Loading...
HomeMy WebLinkAbout20210722 Ver 1_P-5627_Stormwater Management Plan_20210430_20210518 Highway North Carolina Department of Transportation ter. ter., Highway Stormwater Program moimi STORMWATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 47604.1.1 TIP No.: P-5726 County(ies): Rowan Page 1 of 1 General Project Information WBS Element: 47604.1.1 TIP Number: P-5726 Project Type: Non-Road Facility Date: 4/30/2021 NCDOT Contact: Brad Smythe,PE Contractor/Designer: Brian Elam,PE Address: Rail Division-Design&Construction Branch Address:Sungate Design Group,PA 862 Capital Blvd 905 Jones Franklin Rd Raleigh,NC 27603 Raleigh,NC 27606 Phone: (919)707-4118 Phone: (919)710-8459 Email: bsmythe@ncdot.gov Email: belam@sungatedesign.com City/Town: Salisbury County(ies): Rowan River Basin(s): Yadkin-Pee Dee CAMA County? No Wetlands within Project Limits? No Project Description Project Length(lin.miles or feet): 0.14 Surrounding Land Use: Train Station,Commercial,Industrial,Urban Proposed Project Existing Site Project Built-Upon Area(ac.) 0.3 ac. 0.1 ac. Typical Cross Section Description: N/A N/A Annual Avg Daily Traffic(veh/hr/day): Design/Future: N/A Year: N/A Existing: N/A Year: N/A General Project Narrative: P-5726 is an improvement project to add a pedestrian underpass and second platform at the Historic Salisbury Train Station in Rowan County.The project involves extending (Description of Minimization of Water an existing 3.75'x3.25'stone box culvert and consolidating existing drainge systems to tie and discharge to a common outfall.The outfall,a Tributary to Town Creek,is a Quality Impacts) jurisdictional stream classified as Class'C'waters by NCDEQ.Measures have been implemented to reduce impacts to the stream,including use of 2:1 fill slopes and maintaining existing drainage patterns.Further,bank stabilization will be used along the remaining section of stream,to restore and preserve the integrity of its banks. -- III Ill Waterbody Information _ Surface Water Body(1): Town Creek NCDWR Stream Index No.: 12-115-3 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None _ Other Stream Classification: None _ Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) f 1 N r 11 1�}�7 A n.+. nnn rwrwa nvvv+u xa ®* ligt See Sheet 1A For Index of Sheets STATE OF NO J'\TH CA I',OLJA�A N.C.- P-5726 �'S I'�AIL DIVISIO ��� � � iik* 47604.1.1 NA P.E. 47604.2.1 NA ROW+UTILITY ERA 134 • Ir7 �P**# . 47604.3.1 NA CONSTRUCTION ... .,...,.,;, 0 - ROWAN COUNTY IN mom alp InN. i� ����y�nkt:Vi `•"`.r /t LOCATION: SALISBURY TRAIN STATION SECOND PLATFORM PERMIT DRAWING PROJEs vl***♦,•44,,.\, �� �I' ���w,>? �` �:q� AND PEDESTRIAN UNDERPASS SHEET 1 OF 4 fly •.