Loading...
HomeMy WebLinkAbout20210686 Ver 1_Shoreline Stabilization_20210519Shoreline Stabilization Application Form 15ANCAC 02H .0500 — Water QualityCertification, Shoreline Stabilization FORM SSGP 10-2013 DRAFT -NOT FOR USE AT THIS TINE Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request here: Busby DWR Pre -Filing Meeting Request 51.46KB Form.pdf Pre -fling Meeting or Request Date 4/2/2021 ID# 20210686 I. Applicant Information [15A NCAC 02H .0502(a)] Version 1 Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * Owner Information: Name: * Email: * Phone Number:* Mailing Address:* donna.lancasterdocks@gmail.com Rease provide an email address for payment and requests for more information here. Sarah Busby s arahpbus by@gmail. c om (704)202-0373 (xxx)xxx-xxxx Street Address 5 Oak Road Address Line 2 City Salisbury Fbstal / Zip Code 28144-6909 State / Rovince / !Region NC Country US Is there an agent working on the project? * Agent/Consultant Information ....................................................................................................... Name:* Company Affiliation: * Email:* Phone Number:* Mailing Address:* C' Yes r No Donna P Hrko Lancaster Custom Dock and Lift Systems, Inc. donna. lane asterdocks@gmaiL com (304)629-6096 ( )m- Street Address 1156 Perth Road Address Line 2 City State / Province / Region Troutman North Carolina Fbstal / Zip Code Country 28166 US Asigned and dated copy of the Agent Authorization letter:* Busby Signed Agent Authorization Form.pdf 144.89KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Busby Dredge and Shoreline Refresh If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* r Upload File C' Look up address Property Address Lookup:* Latitude:* 35.580810 Street Address 321 Grasshopper Circle Address Line 2 City State / Ftovince / F bgion Mooresville NC Fbstal / Zip Code Country 28117-6615 US Longitude:* -80.929166 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Busby Buffer Notification and Site Plan.pdf Busby Duke Energy Excavation Application and Supplemental Information.pdf Please use the diagram at the link below: 669.96KB 6.61 MB https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Busby Shoreline Photos.pdf 759.45KB 4. Location of the property (where work is to be conducted) Nearest Town:* Mooresville County:* Iredell Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address:* Crescent Land+ Timber Corp. Section 8 Lot #443 hclude phase/lot number Directions to site:* From I-77 NB Exit 35, Left onto Brawley School Road, Right onto McKendree Road, Right onto Grasshopper Circle, Keep right at the "Y" and continue on Grasshopper Circle, Property is on the right. Rease include road naves and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Residential Residential, undeveloped, etc. 6. Property Size .55 Acres Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Dredge area for boat slip access to new dock to be constructed. Shoreline refresh of rip rap at base of existing timber wall and on back right of dock where wall does not extend as shown on drawing for stabilization and erosion control. 8. How will the work be done?* rJ From Land 17 From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 2,934 sf square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 746 sf incl. const. corridor square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nunber of trees, for instance) None Sketch: Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Signature: Donna P. Hrko Initial Review Is this accepted into the review fr Yes 0 No process?* Project Number:* 20210686 Select Reviewer:* Select Reviewing Office: Has payment been received?* What amount is owed?* Version:* 1 Alan Johnson:eads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received C' Need Fee - send electronic notification C' $240.00 r $570.00 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO: 443 STREET ADDRESS: 321 Grasshopper Circle PLAN NO: PARCEL ID: 4627614803 Mooresville, NC 28117 Please print: Property Owner: Sarah Busby Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize Donna P. Hrko , of Lancaster Custom Docks and Lift Systems, Inc. (Contractor/Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owners Address (if different than property above): 5 Oak Road Salisbury, NC 28114 Telephone: 704-202-0373 We hereby certify the above information submitted in this application is true and accurate tothe best our knoiiedge, Authorized Signature Authorized Signature Date 5/3/2021 Date Project Rlame/eddress: Owner: 5C+`r Print Contractor/agent PA JJAN BUFF [ 3 NO'GRCAnORVORIM Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are riot allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed, Minimal shaping and sloping along the Immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. j15A NCAC 02B .0243 (5)] Beaches, impervious patios, impervious walkways, etc, are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. 