Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20051877 Ver 1_Year 2 Monitoring Report_20130212
05- Inq Dye Branch II Stream Restoration NCEEP Project Number: 92255 Monitoring Year 2 Monitoring Contract Number: 004523 2012 Final Report Submitted to North Carolina Ecosystem Enhancement Program North Carolina Department of Environment and Natural Resources November 2012 Ecosystem DO IF Fg 1 9. 20PROGRAM R - WaTEK DUALITY 1652 Mail Service Center Raleigh, NC 27699 RECEIVED FEB 5 - 2013 NC EC(QA��YSTEM ENHANCEML'NT PROORAM Monitoring Firm EQUINOX ENVIRONMENTAL CONSULTATION & DESIGN 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Phone: 828 - 253 -6856 Project Contact: Kevin Mitchell Email: kevin@equinoxenvironmental.com Dye Branch II Stream Restoration 2012 Monitoring Report (MY 2) Table of Contents 10 Executive Summary / Project Abstract 20 Methodology 30 References I Page 1 Page 2 Page 3 1 Appendices ' Appendix A Project Vicinity Map and Background Tables Figure 1 Vicinity Map and Directions ' Table la Project Components Table lb Component Summations Table 2 Project Activity and Reporting History ' Table 3 Project Contacts Table 4 Project Attributes Appendix B Visual Assessment Data ' Figure 2 Integrated Current Condition Plan View Table 5 Visual Stream Morphology Stability Assessment Table 6 Vegetation Condition Assessment ' Photo Station Photos Appendix C Vegetation Plot Data Table 7 Vegetation Plot Criteria Attainment Vegetation Monitoring Plot Photos Table 8 CVS Vegetation Plot Metadata ' Table 9 Planted and Total Stem Counts (Species by Plot with Annual Means) Appendix D Stream Survey Data ' Cross - Sections with Annual Overlays and Photos Longitudinal Profiles with Annual Overlays Pebble Count Plots with Annual Overlays ' Table 10a Baseline Stream Data Summary Table l Ob Baseline Stream Data Summary (Substrate, Bed, Bank, and Hydrologic Containment Parameter Distributions) Table 11 a Monitoring Data — Dimensional Morphology Summary (Dimensional Parameters — Cross - Sections) Table l lb Monitoring Data — Stream Reach Data Summary Appendix E Hydrologic Data Table 12 Verification of Bankfull Events ' Figure 3 Dye BranchWater Level Logger Chart Figure 4 Precipitation for Mooresville, North Carolina 1 M II �I 1.0 EXECUTIVE SUMMARY / PROJECT ABSTRACT The goals and objectives stated in the Dye Branch Stream Restoration Plan (NCEEP 2005) are as follows • Provide a stable system of stream channels that neither aggrade nor degrade while maintaining dimension, pattern, and profile with the capacity to transport the watershed's water and sediment load, • Improve the overall water quality and aquatic habitat by reducing sediment and waste inputs into the stream caused by bank erosion, mass - wasting, and stormwater runoff through stabilization of the stream channel and creation of a stormwater wetland, and • Improve the overall viability of the riparian vegetative communities through establishment of native species and elimination of invasive exotic species The site includes a diverse assemblage of 21 planted species of native trees and shrubs Planted species range from 3 to 6 per plot with 4 to 10 species observed when volunteers are included Between the baseline and year 1 (MY 1) monitoring vegetation data collection efforts, two monitoring plots were impacted by repairs made to the stream channel in summer 2011 A significant number of planted stems were damaged in VP7 and all plants in VP8 were destroyed Based on the MY2 vegetation data from plots 1 through 7 the project is not on track to meet the 320 planted stems per acre criterion that must be achieved by the end of the year three monitoring period Average stem density for planted stems in MY2 is approximately 266 stems per acre Of the seven remaining plots, six plots ( -86 %) will not meet the year three interim success criteria numbers per acre These include VP 1, 3, 4, 5, 6, and 7, which had 202, 283, 283, 202, 202, and 283 stems per acre, respectively However, when planted and natural stems are combined, the average stem density is 885 stems per acre, which is above the minimum established criterion Six of the seven plots meet the year three interim success criteria when planted and natural stems are combined There are also approximately 32 isolated patches of high threat invasive plants that are distributed throughout the project area Stream longitudinal profiles within the Cemetery Branch reach have remained stable among monitoring years with the exception of a few isolated areas of bed degradation and aggradation The primary stream issues observed during MY2 along Dye Branch include structure degradation, bank erosion, bed degradation, and bed aggradation Significant portions of the downstream reach on Dye Branch appear to have downcut between monitoring years A water level logger was installed in December of 2010 and has since recorded a total of six bankfull events including three during the MY2 monitoring period Summary information/data related to the occurrence of items such as beaver or easement encroachment and statistics related to performance of various project and monitoring elements can be found in the tables and figures in the report appendices Narrative background and supporting information formerly found in these reports can be found in the mitigation and restoration plan documents available on EEP's website All raw data supporting tables and figures in the appendices are available from EEP upon request ' Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 1 Equinox Environmental Consultation and Design, Inc November 2012 �I 2.0 Methodology I The stream monitoring methodologies utilized in MY2 replicate those employed during the previous monitoring years and are based on standard guidance and procedures documents (Rosgen 1996, USACE 2003) Vegetation monitoring data were collected following the ' standard CVS -EEP Protocol for Recording Vegetation, Level H, Version 4 2 (Lee et al 2008) LI Dye Branch II Final 2 Equinox Environmental Consultation and Design, Inc ' Project No 92255 November 2012 Monitoring Year 2 of 5 F 3.0 References ' Lee, M T, R K Peet, S D Roberts, and T R Wentworth 2008 CVS -EEP Protocol for Recording Vegetation Version 4 2 The University of North Carolina at Chapel Hill, Department of Biology NCEEP (North Carolina Ecosystem Enhancement Program) 2005 Dye Branch Stream ' Restoration Plan Raleigh Rosgen, D L 1996 Applied River Morphology Wildland Hydrology Books Pagosa ' Springs, Colorado I USACE (U S Army Corps of Engineers) 2003 Stream Mitigation Guidelines U S Army ' Corps of Engineers, U S Environmental Protection Agency, North Carolina Wildlife Resources Commission, North Carolina Department of Environment and Natural Resources - Division of Water Quality Wilmington District � I J ' Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 1 3 Equinox Environmental Consultation and Design, Inc November 2012 � Appendix A Project Vicinity Map and Background Tables �' • 1 ,k: +f r ? - r `'1 The subject project site is an environmental restoration site of •," - ,;'�.�, (� + '. �d' t r S� :; the NCDENR Ecosystem Enhancement Program (EEP) and is + ` J - -•I �'•- `�� /� '' encompassed by a recorded conservation easement, but is bordered by ��� /x ',3 i*', i .+ �t t '•'+f •t,,.,. Y land under private ownership. Accessing the site may require traversing areas near or along the easement boundary and therefor access by the 4 general public is not permitted. Access by authorized personnel of state and federal agencies or their designees/contractors involved in the a development, oversight and stewardship of the restoration site is permitted within the terms and timeframes of their defined roles. Any �^_A r �- + �,X.• .T h rr1- intended site visitation or activity by any person outside of these ' '+ •v, j / previously sanctioned roles and activities requires prior coordination with ...x1.' t �•' t l 115 a o „ll 1 P.9 1 Dye Branch 11 1s— Stream Restoration Site d , ale 1 I 3 1 1. *Oa�{1S rt >�,� \� `�ia <115 )v ..,�\ �� ' � + .�� t 4 �, i r :J.• i JI `� I�`Fy' ) • 4 � s ,rt , W A_ ilCD, � 1 � e• j�; �I e,f` ,4 �`'' Y ' � YJJ � �� gip' `'� t _ 1 / ✓' 4 btu ``� '. Y h^ `j 14 J t r,, \.�! :ti ' ll� a- ) _ ell ;'�) s '`.:�i ,(s, t 1 - ,f.r"' • 1 '; + $vJ`.r a s,Yv'gka..