♦�'i��i��Ip �-�� PPrtirlibp , ts•AV i%Veifi k DATE: 04-30-2021 0E rIC TYPE OF WORK: GRADING,DRAINAGE,STRUCTURE, Lr .) % ,� RETAINING WALL,ARCHITECTURE V .� `� ., 1 (( WETLAND AND SURFACE WATER IMPACTS PERMIT ,oN%V O /�qo VICINITY MAP N.T.S. �_ — -- j— — f QEPSi SL ____ " ~ '- ---- — _ r i TO CHARLOTTE,NC =' R w- -- .Y a—J �y � F TO LINWOOD�C I./fin RI,; 1R2r ,11 ;dy 1 RR SOUTH 'S 16 fl /I - — qSL ILI �:= gi A• ~- RR NORTH ' II ____ S SOUTHERNNORFOLK RAILRO / —— 9 17RK I—■1-7 °�p° I} \ Li]L_ 1z11, II -101 NS WO 1- 1 TRIBUTARY TO TOWN CREEK— I \ 12 x m-. I 1 1 END SITE 1 BEGIN PROJECT PROJECT rn -EX NS MAIN I- STA -EX NS MAIN I- STA M 8836+18,16 8827+65.58 O N U NOYES UNLESS: 1 CLEARING ON THIS PROJECT SHALL BE PREPARED TO THE LIMITS ESTABLISHED BY METHOD II 2 THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE CITY OF SALISBURY SIGNATURES COMPLETED 49 U GRAPHIC SCALES PROJECT LENGTH CROUCH ENGINEERING NC PC RAIL ENGINEER HYDRAULICS ENGINEER a<x. �j� NC License No.C-4639 4 W 5115 oeooe,C Way.Sulte 225 , Eata eoeeoexn sPscIPTo.0200WntWo00.TN 3i02i 0� 50I 100 n n ��� LENGTH RAILROAD TIP PROJECT P-5726 = 0.16 MILES ,,, c, "'� : hill KEVIN LINDSEY,P.E. PLANS PROMO'ENGINEER INCOMPLETE PLANS 4, 50 0 50 100 TOTAL LENGTH TIP PROJECT P-5726 = 0.16 MILES RIGHT OF WAY DATE, oo N SUBMITTAL: Ln II I I I I I H\I------1 FEBRUARY 28,2019 DATE: MARCH si,zozi NTRANSPORTATION DEPARTMENT OF PROFILE(HORIZONTAL) I'\'\I LLvLnOs LETTING DATE, � lI1II III � NOVEMBER 17,2021 BRAD SMYTHE,PE Nmo DESIGN ENGINEER .� .. a/ Pe PE� PROFILE(VERTICAL)®w" \ 5I' 25' 0 50'J' DATE: 04-30-2021 PERMIT DRAWING °e M:pw';5n=R` PROJECT REFERENCE NO. SHEET NO. TO CHARLOTTE,NC DENOTES IMPACTS IN IIII�IWI SHEET 2 OF 5 RW SHEET C // SURFACE WATER SCALE:7" ioo' ROADWAY ENGI DE NO HYDRAULICS ENGINEER ■ TO LINWOOD,NC RR SOUTH t l \ L° 3�r �, —L� y, IIEM �9,1 �J II { of vI,,,...mu.,,roBaaw vv"_i u�-�—=v�w a,Jl T —� CO= - r n•I��, ME I C�R--,,,,°�Sl3G i=_i_ .la : -'�• In -°r J 14....wWtiPwE6n0aCeLr ,Irl �ND�MOPERTIESE _ wRNowN B.cP.cir or SAL SBwr� }ll�bE„vT.Ha " °N ISToam saL62eupv i u"DanaN°Iry ous co-s- I I 'll � INCOMPLETE PLANS o-:. x°LSE--,FA�\ 1 WTI' D6 �� , — ��Ilrr :I'1 `TbFS: Nor wn NOR A.Aw�1„°N 56428253.67 -III I�'m I' 6 BR Cx nLLL x>R N0 - 2siexeus N XISTING .e I / ,® 5e M:5 I i.xTEeE.a aG °°G&Tr J p 0 125 LEFT ,..1_ J`{p��y� 7 SALIS:NRY STATION k2- pl\ STORK SALISBWY FOUNDATION.INC.ry"' H °I 9 DOCUMENT NOT CONSIDERED FINAL IN 26'OPK 1 cA pM.c sr RETAINOOUn T IB wMH ° Nc •••••••'••••'•••••ce•• L 1 z uv m BI IRe� R,e1 UNLESS ALL SIGNATURES COMPLETED 6MI� @- III 91 Rlus L E c� 0 B TE _�I uT RN�AILIYal —-p— n +��I �II ��Tia' +fin -' i■i --- �M°TaT vice Id 1 Ice.:.E` ": .6 eArnR X'x :4, • i10LI� 51 ,. sF11:,. Enx - ` — 'VEIPI T R%q,,• IBL• ! ten rt�s BT LTo LTo Lio`o o SSIBLE �ITIM OF CULVERT / —, -- --- — — __ NOT N SERVICE ilfilfilfilfilfilfilfil____MNgiiiMIirwwaue - IlL'li[I,Malliil"MIIIfilfilfilfilfilMEI EMOI ___ - Ir_ _Ml 7NNal LOi 7f "�74 PF C9'.m' rFT rr�— -: - W. -a' T III' --, / ��I:lir.