Loading...
HomeMy WebLinkAbout20091273 Ver 1_Pre-con notice_20100625��Gavev�} BEVERLY EAVES PERDUE GOVERNOR June 25, 2010 Contract ID: DA00055 T.I.P. No.: B -4576 WBS No.: 33780.3.ST1 /STM -0017 (106) Counties: Martin Location: Bridge #6 over Ready Branch on US 17 SBL Mr. Brent Roberson Roberson Contracting, Inc. PO Box 1596 Williamston, NC 27892 Dear Mr. Roberson: EUGENE A. CONTI, JR. SECRETARY This serves to confirm the Preconstruction Conference for the above referenced projects scheduled for Monday, July 12, 2010, at 3:00 p.m. in the Williamston Construction Office, located at 19210 US Highway 64E Williamston, NC. A proposed Progress Schedule shall be submitted to the Department no later than seven (7) days prior to the date of the project preconstruction conference and shall be approved before any payments will be processed for the project. In addition, the following information should be submitted to the Department at the Preconstruction Conference: • Detailed Construction Schedule • List of Project Personnel (i.e. Project Manager, Project Superintendent, Traffic Control Coordinator, Erosion Control Coordinator, EEO Coordinator, etc.) • List of Material Suppliers • List of Subcontractors • List of Company Officials Authorized to Execute Supplemental Agreements It is requested that you invite any proposed subcontractors deemed necessary. By copy of this letter, I am inviting various Department representatives having involvement and/or interest in this project. I am also inviting utility company representatives along with representatives from Martin County. Should you require additional information on this matter, please contact this office at (252) 482 -7977. Sincerely, R.E. Capehart, PE Division Construction Engineer 113 Airport Drive, Suite 100, Edenton, NC 27932, Phone (252)- 482 -7977, Fax (252)- 482 -8722 Roberson Contracting, Inc. June 25, 2010 Page 2 cc: Mr. Ron Hancock, PE — State Construction Engineer Mr. Jerry Jennings, PE — Division Engineer Mr. Darrick Lee, PE — District Engineer Mr. John Abel — Division Bridge Manager Mr. Charles Mebane, PE — Resident Engineer Mr. Tony Bracy — Division QA Lab Supervisor Mr. Mike Kinlaw -- Division Right of Way Agent Mr. Ryan Shook — Division Environmental Specialist Mr. Chad Edge, III, PE Division Traffic Engineer Mr. Andy Blankenship, PE — Roadside Environmental Field Operations Engineer Mr. Christopher Peoples, PE — State Materials Engineer Mr. Keith Brown — Section Materials Specialist Mr. Eddie Bunn, PE — Bridge Construction Engineer Mr. David A. Jackson — Pavement Construction Specialist Mr. Charles W. Brown, PE, PLS — State Location & Surveys Engineer Mr. Jason Smith — Location & Surveys Locating Engineer Mr. Robert Memory — State Utility Agent Mr. Jake Riggsbee, PE — FHWA Transportation Engineer Mr. Bill Biddlecome — US Army Corps of Engineers (Washington) Mr. Garcy Ward — NCDENR, Water Quality Section (Washington) Ms. Judi W. Williams — DBE /EEO Compliance Manager Mr. Russell Overman — Martin County Manager Mr. Kerry Spivey — Town of Williamston Public Works Mr. Ed Warren — Martin County Public Works Mr. Bobby Gooding — Piedmont Natural Gas Ms. Cecilia Price — CenturyLink Mr. C. Lee Wall — Dominion Power 113 Airport Drive, Suite 100, Edenton, NC 27932, Phone (252)- 482 -7977, Fax (252)- 482 -8722