+4r v 1." � •y+t, i F °: � i :iCS� �,, -'fit ?a 1. rf �•, cows anwrrr• o�.» °°"" c" """ "" Figure I - Vicinity Map Douny Dye B—ch II Cow11y �:. �• Slreem RenoraUan site r'd cauory % ` Cr•xo• CO"" Dye Branch II EQUINOX KNV1R0RMt: 0Sayl'stem Stream Restoration Site �•w ° ° ° °• ° ° °• J lallCl Ir r CMNwtl � PROGRAM Gas1m / � ° ' `""" Project No. 92255 N Directions: From Raleigh, proceed west on 1 -40 towards 0 0.5 1 2 Statesville. Take Exit 152 A (1 -77S) towards Charlotte. Mlles Proceed on 1.775 to Exit 36 (NC -150) towards Mooresville. Iredell County, North Carolina From NC -150 turn slight right onto McLelland Avenue/NC -152 for approximately 1.2 miles. The site is located on the west 7.5 Minute Series Mooresville side of McUlland Avenue/NC -152. Quadrangle Appendix A Project Vicinity Map and Background Tables - Inlormatlon unavailable Non- Apphcable ab s. ject Csomponents Activity or Report Restoration Level Stream (10 ranch / P.ro' _et No. 91f155 Upland (ac) Buffer (ac) BMP Protect Aril 2006 Ravenne Non- Rivenne Footage - -- Dec 2010 Restoration Component Existing Restoration Approach - Stationing Buffer BMP Elements Comment or Feet/Acres Level - or 0. --'N Acres Jan 2013 Year 3 Moni Reach ID - Enhancement II 0 Acreage Year 5 Monitorm - - - Creation 00 00 Cemetery Branch 9681f R P3 1,0141f 0+00-10+14 ■ Stormwater wetlands HQ Preservation Dye Branch 1,772 If R P2 1,500 If 0400-15+00 Stormwater wetlands 00 - Upstream Totals 3,685 0 0 0 Dye Branch 1 232 If R P2 1 171 If 16 +00 - 27 +71 Downstream - Inlormatlon unavailable Non- Apphcable =Non - applicable a le c c vi 1, & g I reach I / e o. 92 +2- lis Co 5 l mnn Summations ranch 1 /Pro act No. 9255 Activity or Report Restoration Level Stream (10 Riparian Wetland (ac) Non- Riparian ac Upland (ac) Buffer (ac) BMP - Aril 2006 Ravenne Non- Rivenne - - -- Dec 2010 Restoration 3,685 00 00 - - - Enhancement Feb 2011 00 00 Aug 2011 Year 1 Monitormiz - Enhancement I 0. --'N Dec 2012 Jan 2013 Year 3 Moni - Enhancement II 0 Year 5 Monitorm - - - Creation 00 00 - Preservation 0 00 00 HQ Preservation 0 00 00 - 00 00 -- Totals 3,685 0 0 0 0 3 =Non - applicable a le c c vi 1, & g I reach I / e o. 92 +2- lis Co 5 Activity or Report Data Collection Complete Actual Completion or Delivery Restoration Plan - Oct 2005 Final Design - Construction Plans - Aril 2006 Final Des - Repair Plans N/A July 2010 Construction Re Irs N/A Dec 2010 Temporary S &E mix a hed N/A Summer 2010 Permanent seed mix ariphed N/A Stemmer 2010 Plantm N/A Feb 2011 Mitigation Plan / As -built Year 0 Monitorm - Basehne March 2011 Aug 2011 Year 1 Monitormiz Nov 2011 Jan 2012 Year 2 Monitoring Dec 2012 Jan 2013 Year 3 Moni Year 4 Momtorin Year 5 Monitorm - lntormation unavailable N/A - Item does not apply Dye Branch II Final A -2 Equinox Environmental Consultation and Design, Inc Project No 92255 November 2012 Monitoring Year 2 of 5 Appendix A Project Vicinity Map and Background Tables able 3. ro'ec Contacts D e ranch tI / ro' ct 255 Designer Mulkey Engineers & Consultants 6750 Tryon Road Cary NC, 27518 Primary Project Design POC Emmett Perdue (919) 858 -1874 Construction Contractor Fluvial Solutions P O Box 28749 Raleigh, NC 27611 Construction Contractor POC Peter Jelenevsky (919) 605 -6134 Planting Contractor Fluvial Solutions P O Box 28749 Raleigh, NC 27611 Planting Contractor POC Peter Jelenevsky (919) 605 -6134 Seeding Contractor Fluvial Solutions P O Box 28749 Raleigh, NC 27611 Seeding Contractor POC Peter Jelenevsky (919) 605 -6134 Seed M ix Sources Hanes Geo Components Winston - Salem, NC 27101 Nursery Stock Suppliers North Carolina Forest Service Goldsboro, NC 27530 Monitoring Performers (YO) - 2010 Equinox Environmental Consultation & Design, Inc 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream M onitonng POC Win Taylor (828) 253 -6856 Vegetation Monitoring POC Win Taylor (828) 253 -6856 Monitoring Performers (YI) - 2011 Equinox Environmental Consultation & Design, Inc 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream M onitoring POC Win Taylor (828) 253 -6856 Vegetation Monitonng POC Win Taylor (828) 253 -6856 Monitoring Performers (Y2) - 2012 Equinox Environmental Consultation & Design, Inc 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream M onitonng POC Kevin Mitchell (828) 253 -6856 Vegetation MonitonngPOC Kevin Mitchell (828) 253 -6856 Monitoring Performers (Y3) - 2013 Stream M onitonng POC Vegetation MonuonngPOC Monitoring Performers (Y4) - 2014 Stream M onitonng POC Vegetation M onitonng POC Monitoring Performers (Y5) - 2015 Stream M onitoring POC Vegetation MonitonngPOC Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 A -3 Equinox Environmental Consultation and Design, Inc November 2012 �1 FI 1� 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Appendix A Project Vicinity Map and Background Tables Table 4. e Branch Project Attributes iI / ct No. 225_5 Project County Iredell Ph siogra hic Region Piedmont Ecore ton Southern Outer Piedmont River Basin Yadkin - Pee Dee USGS HUC 03040105010010 NCDWQ Sub -Basin 03 -07 -11 Within Extent ofEEP Watershed Plan Upper Roc River Local Watershed Plan W RC Clas s Warm % of Project Easement Fenced or Demarcated 1000/0 Beaver Activity Observed During Design Phase No Restoration Com onent Attributes Dye Branch Cemetery Branch Drainage Area (sq rm) 060 006 Stream Order First / Second First Restored Length (feet) 2,671 1,014 Perennial or Intermittent Perennial Perennial Watershed Type Urban Watershed LULC Distribution Urban Other 85% 15% Watershed Impervious Cover - NCDWQ AU /IndexNutnber 13 -17 -2 NCDWQ Classification C 303d Listed Yes Upstream of 303d Listed Segment Yes Reasons for 303d Listing or Stressor Poor Btoclassification Total Acreage of Easement 120 Total Vegetated Acreage within Easement 120 Total Planted Acreage as Part of Restoration 89 Ros en Classification of Pre- Emstmg 64 G4c E4 Rosgen Classification of As -Built C C Valley Type - Valley Sloe 0 0097 / 0 0125 00217 Valley Side Slope Range - Valley Toe Slope Range Cowardin Classification N/A N/A Trout Waters Designation No No Species of Concern, Endangered, Etc None Dominant Soil Series and Characteristics Series Depth Clay% K T Chewacla / Cecil / Colfax - Information unavailable N/A - Item does not apply Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 A -4 Equinox Environmental Consultation and Design, Inc November 2012 d 1 Appendix B Visual Assessment Data t 1 t F' ii 1 Appendix B Visual Assessment Data iviA - item ooes not appiy Dye Branch I1 Final B -2 Equinox Environmental Consultation and Design, Inc Project No 92255 November 2012 Monitoring Year 2 of 5 Table 5. Visual Stream Morphology Stability Assessment Dye ranch II I Project No. 92255 - Cemetery Branch Assessed th 1 0!1.4 )teat Number Footage Adjusted% Number Total Number of Amount of % Stable, vath v4th for Major Channel Channel Metric Stable, Number in Unstable Unstable Performing Stabilizing Stabilizing Stabilizing Category Sub Category n Performing As-built Segments Footage as Intended Woody Woody Woody nt as s Intendeed d Vegetation Vegetation Vegetation 1 Bed 1 Agpradation - Bar formation/growth sufficient to significantly 1 Vertical Stability deflect flow laterally (not to include point bars) 0 0 100% (Riffle and Run Units) 2 Degradation - Evidence of downcutting 0 0 100% 2 Riffle Condition 1 Texture/Substrate- Riffle maintains coarser substrate 14 14 100% i Depth Sufficient (Max Pool Depth Mean Bankfull Depth a 1 6) 14 15 93% 3 Meander Pool Condition 2 Length appropriate ( >300/ of centerline distance between tail of upstream riffle and head of downstream riffle) I S 15 100% I Thalweg centenng at upstream of meander bend (Run) 15 15 100% 4 Thalweg Position 2 Thalweg centenngat downstream of meander bend (Glide) 14 14 100% 2 Bank Bank lacking vegetative cover resulting simply from poor growth 1 Scoured /Eroding and/or scour and erosion 0 0 100% N/A N/A N/A Banks undercut /overhanging to the extent that irasss wasting appears 2 Undercut likely Does NOT include undercuts that are modest, appear 0 0 100% N/A N/A N/A sustainable and are providing habitat 3 Mass Wasting Bank slumping calving or collapse 0 0 100% N/A N/A N/A Effiff 0 0 100% N/A N/A N/A 3 Engineered I Overall Integrity Structures physically intact with no dislodged boulders or logs 32 32 100% Structures 2 Grade Control Grade control strictures exhibiting maintenance of grade across the sill 28 28 100% 2a Piping Structures lacking any substantial flow underneath sills or arms 27 28 96% 3 Bank Protection Bank erosion within the structures extent of influence does NOT Bank 4 4 100% 15% Pool forming structures maintaining - MaxPoolDepth Mean 4 Habitat lBankfull Depth Ratio? 1 6 Rootwads /logs providing some cover at 13 13 100% base -flow iviA - item ooes not appiy Dye Branch I1 Final B -2 Equinox Environmental Consultation and Design, Inc Project No 92255 November 2012 Monitoring Year 2 of 5 Appendix B Visual Assessment Data Table 5. Visual Stream Morphology Stability Assessment Dye Branch I1 / Project No. 92255 - Dye Branch - Upstream Assessed Len th 1,500 feet Number Footage Adjusted % Number Total Number of Amount of % Stable, with with for Major Channel Channel Metric Stable, Number in Unstable Unstable Perforimng Stabilizing Stabilizing Stabilizing Category Subcategory Performing As-built Segments Footage as intended Woody Woody Woody as Intended Vegetation Vegetation Vegetation 1 Bed 1 Ag radatxon - Bar frrination/growth sufficient to significantly 4 227 85% 1 Vertical Stability deflect flow laterally (not to include point bars) 2 Degadation - Evidence of downcuttmg 2 83 94% (Riffle and Run Units) 2 Riffle Condition 1 Texture/Substrate - Riffle maintains coarser substrate 15 17 88% 1 Depth Sufficient (Max Pool Depth Mean Bankfull Depth z 1 6) 18 20 90% 3 Meander Pool Condition 2 Length appropriate (>30% of centerline distance between tad of 18 20 90% upstream riffle and head of downstream nffle) I Thalwegcentenngat upstream of meander bend (Run) 14 17 82% 4 Thalweg Position 88% 2 Thalwegcentenngat downstream of meander bend (Glide) 14 16 2 Bank 1 Scoured /Eroding Bank lacking vegetative cover resulting simply from poor growth 5 167 94% 5 50 96% and/or scour and erosion Banks undercut /overhangingto the extent that mass wastingappears 2 Undercut likely Does NOT include undercuts that are modest, appear 0 0 100% N/A N/A N/A sustainable and are providmg habitat 3 Mass Wasting Bank slumping calving or collapse 2 62 98% 2 0 98% Totals 7 229 92% 7 50 94% 3 Engineered I Overall Integrity Structures physically intact with no dislodged boulders or logs 26 30 87% Structures 2 Grade Control Grade control structures exhibiting maintenance of grade across the sill 8 8 100% 2a Piping Structures lacking any substantial flow underneath sills or arms 6 8 75% 3 Bank Protection Bank Bank erosion within the structures extent of influence does NOT 18 23 78/ 15% Pool forming structures maintaining - MaxPoolDepth Mean 4 Habitat JBankfull Depth Ratio ? 