Loading...
HomeMy WebLinkAbout20130135 Ver 1_401 Application_20130213of WATF9 o� O < 20130 135 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Fo o A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP)'number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes Q No 1d. Type(s) of approval sought from the DWQ (check all that @pply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes © No 1f. Is payment into'a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes No 1 g. is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes Q No 1Ih. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes © No 2. Project Information 2a. Name of project: Jeffrey Myers Golf Cart Bridge ° 2b. County: Alamance ° 2c. Nearest municipality / town: Burlington 2d. Subdivision name: Spring Forest 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Jeffrey Todd Myers 3b. Deed Book and Page No. 1374, 660 LM 3c. Responsible Party (for LLC if applicable): Jeffrey Todd Myers FEB 3d. Street address: 1402 Cherry Drive 81NR . 3e. City, state, zip: Burlington, NC 27215 3f. Telephone no.: 336 - 260 -7232 , 3g. Fax no.: 3h. Email address: JMyers7 @tdad.rr.com Page 1 of 10 PCN Form — Version 1.4 January 2009 1/ 0 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: S. Agent/Consultant Information (if applicable) 5a. Name: Jack Harman/Daren Cox 5b. Business name (if applicable): 5c. Street address: 7027 Yarbrough Rd 5d. City, state, zip: Mebane, NC 27302 5e. Telephone no.: 919 -818 -2077 / 336 -669 -7297 5f. Fax no.: 5g. Email address: jackharman53 @gmail.com / NCSUCEEBAE @aol.com Page 2of10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 116821 (Alamance County) 1b. Site coordinates (in decimal degrees): Latitude: 36.100833 Longitude: 79.476667 1c. Property size: 0.47 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Little Alamance Creek 2b. Water Quality Classification of nearest receiving water: WS-IV, NSW 2c. River basin: Haw 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Residential Use. Undergrowth of Briars and poison oak with some 6-14 inch caliber hardwoods with approximately 49 AGL canopy. Little Alamance Creek Bank Rip- Rapped on East Side and sporadic natural low growth on West Creek Bank. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 70 3d. Explain the purpose of the proposed project: Access approximately 4200 square foot of the owners property on the West Side of the Creek for summer shade for grilling and cookouts 3e. Describe the overall project in detail, including the type of equipment to be used: Remove undergrowth, construct bridge across Little Alamance Creek, Rip -Rap west bank to match East Bank for aesthetics. Hand tools, backhoe 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project includin all prior phases) in the past? ❑ Yes No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Cl Yes 0 No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes 0 No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one YesM0 we - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Type In (Other) Little Alamance Creek PER DWQ 15 70 S2 - Choose one S3 - Choose one S4 - Choose one - - S5 - Choose one S6 - Choose one - 3h. Total stream and tributary impacts 3i. Comments: Rip -Rap Creek Bank, Installation of Bridge Abutments Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Temporary 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 51. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWO) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse 0 Tar - Pamlico [] Catawba [:] Randleman © Other: 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number — Permanent (P) or mitigation impact impact Temporary required? (square (square feet ) feet 131 P property accesslabutments Little Alamance Creek No 140 B2 P rip -rap west bank Little Aiamance Creek No 770 B3 - YesMo B4 - Yes/No B5 - Yes/No B6 Yes/No 6h. Total Buffer Impacts: 910 6i. Comments: rage o or i o D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Activity to take place during Dry Season. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Temp seeding of area where undergrowth has been removed. Silt fence along west stream bank 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete If Using a Pennittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? 0 Yes Q No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes © No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? City Of Burlington, NC 3b. Which of the following locally- implemented stormwater management programs apply (check all that apply): ❑ Phase 11 ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 4. DWQ Stormwater Pro ram Review 4a. Which of the following state - implemented stormwater management programs apply (check all that apply): ❑Coastal counties ❑HQW HSession ORW Law 2006 -246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No S. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes Q No use of public (federallstate) land? 1b. If you answered *yes' to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ©Yes ❑ No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after- the -fact permit application? ©Yes ❑ No 2c. If you answered "yes' to one or both of the above questions, provide an explanation of the violation(s): Failure to Secure a 401 Water Quality Certification. Owner was unaware of permitting requirements. 