115A NCAC 02B .0243(4) and (6)] Work to be condlucted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. (15A NCAC 02H .0502 and 15A NCAC 028 .0243 (4), (6), (8)] Storrnwater cannot be piped or channeled for direct discharge to the lake. All constructed stormweter discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 0213 .0243(5), (6)] Acknowledgement of Nottfmion 1, hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work coed ed in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting rnaterials. Signature (owner): Date: 5- -Z1 Water Resources ENVIRONMENTAL QUALITY State of North Carolina Department of Environment and Natural Resources Division of Water Resources 15A NCAC 0211 .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 02-2017 Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Full Pond/ Normal Water Level Shoreline Plan View FORM: S5GP 02-2017 Pull Pend/ Normal Water Level 2 ft.x 150 ft. addnonr l deanng • H necessary Plan View Lake (At Full Pond/ Normal Water Level) ra.p bast. Lake lA[ Full Po.d/Norrca/ Weer ievel] Existing Dock 30 kx 7 ft /1Nof-fa5cje ZA6926f 4044: 0D' Dred e-Avea_ IN recto ur CA7 obipond. — —1)ais‘'i t. _+a7` rtprapr 3 f e 150 ft Below Al pond/ NWL .1= MAW - 4 Ni 15011 Above feel pond/ NWL E 54`x 1 54 F Page 1 of 3 -1 r�f` ti 1 • 97 Feet Iredell Printed October 14, 2020 See Below for Disclaimer Addresses A InfrastructLre ▪ NonResidential Use • Residential Use Streets — interstate Ramp — US Hoy State Hti4y' — Main Road Local Road Residential Private Ina ti.e Parcels Hooks Parcels 0 Ci;y• Limits Lake Normar €rec ell Couryiire NC Counties The maps prepared for this website we generated from recorded deeds, plats, and other public records. Users of these maps are hereby notified that the information ❑rovided herein should be verified. Iredell County assumes no legal responsibilities for any of the information contained on this site. Users are advised that the use of any of this information is at their own risk. All maps on this site were prepared using a 1000A€"' Grid based upon the North Carolina State Plane Coordinate System from the 1983 North American Datum. The delinquent real property tax overlay is updated monthly. The information presented is not intended to be used or relied upon as official notice of tax liens. For additional Information regarding delinquent taxes, contact the Iredell County Tax Collector's Office. Duke Energy Lake Services Guidance for Completing an Excavation Permit Application Note: If you are proposing excavation in association with the permitting of a new or expanded facility under the Marina or Conveyance Programs, you do not need to complete this application. Instead, you should incorporate the excavation request into the permit application for the marina/conveyance using the appropriate application. Step 1: Contact Duke Energy Lake Services Complete "Part I" of the application and develop a drawing of the proposed excavation area. Contact Duke Energy Lake Services to schedule a site visit. Lake Services will conduct a site visit to determine if Duke Energy will accept an excavation permit application for the proposed work. If the Lake Services representative determines the application process may proceed, he/she will initial Part I of the application. Step 2: Draft Application Development Complete Parts II-III.A-G and Part V of the Excavation Permit Application. Step 3: Agency Consultation Send the draft application developed during Step 2 to the agencies for review and comment on the proposed activity. Refer to the Agency / Organization List available from Duke Energy to determine which federal, state, regional, and local agencies and organizations require consultation or review. Note: Duke Energy reserves the right to require consultation with additional organizations beyond those included in the Agency / Organization List. Each agency / organization must be provided at least 30 days prior notification. Evidence must be provided (e.g., response letter or Certified Mail receipt) in the complete application to show each agency / organization was given the opportunity to review the proposal. Consultation letters must be dated within the two years preceding Duke Energy's receipt of the application. All