16 Rootwads /logs providing some cover at 4 5 80% base -flow N/A - Item does not apply Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 B -3 Equinox Environmental Consultation and Design, Inc November 2012 Appendix B Visual Assessment Data i,, + - uem Does not appiy Dye Branch II Final B -4 Equinox Environmental Consultation and Design, Inc Project No 92255 November 2012 Monitoring Year 2 of 5 Table 5. Visual Stream Morphology Stability Assessment Dye Branch II /Project No. 92255 -Dye Branch - Downstream Assessealmeng th 1 17r1 Leet Number Footage Adjusted% Number Total Number of Amount of % Stable, with with for Major Channel Channel Metric Stable, Number in Unstable Unstable Performing Stabilizing Stabilizing Stabilizing Category Sub.-Category Ps As-built Segments Footage as intended Woody Woody Woody as Intended Vegetation Vegetation Vegetation 1 Bed 1 Aparadation - Bar formation/growth sufficient to significantly 1 Vertical Stability deflect flow laterally (not to include point bars) 2 55 95 (Riffle and Run Units) 2 Degradation - Evidence of downcutting. 3 184 84% 2 Riffle Condition 1 Texture/Substrate- Riffle maintains coarser substrate I i i l 100% 3 Meander Pool i Depth Sufficient (Max Pool Depth Mean Bankfull Depth a 1 6) 10 10 100% Condition 2 Length appropriate ( >30% of centerline distance between tail of upstream riffle and head of downstream riffle) 10 10 100% 1 Thalwegcentenngat upstream of meander bend (Run) 8 10 80% 4 Thalweg Position 90% 2 Thalwegcentenngat downstream of meander bend (Glide) 9 10 2 Bank Bank lackingvegetative cover resulting simply from poor growth 1 Scoured/Eroding and/or scour and erosion 2 63 97% 2 30 99% Banks undercut /overhanging to the extent that mass wasting appears 2 Undercut likely Does NOT include undercuts that are modest, appear 0 0 100% N/A N/A N/A sustainable and are providing habitat 3 Mass Wasting Bank slumping, calving or collapse 2 117 95% 1 22 96% Totiil -s 4 180 92% 1 1 22 1 93% 3 Engineered i Overall Integrity Structures physically intact with no dislodged boulders or logs 16 22 73% Structures 2 Grade Control Grade control structures exhibiting maintenance of grade across the sill 6 8 75% 2e Piping Structures lacking any substantial flow underneath sills or anus 4 8 50% 3 Bank Protection Bank erosion within the structures extent of influence does NOT 12 14 86% exceed 15% Pool forming structures maintaining- Max Pool Depth Mean 4 Habitat Bankfull Depth Ratio? 1 6 Rootwads/logs providing some cover at 5 5 100% base -flow i,, + - uem Does not appiy Dye Branch II Final B -4 Equinox Environmental Consultation and Design, Inc Project No 92255 November 2012 Monitoring Year 2 of 5 Appendix B Visual Assessment Data Table 6. Vegetation Condition Assessment ye Branch II / roject No. 92.255 0 Planted AcrLe� e 9 �0 % of Vegetation Category Definitions CCPV Depiction Number of Combined Planted Polygons Acreage Acreage 1 Bare Areas Very limited cover of both woody and herbaceous matenal SWhrte 1 0 01 <1% Black Dots Background 2 Low Stem Density Areas Woody stem densities clearly below target levels based on MY3, N/A 0 000 0% 4, or 5 stem count criteria - otals 1 0 01 <1% 3 Areas of Poor Growth Rates or Vigor Areas with woody stems of a size class that are obviously small N/A 0 000 0% given the monitoring yew –IMEMMOMELt—Ed Toials 1 001 <1% Easement Acreage 12.01 % of Number of Combined Vegetation Category Definitions CCPV Depction Easement Polygons Acreage Acreage 4 Invasive Areas of Concern Areas or points (if too small to render as polygons ns at map scale) ross Hatch 33 260 22% (Red - Dense/Yellow - Present) 5 Easement Encroachment Areas ns at map scale) Areas or points (If too small to render as polygons tipple Orange Dots White Background 1 0 06 ° 0 5 /o N/A - Item does not apply Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 B -5 Equinox Environmental Consultation and Design, Inc November 2012 1 1 1 1 1 1 1 1 Appendix B Visual Assessment Data Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Cemetery Branch — Permanent Photo Station 1 Downstream B -6 Equinox Environmental Consultation and Design, Inc. November 2012 i 1 1 1 Appendix B Visual Assessment Data Cemetery Branch — Permanent Photo Station 2 Upstream Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Cemetery Branch — Permanent Photo Station 2 Downstream B -7 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix B Visual Assessment Data Dye Branch — Permanent Photo Station 3 Downstream Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch — Permanent Photo Station 4 Upstream B -8 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix B Visual Assessment Data Dye Branch — Permanent Photo Station 5 Upstream Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch — Permanent Photo Station 6 Upstream B -9 Equinox Environmental Consultation and Design, Inc. November 2012 t 1 Appendix B Visual Assessment Data Dye Branch — Permanent Photo Station 7 Downstream Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch — Permanent Photo Station 8 Upstream B -10 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix B Visual Assessment Data Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch — Permanent Photo Station 9 Upstream B -11 Equinox Environmental Consultation and Design, Inc. November 2012 u t F, 1 Appendix C Vegetation Plot Data Appendix C 1 Ij Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 Vegetation Plot Data nmnT VetiII / ProjenNa Aa,- Vegetation Plot ID Vegetation Survival Threshold Met? Tract Mean 1 No 14% 2 Yes 3 No 4 No 5 No 6 No 7 No C -1 Equinox Environmental Consultation and Design, Inc November 2012 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 1 Monitoring Year 2 —June 11, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Vegetation Monitoring Plot 2 Monitoring Year 2 — June 11, 2012 C -2 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 3 Monitoring Year 2 —June 11, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Vegetation Monitoring Plot 4 Monitoring Year 2 — June 11, 2012 C -3 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 5 Monitoring Year 2 —June 11, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Vegetation Monitoring Plot 6 Monitoring Year 2 —June 11, 2012 C-4 Equinox Environmental Consultation and Design, Inc. November 2012 1 1 1 1 1 1 1 1 Appendix C Vegetation Plot Data Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Vegetation Monitoring Plot 7 Monitoring Year 2 — June 11, 2012 C -5 Equinox Environmental Consultation and Design, Inc. November 2012 1 1 I Appendix C Vegetation Plot Data Table 8. CVS FIRMt IF 21a e Branch i /Pro ect No. 92.255 Report Prepared By W ilham Carson Date Prepared 8/9 /2012 14 55 Database Name Equmox 2012- A- DyeBranch MY2 mdb Database Location Z \ES \NM &M \EEP Monitonng \Dye Branch \DB -MY2 -2012 \Data \Veg Computer Name D16TNK71 File Size 51560448 DESCRIPTION OF WORKSHEETS IN TIES DOCUMENT ��� Description of database file, the report worksheets, and a summary ofproject(s) and project data Project Planted Each project is listed with its PLANTED stems per acre, for each year This excludes live stakes Project Total Stems Each project is listed with its TOTAL stems per acre, for each year This includes live stakes, all planted stems, and all natural/volunteer stems Plots List ofplots surveyed with location and sunmmary data (live stems, dead stems, missing, etc ) Vigor Frequency distribution of vigor classes for stems for all plots Vigor by Species Frequency distribution of vigor classes listed by species Damage List ofmost frequent damage classes with numberofoccurrences and percent oftotal stems impacted by each Damage by Species Damage values tallied by type for each species Damage by Plot Damage values tallied by type for each plot Planted Stems by Plot and Species A matnxofthe count of PLANTED hvmg stems of each species for each plot, dead and Missing stems are excluded ALL Stems by Plot and Species A matnxof the count of total living stems of each species (planted and natural volunteers combined) for each plot, dead and missing stems are excluded PROJECT SUMMARY Project Code 92255 Project Name Dye Branch Description River Basin Yadkin-Pee Dee Length(ft) Stream- to-Edge Width (ft) Area (sq m) Required Plots (calculated) Sampled Plots 7 Dye Branch II Final Project No 92255 Momtonng Year 2 of 5 C -6 Equinox Environmental Consultation and Design, Inc November 2012 Appendix C Vegetation Assessment Data Table 9. Planted and Total Stem Counts (Species by Plot Witis Annual Mema) Dye Bramb H Project No. 9255 ��oa ®aaaaaaoaoaa ®������mmmmmmmmm ®������ 000 ©aa���ooao ©00000000 ©© ®���a000 ©o������00000 ©oom000000 o ©ommmoomoomo ©oo ©m00000 ®mmmmmo 000aa00000 o ©000000000mo ©vo ©oA ©ommommm ®mm Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 C -7 Equinox Environmental Consultation and Design, Inc. November 2012 r 1 1 Appendix D Stream Survey Data Appendix D 840 839 838 837 a� w 0 0 836 W 835 834 833 832 0+00 Stream Survey Data Cemetery Branch Cross - Section 1 - Pool Station I + 04.27 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 Station (feet) As -built 12/6/2010 MY16/13/2011 --dr-- MY2 12/12/2012 - - --Bkf Dye Branch I1 Final D -1 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 Appendix D Stream Survey Data Cemetery Branch — Cross - Section 1 — Pool Left Bank Descending Monitoring Year 2 — December 12, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Cemetery Branch — Cross - Section 1 — Pool Right Bank Descending Monitoring Year 2 — December 12, 2012 D -2 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D Stream Survey Data Cemetery Branch — Cross - Section 1 — Pool Downstream Monitoring Year 2 — December 12, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Cemetery Branch — Cross - Section 1 — Pool Upstream Monitoring Year 2 — December 12, 2012 D -3 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D 830 829 828 a� w C 0 827 6� W 826 