Loading...
HomeMy WebLinkAbout20210952 Ver 1_Riparian Buffer Authorization Request_20210517Buffer Authorization Application Form 15ANCPC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Online Form - Update 10/23/2018 Water Resources ENVIRONMENTAL QUALITY Original Submittal 5/17/2021 A. Owner/Applicant Information General Information Primary Contact Email:* Who is submitting the application?* Iknhardscape@gmail.com Reese list the contact person's enail for questions or payment on this project if needed. ® Owner ❑ Applicant other than Owner El Agent Is there an agent working on this application C Yes but not submitting it? O No 1. Property Owner Information: ..................................................................................................... la. Name on Recorded Deed:* 1b. Responsible Party: lc. Mailing Address:* Id. Telephone:* 203-561-6888 BARBER BRENDA S REVOC TRUST (for Corporations) Street Address 4474 Ivy Run Lane Address Line 2 Oly Denver I stal / Zip Code 28037-9370 B. Project Information and Prior Project History ............................................................................................. 1. Project Information ............................................................................................. 1a. Name of Project:* Barber Walkway State / Rovince / Region NC Country US le. Email Address:* brenda.burke42@gmail.com (Subdivision, facility, or establishrrent nacre) 1b. Is this a publicly -funded transportation project?* r Yes F No Id. Subdivision Name: CRESCT SECT le. Nearest Municipality: Denver If. Property Size: 1.12 acres 1g. County (or Counties) where the project is located:* Lincoln 1h. PropertylD# 4605862131 Tax RN or Parcel id 1 i. Deed Information Date of Purchase 6/24/2014 Type of Book Book# Page# Deed 3009 581 Map 4605 1j. Attach a copy of the recorded map that indicates when the lot was last platted. aick the upload button or drag and drop files here to attach docurrent 4474 Ivy Run Ln Plat.pdf FEF only 390.08KB 1k. How would you like to provide the Latitude and Longitude information?* r Address Lookup C' Manually Latitude* 35.53655 Longitude* -80.98928 11. Is the project located in any of North Carolina's twenty coastal counties?* r Yes 6* No 2. Surface Waters 2a. Name of the nearest body of water to proposed project:* Lake Norman 2b. Water Quality Classification of nearest receiving water:* Lake Norman 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:* 182 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Walkway from steps to dock 3b. Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach document NC_Lake_Norman_North_20190727_TM_geo.pdf 76.34MB FDF only 3c. Attach an 8 1/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document lincoln.pdf 13.66MB FDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:* Replace old concrete walkway with new flagstone walkway. Bobcat used for remove sidewalk and bring in material Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document Barber walkway site plan.pdf 650.31 KB FCF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* ✓ Yes C' No 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* ✓ Yes C: No 7. Future Project Plans 7a. Is this project a phased project?* r Yes C' No C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* ✓ Neuse River Basin (15A NCAC 02B.0233) C' Catawba River Basin (15A NCAC 02B.0243) ✓ Randleman Lake Watershed (15A NCAC 026.0250) ✓ Tar -Pamlico River Basin (15A NCAC 02B.0259) ✓ Jordan Lake Watershed (15A NCAC 02B.0267) C Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# -Reason Stream Name Buffer Impact* Impact Type* Zone 1 Zone 2 Replacing walkway Nap label (e.g. Road Crossing 1) Catawba River Basin Permanent (P) F2rmor Temp Allowable 20.00 Square Feet 0.00 Square Feet Total Zone 1 Impacts: 20.00 Total Zone 2 Impacts: 0.00 Total Buffer Impacts: 20.00 Comments: h D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* Limit the access points within the buffer 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.