permits must be valid at time of application and have a term longer than the projected schedule for completing the permitted project. What to Expect During Agency Review and Comment: • You will typically receive a letter from each agency / organization either documenting its concurrence with your proposal, requiring additional information, recommending modifications. or offering no comment. You must address each agency's / organization's comments with a follow-up letter and in your final application as described in part IV. • If you do not receive any documentation from an agency / organization within 30 days of its receipt of your proposal, you must provide the agency / organization with a follow-up letter requesting comment on your proposal within 15 days from the date of the follow-up letter. If you still do not receive any response as a result of the second letter, type "NO RESPONSE" Duke Energy Excavation Program Page 1 of ] 3 rev 1O/112019 at the top of the follow-up letter and include it in the application along with proof of the agency's / organization's receipt of the letter (e.g., Certified Mail receipt). You may proceed with the application process recognizing, however, that if its comments come later in the application process, you will be required to address them. • From the United States Army Corps of Engineers (Corps): (* * Note — The Corps may have additional forms to submit for your proposal and an additional fee.) If the excavation can be done under the requirements of the General Permit (GP) or a Nationwide Permit (NWP), you will typically receive a copy of the Corps' tear sheet documenting authorization and providing any additional instructions. If the excavation isn't covered under the GP or a NWP, you'll be required to obtain an individual 404 Dredge and Fill permit from the Corps. You must receive written documentation from the Corps that your application either (1) meets the requirements of the GP or a NWP or (2) the proper 404 Dredge and Fill permit has been received before Duke Energy can process your application. • From the North Carolina Department of Environmental Quality (NCDEQ), Division of Water Resources: (Note —NCDEQ may have additional forms to submit for your proposal and an additional fee.) If the proposal meets the requirements of the Clean Water Act Sect. 401 Water Quality Certification, you will typically receive a letter from the NCDEQ Division of Water Resources documenting Sect. 401 Certification and providing any additional instructions. You may also receive a letter requiring additional information or recommending modifications. You must receive written documentation from NCDEQ noting any required Sect. 401 Certification has been received before Duke Energy can process your application. • From the North Carolina Wildlife Resources Commission (NCWRC): If you do not receive any documentation from the NCWRC within 30 days of their receipt of your application, you may proceed with the application process without submitting a follow-up request, recognizing however if comments come in later in the application process, you will be required to address them. • From the South Carolina Department of Health and Environmental Control (SCDHEC): (Note — SCDHEC may have additional forms to submit for your proposal and an additional fee.) The SCDHEC conducts a joint application process with the USACOE in S.C. If the proposal meets any applicable requirements of the Clean Water Act Sect. 401 Water Quality Certification, you will typically receive a letter from SCDHEC documenting Sect. 401 Certification and providing any additional instructions. You may also receive a letter from USACOE requiring additional information for the agencies participating in the joint application process. You must receive written documentation from SCDHEC noting Sect. 401 Certification has been received if required before Duke Energy can process your application. • From the South Carolina Institute of Archaeology and Anthropology (SCIAA): The applicant must wait 30 days after receiving the signed postal returned receipt. If a response from SCIAA has not been received by this time you may proceed with the application process without submitting a follow-up request, recognizing however if comments come in later in the application review process, you will also be required to address them. Duke Energy Excavation Program Page 2 of 13 rev 10/1/2019 Step 4: Final Application & Submittal to Duke Energy Following the consultation process, finalize the application. The final application submitted to Duke Energy should incorporate