�c ISBABOS - �� I 5> Y.¢omaB IrI T. rL1 F �. c�N BLEa W`• 01 III;EA P��S�w .wo.,. y dB RCP ''. 'f -B u�:I-0Rw "vR��e ,' ,J.roPEl WE, BSTI U I a eBLiARB ce °` se[DETAIL 3 ` - \ F m I. L l F yl ® x9 L�9.xRA'NV: H` L Ni Ri © , _ - N CRP w< DI 11 I ' III rs4 RCP _ � wELLNcO/ / �/ ip A4v1L>azs. CHANDLER CONCRETE 11 SBRBBS SITE 1 m E POSSIBLE JB `—'.,_1 I R 1 MM � EIIP .�LV L—��w $: 4 I T ss �B HELD D SITENECESSARY —— °I f° .y C DETAIL 2 I ENLARGEMENT VIEW -EX NS MAIN 1- DETAIL 1 PIPE OULIET CHANNEL STABILIZATION DETAIL 3 IT4'*RVds YA CHANDLER CONCRETE T �'4 N L�Z�� 6 SEE SHEET 4 OF 5 NATURAL GAS COMPANY ,,, v1'emoRFISSIC�EICO�,Inc.,. EEL o C UTERI B!sS oRCH ,...g-� SPECIAL LATERAL pYtlx EnAeesr yv " A=05'5"(RT) B�,C,P wo SEE DUAL 2 �'q/ '°'. a,o. aA,�e ` :..wL $ \ L=fi0.74 �0 U a B=o-1rs N. a,.,1-.e � '^ mu,. °J �o(/ -x * na FROM STA.0333.00 TO STA BB32.90-RR_LT FROM STA.B331.43 TO STA Ele31.92-RR-LT FROM STA.BB3.1.35 To STA OB35.35_RR_LT I x 770' —EX NS MAIN 1— 785' 765' 780 760' 755' 755' 750 - 750' 2k ETe 44T4.'5-Rn-.rT_ ELL-7..90 745' 4g' k 745' O MCT PI STA BBJS.3 RR-LT 740' 740' • 735' 735' 730 BBE E-C IE wn _ - 730' ig MI k ryT'H (A 8 -AA-LT ELBV-73350 [0p.T�H i 725' AW51A l>8%.w-RN-a 1 725' FE ELEVV340 8839.00 B838.00 8837+00 8836+00 8835+00 8834+00 8833+00 8832+00 8831+00 8830+00 8829+00 8828+00 8827+00 8826+00 8825+00 s°' 25" 0 5°"J DATE: 04-30-2021 PERMIT DRAWING ��°e M:.pw';'n=" PROJECT P-5726REFERENCE N° SHEET No. TO CHARLOTTE,NC DENOTES IMPACTS IN 1 SHEET 3 OFrj ox NO SURFACE WATER SCALE:I" Ioo' RW SHEET CTO 'NWOOD,NC ROADWAY ENGINEER ENGINEER RR SOUTH ` �.E�>_,MLM�.xx. ,. ,r r — �, A' .:-(- L 'IM 1�.— I111 BTcn oc7 Ls�r> vax 7&', J- Ba" Br J MEE 1 30TO G ¢ixw wx x,:.,r 0,03T—r �—" wvneN-wWtiPwEMmGvbrr ,,II I 'i NO�MOPERTIESE wrcxown B,cRCITY of SAL BBWx�— 9 fie_ @Rl\c saLlzeup FUNoanaN,i!! _ QSS¢5— II II I INCOMPLETE PLANS o- noL "s9! .r41 rBx .,, . IT.yt ' �`r��.xEa. ��Iler .S.t.`IiYY bF`: ANON. r /+ _I{LI Once I �O' I�DRY STATION �- METER P LL[B ��\ ¢B Cx36' BOBxB _ A _ iN 20'OPK cRII E R _� "HOUn r`�SkL R x V� ~I- I DOCUMENT NOT DONSIDEBED FINAL ,,,,,,,,,,,,,,,,,,B . 4 L 8 1Tr- .v.-,.a..,, z' —, My LJL� UNLE88 ALL BIGNATUREB COMPLETED kit s 8M1 ' REr m v -a. .115I T l -nxT cru �' 'i.aa gNIW ...� m s'.8.