Loading...
HomeMy WebLinkAboutNCG170023_SW Inspection Report_20210513Compliance inspection Report Permit: NCG170023 Effective: 08?01119 Expiration: 05131)24 Owner: Glenoit Fabrics (HG) Corporation SOC: Effective: Expiration: Facility: Glenoit Fabrics (HG) Corporation County: Edgecombe 3001 N Main St Region: Raleigh Tarboro NC 27886 Contact Person: Jerry Howard Titln: Phone: 252-641-6034 Directions to Facility: System Classifications: SWNC. Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/13/2021 Entry Time 12:55PM Primary Inspector: Thaddeus W Valentine Secondary Inspector(s): Certification: Phone: Exit Time: 01:50PM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COC Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG170023 Owner - Facility: Glenoil Fabrics (HG) Corporation Inspection Date: 05/13/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: I soke with the owner of teh buiding and he showed me the warehouse that was leased by Glenit Fabrics. The area is leased by someone else as a solar panel storge facility. The owner indicated that Glenit Fabrics moved out and carried everything with them in approx. 2018 Page 2 of 3 Permit: NCG170023 Owner - Facility:Glenolt Fabrics (HG) Corporation Inspection Date: 05/13/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ 0 ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ 0 ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ 0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ 0 ❑ Cl # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ E ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ N ❑ ❑ Comment: No records were found. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ 0 ❑ Comment: no outlets Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ N ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ E ❑ Comment: no outlets Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ W ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ N ❑ # Has the facility evaluated all illicit (non sormwater) discharges? ❑ ❑ E ❑ Comment: The cewrtificate was not at the facility Page 3 of 3