all comments and recommendations provided by agencies and organizations during the agency consultation process as well as copies of all permits received. In addition to the final application include the following: • One check payable to Duke Energy for the application fee and security deposit • If applicable, a separate check payable to the appropriate Habitat Enhancement Program fund • Signed Excavation Program Applicant's Agreement Note: Co -applicants must also submit the application fees and applicable HEP fees with the application. Duke Energy Excavation Program Page 3 of 13 rev 30/1/2019 Duke Energy Excavation Permit Application Form FOR DUKE ENERGY USE ONLY Duke File No. Application Fee $ Security Deposit $ Check # Date Recv'd Initials Date of Duke Energy Lake Services. applicant and/or contractor on -site inspections Date 4 Z 2 Zlttitials 412 11i Date Final Protection/Avoidance Area Markings Field - Verified Initials Approved to Start Work By * : Date (Print) (Sign) Date Completion Required Date of Any Approved Extension Initials Date Passed Closeout Inspection* Initials Any Stop Work Orders or SMG Violations*? (check one) ❑Yes No (If Yes, explain in PART V) Date Deposit Refunded Initials Date Permit Database Updated Initials * Forward copy of approved application (all pages, plus any attachments that Duke Energy changed) back to applicant with Approval Letter and highlight any changes. File copies of Approval and Close-out Checklists and any Stop Work Orders with a s s lication. Part I. Applicant Information (Please Print) Name Email address: Sarah Pu4,11 cxra1f-I p busbki P sv-nr-i i l, c n m Lake Address Mailing Address (f different) J?���ra_ ��n j- CI e. [ Ll 1' R(-1. Telephone '70i - 2OZ - 03 73 ivinnresvl 11e, N\ C zB 117 Sclil isbur� MC. Let l4- Contractor Company Contractor Contact Person Contractor Email Address: u flc n nc P 14r 12 donne . 1QuncALT1-p Telephone 304. L q_ C,0(467 r-doc.1.1683rnciim LAKE LOT INFORMATION 1lC P! [�27( 14&o3 Lake �p,r�gyl County 1 re.c]e i I Cityooresvl 11� State Tax MapNo. Subdivision ere r - Lana + Lot / Section No.143/ e Lot Size .55 Acres —rt nriber Corp, Duke Energy Excavation Program Page 4 of 13 rev 10/1i2019 Duke Energy Excavation Permit Application Form Are there any Co -Applicants*? (check one) ❑ Yes Jo (If Yes, include names, street addresses or lot numbers, pier numbers, phone numbers, and email addresses in Part V — Additional Information) * Co -Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project, and is done to benefit multiple owners / lease holders of Project -front properties within a single development. There can be no more than 4 co -applicants in addition to the lead applicant on any application. Do not continue the application until an on -site inspection has been conducted between a Duke Energy Lake Representative and the applicant and/or the excavation contractor. NOTE: Initialling this portion of the application by a Lake Representative in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. Date of on -site inspection 4 Z Z 1 Initials (Duke Energy) J R jC 11` Duke Energy Excavation Program (applicant/contractor) C Page 5 of 13 rev 10/1/2019 Duke Enemy Excavation Permit Application Form Part 11. Description of Project A. Basic Information 1. Type of excavation: (check one) CR.New excavation ❑ Maintenance excavation 2. Purpose of excavation: (check one) Rf Boat Access Channel ❑ Water Intake Channel ❑ Wastewater Discharge Channel 0 Other (spec): 3. Lake user category: (check one) Z.Private ❑Residential Marina ❑Commercial Marina ❑Public ❑Other (spec): 4. Max. Excavation Area Dimensions (ft): Length 54 Width 48 Depth /0 (Note: include additional area dimensions if necessary so response to #5 below equals max. area dimensions in #4) 5. Volume of Excavated Material (TOTAL for the project): 2.5() Cubic yards 6. Type of material removed (applicant determines by. field sample if practical): �Cu�1d, slit cloy 7. Excavation Site area: .OJT 95 Acre (s) Disposal Site area: . Qom' Acre(s) 8. Total Disturbed Area (including equipment staging area): . 