825 824 0+00 Stream Survey Data Cemetery Branch Cross - Section 2 - Riffle Station 6 + 40.40 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 Station (feet) As -built 12/6/2010 MY 16/13/2011 --*-- MY2 12/12/2012 - -- Bkf 0 +35 Dye Branch II Final D -4 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 Appendix D Stream Survey Data Cemetery Branch — Cross - Section 2 — Riffle Left Bank Descending Monitoring Year 2 — December 12, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Cemetery Branch — Cross - Section 2 — Riffle Right Bank Descending Monitoring Year 2 — December 12, 2012 D -5 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D Stream Survey Data Cemetery Branch — Cross - Section 2 — Riffle Downstream Monitoring Year 2 — December 12, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Cemetery Branch — Cross - Section 2 — Riffle Upstream Monitoring Year 2 — December 12, 2012 D -6 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D 825 824 823 w w c 0 822 w c� W 821 820 819 0 +00 Stream Survey Data Cemetery Branch Cross - Section 3 - Riffle Station 8 + 77.10 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 Station (feet) As -built 12/6/2010 MY1 6/13/2011 f MY2 7/25/2012 - - -- Bkf Dye Branch II Final D -7 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 Appendix D Stream Survey Data Cemetery Branch — Cross - Section 3 — Riffle Left Bank Descending Monitoring Year 2 — July 25, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Cemetery Branch — Cross - Section 3 — Riffle Right Bank Descending Monitoring Year 2 — July 25, 2012 D -8 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D Stream Survey Data Cemetery Branch — Cross - Section 3 — Riffle Downstream Monitoring Year 2 — July 25, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Cemetery Branch — Cross - Section 3 — Riffle Upstream Monitoring Year 2 — July 25, 2012 D -9 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D 829 828 827 826 w 825 0 0 > 824 d W 823 822 821 Stream Survey Data Dye Branch - Upstream Cross - Section 4 - Riffle Station 1 + 15.75 820 1 I I f I -i i ' - i I I F- ----I 0 +00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0 +45 0+50 0+55 0+60 0+65 0 +70 Station (feet) As -built 5/10/2011 MY1 6/13/2011 _*— MY2 7/25/2012 - -- Bkf Dye Branch 11 Final D -10 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 Appendix D Stream Survey Data Dye Branch Upstream Reach — Cross - Section 4 — Riffle Left Bank Descending Monitoring Year 2 — July 25, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Upstream Reach — Cross - Section 4 — Riffle Right Bank Descending Monitoring Year 2 — July 25, 2012 D -11 Equinox Environmental Consultation and Design, Inc. November 2012 1 1 1 Appendix D Stream Survey Data Dye Branch Upstream Reach — Cross - Section 4 — Riffle Downstream Monitoring Year 2 — July 25, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Upstream Reach — Cross - Section 4 — Riffle Upstream Monitoring Year 2 — July 25, 2012 D -12 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D 822 821 820 819 a� w 818 c 0 a 817 a� W 816 815 814 813 0+00 Stream Survey Data Dye Branch - Upstream Cross - Section 5 - Pool Station 7 + 74.58 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0 +45 Station (feet) As -built 5/11/2011 MY16/14/2011 —*— MY2 7/25/2012 - - -- Bkf 0 +50 Dye Branch II Final D -13 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 Appendix D Stream Survey Data Dye Branch Upstream Reach — Cross - Section 5 — Pool Left Bank Descending Monitoring Year 2 — July 25, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Upstream Reach — Cross - Section 5 — Pool Right Bank Descending Monitoring Year 2 — July 25, 2012 D -14 Equinox Environmental Consultation and Design, Inc. November 2012 1 1 1 1 Appendix D Stream Survey Data Dye Branch Upstream Reach — Cross - Section 5 — Pool Downstream Monitoring Year 2 — July 25, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Upstream Reach — Cross - Section 5 — Pool Upstream Monitoring Year 2 — July 25, 2012 D -15 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D 821 820 819 818 817 a� 816 C O 815 W 814 813 812 811 Stream Survey Data Dye Branch - Upstream Cross - Section 6 - Riffle Station 10 + 75.57 810 ii Ii i i I I I i I i i '� ' 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0 +45 0+50 0+55 0+60 0+65 0 +70 0 +75 0 +80 0 +85 Station (feet) As -built 12/6/2010 MY16/14/2011 --*-- MY2 7/25/2012 - -- Bkf Dye Branch II Final D -16 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 Appendix D Stream Survey Data Dye Branch Upstream Reach — Cross - Section 6 — Riffle Left Bank Descending Monitoring Year 2 — July 25, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Upstream Reach — Cross - Section 6 — Riffle Right Bank Descending Monitoring Year 2 — July 25, 2012 D -17 Equinox Environmental Consultation and Design, Inc. November 2012 1 1 1 1 Appendix D Stream Survey Data Dye Branch Upstream Reach — Cross - Section 6 — Riffle Downstream Monitoring Year 2 — July 25, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Upstream Reach — Cross - Section 6 — Riffle Upstream Monitoring Year 2 — July 25, 2012 D -18 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D 819 818 817 816 a� 815 w C g 814 w es as W 813 812 811 810 Stream Survey Data Dye Branch - Upstream Cross - Section 7 - Riffle Station 13+ 85.87 809 1 i i i i I I ii —i ' ' i —___4 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0 +45 0+50 0+55 0+60 0+65 0 +70 Station (feet) As -built 12/6/2010 MVO 6/14/2011 } MV2 7/26/2012 Dye Branch 11 Final D -19 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 Appendix D Stream Survey Data Dye Branch Upstream Reach — Cross - Section 7 — Riffle Left Bank Descending Monitoring Year 2 — July 25, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Upstream Reach — Cross - Section 7 — Riffle Right Bank Descending Monitoring Year 2 — July 25, 2012 D -20 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D Stream Survey Data Dye Branch Upstream Reach — Cross - Section 7 — Riffle Downstream Monitoring Year 2 — July 25, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Upstream Reach — Cross - Section 7 — Riffle Upstream Monitoring Year 2 — July 25, 2012 D -21 Equinox Environmental Consultation and Design, Inc. November 2012 M M M M M M M M M M M M r M M M M M M Appendix D 815 814 813 812 +^� 811 a� w c 0 810 w a� W 809 808 807 806 Stream Survey Data Dye Branch - Downstream Cross - Section 8 - Riffle Station 17 + 27.43 805 ; I f I i i ii I I i i i i i 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0 +45 0+50 0+55 0+60 0+65 0 +70 0 +75 0 +80 0 +85 Station (feet) As -built 12/6/2010 MY1 6/14/2011 - - -- Bkf f MY2 8/1/2012 Dye Branch II Final D -22 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 Appendix D Stream Survey Data Dye Branch Downstream Reach — Cross - Section 8 — Riffle Left Bank Descending Monitoring Year 2 — August 1, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Downstream Reach — Cross - Section 8 — Riffle Right Bank Descending Monitoring Year 2 — August 1, 2012 D -23 Equinox Environmental Consultation and Design, Inc. November 2012 i 1 1 1 1 Appendix D Stream Survey Data Dye Branch Downstream Reach — Cross - Section 8 — Riffle Downstream Monitoring Year 2 — August 1, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Downstream Reach — Cross - Section 8 — Riffle Upstream Monitoring Year 2 — August 1, 2012 D -24 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D 812 811 810 809 808 as 807 0 0 806 a� W 805 804 803 802 801 0+00 Stream Survey Data Dye Branch - Downstream Cross - Section 9 - Pool Station 19 + 80.80 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0+45 0+50 0+55 0+60 0+65 Station (feet) As -built 12/6/2010 MY1 6/14/2011 - - -- Bkf --*—MY278 /1/2012 Dye Branch 11 Final D -25 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 1 1 1 1 1 1 1 1 1 Appendix D Stream Survey Data Dye Branch Downstream Reach — Cross - Section 9 — Pool Left Bank Descending Monitoring Year 2 — August 1, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Downstream Reach — Cross - Section 9 — Pool Right Bank Descending Monitoring Year 2 — August 1, 2012 D -26 Equinox Environmental Consultation and Design, Inc. November 2012 1 1 1 1 1 1 1 i 1 1 1 1 Appendix D Stream Survey Data Dye Branch Downstream Reach — Cross - Section 9 — Pool Downstream Monitoring Year 2 — August 1, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Downstream Reach — Cross - Section 9 — Pool Upstream Monitoring Year 2 — August 1, 2012 D -27 Equinox Environmental Consultation and Design, Inc. November 2012 M M M M M M M M M M M M M M M r M M M Appendix D 810 809 808 807 806 805 a� 0 804 0 w 803 W 802 801 800 799 798 797 0+00 Stream Survey Data Dye Branch - Downstream Cross - Section 10 - Riffle Station 24 + 85.22 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0 +45 0+50 0+55 0+60 Station (feet) As -built 12/6/2010 MY1 6/14/2011 —dr,-MY2 8/1/2012 Dye Branch I1 Final D -28 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 Appendix D Stream Survey Data Dye Branch Downstream Reach — Cross - Section 10 — Riffle Left Bank Descending Monitoring Year 2 — August 1, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Downstream Reach — Cross - Section 10 — Riffle Right Bank Descending Monitoring Year 2 — August 1, 2012 D -29 Equinox Environmental Consultation and Design, Inc. November 2012 1 1 1 1 1 1 1 1 1 Appendix D Stream Survey Data Dye Branch Downstream Reach — Cross - Section 10 — Riffle Downstream Monitoring Year 2 — August 1, 2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 Dye Branch Downstream Reach — Cross - Section 10 — Riffle Upstream Monitoring Year 2 — August 1, 2012 D -30 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D 840 839 838 837 836 835 834 833 832 831 830 ^. 