* Limit the use of machinery and use wheel barrels as much as possible E. Diffuse Flow Plan la. What type of SCM are you providing?* ❑ Level Spreader ❑ Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) 17 Proposed project will not create concentrated stormwater flow through the buffer r Other SCM that removed minimum of 30% nitrogen lc. Diffuse Flow Documentation* F. Supplementary Information Environmental Documentation dick the upload button or drag and drop files here to attach docurrent Barber Walkway existing diffuse flow.pdf 613.35KB I tF only la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? r r No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 6- 2b. Is this an after -the -fact buffer authorization application? 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): It was thought that since one hardscape surface was being replace with a flagstone hardscape surface to allow access to the dock it was not need/required G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Additional Comments: H. Sign and Submit dick the upload button or drag and drop files here to attach docurrent FDF only By digitally signing below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* Benda Barber Signature Submission Date: 5/17/21 (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project? * O Yes O No O Yes C' No ID#* 20210952 Version:* 1 Select Reviewer: Alan Johnson:eads\adjohnsonl Select Reviewing Office * Mooresville Regional Office - (704) 663-1699 Has payment been received?* ( No Payment Needed ✓ Fee Received ✓ Need Fee - send electronic notification PARTMENT OF THE USGS U.S. DE U.S. GEOLOGICAL SURVEY ERIOR science fora changing world -81.0000° NV 35.6250° 3942000m N 41 40 39 38 37 36 35 34 33 32 31 30 29 501 °°°m E 02 03 04 05 The National Map US Topo 06 07 08 09 LAKE NORMAN NORTH QUADRANGLE NORTH CAROLINA 7.5-MINUTE SERIES 10 11 -80.8750° 35.6250° 9 1 Sherrills \\\° �rfiVil I _.t41/ ISLANDOINT-R r hio.._ ,),( w „,,, C4PE-S �ii,��'•//_Ac C -Th -h° i� I_AlitalliTiat �� Ailrtil.,....1) \ '4 .* �� la �, 11 WA OHO ®,40. 1/4.,,c‘ .%e217(r... iiif Ford Aso eso �i IIP o ip A / } 8,I "c110 r ., lit:Likra , 1 850 0 W ..... A -6), 10 00 �, o — ,\JV)-(.41,1),..rico 4 (3' o ° 0 i 6 ....47 obi/ 4 z; ici) ----,..._ 0 0 0....i 0 i " .01 ��� o I . o a<� 00` Sf;-\1 Lake Norman .,)/it 4) _,,,,,ri ,/,‘, ..\ Gold Mine Island &And_ SI: r . 041, 1 7 lw., 0 r s____ villhi # V PigAilf • , , - „no_ li 5� P h t , 41.111k \\,7 a ®ram , )1.9 rde0‘ VP 1 o �. (PkW/Ar*.r..L(6.:7 iiki......n 44 Ct ( zQ4 ?,, , 1n , =%/ silc. )1—, rNA)‘ l' .,a- vA. __,,,...1 ,p.w-.......--- - ir \NII.,„.#,-„.,.,e--____ o a Tag 11 , �� 0 ?,),\711500P-.2 , ',. ..----_ 9 ,✓ A �� �. t7i74'a ���®��I v REID CIR ii --N\---p5$ --------\:, - tv--_:- e...- u1 Mi LAKEINO ALDAe. v l N\ < r/ "IfQ>. �iAll o ��.7/ . I 'A Porl Oho r0/ oih $-10' ° 1 800��' i�___GREENWOOD"RD 0 ` I®��® iitpr • \ 7 1� �� _ if RED®® a II �_� Tom' 1®Doolie� A a ` CCRAR -RD 059 (�A 9 l ,. GRESHAM L 7 cow • o i 1;. I CJ I � ,PAII TSSIIIIII17:11111 _AIM; 4--.4"1--- ° . mili �� W Y ttit Q �BSo ril ��� ,t )il CZ r:ol 7 Fr r , ,, 800 m i".. ----•,.: °It i :11 �� ,-• _®_ p\`\\ Pow 1 l� � o ro� \0796j � 1psc O O Rp �' DON GOR _ ST � l ��� , o / l I iik i" to, ro- e-Alk v..