0955 Acre (s) 9. Does the project meet the requirements of the applicable General Permit? (check one) ees Vo 10. Do you claim title to the disposal area? (check one) ❑Yes 1a 11. Do you claim title to the equipment staging area? (check one) I7`Yes Vo 12, Are there any water -treatment facilities within 50 feet of the proposed excavation area? (check one) Yes Rio (If Yes, sped): 13. How will the excavated material be entrapped and the erosion controlled? (e,g. see attached erosion control plan and disposal area design): �14 ]r�� �\N - \'\ 1prtL� rreachex��ccis na+eri 0.1 i n I/ Dp� h e,5 Rao 10.Wckv lt] `''tOgr � 'o o 1 DG.d onirucitivylp -iruL11)5Gtnc spor-+ -ha di sal 5 e Duke Energy Excavation Program Page 6 of 13 rev 10/ 1 /2019 Duke Enerey Excavation Permit Application Form 14. Type(s) of excavation equipment to be used: Lona, regch exC Jc--& 511or+ reotc.11 e?tc cd-or bckrcdes, d uorYtp 15. Will waters or wetlands be crossed in transporting equipment to or from the site? (check one) j Yes ENo (If yes, explain) Afl d`r do n eg0ipry) en+ iS+r& or+ed via-laciliVI ICIVI1+1,fu�J bOct -- r0 v:Y- + CL.Yl C&S f r � sit) m dc. I 4y'eq 4 44 - w c� Tao-pr5I +e On LQAe 1, 1�1bra�Ctz'1. V 16. Will return water re-enter the reservoir? (Check one) ❑Yes ❑No XNIA (If Yes. specify point(s) of re-entry and show on Excavation Area Drawing) 17. Is there an existing facility (e.g. pier) that access is being maintained to by conducting the excavation? ❑Yes J io New c j *j be emdrucked Sec 4 k c he D w1'n 5 4 (If Yes, provide the existin ermit number. IfSD, include a scaled drawi g of the pr Qposed facility). Permit # Privq}e FiCi ��iie5 stru_c77or14pp1;ccc7rov Exi or -A -1-obe,revYloved 4 rep 1 creed) 18. Total planned duration of -the work (Include first equipment mobilizatio , excavation through final mitigation measures complete): START 7 / j i FINISH 1 Z7 (Month) (Year) (Month) (Year) Duke Energy Excavation Program Page 7 of 13 rev 10/1/2019 ication Form Part II. (Continued) B. Protection / Avoidanc ca -r a3 CeS rd c0 a) CC etl CJ Ci a Cci GA a) a) r� V a 7 Identification d 2 2 4 2 -z e. Historic properties (specij) a) Cs] 1. Rare or threatened species (sped) rev 10/1/2019 Co cc O. u • Excavation Per Duke Ener Avoid (A) or Mitigate (M) (**) 2 Work Area Dwg. I❑ Identification '' 2 Z 1L LI Q� Protection/Avoidance Areas (check all that apply) g. Buried gas, water, sewer, communications or electric lines (circle) h. Impact Minimization Zones as identified by Duke Energy i. Other areas requiring specific avoidance, protection or mitigation (specify) List and attach mitigation plans Duke Energy Excavation Permit Application Form C. Applicant's Signatures Comments: Applicant Name (print) rot. ��L�s Applicant Signature* Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Date 5-3 I Date Date Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date *Per my signature, the information provided in this application is correct to the best of my knowledge. Duke Energy Excavation Program Page 10 of 13 rev 1o/1/2019 Duke Energy Excavation Permit Application Form Part III. Additional Information y Deed and Survey Plat: A copy of the deed and registered survey plat or other instrument under which each applicant and co -applicant claims title to the affected property (the shoreline adjoining the excavation area. equipment staging area, area crossed by any spoil and return water lines, and the disposal area). If the applicant(s) is(are) not the owner(s) of said property, then forward a copy of the deed and registered survey plat or other instrument under which the owner(s) claim title plus written authorization from the owner(s) to carry out the project on their land. Excavation Area Drawing: An accurate drawing of the area to be excavated. The drawing must show at a minimum, a North arrow; the boundaries and acreage of the proposed excavation area and equipment staging areas; lake, county, city, cove, tributary, road and subdivision names and lot numbers (as applicable); property corners for project front lots; the full pond elevation contour and lines dividing the cove width into equal thirds (as applicable); approximate volume in cubic yards of the material to be excavated; point(s) of return water re-entry; the boundaries of any adjoining areas that are to be specifically avoided or protected during the work and the location (address) of the disposal area for the excavated material. [NOTE: A copy of this drawing must also be provided to the excavation contractor to ensure restricted areas are not impacted.] Disposal Area Drawing: An accurate drawing of the proposed design for the disposal area. The drawing must show at a minimum, a North arrow; the boundaries and acreage of the proposed disposal area; lake, county, city, cove, tributary, road and subdivision names and lot numbers (as applicable); the full pond elevation contour (unless disposal is well away from the lake); the boundaries of any adjoining areas that are to be specifically avoided or protected during the work; the location (address) of the excavation area from which the material came and a statement