829 a 828 0 827 w 826 825 824 823 822 821 820 819 818 817 816 815 Stream Survey Data Cemetary Branch Longitudinal Profile 0 +00 to 9 +89.93 19,019 Dye Branch 11 Final Project No. 92255 Monitoring Year 2 of 5 r� 0 IN0 1%0 %a 1%0 r/, -'-&19 im Station (feet) TW- MY012/6/2010 TW -MY1 6/13/2011 - TW -MY2 12/12/2012 WS • BKF o Structure D -31 -0-00 [a Equinox Environmental Consultation and Design, Inc. November 2012 XS1 Misse, • Vegetation - - - - -- - • Shot Due - _ ' ' - -- • -P Average Ban ull Slope 71 - m"-- XS2 - R - - - - -- - • X -R 4 _ 19,019 Dye Branch 11 Final Project No. 92255 Monitoring Year 2 of 5 r� 0 IN0 1%0 %a 1%0 r/, -'-&19 im Station (feet) TW- MY012/6/2010 TW -MY1 6/13/2011 - TW -MY2 12/12/2012 WS • BKF o Structure D -31 -0-00 [a Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D 826 825 824 823 822 821 820 819 818 w c 817 816 W 815 814 813 812 811 810 809 808 Stream Survey Data Dye Branch - Upstream Longitudinal Profile 0 +30.36 to 15 +03.3 *190 8 �o �o �o 'bo 'bo Station (feet) TW- MY012/6/2010 TW MY16 /14/2011 TW -MY2 7/25/2012 WS • BKF 0 Structure Dye Branch II Final D -32 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 • - Average I gankfuR Slop,, • • • • "M S ------- N-- • XS5 -P ------ - - - - -- V ' XS6- XS7 -R *190 8 �o �o �o 'bo 'bo Station (feet) TW- MY012/6/2010 TW MY16 /14/2011 TW -MY2 7/25/2012 WS • BKF 0 Structure Dye Branch II Final D -32 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 Appendix D 810 809 808 807 806 805 y J! 804 C O y 803 W w 802 801 800 799 798 797 16. X19 Stream Survey Data Dye Branch - Downstream Longitudinal Profile 16 +52.72 to 25 +34.71 l>X&o r�o 190 0 2ro 1jX-to ap Xo Station (feet) TW MY012 /6/2010 TW- MY16/15/2011 - TW MY2 8/1/2012 WS • BKF C Structure -2 o �s �o Dye Branch I1 Final D -33 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 • 1„ 1 -- ---- -- --" - -- I Average Bankful. Slope -- - - - - -- • XS8 - R 'r _ I I VV 1 1 • XS9 - P ----- - - - • - -- V1- - - - - - -- - • 1 _ _ I 1 1 1 XS10 -R l>X&o r�o 190 0 2ro 1jX-to ap Xo Station (feet) TW MY012 /6/2010 TW- MY16/15/2011 - TW MY2 8/1/2012 WS • BKF C Structure -2 o �s �o Dye Branch I1 Final D -33 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5 Appendix D Stream Survey Data t ye rant / jest No. 922�5'S C MEN, ranch - Cross- Section 1 - 00 If Count , ummary D50 Mo ormg Year 2 Description Material Size (mm) Total # Item % Cum % Silt /Clay sdUclay 0 062 0 0% 0% Sand very fine sand 0 125 0 0% 0% fine sand 025 0 0% 0% medium sand 050 0 0% 0% coarse sand 100 0 0% 0° /U very coarse sand 200 39 39% 39% Gravel very fine gravel 40 6 6% 45% fine gravel 57 11 11% 56% fine gravel 80 8 8% 64% medium gravel 113 6 6% 70% medium gravel 160 13 13% 83% coarse gravel 223 13 13% 96% coarse gravel 32 3 3% 99% very coarse gravel 45 1 1% 1000/0 very coarse gravel 64 0 0% 100% Cobble small cobble 90 0 0% 100% medium cobble 128 0 0% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 100% Boulder small boulder 362 0 0% 1000/0 small boulder 512 0 0% 1000/0 medium boulder 1024 0 0% 100% large boulder 2048 0 0% 1000/0 very lar a boulder 4096 0 0% 1000/0 Bedrock bedrock >4096 0 0% 100% TOTALS 100 100% 100% S ar►y Da>�a D50 48 D84 16 D95 21 Dye Branch II Final ProjectNo 92255 Monitoring Year 2 of 5 D -34 Equinox Environmental Consultation and Design, Inc November 2012 LJ F1 Appendix D Stream Survey Data ' Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D -35 Equinox Environmental Consultation and Design, Inc. November 2012 Cemetery Branch Pebble Count - Percent Cumulative Cross Section 1 -Pool 100% 90% 80% C W Z F' 70% e 60% G. G d a 40% > 30% E 0 U 20% 10% 0% O O d LO Particle Size (mm) MY16/13/2011 — MY27/26/2012 Cemetery Branch Pebble Count - Percent Individual Cross Section 1 -Pool 45% 40% - — 35% 30 0 9 25% 20% a? u 15% a 10% 5% 0% O O N 9 m Particle Size (mm) ■ MY1 6/13/2011 ■ MY2 7/26/2012 ' Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D -35 Equinox Environmental Consultation and Design, Inc. November 2012 0 Appendix D Stream Survey Data Dye >Ganch / jec o. 2�ls55 C•eme>le Bra -h - • ss- Seotio 2 - e P IF Couet Summmy D50 Monitoring Year 2 Description Material Size (mm) Total # Item % Cum % Silt /Clay silt/clay 0 062 0 0% 0% Sand very fine sand 0 125 0 0% 00/0 fine sand 025 0 0% 0% medium sand 050 0 0% 0% coarse sand 100 0 0% 00/0 very coarse sand 200 17 17% 17% Gravel very fine gravel 40 5 5% 22% fine gravel 57 4 4% 26% fine gravel 80 10 10% 36% medium gavel 113 3 3% 39% medium gravel 160 16 16% 55% coarse gravel 223 25 25% 80% coarse gravel 32 5 5% 85% very coarse gravel 45 3 3% 88% very coarse gravel 64 5 5% 93% Cobble small cobble 90 1 1% 94% medium cobble 128 1 1% 95% large cobble 180 4 4% 99% very large cobble 256 1 1% 1000/0 Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 100 100% 100% Summary D�a� D50 14 D84 30 D95 130 Dye Branch II Final D -36 Equinox Environmental Consultation and Design, Inc Project No 92255 November 2012 Monitoring Year 2 of 5 Appendix D Stream Survey Data ' Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D -37 Equinox Environmental Consultation and Design, Inc. November 2012 Cemetery Branch Pebble Count - Percent Cumulative Cross Section 2 - Riffle 100% 90% 80% L F' 70% 60% is C d 50 Q a 40% i 30% E U 20% 10% N h V✓ VI r. N Y b 00 N Vi K X G �D N N C .. � ry M � .O T S N• N R S G Y � Y T 0% Particle Size (mm) MY1 6/13/2011 —MY2 7/26/2012 Cemetery Branch Pebble Count - Percent Individual Cross Section 2 - Riffle L 45% ! 40 % 35% I 30 0 9 25 c 20% u 15% a 10% 5% o% O N !r 9 O O m Particle Size (mm) ■ MY1 6/13/2011 E MY2 7/26/2012 ' Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D -37 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D Stream Survey Data � y ranch / ;ject o. 92155 Us! eme ry RHOW - C3ross -Se -tio 3 - e , btde Comet Summary D50 Monitonng Year 2 Description Material Size (mm) Total # Item % Cum % Silt /Clay sift/clay sift/clay 0 062 0 0% 0% Sand very fine sand 0 125 0 0% 0% fine sand 025 0 0% 0% mednun sand 050 0 0% 0% coarse sand '100 7 7% 7% very coarse sand 200 28 28% 35% Gravel very fine aravel 40 7 7% 42% fine gravel 5 7 15 15% 57% fine gravel 80 10 10% 67% medium gravel 113 11 11% 78% medium grav8l 160 12 12% 90% coarse gravel 223 3 3% 93% coarse gravel 32 2 2% 95% very coarse gravel 45 1 1% 96% very coarse gravel 64 2 2% 98% Cobble small cobble 90 1 1% 99% medium cobble 128 1 1% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 100% Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 100 100% 100% �ff Summary Data D50 5 D84 13 D95 32 Dye Branch 1I Final Project No 92255 Monitoring Year 2 of 5 D -38 Equinox Environmental Consultation and Design, Inc November 2012 1 Appendix D I Stream Survey Data ' Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D -39 Equinox Environmental Consultation and Design, Inc. November 2012 Cemetery Branch Pebble Count - Percent Cumulative Cross Section 3 - Riffle 100 90 i 80 C Z E 70% c 60 u 50 i 40% > 30% E 0 U 20 10% I 0 N If1 In 1f! .•� O N N O O � C N R b OD b N N Y O O � O O N N .. .•. N � 7 `O O N o0 !, .O .. � .•. N M h e� OD O X N O O• V O O O O CG Particle Sue (mm) MY16/13/2011 ---MY27/26/2012 Cemetery Branch Pebble Count - Percent Individual Cross Section 3 - Riffle 45 40 35% 30% m 0 ;o 25% a 20 V 15% a 10% �16 5% ME 11 Q0 N N kn W� O N N N V O O O O N N_ N V w 'O Y N R T V 0% M en h O O O C CC Particle Size (mm) ■MY16 /13/2011 ■MY27/26/2012 ' Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D -39 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D Stream Survey Data Dye rant / jec o. 9 +255 4 Dye Branch - tream - Cross- Section 4 - lisle P WHE CKount Summary D50 Monitormg Year 1 Description Material Size (mm) Total # Item % Cum % Silt/Clay silt/clay 0 062 0 0% 00/0 Sand very fine sand 0 125 8 8% 8% fine sand 025 16 16% 24% medium sand 050 10 10% 34% coarse sand 100 6 6% 40% very coarse sand 200 39 39% 79% Gravel very fine gravel 40 10 10% 89% fine gravel 57 8 8% 97% fine gravel 80 1 1% 98% medium gravel 113 0 0% 98% medium gravel 160 0 0% 98% coarse gravel 223 0 0% 98% coarse Eavel 32 0 0% 98% very coarse gravel 45 0 0% 98% very coarse avel 64 1 1% 99% Cobble small cobble 90 0 0% 99% medium cobble 128 0 0% 99% large cobble 180 1 1% 100% very large cobble 256 0 0% 100% Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 100 100% 100% Summary Data D50 12 D84 28 D95 54 Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 D -40 Equinox Environmental Consultation and Design, Inc November 2012 1 Appendix D L� J Stream Survey Data ' Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 1 D41 Equinox Environmental Consultation and Design, Inc. November 2012 Dye Branch - Upstream Pebble Count - Percent Cumulative Cross Section 4 - Riffle - 100 i 90 80 e w r F' 70% c I 60 c a 50% i 40% > a U 20 10% O N 0% v O O O O Ci O d m Particle Size (mm) MY16/13/2011 tMY27/26/2012 Dye Branch - Upstream Pebble Count - Percent Individual Cross Section 4 - Riffle 45 40 35% 30 :E 25 c e I 20% u � 15% d 10% 5% 0% N h In VI w. N 7 b X O 00 O O N N 00 10 Y m Particle Size (mm) ■ MY1 6/13/2011 ■ MY2 7/26/2012 ' Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 1 D41 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D Stream Survey Data ► yo ralnoh / ; ct o. 92+255 ► y 1� � - - C�rnss Sec>fa 5 - ool D50 Mo onng Year 2 Description Material Size (mm) Total # Item % Cum % Silt /Clay sflUclay 0 062 8 8% 8% Sand very fine sand 0 125 5 5% 13% fine sand 025 1 1% 14% mednxm sand 050 2 2% 16% coarse sand 100 4 4% 20% very coarse sand 200 38 38% 58% Gravel very fine gravel 40 3 3% 61% fine gravel 57 9 9% 70% fine gavel 80 8 8% 78% medium,gravel 113 6 6% 84% medium gravel 160 4 4% 88% coarse gravel 223 1 1% 89% coarse gravel 32 1 1% 90% very coarse gravel 45 1 1% 91% very coarse gravel 64 1 1% 92% Cobble small cobble 90 4 4% 96% medium cobble 128 4 4% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 100% Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 100 1000/0 100% Summary Data D50 17 D84 11 D95 83 Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 D-42 Equinox Environmental Consultation and Design, Inc November 2012 I--, F 1 1 1 Appendix D Stream Survey Data Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D-43 Equinox Environmental Consultation and Design, Inc. November 2012 Dye Branch - Upstream Pebble Count - Percent Cumulative Cross Section 5 - Pool i 00% 90% 80% °w F' 70% L e 60% W e d 50% u a 40% i I m 30% E U 20 10% r- -r 0 O 9 v m Particle Size (mm) MY16/14/2011 -,*—MY27/26/2012 Dye Branch - Upstream Pebble Count - Percent Individual Cross Section 5 - Pool 45% 40% 35% 30% m e 25% b 20 V L 15% d 10% 5% N -n to h ... 