Loading...
HomeMy WebLinkAbout20210722 Ver 1_ePCN Application_20210518 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form April 4,2021 Ver 4 Initial Review Has this project met the requirements for acceptance in to the review process?* 6 Yes ✓ No Is this project a public transportation project?* 0 Yes r No Change only if needed. BIMS#Assigned* Version#* 20210722 1 Is a payment required for this project?* ✓ No payment required What amout is owed?* ✓ Fee received r $240.00 6 Fee needed-send electronic notification G $570.00 Reviewing Office* Winston-Salem Regional Office-(336)776- Select Project Reviewer* 9800 Dave Wanucha:eads\djwanucha Information for Initial Review 1a.Name of project: Salisbury Station Track Improvements 1a.Who is the Primary Contact?* Mr.Matthew Potter,PE-NCDOT Rail Division lb.Primary Contact Email:* lc.Primary Contact Phone:* mwpotter@ncdot.gov (919)707-4738 Date Submitted 5/18/2021 Nearest Body of Water Town Creek Basin Yadkin-PeeDee Water Classification C Site Coordinates Latitude: Longitude: 35.667010 -80.465670 A. Processing Information County(or Counties)where the project is located: Rowan Is this a NCDMS Project ✓ Yes r' No Is this project a public transportation project?* c Yes r No Is this a NCDOT Project?* s Yes r No (NCDOT only)T.I.P.or state project number: P-5726 WBS#(7) 47604.1.1 Pre-Filing Meeting Information Is this a courtesy copy notification?* ✓ Yes r No ID# Version Pre-fling Meeting or Request Date 4/8/2021 Attach documentation of Pre-Filing Meeting Request here: aick the upload button or drag and drcp files here to attach document DWR Pre-Filing Meeting Request Form.pdf 50.55KB Re type oust be FCF 1a.Type(s)of approval sought from the Corps: 17 Section 404 Permit(wetlands,streams and waters,Clean Water Act) n Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes r No lb.What type(s)of permit(s)do you wish to seek authorization? 17 Nationwide Permit(NWP) n Regional General Permit(RGP) n Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? ✓ Yes r No Nationwide Permit(NWP)Number: 39-Commercial/Institutional Developments NWP Numbers(for multiple NWPS): Id.Type(s)of approval sought from the DWR: fJ 401 Water Quality Certification-Regular n 401 Water Quality Certification-Express n Non-404 Jurisdictional General Permit n Riparian Buffer Authorization n Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes r No For the record only for Corps Permit: r Yes r No 1f.Is this an after-the-fact permit application?* ✓ Yes ( No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes ( No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes CNo Acceptance Letter Attachment I h.Is the project located in any of NC's twenty coastal counties? ✓ Yes r No 1j.Is the project located in a designated trout watershed? ✓ Yes r No B. Applicant Information 1d.Who is applying for the permit? I—Owner fJ Applicant(other than owner) 1e.Is there an Agent/Consultant for this project?* r Yes r No 2.Owner Information 2a.Name(s)on recorded deed: North Carolina Railroad 2b.Deed book and page no.: Book 1255,Page 215 2c.Contact Person: 2d.Address Street Address 2809 Highwoods Boulevard,Suite 100 Address Line 2 Oty State/Bovine/Raglan Raleigh NC Postal/Zip Code Country 27604 USA 2e.Telephone Number: 2f.Fax Number: (919)954-7601 2g.Email Address:* ncrr_info@ncrr.com 3.Applicant Information(if different from owner) 3a.Name: Mr.Matthew Potter,PE 3b.Business Name: NCDOT Rail Division 3c.Address Street Address 1 South Wilmington Street Address Line 2 1553 Mail Service Center Coy State/Province/legion Raleigh NC Postal/Zip Cork Country 27699-1553 USA 3d.Telephone Number: 3e.Fax Number: (919)707-4738 3f.Email Address:* mapotter@ncdot.gov 4.Agent/Consultant(if applicable) 4a.Name: Alexander P.Smith 4b.Business Name: Mom Environmental,Inc. 4c.Address Street Address 218 Snow Avenue Address Line 2 atY State/Bovine/legion Raleigh NC Fbstal/Zip Code Country 27603 USA 4d.Telephone Number: 4e.Fax Number: (919)270-9306 4f.Email Address:* ssmith@wdomenvironmental.org Agent Authorization Letter* P-5726 AGENT AUTHORIZATION FORM.pdf 1.33MB C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (d appropriate) 1c.Nearest municipality/town: Salisbury,NC 2. Project Identification 2a.Property Identification Number: 2b.Property size: NCR NCR 2.45 2c.Project Address Street Address 215 Depot Street Address Line 2 (lly State/Rovince/FOgion Salisbury NC Fbstal/Zip Code Country 28145 USA 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Town Creek 3b.Water Resources Classification of nearest receiving water:* C 3c. What river basin(s)is your project located in?