--zuffm / R�E�°- 0_ '' AA ,, A'� O Q� Z if". orrell°— l te ? In AC u �\�E��O R p?' fik* i 4 DO ESVhL"LE II- Po:'' metikfi $111 q 'O� �I 1 Q �4 \� �. \\INN �� Cq�G.,,,, , ° �\ CYPRESS ST ray°ci(g"‘"1 a i njyr 4 T-_ 77 a �► 1/1141c \f‘ o - "I° ,, >) ,. - o�J�C w /, BEATEN•PAT 4J‘13ddO1455111 O ._� �� 1 I 85o O / ® ��41 E RD ��FS_GATE DR® - 1 - d - eCr_a r_���o s� OFF oa oL o � cc a v?Illij co o:::: m �10* Q . H D1 rx Ne..4 ��� TEA0.LN �� � ® �t wo 0 D R''44 .r �R G� ®o ®\� ! o 114 �® _® Q-631r7,•..A �' t KtNu �� 1' o lf 0 ap0 gEECN/le e tLAKEBLVD4 /�j� ♦ tiFRONS G a so , D ` - P L , N'o � A A �� °j aka ke kr '~Lake Number-T\ I � -f �J • 'to Stor_a e t��� INVERNESS LOOP �Number�Oe' 1-REGENCY RDf ,Lr o --, ISLAND RDA �� / o �C�ENDR 3 i 6ERit? CREEK- RD Kw 1 o 2 Ilan TURN, ( fRRYCN �1 -"\Voe' �A SLANTING BRIDGERD LJ U O OLCEY" 1 ii r 5,0 � i% FS'4"<(' r :110*'1-' , </,q R"'-r es, � � �o � 0 rut 550 DSO �� M'ayh g'5° A tikkil \ cr Q CI 1 V o eR�S�P �) �Y / haw) j Op O � O. Lake t I / Alrior---- 00P ® I CHUCK Q � WOOD RD � �,/ if r, ril 1TERLN,.. I ci ATLANTIC WAy 4 OA • . R �� -��cel �' ir iJ . -< 0 q ' � �yF ' W1 (1...00,5„,..44,„, t:' 4111C i• li, likV" , 11 57 . l�� s T`G-7 Pow R .. ��F Cq �o ti2(--, �E� RO ��� •I t,' iaV ras_ �� • n �� �' yJVATT CATAWBA CO IA E • nbc,MISTDR SE DR /PBBo BR + SOUTH WOOD PARK RD KEAT, 5t:0 ® COMMODORE �0°P , ► o • � „ , W. 1 o � yy �' 1. 1 LINCOLN CO W C`� it i O 1 0,du NSt�Q 1' �� ® �� 7 �_ joil TON RD Am Z� �� / ;raj �:_ o , ��/ V�E RIDGE DR Q o '‘ DI;PliRD1471 TRAILS E ® ASH � �� o , - ( `te n z cNN 800 0.- go 0 0 ili, , li, 7� ° C. CAMIN° drove, ,767/e" lc V �.; u ,*?..102,iMt O � /< drif y '�2� 9P�qN�fL"L RD �� '0ti,-,, �� r�r` „t 1,,,�,0 li -coi._ ,,, •.�� ENV z y 1 0 F�� qP P, DER JADE DRD i SILV ��� I Q i V FAWN-LN 1'! O ATTLEBORO_R. '� a' . �_ th. lli song m''.- Z$oo\ Ir A. 111.0 D n �ILFORp�,�� o Lake Norman (� V �, o r N'Illk.i7Lai\ m o , N �$a0, 0 o o 00,- �P\, A � -. .` I I l 1 $ O l ®,.r� �Q /` _ 1 �k S RD ° �� :44,, ►� , -40 mes KATHERINE _R( Illrlig4i-11110 1,--..11‘j iffitki DR RFOR 0 ., kir vt \\ 1 ® 1I +I — \NAk. ,,,,, iesko BAYpOi o v. ® , it \ \ I l A, 1 , _ 11----,, .,,..06_11wi i ,_ 1 �� ,c, 0 1 z �. �(o �� ® C FAT �La I I WNW 117,,-- ii, it - _ _ IREDEL(l _ wok, CO • 141 - VA isP' 74.0 . 2F' COD WAY,` SHELBpv cy4�<_�a " �` BLADES TRL� =s VaMiliffilR4 �4R4 O � Ilhi di-5,4_, �G5. r ,co�SE �- _11,....--- W off. '-�/�� 1 Wes ort s °4--_-1-Rb'S r Ep � 1FP E SHo�F �z ,/ / / / • �® ♦ it G, �GD D� MECKLENB I RG CO — I 41110-.47..AIPA'& itliklillib - W „-otri A. rt -v-NlIW -)b m • ,. - -14/7„4 k ,�} it l'AR G) 4,01. 35.5000 NV -81.0000° 01 02 Produced by the United States Geological Survey North American Datum of 1983 (NAD83) World Geodetic System of 1984 (WGS84). Projection and 1 000-meter grid:Universal Transverse Mercator, Zone 17S This map is not a legal document. Boundaries may be generalized for this map scale. Private lands within government reservations may not be shown. Obtain permission before entering private lands. Imagery NAIP, May 2016 - November 2016 Roads U.S. Census Bureau, 2016 Names GNIS, 1980 - 2018 Hydrography National Hydrography Dataset, 1899 - 2018 Contours National Elevation Dataset, 2008 Boundaries Multiple sources; see metadata file 2017 - 2018 Wetlands FWS National Wetlands Inventory 1983 - 1984 03 MN. , 7°50" 139 MILS 0°2" 1 MILS UTM GRID AND 2019 MAGNETIC NORTH DECLINATION AT CENTER OF SHEET 100,000 - m Square ID NV Grid Zone Designation 17S 04 1 05 SCALE 1:24 000 06 0.5 0 KILOMETERS 1 07 2 1000 500 1 0.5 0 METERS 0 1000 2000 1 MILES 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 FEET CONTOUR INTERVAL 10 FEET NORTH AMERICAN VERTICAL DATUM OF 1988 This map was produced to conform with the National Geospatial Program US Topo Product Standard, 2011. A metadata file associated with this product is draft version 0.6.18 08 QUADRANGLE LOCATION 1 2 3 4 6 7 5 8 ADJOINING QUADRANGLES 1 Catawba 2 Troutman 3 Shepherds 4 Denver 5 Mooresville 6 Lowesville 7 Lake Norman South 8 Cornelius 09 10 ROAD CLASSIFICATION Expressway Local Connector Secondary Hwy Local Road Ramp 4WD • Interstate Route US Route 42 41 40 39 38 37 36 35 34 33 32 31 30 3929000m N 511000mE 35.5000° -80.8750° OState Route LAKE NORMAN NORTH, NC 2019 Photography 30158 Exis g drainage dtiches, roadside ditechefs, ad sto mwater outfalls provided that they are an ed to minimize the sediment, .nutrients and oth * q l tions'that convey to watterbodies•., ��