of the disposal area's capacity with all dimensions labeled that were used in the volume calculation. [NOTE: A copy of this drawing must also be provided to the excavation contractor to ensure restricted areas are not impacted.] Also note for projects larger than one (1) acre in North Carolina. including excavated. equipment staging, and disposal areas, you must submit an erosion control plan. For projects larger than two (2) acres in South Carolina, including excavated, equipment staging and disposal areas, you must submit an erosion control plan. For projects < two (2) acres in South Carolina, you must submit a completed standard reporting form for construction sites disturbing two (2) acres or less to the South Carolina Dept. of Health and Environmental Control (SCDHEC) Stormwater Management Vicinity Map and Driving Directions: A vicinity map and directions by road showing directions to both the excavation area and disposal area. Include the latitude and longitude of both the excavation area and the disposal area. Part IV. Agency Reviews and Approvals Begin this section with a summary table of all agencies consulted and applicant response to agency comments as shown in the example table below. Agencies should be listed in the order Duke Energy Page 11 of 13 rev 10/1/2019 Excavation Program Duke Energy ExcaN ation Permit Application Form shown in the Agency/Organization List. Consultation letters must be dated within the two years preceding Duke Energy's receipt of the application. Table IV-1. Sample Agency Comment and Response Table Agency Comment f Agency 1 The activity is approved as proposed. Agency 2 The on -site well provides drinking water to the public. Please contact Mr. Smith to discuss the proposed changes and potential issues associated with your proposal. You must contact us immediately if endangered species are located during the course of construction. Agency 3 Requested agency comments on 1/1/20xx and again on 2/1/20xx. No response as of 2/1 6/20xx. Agency 4 Section 401 Water Quality Certification NA Applicant Response Contacted Mr. Smith on 111/20xx. No further action needed. Applicant will contact Agency 2 if endangered species are located during construction NA Applicant will comply with the conditions of the 401 Water Quality Certification Following the table of agency comments and applicant responses, include a table of permits and certifications issued by the reviewing agencies. As with the table of agency comments and applicant responses, agencies should be listed in the same order as they are listed in the Agency/Organization List. Table IV-2. Sam le A en Agency Agency 1 Agency 2 Permits and Certifications Table Permit/Certification Name Surface Water Withdrawal Permit Section 401 Water Quality Certification Date of Issuance Date of Ex i 'ration Following the two summary tables, include a copy of all correspondence to and from any local, regional, state and federal agencies or other organizations with which you are required to consult, including any required permits (e.g.. Section 401 water quality certifications, Section 404 dredge/fill permits, building permits, etc.) or other approvals or comments which have been obtained from these organizations regarding this activity. Include a copy of any local, regional, state or federal regulations or guidelines that will be followed. All permitting issues must be resolved and clearly documented. Correspondence should be organized in the order the agencies are listed on the Agency/Organization list with the applicant's request for comments followed by additional correspondence in chronological order. All permits must be valid at time of Duke Energy Excavation Program Page 12 of 13 rev 10/1/2019 Duke Energy Excavation Permit Application Form application and have a term longer than the projected schedule for completing the permitted project. Part V. Additional information Provide relevant additional information. Reference previous parts as applicable. Include the FERC-required Environmental Assessment if you were directed to do so during the initial site visit. If there are co -applicants, this is where their information would be provided (see Part I). Duke Energy Excavation Program Page 13 of 13 rev 10/1/2019 Type: CONSOLIDATED REAL PROPERTY Recorded: 10/2/2020 1:43:20 PM Fee Amt: $1,126.00 Page 1 of 4 Revenue Tax: $1,100.00 Iredell County, NC Ronald N. Wyatt Register of Deeds BK 2740 PG 1132 - 1135 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: $1,100.00 Tax Map Parcel Identifier No.: 4627614803.000 & 4627613061.000 Mail to: Andrew J. Abramson, 