* Yadkin-PeeDee 3d.Please provide the 12-digit HUC in which the project is located. 030401030301 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The stream to be impacted is located between a railroad line(in place since the mid-1850s)and an industrial/commercial part of downtown Salisbury.The stream receives subterranean runoff from downtown Salisbury and is daylighted for approximately 175 feet before entering another culvert that extends more than 1000 feet to the east under the industrial/commercial area.The landscape around the stream is heavily disturbed.Woody vegetation has been removed,and the regularly maintained site primarily supports kudzu vines.The stream banks and substrate consist of sand,gravel,cobble,and broken bricks. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* C Yes r No C Unknown 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) P-5726 USGS Quad.pdf 471.12KB 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) P-5726 Soil Survey.pdf 658.29KB 4f.List the total estimated acreage of all existing wetlands on the property: 0 4g.List the total estimated linear feet of all existing streams on the property: 175 4h.Explain the purpose of the proposed project:* The proposed project will construct an additional passenger rail platform at the Salisbury Train Station.The new platform will be constructed on the southeast side of the NCRR/NS Main-Line track#1.The improvements will allow the expansion of both passenger and freight services at Salisbury Station.This project is to improve safety while implementing infrastructure consistent with the historical character of the train station. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The proposed project will construct an additional passenger rail platform at the Salisbury Train Station.The new platform will be constructed on the southeast side of the NCRR/NS Main-Line track#1.A new pedestrian underpass will also be constructed to provide passenger access between the new platform and the existing station/platform.The new platform will mirror the existing platform onto the southeast side of the NCRR/NS Main-Line.A new pedestrian underpass will be constructed to provide passenger access from the Station side of the Main-Line to the new platform.The underpass will include a reinforced concrete box style tunnel providing a 12 feet wide and 10 feet high pedestrian walkway between two elevator/stairway towers,one on each side of the Main-Line.The reinforced concrete tunnel will be buried a minimum of 6 feet from the top of track elevation to the top of reinforced concrete structure.The reinforced concrete tunnel and two elevator/stairway towers will be supported by a driven pile foundation.Ground-surface graders and pile drivers will be used. 4j.Please upload project drawings for the proposed project. P-5726_RR_60%_11 x17.pdf 5.77MB P-5726_Permit Drawing_20210506.pdf 1.36MB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes C No r Unknown Comments: Delineation conducted September 12,2018 5b.If the Corps made a jurisdictional determination,what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: SAW-2019-00063 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Allison Keith and Phillip Parkinson Agency/Consultant Company: Axiom Environmental,Inc. Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR USAGE issued a Notification of Jurisdictional Determination dated February 5,2019(Monte Matthews) NCDWR sent an e-mail notification of approval of the delineation on November 19,2018(Dave Wanucha) 5d1.Jurisdictional determination upload SAW No.2019-00063 P 5726 Salisbury Station(002).pdf 1.4MB 6. Future Project Plans 6a.Is this a phased project?* C Yes ( No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? Nothing is planned at this time. D. Proposed Impacts Inventory U 1. Impacts Summary la.Where are the impacts associated with your project?(check all that apply): r Wetlands I7 Streams-tributaries 1 Buffers 1 Open Waters 1 Pond Construction 3.Stream Impacts 3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S1 Culvert Placement Permanent Culvert UT to Town Creek Perennial Both 5 132 Average(feet) (inner feet) S2 Bank Stabilization Temporary Bank Stabilization UT to Town Creek Perennial Both 5 43 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 132 43 3i.Total stream and ditch impacts: 175 3j.Comments: 875 square feet of stream are proposed to be impacted,approximately 0.02 acre.The PJD package used GIS to estimate the stream was 182 linear feet.Subsequently,a field survey revised stream length to 175 linear feet. E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Initially,the entire length of stream between two long culverts was planned to be contained in a culvert.A design revision was used to minimize the culverted portion to leave 43 feet in daylight. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Fill slopes were steepened to reduce the project footprint,and the remaining 43 feet of stream will receive bank stabilization to protect it from the surrounding urban landscape. 2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? (' Yes ( No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: This project avoids impacts to wetlands.The project will result in only 132 feet of permanent impacts to a jurisdictional stream(approximately 0.015 acre of bed)in a highly disturbed, urban setting.This stream received an NC SAM overall rating of Low,with sub-function ratings of Low.Low,and Medium for Hydrology,Water Quality,and Habitat,respectively. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C Yes (No If no,explain why: The project is not in a river basin that is subject to the NC Riparian Buffer Protection Rules. 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* ✓ Yes ( No Comments: An NCDOT Highway Stormwater Program Stormwater Management Plan is attached. G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* a Yes (' No lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* ✓ Yes ( No 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* ✓ Yes r No Comments:* The NCDOT Rail Division generated a Minimum Criteria Determination Checklist for this project. 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* (' Yes No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* (' Yes rNo 3b.If you answered"no,"provide a short narrative description. The reach of stream to be culverted(132 feet)is between two long culverts.The remaining stream left daylighted(43 feet)will be protected by bank stabilization from adjacent development activities. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes r No r N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* aYes (' No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* f Yes f•No 5d.Is another Federal agency involved?* f Yes r No f Unknown 5e.Is this a DOT project located within Division's 1-8? f Yes (' No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? f Yes ( No 5g.Does this project involve bridge maintenance or removal? f Yes (' No 5h.Does this project involve the construction/installation of a wind turbine(s)?" f Yes ( No 5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? ( Yes C No If yes,please provide details to include type of percussive activity,purpose,duration,and specific location of this activity on the property. Percussive Activities.pdf 109.59KB 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? https://www.fws.gov/raleigh/species/cntylist/rowan.html,https://ncnhde.natureserve.org/content/axiom-environmental,and field surveys conducted by Axiom Environmental,Inc.biologists. Consultation Documentation Upload 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* f Yes (' No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://wwwfisheries.noaa.gov/resou rce/ma p/esse ntia l-fish-habitat-mappe r 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* • Yes f No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* Throughout the planning process,the NCDOT Rail Division has been coordinating with the N.C.State Historic Preservation Office(SHPO),the Salisbury Historic Preservation Committee,and the Historic Salisbury Foundation. 7c.Historic or Prehistoric Information Upload 1 ER 18-3254_Original_Review.pdf 194.84KB 2 ER 18 3254_6_Original_Design_Review.pdf 111.99KB 3 ER 18-3254_Letter_SHF.pdf 273KB 4 ER-18-3254_25%Plan Review.pdf 164.47KB 5 ER-18-3254.pdf 166.2KB 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-yearfloodplain?* f Yes ( No 8c.What source(s)did you use to make the floodplain determination?* https://rowan2.connectgis.com/Map.aspx Miscellaneous C^U Comments The stormwater management plan is attached below(it is also part of the permit drawings). Miscellaneous attachments not previously requested. P-5627_Stormwater Management Plan_20210430.pdf 1.46MB Signature U * rJ By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Alexander P.Smith Signature Date 5/18/2021