00 `O N N h ' O 00 O I O� N 00 O N N R 00 h 10 10 a, Y V 0% O N R O O 9 CC Particle Size (mm) ■ MY1 6/14/2011 ■ MY2 7/26/2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D-43 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D Stream Survey Data Dye reach Project No. 255 D e Branch - pstream - Gross -Sectio 6 - Rule ebble Count Summary D50 Mo onng Year 2 Description Material Size (mm) Total # Item % Cum % Silt /Clay sdUclay 0 062 0 0% 0% Sand very fine sand 0 125 0 0% 0% fine sand 025 0 0% 0% mednun sand 050 4 4% 4% coarse sand 100 8 8% 12% very coarse sand 200 21 21% 33% Gravel very fine gavel 40 13 13% 46% fine gravel 57 14 14% 60% fine gravel 80 4 4% 64% medium gravel 113 10 100/0 74% medium gravel 160 9 9% 83% coarse gravel 223 5 5% 88% coarse gravel 32 3 3% 91% very coarse gavel 45 5 5% 96% very coarse gavel 64 1 1% 97% Cobble small cobble 90 1 1% 98% mednun cobble 128 0 0% 98% large cobble 180 1 1% 99% very large cobble 256 1 1% 100% Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 1 0% 1000/0 large boulder 2048 0 0% 1000/0 very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 1000/0 TOTALS I 1 100 100% 100% Suma►ary Data D50 45 D84 17 D95 42 Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 D-44 Equinox Environmental Consultation and Design, Inc November 2012 t n Appendix D Stream Survey Data ' Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D45 Equinox Environmental Consultation and Design, Inc. November 2012 Dye Branch - Upstream Pebble Count - Percent Cumulative Cross Section 6 -Riffle - 100 90% 80% e m t F' 70% e 60 e d 50% i 40% > 30% E U 20% 10% 0% d m Particle Size (mm) - MY16/14/2011 -gh—MY27/26/2012 Dye Branch - Upstream Pebble Count - Percent Individual Cross Section 6 - Riffle 45% 40% 35% 30 25 20% c u 15% i 10% 5% 0% N V1 VI 1f1 ..n ry Q 10 OD O N N h Q O W O b N N Q d7 a Y O N Q O O V Oi Particle Size (mm) • MY1 6/14/2011 ■ MY2 7/26/2012 ' Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D45 Equinox Environmental Consultation and Design, Inc. November 2012 n Appendix D Stream Survey Data Dy rich l / jest o. 255 Dye Bra -h � ps am - C�'ross • ection 7 - ' piffle e e C•ouat Summary D50 Monrtonn Year 2 Description Material Size (mm) Total # Item % Cum Silt /Clay sift/clay 0 062 0 0% 0% Sand very fine sand 0 125 0 0% 0% fine sand 025 0 0% 0% medium sand 050 3 3% 3% coarse sand 100 4 4% 7% very coarse sand 200 10 100/0 17% Gravel very fine aravel 40 9 9% 26% fine gravel 57 14 14% 40% fine gravel 80 10 10% 50% medium gravel 113 16 16% 66% mednim gravel 160 18 18% 84% coarse gravel 223 11 11% 95% coarse gravel 32 4 4% 99% very coarse gravel 45 1 1% 1000/0 very coarse aravel 64 0 0% 1000/0 Cobble small cobble 90 0 0% 100 ° /a medium cobble 128 0 0% 1000/0 large cobble 180 0 0% 1000/0 very large cobble 256 0 0% 100% Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 100 1000/0 100% Sammary Data D50 8 D84 16 D95 22 Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 D-46 Equinox Environmental Consultation and Design, Inc November 2012 1 Appendix D 1 Stream Survey Data ' Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 1 D47 Equinox Environmental Consultation and Design, Inc. November 2012 Dye Branch - Upstream Pebble Count - Percent Cumulative Cross Section 7 - Riffle Jr 100 90 80% c L E' 70% C W/6 C d 50% i 40% > 30% E e U 20 10% P 0% N Q O O 9 Y 6i Particle Size (mm) MY1 6 /14/2011 —MY2 7/26/2012 Dye Branch - Upstream Pebble Count - Percent Individual Cross Section 7 -Riffle 45% 40% 35% 30% a t 25 a 20% u 15% i 10% 4 5% � 0% m Particle Size (mm) ■ MY1 6/14/2011 ■ MY2 7/26/2012 ' Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 1 D47 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D Stream Survey Data � ye h II /Pro' ct o. X55 Dye ranch - ►owns am - C s - Secfion 8 - e bole Count eurnnary D50 Monitonng Year 2 Description Material Size (mm) Total # Item % Cum % Silt/Clay sdUclay 0 062 0 0% 0% Sand very fine sand 0 125 0 0% 0% fine sand 025 0 0% 0% medium sand 050 27 27% 27% coarse sand 100 18 18% 45% very coarse sand 200 30 30% 75% Gravel very fine gavel 40 10 10 °/U 85% fine gave l 57 5 5% 90% fine gravel 80 5 5% 95% medium gravel 113 4 4% 99% medium gravel 160 0 0% 99% coarse gravel 223 1 1% 1000/0 coarse gravel 32 0 0% 100% very coarse gravel 45 0 0% 1000/0 very coarse juavel 64 0 0% 1000/0 Cobble small cobble 90 0 0% 100% medium cobble 128 0 0% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 1000/0 Boulder small boulder 362 0 0% 100 ° /a small boulder 512 0 0% 100 ° /a medium boulder 1024 0 0% 1000/0 large boulder 2048 0 0% 1000/. very larize boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 1000/. TOTALS 1 100 1000/. 100% Summary Data D50 1 1 D84 37 D95 8 Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 D-48 Equinox Environmental Consultation and Design, Inc November 2012 C Appendix D Stream Survey Data Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D-49 Equinox Environmental Consultation and Design, Inc. November 2012 Dye Branch - Downstream Pebble Count - Percent Cumulative Cross Section 8 - Riffle 100 90 80 ca r 70 60% Lr c a 50% i a 40% i i a 30% E 0 At U 20 i 10% 0% O O N rn VI O O O O O d 00 Particle Size (mm) MY1 3/2/2011 —MY2 7/26/2012 Dye Branch - Downstream Pebble Count - Percent Individual Cross Section 8 - Riffle 45 40 35 .30% a 9 25 C 20 V 15% a 10% 5% 0% N Ln W1 W1 n.i N `G 00 = 10 N N V) ? O 00 O `D N N `O N N ... N M `G O. N h `O V 00 N 7 10 Y O� U t O -: O O .� .+ N In VI O O N O O 7 O O p m Particle Size (mm) ■MY16 /14/2011 ■MY27/26/2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D-49 Equinox Environmental Consultation and Design, Inc. November 2012 1 1 Stream Survey Data ye ranch / Project o. 92+255 Dy Bra ch - ownstrearo - 6w -Section - 0101 Co t Summary I, D50 Monitonng Year 2 Description Material Size (mm) Total # Item % Cum % Silt /Clay sdUclay 0 062 1 1% 1% Sand very fine sand 0 125 0 0% 1% fine sand 025 0 0% 1% medium sand 050 0 0% 1% coarse sand 100 0 0% 1% very coarse sand 200 21 21% 22% Gravel very fine aravel 40 10 10% 32% fine gravel 57 15 15% 47% fine gravel 80 15 15% 62% medttum gravel 113 12 12% 74% medium gravel 160 13 13% 87% coarse gravel 223 7 7% 94% coarse gravel 32 4 4% 98% very coarse gravel 45 2 2% 100% very coarse gravel 64 0 0% 100% Cobble small cobble 90 0 0% 100% medium cobble 128 0 0% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 100% Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very larize boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 100 100% 100% MOKSM-011 Data D50 64 D84 15 D95 24 Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 D -50 Equinox Environmental Consultation and Design, Inc November 2012 1 Appendix D Stream Survey Data Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D -51 Equinox Environmental Consultation and Design, Inc. November 2012 Dye Branch - Downstream Pebble Count - Percent Cumulative Cross Section 9 - Pool 100% 90% 80% e m r P 70% c 60% Ga e d 50% i � u a 40% i a J 30 0 U 20% 10% N h h 1/1 N �tC iD �O N N 1f� Q O O b N N Q O Y 0% d CC Particle Size (mm) MY16/14/2011 tMY27/26/2012 Dye Branch - Downstream Pebble Count - Percent Individual Cross Section 9 - Pool 45% 40% 35% 30% m i ;o 25% v 20% 6 V 15% a 10% 5% 0% CO Particle Size (mm) ■ MY1 6/14/2011 ■ MY2 7/26/2012 Dye Branch II Final Project No. 92255 Monitoring Year 2 of 5 D -51 Equinox Environmental Consultation and Design, Inc. November 2012 Appendix D 1 1 1 1 1 1 1 1 1 1 1 1 Stream Survey Data I ' a 255 Dye B h 10,0 - IS ecti 0 e e Co Smnma>ty D50 Monitoring Year 2 Description Material Size (mm) Total # Item % Cum % Silt /Clay sdUclay 0 062 8 8% 8% Sand very fine sand 0 125 9 9% 17% fine sand 025 4 4% 21% medium sand 050 16 16% 37% coarse sand 100 16 16% 53% very coarse sand 200 35 35% 88% Gravel very fine gravel 40 4 4% 92% fine gravel 57 2 2% 94% fine gravel 80 2 2% 96% medium gravel 113 2 2% 98% medium gavel 160 1 1% 99% coarse gravel 223 1 1% 100% coarse gravel 32 0 0% 100% very coarse gavel 45 0 0% 100% very coarse gravel 64 0 0% 100% Cobble small cobble 90 0 0% 100% medium cobble 128 0 0% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 1000/0 Boulder small boulder 362 0 0% 1000/0 small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 1000/0 Bedrock bedrock >4096 0 0% 100% TOTALS 1 100 1000/0 100 0/. Summate Data D50 088 D84 1 8 D95 69 Dye Branch 11 Final Project No 92255 Momtonng Year 2 of 5 D -52 Equinox Environmental Consultation and Design, Inc November 2012 1 U' 1 1 n 1 1 Appendix D Stream Survey Data Dye Branch - Downstream Pebble Count - Percent Cumulative Cross Section 10 - Riffle 100 90 80 e m A F' 70% c 60 c u 50 u a 40% i 30% E 0 U 20 10% 0% N Q O O 7 V m Particle Size (mm) MYI 6/14/2011 —MY2 7/26/2012 Dye Branch - Downstream Pebble Count - Percent Individual Cross Section 10 - Riffle 45 40 35% 30% m 0 t 25 20% e u V d 15% a 10% _5% 0% N V1 1n h — N Y `O W `O N N N R O 00 O 10 N N ... .