HomeMy WebLinkAboutNCC210862_MODIFICATION Supporting Documents_20210518 F ..
ROY COOPER t
:g r i1� (,
Covertitir ., r-
II
DIONNE DE.LLF-GATTI
crerawy
BRIAN WRENN NORTH CAROLtN;r
3 rector 'ni t•orinl sixthfury
May 14,2021
LETTER OF APPROVAL`WITII MODIFICATIONS
Concord Housing,LLC
Attention:Michael P.Winstead Jr.Managing Member
2918-A Martinsville Road
Greensboro,North Carolina 27408
RE:Project Name: Evolve at Parkway Off site Roadway Improvements
Acres Approved:3.42
Project ID:CABAR-2021 042
County: Cabarrus City: ;No 2 Township
Address: Concord Parkway South US Highway 29
River.Basin. Yadkin PeeDee
Stream Classification: Other
Submitted By Concord Housing,LLC
Date Received by LQS May 7 2021
Plan Type: Revised
Dear Mr,Winstead;
This office has reviewed the subject erosion and sedimentation control plan We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications The Modifications Required
for Approval are listed on the attached page, This plan approval shall expire three(3)years following the date •
of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129.
As of April 1,21319,all new construction activities are required to complete and submit an electronic Notice of
Intent(NOI)foal'requesting a Certificate of Coverage(COC)under the NCG010000:Construction StcFrrrivvater
General Permit This form MUST be submitted prior to the commencement of any land disturbing activity on
the above named project. The NOI form may be accessed at deq::tic,gov/NCG01 Please direct questions about
the NOI form to Annette Lucas at Annette.lucas@ncdeni•.gov or Paul Clark at Paul.clarl@ncdenr gov After
you submit a complete and correct NOI Form,a COC will be emailed to you within three business days. Initially,
DEMLRwill not charge a fee for coverage under the NCGO I permit However,on or after May 1,2019,a$i00
fee will be charged annually,This fee is to be sent to the DEMLR Storrnwater Central Office staff in Raleigh.
Title 15A NCAC 413 ,0118(a)and the NCGO1 permit require that the following documentation be kept on file
at the job site:
I, The approved E&SC plan as well as any approved deviation.'
2. The NCGO I permit and the COC,once it is received.
3. Records of inspections made during the previous 30 days.
ii, ii. --;;.‘‘,7,,,,e,11,., North Carolina Department of Environmental QQrality I Division of Energy,Mineral end Land Resources
Atiaoreaille,lizegional Office I 610 East Center Averine,Suite 301 1 Mwresville,North Caar-olma.6115
uu 7O4 4fa3.1 t}
Letter of Approval with Modifications
Concord Housing, LLC
May 14,2021
Page 2 of 3
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act
of 1973(North Carolina General Statute 1 13A-51 through 66),this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws,regulations, and rules In addition, local city or county ordinances or rules may also apply to this land-
disturbing activity.This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form,which you provided.You are requested to file an amended form:if there is any change in
the information included on the form In addition,it would be helpful if you notify this office of the proposed
starting date for this project
Your cooperation is appreciated
Sincerely,
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures. Certificate of Approval
Modifications.Required for Approval
NCG0l Fact Sheet
c CPT Engineering&Surveying 4400 Tyzking Streetilligh Point,North Carolina 27265
Inspection Department
Letter of Approval with Modifications
Concord Housing, LLC
May 14, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name:Evolve at Parkway-Off site Roadway Improvements
Project ID: CABAR-202 1-042
County: Cabarrus
I. The new NCGO1 Construction stormwater permit requires Ground Stabilization and Materials
Handling and Self-Inspection, Recordkeeping and Reporting requirements on your plans. The
NCG01 compliance plan sheets for these can be found at
https/Ideq.nc.gcvfaboutidiv sionsiez ergy-mineral-land-resoercesienergy-rni aeral iand-
permits/storm mate►--permits/construLtion-srxr.