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered 'yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes © No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ® No 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes © No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑X No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes © No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? -3 %/"-Ye "s Applicant/Agent's Printed Name t\v v r-4 '/' "Xb�� plicant/Agent's 5 ature 14")nt;Ignature is valid only if an authorization lr from the applicant is provided.) a,_ 7 -/3 Date Page 10 of 10 City of Burlington a ^ Stormwater Division 0 1103 Mebane Street Burlington, NC 27215 (336) 222 -5140 Pre - Construction Notification (PCN) Form 0 1, gf13urlington Ripariwt Bifffier Prulection Ordinance [for Lands within the Jordan Watershed] RIPARIAN BUFFER PROTECTION ORDINANCE IO.A 1. Ownerand Property Information 1. Namc(s) on Recorded Deed _Jeffrey Todd Myers 2. Deed Book 1374 Page No. 3. Property Identification No. Tax PIN or Parcel ID 116821 (Alamance Co.) 4. Property Size (acres) 0 .4 7 S. Site Coordinates (Decimal Degrees) Latitude 36d06' 03 "N and Longitude 79d28' 36 "W 6. Responsible Party (for LLC if applicable) -- 7. Property Owner Name Jeffery To yers Street Mailing Address 1402 Cherry Drive Email Address ]ffyers@tr—lad.rr—.com City Burlington Telephone Number 336.260.7232 State _worth Ca rnl i na Fax Number Zip 97,215 11. Project Information I. Project Name Minor Stream Modification w/ Aerial Stream Crosse 1a _ 2. County Alamance -- . 3. Is project located in the City of Burlington or F.TJ? Yes 4. Subdivision Name (if applicable) Spring Forest 3. Nance of nearest body of water (river, stream. etc.) to proposed project Little Alamance_ Creek 6. Water Quality Classification of Nearest Receiving Water WS-IV. NSW 7. Subwatershed Little Alamance Creek Ill. Project Description 1. Describe the existing conditions of the site and the general land use in the vicinity ofthe project at the time of this application (include maps, diu rants or plans as needed) Developed residential subdivision since year 2000. Approximate average lot size =/- 0.5 ac. See attached Google Earth photo. 3 List the total estimated linear feet of all cxistin$ streams intermittent and perennial) on the property Approximately 80' Sturm Water Di%-ision Website I %%-w %%,.Berlin totg�iNC.I!o% /Stortm%*ttter 0 City of Burlington Stormwater Division 1103 Mebane Street Burlington, NC 27215 (336)222.5140 111. Protect Description (Cont'd) 3. Explain the purpose or the proposed project To provide stream flow conveyance improvements, including slight widening of stream bottom, armoring stream banks, and to instal] an aerial stream crossing to provide access of maintenance equil ment to opposite side of stream. d Describe the overall pro ect in detail including the type of equipment to be used Heavy Rough Sawn Timber Bridge approximately 11' 10" wide and !spanning the brook 1413. Timber will be 18" square decked with 3' heavy rough sawn boards. The timber will be bolted down to two 4 "x 6" dry sills on each end. The Abutments will be a gravity design made of solid precast Concrete blocks,stacked two high an unree ong on geo -piers of washed stone.Small backhoe /hand tools. 3. Have iurisdictional wetland or stream determinations by the US Army Corps of Engineers or NC Division of Water Quality been requested or obtained for this property in the asf? (attach any supporting documentation) To my knowledge and belief, any information on Wetlands has not been requested to be obtained. 6. Have any permits been obtained from the NC Division of Water Quality or lice US Army Corps of Engineers? if so attach permits to this application. Yes or NO No. IV. Certification A certilj under penalty of law that this document and all attachments were prepared under ni) direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons directly responsible for gathering the information. the information submitted is. to the best of my knowledbe and belief. true. accurate. and complete. ( ani aware that there are significant penalties for submitting false information. including the possibilit) of fine and imprisonment for knowing violations." "In addition. 1 understand that b) submitting this I CN that I am not authorized to work in cite Rilhirian Butter without receiving an approved Huffer Authorization Certificate** Typed or Printed Name Signature: Jeffrey Todd Myers Title. Property Owner Date: Storm Water Division Website nNC•.�or /Stonmwater at7, j, Oaf[ ouoe•� ar ^� .Wft asr. aMrr..r ar \ �,. ssstlsl r tlr A-W \ / H sr...� Ilse( �1e OMY�M 1q . atl� 1M JC. si , C.1AZ a tar_ CONTROL CORNER 1rM� r Msr tidYs Cwb r sllswe� DR. PAUL ABERNATHY O.B. 253 PG. 574 O.B. 280 PG. 182 D.B. 293 PG. 188 D.B. 289 PG. 111 iFl m a ROCK CORNER o EXISTING IRON STAKE • NEW IRON STAKE x CALCULATED POINT ..e,2 VIL.IIVI I T IVImr_ d— 6 BOONE STATION TOWNSHIP. ALAMANCE COUNTY. NORTH CANUUrw DATE: 03/08✓ 99 SCALE: 1' — 40 BOSWELI. SURVEYORS. INC. J. LEO 130SWELL L -3177 505 EAST DAVIS STREET. BURLINGTON. NORTH CAROLINA Tole: (338) 227 -8723 E —Mail: surveyormnstpath.not GRAPHIC SCAIE ( IF MTt t Iow 40 ti 30' Buffer Zone "A" -Allow to ReEstablish with Stream Bed In Natural State Center Line of Stream 30' Buffer Zone "A" -Allow to ReEstablish with E)dsting Stone Rip Rap -Allow Vegetation to Re- Establish Within Voids - Stream Restoration Plan - 1402 Cherry Drive - -- Burlington, NC Not To Scale' Attachemnt "B" To PCN A- Zone lication I T IL M N 5 �� M A Drive N rth 1 " =100'