� 'm - _ ur RN�aIL av oxc sw - II M al P l B— MI I CB �Eo EMI, f_i-cxic`�� c:FLow .o.a:c+ u,IZ1 ',B 1 I.I .:.E a..o n.x sae -1-ON. '� I�. �.w.,., •'F��' ' �� III �' ,.s.,_ rt�—, ' I r, Ir ae k8 8 J / m m --- --- --- - iet � I �¢' I�`k'8 84 1s` r. >T� ./__�. "�- �.6 .:�� --- EOI it a .a 0 0 0 0 E o __ - I ".mac.- - _ _ r - '0i.,m Li-....1...�7.Ilr-= '+ I+'.' �Ilyw9al.rarrn I. Ir..lw — '-'--- - : li�Ir�BM�a�ri�!! "� =aspen � y s'Aa / 'N ;IL fir--� VNM_ —±rl .-e" - i�`Iit Ij Est„ T�F'e -., -► ' ,B ,, `✓ _.,.,fi II��IF7ul`r'—�—__ Eu�.,. a.,J - / Ro/ �bcs. .1_ M E a. ...e� F� _:v.� W $ �.�I_. � .owE ILEO is \�. 7r, "r�_7� \��—� wEL... E�� 1 AmIE —� �r9un CF,FVC �' 11 \�E L ( �CHADLER CO CRETE D AW rt-fl SITE 1 I ° �--,� y L # aRBDs 1y, 2SFo �d Q �� B $ � �I n 3<•R� ) \ f "I` as luE��MG o,u4°`BT'`�hK lu--�"� of �xu� �,•o � � .r'-EX NS MAIN 1- sA"T ENLARGEMENT DETAL L EN G VIEW DETAIL 1 FIFE Ou DETAIL 3 °i9R�IERIds ` CHANDLER CONCRETE FI a sT �'4 N L0�LZZ��TT�LgqNL+ SEE SHEET 4 OF 5 NATURAL GAS COMPANY ,p' ',moRF=C69'5"(RT) I��.. E� o c UTERI t,S mrcx ix�•'«� SPECIAL LATERAL.Y.x EsiAe6sOBTMp�" A=05'5"(RT) 6.1 4 w SEE DUAL 2 0=O'14'57" �'q U a x=o-irs D a,..w-.a � '^o�'D FRuu N. EST 120 TONS J o(/ —x 1( FROM sTA.8833 xoo TO STA 8832.90-RE_LT FROM STA.8831.,3 To STA.8831 x92-RR-LT FROM sip.8834+3s To sTA B835,35_RR_LT I x 770'nD -EX NS MAIN 1- 785' 765' 780' 780' 755' 755' 759 py�p{�ry — 750' N E0e 44T9+'5-en-.,r_ EEEY-7..90 745' 'g' 4, 745' O MCH '� PI Nra�JS*J RR-LT tLCVT746b0 740' 740' af 35' 735' f.L.OP 58X--� 73D BBE E-c 1E wn �_- 730' ryT'H Wk%.✓ -AA-LT • ELBV-73350 [0p.T�H iligo.i 725' AAS.A�%4w-aN-a 725' ELEYV340 54, 8839x00 8838+00 8837x00 8836+00 8835x00 8834x00 8833+00 8832+00 8831+00 8830+00 8829+00 8828+00 8827+00 8826+00 8825+00 �n�l E„ 7Z47 Go:IcGET�01 5 Ho. sxe1T Ho. 1// DENOTES IMPACTS IN SURFACE WATER 20' 10' 11 I ° ��20' a0' R E4o��EEa No 00100 0 ' SCALE:1'—20' j INCOMPLETE PLANS ryi' DOCUMENT NOT CONSIDERED FINAL �0p'� UNLESS ALL SIGNATURES COMPLETED 2?"ry PERMIT DRAWING SHEET 4 OF 5 8835+, 40 8835+ 60 DATE: 04-30-2021 1 - 1--- \ r P3_ /Gi✓AL _ : n n- e - _ _ _ D QoX_ I Uu JB=�� D � t�—��61�A �` O � C;UNL I TA I , U P At DETAf --) FLAT. 5' BASE DITCH � :� CUL2 O O SEE DETAIL 1 —I —I ►` — - z 48 RCP III z E \k\ C) 0 I // 12" C',_ 440TCB // 6" PVi RCP—III 5.. % 1 (ASSUN ED) -� i a1 J EW-" `�'_ A 311 DVC W ------ __�--- OE = \ END N SITE 1 S v�� nn \v� 1 DI SBKBUS 2SFD CONC nn v�v DD s - \r \BST �� E WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 8833+09 to 8832+47-EX NS 1-RT Railroad Embankment <0.01 132 Bank Stabilization <0.01 43 TOTALS*: I 1 1 1 I I 0.01 I I 175 1 0 I 0 "Rounded totals are sum of actual impacts NOTES: NC DEPARTMENT OF TRANSPORTATION RAIL DIVISION 4-30-21 ROWAN COUNTY P-5726 47604.2.1 Revised 2018 Feb SHEET 5 OF 5