225 N Main Street, Suite 200, Salisbury, NC 28144 This instrument prepared by: Andrew J. Abramson, a licensed North Carolina attorney. Delinquent taxes, if any, to be paid by the dosing attorney to the County Tax Administrator upon disbursement of closing proceeds THIS DEED, made this Pt day of October, 2020, by and between CURTIS H. FOREMAN, widower Whose mailing address is: 116 E. Brentwood Road, Greensboro, NC 27403 Hereinafter referred to as GRANTOR; and BRET R. BUSBY and wife, SARAH P. BUSBY Hereinafter referred to as GRANTEE, Whose mailing address is: 5 Oak Road, Salisbury, NC 28144 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors and assigns, and shall include singular, plural masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the County of Iredell, North Carolina, and more particularly described as follows: See attached Exhibits "A" and "B" for legal description. The property herein described was acquired by Grantor by instrument recorded in Deed Book 633, Page 987, and Deed Book 633, Page 977, Iredell County Registry. The Property Conveyed hereby is/ X is not the primary residence of the Grantors. submitted electronically by "The woodson Law Firm" in compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Iredell county Register of Deeds. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions herein after stated. Title to the property hereinabove described is subject to the following exceptions: Easements, conditions, restrictions of record and the Ad Valorem property taxes for the current year. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. citurtis. For an STATE OF NORTH C ROLINA (SEAL) COUNTY OF ROWAN 1, 0.510_ . S %CiSSIDn , a Notary Public of CLO}L County and aforesaid State, do hereby certify that Curtis H. Foreman personally appeared before me this day, and acknowledged the due execution of the foregoing instrument. WITNESS my hand and Notarial seal, this day of October, 2020. My commission expires: (SEAL) NOTARY PUBLIC LESLIE H JACKSON Votary Puol,c, North C6firAna Dave County MyCammis ,on Expires EXHIBIT "A" Tract 1 (Parcel 4627614803.000): BEING Lot 443 in Section 8, as shown on map recorded in Map Book 13 at Page 78, in the Office of the Register of Deeds for Iredell County and being pant of the property conveyed to Crescent Land & Timber Corp. by deed of Duke Power Company recorded in Book 481 at Page 91, in the Office of the Register of Deeds for said county. Tract 2 (Parce14627613061.000): That tract containing 0.20 acre as it is shown on nzap of Grantor dated February 9, 1978 marked Mountain Island, ale No. 1168 a copy of which is attached as Exhibit 'B" and incorporated herein for further reference. Being the same property conveyed to Curtis H. Forman and wife, Jean B. Foreman as described in Deed recorded in Book 633, Page 987, Rowan County Registry. Said description being incorporated herein for further reference. EK11IBIT "B" This map may not be a certified survey and has not been reviewed by a local government agency for compliance with any applicable land development regulations and has not been reviewed for compliance with recording requirements for plats. • .,.•.tip, LOT 433 414 4.36'i n + 274,t' SECTION 8 LOT 438 "` AR E A = 0.20 ACRE ti CRESCENT LA NO a TIMBER CORR { OAVENFQRT COLLEGE U_M,i. -6'1-A pi Bp' ‘50 n ' iI3 'ai3dd01-G5tral� Q z W a rr C7 2 f+7 0 a r d �a CD 03 cn- `t rn co-4D N b° - -1 Ylz :,0 co C1 PC_ E ` rn r rn zn�rn 0RL,z Cr f. c Ln { C C) W wN 111 -i \\c � \ \ 7' " ' 0 a 0 z 7- 0 19? '311;r153OLMV NO00 Old 3102{Ic 213ddo1-155 N9 EZE I I -Ot•LZ co 03rnC a Z NYW ON J V1 fl 0 Custom Dock & Lift Systems, Inc. NC General License Contractor # 49723 1156 Perth Road Troutman, NC 28166 704.528-7400 Phone 704-528-3400 Fax Sarah Busby 321 Grasshopper CIR Mooresville, NC 28117 SUMMARY 4/22/21 DESCRIPTION 1) Dredge approximately 250 cubic yards with ail required slopes at full pond. a. Dredge material to be hauled off site 1 ■4 z 4 WI- '(� :3 1— 2 r — 4 N� oQ2m 3P',6 sf N i j: :14 LAKE l Ic-FNfpE NIJMBCR L-3934 62R-443•i92a 0drJ �° \r y, °mod � b/� s‘ N. YS) N. M u1 1 0. n tO DJ mNIL U x 3' O K c —} a 0. OF zt a n, ca 0 z U Cd N U C4, 45-7 f rri / rr, MACE OIL 4- Atcatt J A co 'Cr 03 =Z ti te Cr9N CI CD 0 -. I Ira • DUKE ENERGY DIRECTIONS BY ROAD FORM Lake Use Permit Applicants and Contractors: Ease of locating the proposed project site canhave a big impact on permitting processing time. Please complete this form and return it along with your completed application to: DUKE ENERGY C/O LAKE SERVICES —EC 12 Q 526 SOUTH CHURCH STREET CHARLOTTE, NC 28202 Applicant's