-� N M1 `O O� N DD �O N N_ -V OD kn 'O Y O .� O .� .�. O N M V7 O O N O O O O 7 da Particle Size (mm) • MY1 6/14/2011 ■ MY2 7/26/2012 Dye Branch Ii Final Project No. 92255 Monitoring Year 2 of 5 D -53 Equinox Environmental Consultation and Design, Inc. November 2012 it r r r r r r r r r r r r �r r r r r r Appendix D Stream Survey Data Table 10a. Baseline Stream Date Summery D e Branch II / Piro ct No. 92255 - Ceme_te . B_ranch 9�7i7 feet Parameter Regional Curve Pre - Existing Condition Reference Reach Data Design Monitoring Baseline Dimension &TS.uLsirate - Rrfil� M LUL,+ LF4� Min Man Me'd L� SD @a MOO MW Me'd IM-7 SD ®Nj Lfffiffl M_an IMS IMO Wan Md� jl 1 S "N� Bankfull Width (ft) - 70 70 70 70 N/A 1 89 11 1 113 141 1 8 7 100 55 72 72 89 N/A 2 Floodprone Width (ft) — i 14 2 142 142 142 N/A 1 190 540 360 1000 381 5 280 >30 >30 >30 >30 N/A 2 Bankfull Mean Depth (ft) 10 10 10 10 N/A 1 07 09 08 16 03 7 07 05 07 07 08 N/A 2 Bankfull Max Depth (ft) M _ M 1 5 1 5 1 5 1 5 N/A I 1 0 1 5 13 24 05 7 08 1 1 1 6 1 0 1 2 1 2 1 4 N/A 2 Bankfull Cross Sectional Area (ft Z) - 68 68 68 68 N/A 1 68 96 84 184 39 7 - 70 30 50 50 70 N/A 2 Width/Depth Ratio _—= 72 72 72 72 1 N/A I 1 1 69 1 1121 1171 1501 NA 3 1 1 143 1 1 103 1 1081 1081 112 N/A 2 Entrenchment Ratio MIMIMI 20 20 20 20 1 N/A 1 1 3 8 1 68 1 77 89 1 NA 3 1 2 8 1 1 >3 41 >4 4 1 >4 4 1 >5 4 N/A 2 Bank Height Ratio 1 5 1 5 1 5 15 N/A 1 10 1 1 10 12 1 NA 3 1 0 10 10 10 1 1 0 1 1 0 1 0 N/A 2 Profile Riffle Length (ft) r - 6 8 23 4 53 9 14 84 l4 Riffle Slope (ft /ft) _ 0 012 0 034 0 088 0 006 0 027 0 026 0 052 0 016 6 - 0 048 - 000410023 0 049 001 14 Pool Length (ft)—__ 47 82 119 35 193 196 328 115 6 138 207 276 58 162 F36 391 717 24 Pool Max Depth (ft)i_� - 26 18 26 29 32 05 7 - 20 - 18 30 37 048 18 Pool Spacing (ft) _ — r 228 860 2282 180 527 402 14081 41 7 7 184 27_6 322 45 38 7 1 11 0 2440 24 Patte Channel Belt Width (ft) r — — 53 108 226 260 49 l 400 1190 29 8 9 230 322 414 113 306 370 467 123 16 Radius of Curvature (ft) _-- 3 9 196 370 50 23 8 220 480 146 9 184 276 368 83 13 7 120 299 5 7 16 Rc Bankfull Width (ft /ft) MIMI 06 28 53 06 2 1 1 8 43 1 3 9 1 8 2 8 3 7 24 24 24 24 N/A I Meander Wavelength (ft) MIMIMI 136 420 7 1 0 260 729 690 1550 476 9 460 552 644 38 8 774 791 1670 36 1 11 Meander Width Ratio 08 75 32 25 47 36 101 27 7 23 32 41 49 66 66 82 N/A 2 Tt !r>inepert Parameters Reach Shear Stress (Competency) lb /ft'` Max Part Size (mm) Mobilized at Bankfull 45-180 Stream Power (Transport Capacity) W /m'- — %ditioaal Reach Parameten+ Rosgen Classification ® E4 E4 / C4 / C5 C4 C Bankfull Velocity (fps) 66-78 4 1- 7 0 55-67 Bankfull Discharge (cfs) 443-528 350- 128 1 384-466 Valley Length (ft) IMIMIM - - Channel Thalweg Length (ft) ® - - - 977 Sinuosity 1 14 1 15-222 1 14 1 08 Water Surface Slope (ft /ft) 00190 0 0057 - 0 0130 00190 - Bankfull Slope (ft /ft) ® - - 00191 Bankfull Floodplam Area (acres) % of Reach with Eroding Banks Channel Stability or Habitat M etnc Biological or Other - miormauon unavaiiaoie N/A - Item does not app 1 on -A cable Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 D -54 Equinox Environmental Consultation and Design, Inc November 2012 Appendix D Stream Survey Data Tetile Oa. Ba�ehne Stream Data Summary _ Branch D /Pro tict o_. 9_2255 - D e Branch- t trleant Il 4 5 feet Regional Curve Pre - Existing Condition Reference Reach Data Design Parameter Ur to Ostin Creek Monitoring Baseline Dimeasion &TS ubstrate - F flI� L L ILEM - in 1Nwan Med IM1 SAD ONA Min Mean 11'1eed Mu SD I N� Mio 1' a (IYIu"'3 Min Mean ' ed (1Nu] SD (N� Bankfull Width (ft) 112 160 185 206 - 20 1 - 257 284 269 327 N/A 3 Floodprone Width (ft) _ _ _ 895 672 702 728 709 769 88 8 544 649 586 818 N/A 3 Bankfull Mean Depth (ft) 16 16 16 17 15 11 13 13 14 N/A 3 Bankfull Max Depth (ft)—_— 28 15 19 24 15 18 22 22 28 25 36 N/A 3 Bankfull Cross Sect tonal Area (ft') 18 1 202 197 229 NA 3 274 303 334 31 0 295 363 325 469 N/A 3 Width/Depth Ratio —__ 62 1 70 1 70 1 79 1 NA 1 3 1 93 1 1141 127 1 1 1301 203 1 2261 228 1 246 1 N/A 3 Entrenchment Ratio =MIMI >3 21 >4 4 1 >5 0 1 >5 0 1 NA 1 3 1 3 5 3 8 1 1 44 1 3 5 1 3 8 1 44 1 20 1 23 1 23 1 25 N/A 3 Bank Height Ratio —__ 10 1 0 1 2 14 1 0 1 0 1 10 1 10 1 10 10 10 N/A 3 ,Profile Riffle Length (ft) _ _ — - 6 1 176 302 66 19 1 327 20 1 516 471 97 295 8 Riffle Slope (ft /ft) _ _ — 0 002 0 014 0 042 0 006 0 028 0 066 00071 0 030 0 070 0 002 0 006 0 005 0 016 0 005 8 Pool Length (ft) — _ _ - - 183 35 1 62 9 19 9 38 1 68 I 8 76 24 6 22 4 66 4 13 20 Pool Max Depth (ft) —_— - 22 29 3 3 2 1 2 7 3 I 2 I 344 3 61 4 48 0 67 20 Pool Spacing(ft) _ _ _ 50 3 78 9 105 8 54 5 85 5 t 14 7 24 I 66 8 65 3 125 28 6 19 iPattern Channel Belt Width (ft) 66 243 569 360 670 1500 390 726 1626 450 484 54 1 834 17 Radius of Curvature (ft) _ _ — 145 524 1488 190 490 1150 206 53 1 112461 31 3 31 2 39 6 4 75 14 Rc Bankfull Width (ft /ft) —_— 1 3 4 7 13 3 1 0 2 7 6 2 1 0 2 7 ]236 6 2 2 3 2 3 2 3 N/A I Meander Wavelength (ft) _ 40 1 79 7 172 7 33 0 94 0 155 0 35 8 102 168 0 130 0 138 2 153 3 18 2 12 Meander Width Ratio ___ 0 6 2 2 5 1 1 9 3 6 8 1 1 9 3 6 8 1 19 19 2 1 0 21 3 tTrausport anmetere Reach Shear Stress (Competency) Ib /tl'- Max Part Size (trim) Mobilized at Bankf 111 — 30- 100 Stream Power (Transport Capacity) W/1111— - �llonai Reich Parameters Rosgen Classification — E4 C4 C5 C Bankfull Velocity (fps) 62-69 4 2 3 5 Bankfull Discharge (cfs) 1122-1248 128 110 Valley Length (ft) — - - - Channel Thalweg Length (ft) — 2,086 1,034 2,405 2,455 Sinuosity — 104 1 20 1 20 121 Water Surface Slope (Channel) (ft /ft) — 00090 00088 00080 00080 Bankfull Slope (ft /fl) — - - - 00083 Bankf ill Floodplam Area (acres) — % of Reach with Eroding Banks Channel Stability or Habitat Meinc — Channel Stability or Habitat Metric — — Biological or Other — - information unavailable N/A - Item does not apply on- pp}ic'ab'le Dye Branch II Final D -55 Equinox Environmental Consultation and Design, Inc Project No 92255 November 2012 Monitoring Year 2 of 5 M M M M� M w M M M M M M M M M M M M Appendix D Stream Survey Data Table l0a Baseline Stream Data Summary D� _e B_rancb U / P,ro _ct No. 9_2255 - D e BraoebiDowns_tre_W 8�7�0 feet Parameter Regional Curve Pre - Existing Condition Reference Reach Data U17 to Ostin Creek Design Mo-toring Baseline Dime'nslon & EuffimteeRiffl� 1 UL LE''ql Min Mean Med I SD N A MIn Mean Meedl IM_zz SD N] Nn I oon Ma: Mn Mean MM lYlaz S'D �N� Bankfull Width (ft) 148 148 148 148 NA 1 160 185 206 - 20 1 - 184 186 186 188 N/A 3 Floodprone Width (ft) _ _ _ 220 220 220 220 NA 1 672 702 72 8 709 769 88 8 487 618 618 748 N/A 3 Bankfull Mean Depth (ft) 1 2 1 2 1 2 1 2 NA 1 1 6 1 6 1 7 1 5 1 9 20 20 20 N/A 3 Bankfull Max Depth (ft)—__ 24 24 24 24 NA I 15 19 24 15 18 22 29 30 30 31 N/A 3 Bankfull Cross Sectional Area (ft') 174 174 174 24 NA 1 274 303 334 31 0 340 36 1 36 1 38 1 N/A 3 Width/Depth Ratio —__ 125 125 125 24 NA I 93 114 127 130 93 96 96 99 N/A 3 Entrenchment Ratio —_— 1 5 1 5 1 5 24 NA I 3 5 3 8 44 3 5 3 8 44 27 34 34 40 N/A 3 Bank Height Ratio —_— 4 9 4 9 4 9 1 24 1 NA I 1 0 1 1 2 1 1 14 1 0 1 0 1 1 0 1 10 1 0 1 1 0 1 10 N/A 3 Proille Riffle Length (ft) _ _ _ - - - - 61 176 302 66 19 1 327 15 7 503 55 7 793 202 7 Riffle Slope (ft /ft) — _ _ 0 003 0 021 0 121 0 006 0 028 0 066 0 007 0 030 0 070 0 001 0 006 0 006 0 014 0 004 7 Pool Length (ft)—__ 29 248 120 183 351 629 199 381 681 101 199 159 396 891 14 Pool Max Depth (ft) _-- 3 1 - 22 29 33 2 1 2 7 3 1 3 3 3 91 3 77 505 059 12 Pool Spacmg (ft) — — _ 79 0 1620 2610 503 789 1058 5 45 855 1147 15 3 575 388 130 41 5 14 �P,attern Channel Belt Width (ft) _ — 15 6 306 677 360 670 1500 390 726 1626 283 492 575 654 154 9 Radius of Curvature (ft) —_ 11 0 42 1 81 9 190 490 1150 206 531 1246 327 407 422 50 1 56 7 Rc Bankfull Width (ft /ft) ___ 07 29 5 6 1 0 2 7 62 10 27 62 1 7 1 7 1 7 1 7 N/A I Meander Wavelength (ft) _ — — 620 1030 157 330 940 1550 358 102 1680 138 9 162 2 157 3 210 5 272 6 Meander Width Ratio --_ 1 1 2 1 46 1 9 36 8 1 1 9 36 8 1 24 28 2 8 3 1 051 2 171�anBpo arame re Reach Shear Stress (Competency) Ib /ftZ — - M ax Part Size (mm) Mobilized at Bankfull — 30- 100 Stream Power (Transport Capacity) W /m- — rAWiIFH_111 lZe'ac6lP,arameteeti Rosgen Classification — G4c C4 C5 C Bankfull Velocity (fps) 6 1- 7 2 42 3 5 Bankfull Discharge (cfs) 1054- 1260 128 110 Valley Length (ft) - - - Channel Thalweg Length (ft) — - - - 870 Sinuosity — 1 14 1 46 1 09 1 10 Water Surface Slope (ft /ft) — 00110 00090 00095 - Bankfull Slope (ft /ft) — - - - 00106 Bankfull Floodp lam Area (acres) — % of Reach with Eroding Banks — Channel Stability or Habitat Metric Biological or Other — — - imormauon unavauante N/A - It does not a I Non -A hca Dye Branch II Final Project No 92255 Monitonng Year 2 of 5 D -56 Equinox Environmental Consultation and Design, Inc November 2012 Appendix D Stream Survey Data N/A V Item L.'s -'not apply Table lOb. Baseline Stream Date Summary (Substrate, Bed, Bank, snd Hydrologic C•ontailsment Parameter D_ istribution D e Branch U / Rro ct No. 92255 - ClVel . ranch 9� 7 feet Parameter Pre -E ustmg Condition Reference Reach Data Design Monitoring Baseline - Ri% /Ru% /P % /G% /S% - - - - __ - __ - - - __ �_ - __ - - -- - 35% 4% 42% 13% 7% 34% 20% 3% SC % /Sa% /G% /C% /B% /Bc% - - - - - SC% /Sa% /G% /C% /B% /Be% - - - - - - _—_�_�__�_(♦� d16/D35/d50/d84/d95 /diP /dPP(mm) 09 12 20 80 101 889 137 021 05 35 139 056 107 130 457 - - - - - - Entrenchment Class <15/15 199/2 49/50 99/>10 Entrenchment Class <15/15 199/2 49/50 99/>10 ■■ ■. Entrenchment Class ■■■■■ ■ ■ ■ ■ ■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ Incision Class <12/12 149/15 199 />20 . Incision Class <12/12 149/15 1 99 >2 0 ■■■ ■■■ - - ■■■■■■■■■■■■■■.