ki 111'41.1.1=....1 =azitin 4 i 0cmc:::: „.„.0..„. J 0 j 'MR.& Z;: :"771 • .1... % , . , , .. • 1 ` 1 ( ... _„............_........_ ... .., la. LI\ I I ... Jr.-- ---. i iii,......." akimiY 173%4 I tx P. '''llni -14 '.'.-•-'"..ap.a."' Pn.41"16:1:1 =511111111.1.1.1wzizz=5.... ... ...i.C1. i •Ir "`NL: 2 .~ iiii H . • I - • • ii 4 i* -114 } 1===a, ii • 4: r - • • - cp, . Clap • • ill • • • • • I • • - • • • - • • • ■ • a. • I • * 0 E. DWR PreFi1ing Meeting Request Form � NORTH CAROLINA Environmental Quality ID# * 20201540 Verslon * 1 Regional Office * Mooresvlle Regional Office - (704) 663-1699 Reviewer List * Alan Johnson Pre-Filing Meeting Request submitted 4/18/2021 Contact Name * Janice Estep Contact Email Address * info@cbcstoneandrecycling.com Project Name * Paludo Dredge Project Owner * Miguel Paludo Project County* Iredeil �. Owner Address: Street Address 115 Taylors Watch Ln Address Line 2 a�Y State / Rovince / Region MooresviUe NC Fbstal 1 Zip Code Country 28117 United States Is this a transportation project? * r Yes � No Type (s) of approval sought from the DWR: 401 Water Quality Certification - 401 Water Quality Certification - Regular Express I' Individual Permit r Modification 14' Shoreline Stabilization Does this project have an existing project ID#? * r Yes re' No Do you know the name of the staff member you would like to request a meeting with? flan Johnson Please give a brief project description below and include location information. * Dredge a 67' x 40' area for new dock. Dredge by barge, haul material out by land . By digitally signing below, I certify that I have read and understood that per the Federal Clean Water act section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this Form that I cannot submit my application until 30 calendar days after this ire-fling meeting request. ei I also understand that DWR is not required to respond or grant the meeting request. Your project' s thirty-day clock started upon receipt of this application. You wilt receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired , and you can submit an application. Signature agerer ocirree-0 Submittal Date 4 ,18/2021