Name: Sarah Busby Street Address (at lake): 321 Grasshopper Lane Mooresville, NC 28117 Lake Name: Norman Subdivision Name: Crescent Land & Timber Corp. Property Section: 8 Lot #: 443 City: Mooresville State: NC Telephone: 704-202-0373 County: Iredell Zip: 28117 Directions (from major road or highway): From I-77 NB, Exit 35, Turn Left onto Brawley School Road, Turn right onto McKendree Road, Turn Right onto Grasshopper Circle. Keep Right at the "Y" and travel approximately to halfway point of circle. Property will be on the right. Descriptive Structure(s) on Property (i.c. brick gat -age, white fence, mobile home, etc.) *Note: Please use the back of this form if desired to draw us a map to the site. D CU Address or Place 321 Grasshopper Circle Mooresville, NC 28117 Home )7 Find Latitude and Longitude Ads by Google r• A Stop seeing this ad 0 ■ Decimal Degrees Latitude: Decimal Degrees Longitude: -80.929176 Show Paint N N D UIE ENERGY DIRECTIONS BY ROAD FORM LANCASTER CUSTOM DOCKS DISPOSAL SITE Lake Use Permit Applicants and Contractors: Ease of locating the proposed project site canhavea big impact on permitting processing time. Please complete this form and return it along with your completed application to: DUKE ENERGY C/O LAKE SERVICES — EC 12 Q 526 SOUTH CHURCH STREET CHARLOTTE, NC 28202 Applicant's Name: Lancaster Custom Dock Disposal Site Street Address (at lake): 1162 River Highway Mooresville, NC 28117 Lake Name: Norman Subdivision Name: Big Daddy's of Lake Norman Property Section: Lot #: 2 City: Mooresville County: Iredell State: NC Zip: 28117 Telephone: 704-361-4908 Directions (from major road or highway): From I-77 NB, Exit 36, Left onto NC- 150 WB, Disposal Area is on the right behind Big Daddy's Restaurant Complex. Descriptive Structure(s) on Property (i.e. brick garage, white fence, mobile home, etc.) *Note: Please use the hack of this form if desired to draw us a map to the site. 1 .-8n-(.0!} OHd U1 Y91BL 'PM '4MWlO Lt '019tl KLH d FLOOR JOIST ALLOWABLE SPANS GENERAL NOTES it n TE CIIN ZW 31q�}dp'♦1' 7.7424 E .at MMS 3l6 servjs woe ROOF RAFTER ALLOWABLE SPANS -i fa g w Eo Ewe xa rfa spwEs zNe Pgg 4,aa rvoudups�a �w MiP �a a3 fkr• Lot wwe 02 r ulcer t ;AA Nit 371J5 � DRIP PAN NOTES HANDRAIL NOTES NOTE: ANY DEVIATION FROM THE PLAN MUST BE APPROVED BY DARDEN ENGINEERING SERVICES, LLC We-gm-0..] 3I04a13L 9uII '31 'xnunmu veva .UrD. 9CI aria ar 71sis31nx da aaurunac ra' Z%0 6 i IN mourn.. 1851I13 HMYS 31B J3 1131081dY ki/Lli Y AA3ai' S d/� 6 ; ICI P IJ NW1dg WALKWAY PLAN VIEW LAYOUT 31YQ Aga A ,l = .f1f 3 M.G ti CN H4LKHAY ISOMETRIC LAYOUT OO L..9ES-[ra1 3Noijdnak •area' It .proNWu'mw *Wad 9S<< arm we IThW9 a. r.ror 411iYttA1 AEISM INNS 0e AB 03WPkN I tln AU71B V AAA' :31111 -41 HMYtl7 1✓Dlldfh9537 3EV0 Fay .��1 • .}IC o PILE do CROSSHEAD PLAN VIEW LAYOUT n N 0 g vvre-azs-Irsz) 311:41drI31 8919E '7X '1l Ilneel 'OVRI ROI 941I - Lr.r 1 JI PI II Mgr ar 2sewmr 4 gRAvNms frr !ON AVIS 3Ib rn nvi AGSM Holes 3nl v¢ G3,0aa6v 4411d X30 : A7y 1111111 1111 EAST aEk,4TION atas 71Y17 AMU Y ACEEM A9 NMI] gla k n uurc-accdwL) 7NOMPai vv=aa •i •rmunwu'moe FLROINNLI elm?5r 2.r 45611=.69 rar ase Mes varim Virus 7114 .0 ELVONcldi ltI:lr firma v .1.1132Br laa ) MLwPa Nouelfii37 Siva OP .o-.� =.�IrTKIS .. O 0 L � O p r L +� 1 al it 1I IIIIIIII[ iing ll�.,,,,...�i . 't ..\ 1 Ia R r— Lo N Onrl-625-0N!] 3NOH1:011 BF Iee 'MH 'NNr rss '+inky NW3d ss11 WINN ARA HMrS Al 0310434? oxhlr order .U13FQ' aim a tow • .FIE 3M£ m cdn m b 0 p I1 V7 r DWR Pre -Filing Meeting Request Form ID#* Regional Office * Reviewer List* 20210686 Version* 1 Mooresville Regional Office - (704) 663-1699 Alan Johnson Pre -Filing Meeting Request submitted 4/2/2021 Contact Name * Donna P. Hrko Contact Email Address* donna.lancasterdocks@gmail.com Project Name * Busby Dredge and Shoreline Refresh Project Owner* Sarah P. Busby Project County* Iredell Owner Address: Street Address Sarah Busby Address Line 2 321 Grasshopper Circle City State / Rovince / Region Mooresville NC Fbstal / Zip Code Country 28117 USA Is this a transportation project?* C Yes ( No Type(s) of approval sought from the DWR: I— 401 Water Quality Certification - I— 401 Water Quality Certification - Reg ula r Express I— Individual Permit I— Modification W Shoreline Stabilization Does this project have an existing project ID#?* C Yes ( No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information.* Dredge area for boat slip access. Shoreline refresh for stabilization and erosion control. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • !also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 4/2/2021