■■ - ■■.■■■■■■■■■■.■■■ N/A V Item L.'s -'not apply miormauon unevauaoic on- p i c (Substrate, Bed, e B_ Weh Table l I Ob. Baseline Stream Data Summary Bank, end Hydrologic Containment Parameter Distributions) I / P.W et P,Io 9.2255 - D e Brsnclt_U Cream Q 465 test Parameter Pre- 6vsting Condition Reference Reach Data Design wintonng Baseline Ri% /Ru% /P% /G% /S°/ - - - - - __ - - - __ - - __ - - - - - - - 28% 15% 34% 20% 3% 43% 6% 34% SC% /So /G% /C% /B% /Be°/ 3% SC% /Sa% /G% /C% /B% /Be% - - - - - d16 /D35 /d50 /d84 /d95 /diP /diP(mm) 015 04 33 103 137 457 dl6/D35/d50/d84/d95 /diP /di' (mm) 015 028 056 107 130 457 - - - - - - Entrenchment Class <15/15 199/2 49/50 99/>10 ■. Entrenchment Class ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ . Incision Class <12/12 149/15 1 99 >2 0 ■■■ - - - - ■■.■■■■■■■■■■.■■■ miormauon unevauaoic on- p i c N/A u Item s not s I's ac 1 �loa- hw c Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 D -57 Equinox Environmental Consultation and Design, Inc November 2012 Table III Baseline S am Data Summary ( Substtate, Bed, Bank, and ydrologic Containmen P eter Distribuhaos Branch II /Pro ct No 92255 - D e Branch: _o�rnstream 17.0 feet Parameter Pre- E-shng Condition Reference Reach Data Design Monitoring Baseline Ri% /Ru% /P% /G% /S% - - - - - __ - - - 43% 6% 34% 13% 3% SC% /Sa% /G% /C% /B% /Be% - - - - - dl6/D35/d50/d84/d95 /diP /di' (mm) 015 028 056 107 130 457 - - - - - - Entrenchment Class ■. ■■■■■■■■■a■■■■■■ <15/15 199/2 49/50 99 >10 Incision Class M.M■M■■■■■■■■E■■■ <12/12 149/15 199/ >20 ■■r - - - - N/A u Item s not s I's ac 1 �loa- hw c Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 D -57 Equinox Environmental Consultation and Design, Inc November 2012 Appendix D Stream Survey Data Table Dye lla. Baseline Morphology & Hydraulic Monitoring Summary Branch II /Project No. 92 *2�5'S - Cemetery Branch 0971 Feeh) Parameter Cross Section 1 Pool Cross Section 2 Riffle Cross Section 3 Riffle Dimension Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Record Elevation (datum) Used 8363 8363 8363 MY2 MY3 MY4 18263 8263 8263 8243 8243 821 7 821 7 821 7 8174 8174 Bankfull Width (ft) 97 102 94 8155 89 106 80 8125 55 60 65 238 229 Floodprone Width (ft) >50 >50 >50 168 >30 >30 >30 277 >30 >30 >30 21 3 Bankfull Mean Depth (ft) 1 9 15 1 5 528 08 06 05 47 1 05 05 06 782 BankMl Max Depth (ft) 3 1 27 24 14 1 2 1 2 10 1 0 1 0 1 0 21 Bankfull Cross Sectional Area (ft) 189 152 143 70 63 39 3 0 28 40 21 Bankfull Width/Depth Ratio 50 68 62 11 2 18 1 164 103 127 106 Bankfull Entrenchment Ratio >5 1 >4 9 >5 3 >3 4 >2 8 >3 8 >5 4 >5 0 >4 6 Bankfull Bank Height Ratio 1 0 1 0 10 Bank-full Width/Depth Ratio 1 0 10 1 0 1 0 1 0 1 0 Cross Sectional Area between End Pins (ft) 189 152 143 246 70 63 39 Bankfull Entrenchment Ratio 3 0 28 40 d50 (mm) N/A 57 48 25 N/A 84 1401 20 N/A _60 50 Bankfull Bank Height Ratio N/A - Item does not apply N/A - Item does not apply Dye Branch II Final D -58 Equinox Environmental Consultation and Design, Inc Project No 92255 November 2012 Monitoring Year 2 of 5 Table a Baseline Morphology &Hydraulic Monitoring San>tmary Dye Branch III / P.mject o. 92.255 - ye Buanch_Ups�tme_am 1,4t7� Feet) Parameter Cross Section 4 Riffle Cross Section 5 Pool Cross Section 6 Riffle Cross Section 7 Riffle Dimension Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Base N1Y1 MY2 MY3 MY4 MY5 Record Elevation (datum) Used 8243 8243 8243 8174 8174 8174 815 5 8155 8155 8125 8125 8125 Bankfull Width (ft) 257 238 229 171 170 168 32 7 287 277 1 269 24 1 21 3 Floodprone Width (ft) 586 528 528 50 47 1 47 1 81 8 782 782 544 526 526 Bankfill Mean Depth (ft) 13 11 10 l7 14 21 14 13 13 11 10 09 Bankfull Max Depth (ft) 25 20 21 34 28 36 36 32 32 22 20 21 Bankfull Cross Sectional Area (ftz) 325 27 1 23 1 288 23 7 350 469 375 362 295 242 199 Bank-full Width/Depth Ratio 203 209 226 102 122 8 1 228 220 21 2 246 240 229 Bankfull Entrenchment Ratio 23 2 2 2 3 29 28 28 25 27 2 8 20 22 25 Bankfull Bank Height Ratio 10 1 0 1 0 1 0 10 10-- 1 0 1 0 1 0 10 1 0 10 Cross Sectional Area between End Pins (ftz) 325 27 I 23 1 288 23 7 350 469 375 36 2 29 5 24 2 199 d50 (mm) N/A 1 2 1 2 N/A 6 0 1 7 N/A 1 9 4 5 N/A 27 80 N/A - Item does not apply Dye Branch II Final D -58 Equinox Environmental Consultation and Design, Inc Project No 92255 November 2012 Monitoring Year 2 of 5 Appendix D Stream Survey Data able lla. B ase line Mo To' I mmary Dye ranch II /Project o. 92255 -Dye Branch- ownstream (869 Feet) Parameter Cross Section 8 Riffle Cross Section 9 Pool Cross Section 10 Riffle Dimension Base MYI NIY2 MY3 MY4 MY5 Base MYI MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Record Elevation (datum) Used 8093 8093 8093 806 1 806 1 806 1 1801 1 801 1 801 1 Bankfull Width (ft) 188 188 196 263 263 243 184 18 5 177 Floodprone Width (ft) 748 73 5 73 5 1 1 >70 >70 >70 1 487 476 1 476 Bankfull Mean Depth (ft) 20 19 2 1 1 8 1 7 23 1 9 1 6 1 6 Bankfull Max Depth (ft) 3 1 30 39 35 3 5 35 29 24 25 Bankfull Cross Sectional Area (ft2) 38 1 35 9 41 0 484 436 553 340 295 278 Bankfull Width/Depth Ratio 93 99 93 143 159 107 99 11 7 11 3 Bankfull Entrenchment Ratio 40 39 3 8 >2 7 >2 7 29 27 26 27 Bankfull Bank Height Ratio 10 1 0 1 0 1 0 1 0 10 1 0 1 0 1 0 Cross Sectional Area between End Pins (ft) 38 1 359 41 0 484 436 55 3 340 295 278 d50 (mm) N/A 1 1 3 1 1 N/A 1 072 64 N/A 1 0 09 N/A - Item does not apply Dye Branch H Final Project No 92255 Monitoring Year 2 of 5 D -59 Equinox Environmental Consultation and Design, Inc November 2012 Appendix D Stream Survey Data R, =RrfBe /Ru�Rw /P =Pool /G =(Lde /S =9ep sC =Sih Clay /SA° Send /G =Gra.el /C= Cobble /B- fnWder /Be- Bcd'ock Percentags braced nn nfBe end pool pebble cowls Dye Branch II Final D -60 Equinox Environmental Consultation and Design, Inc Project No 92255 November 2012 Monitoring Year 2 of 5 ® ��m�m000000000000000000000000000000 m® ����OO�OOOO (��(�OOOOODOD�DDOI�OOOO�OO m����o000000000000000000000000000�00 �����m000000000000000000000000000000 ' �m® �® a�a00000000000000000000000000000 l �l r. 1, R, =RrfBe /Ru�Rw /P =Pool /G =(Lde /S =9ep sC =Sih Clay /SA° Send /G =Gra.el /C= Cobble /B- fnWder /Be- Bcd'ock Percentags braced nn nfBe end pool pebble cowls Dye Branch II Final D -60 Equinox Environmental Consultation and Design, Inc Project No 92255 November 2012 Monitoring Year 2 of 5 Appendix D Stream Survey Data -Pool / G -Gl.dc / S = 3ep SL ^ SH Clay / S4 m $ond / G -Govel / C = Cobhle / B = RoWder / Be a Ekdrock •Percentages bo don n(Ile and pool pebble coimrs Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 D -61 Equinox Environmental Consultation and Design, Inc November 2012 MM=]Fff It ]Mai =J � ® ®�F-ff-l® ®tomrMFO =F - • mmmm ® ©mm ®mom ©mmmm ® ©������������������ ���mm�OOO�00000�00� (�O�OOOOl�OOOOOO�DO �®® �mmOO�OO�DOO (�OOOOODOODOOOO0000��0 mmmm® 0000000000000000000000000000000 � r r �® �® OOO�OOO���Ol�OOOOOOOOOOOOOl�O [��� • • ® mmm® ©OOO�OOODODOO��OOOO�OOODODOOOO� r rr r rr• rr r . rrr -Pool / G -Gl.dc / S = 3ep SL ^ SH Clay / S4 m $ond / G -Govel / C = Cobhle / B = RoWder / Be a Ekdrock •Percentages bo don n(Ile and pool pebble coimrs Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 D -61 Equinox Environmental Consultation and Design, Inc November 2012 Appendix D Stream Survey Data Y =Po1ol 11 /G- Gh& /S- Sep SC = &It Clay I M = Sand / G - G,—] / C - Cobble / B = Boulder / B, — Bedroek Percentages based on nFB. end pool pcbble count, Dye Branch II Final D -62 Equinox Environmental Consultation and Design, Inc Project No 92255 November 2012 Monitoring Year 2 of 5 • ®m ® ®� ® ®mmmm ®mom ®m ®������������������ ��® ��oOOO�Ot��O00000 (�OODODODOOODOOOO� ® ���m0( �OI � I�OO(�(�OOOO(�ODO�ODODOOOODO0�0 mmmm�0000000000000000000000000000000 - �� ®�® 0000000000000000000000000000000 mmmm�a0000000000000000000000000QOOOo ' EEC „ • • • •• 000000000000000000�����o�����o�����o Y =Po1ol 11 /G- Gh& /S- Sep SC = &It Clay I M = Sand / G - G,—] / C - Cobble / B = Boulder / B, — Bedroek Percentages based on nFB. end pool pcbble count, Dye Branch II Final D -62 Equinox Environmental Consultation and Design, Inc Project No 92255 November 2012 Monitoring Year 2 of 5 J 1 Appendix E Hydrologic Data Appendix E 1 1 MmapnzaVerh.-115-30on D ofB vents ranch / jest No. 9 5- Date of Occurrence Method Feet Above Average BankM Elevation 7/8/2011 Water level logger 107 9/21/2011 Water level logger 114 9/24/2011 Water level logger 052 5/16/2012 Water level logger 163 7/11/2012 Water level logger 021 9/29/2012 Water level logger 022 ' Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 Hydrologic Data E -1 Equinox Environmental Consultation and Design, Inc November 2012 Appendix E Hydrologic Data n 45 4 3.5 3 a� 25 2 15 1 05 0 AverageB4nkfull 2.8 Feet >r� Ol 2 Dye Branch II Final Project No 92255 Monitoring Year 2 of 5 Figure 3. Dye Branch Water Level Logger Chart s, s, c lj�O,2 U, ��26 `2O1 050 Jp;;,8 1 ?Ol2 �Of2 �Oj2 X022 Equinox Environmental Consultation and Design, Inc November 2012 �O12 �Of2 201,2 Oft E -2 Jp;;,8 1 ?Ol2 �Of2 �Oj2 X022 Equinox Environmental Consultation and Design, Inc November 2012 Appendix E 2.5 2 1.5 u c i 0.5 Hydrologic Data Figure 3. Precipitation for Mooresville, North Carolina 0 I P. Yom.. . .. I .. .,, . � . ■ ■ ■ u ---,m . a ■ ■+� ■ ■ r0lj '1�j'2 2pj2 11 rolj r�12 role rpjl roll r�l? ��12 NC CRONOS (North Carolina Climate Retrieval and Observations Network of the Southeast Database). State Climate Office of North Carolina. Version 2.7.2. Mooresville 1.9 SSE (NC- IR -1). htti)://www.nc-climate.ncsu.edu/cronos/ Accessed November 2012. Dye Branch II Final E -3 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2012 Monitoring Year 2 of 5