Loading...
HomeMy WebLinkAbout20210189 Ver 1_Updated Impact Tables_202104270 0 D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): 0 Wetlands ❑ Streams -tributaries O Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. "W." will be used in the table below to represent the word "wetland". 2a1 Reason*(?) 2b. Impact type* (?) 2c. Type of W.* 2d. W. name* 2e. Forested * 2f. Type of Jurisdicition*(?) 2g. Impact area* W 1 Fill P v Non -Tidal Freshwater Mary Wetland G I I Both 10.068 (acres) �FT—�Fill �Jp v Non -Tidal Freshwater Mary Shoreli I Both 10.032 (acres) Add 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.100 2g. Total Wetland Impact 0.100 2i. Comments: Impact W1 associated with fill material for proposed swim beach. Impact W2 associated with fill material for trail improvements. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)? * Check all that apply. Q Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Goose Creek ❑ Jordan Lake ❑ Other 6b. Impact Type* (?) 6c. Per or Temp* (�) 6d. Stream name* 6e. Buffer mitigation required?* 6f. Zone 1 impact* 6g. Zone 2 impact* Fill for Swim Beach - Prohibit( P Open Water Yes 1,731 3,290 Trails, Allowable P Open Water No (square feet) 119,490 (square feet) 8,290 Fishing Piers, Allowable -] P Open Water No (square feet) 1,980 (square feet) 1,320 Pedestrian Bridge 1, Allowabl P Stream 1 �EN-: (square feet) 250 (square feet) Q Pedestrian Bridge 2, Allowabl �Ep Stream 2 1 No (square feet) 250 (square feet) Q (square feet) (square feet) Pedestrian Bridge 3, Allowabl P Stream 3 1 �FNO 500 Q (square feet) (square feet) Add another impact 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 24,201.00 12,900.00 Zone 1 Zone 2 Total combined buffer impacts: 24,201.00 12,900.00 6i. Comments: mpacts associated with fill for proposed swim beach and trails, and pier and bridge structures. Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. Click the upload button or drag and drop files here to attach document Upload] File must be PDF E. Impact Justification and Mitigation 1. Avoidance and Minimization