Loading...
HomeMy WebLinkAboutNCC212999_ESC Approval Submitted_20210519ROY COOPER Governor -MICHAEL S. PEGAN seeretQry S. DAMEL SMITH Director Walter Todd Starnes 3119 Parkwood School Road Monroe, North Carolina 28112 NORTH CAROLINA Envtronntental Quality December 31, 2019 LETTER OF APPROVAL RE: Project Name: Trinity Ridge Sect. 2 Acres Approved: 2.1 Project ID: UNION-2020-044 County: Union City: Buford Township Address: Trinity Church Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Walter Todd Starnes Date Received by LQS: December 17, 2019 Plan Type: New Dear Mr. Starnes: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129, As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form. MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOl form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Storm -water Central Office in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. North Carolina Department oI£nvironmental Quakty 1 Division of Energy, Mine(A�Pjrk�� ral and land Resources Mooresville Regional office l 610 East Center Avenue, Suite 301 1 Mooresville. North Carolina 28115 Letter of Approval Walter Todd Starnes December 31, 2019 Page 2of2 2. The NCG01 permit and the COC, once it is received. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentationcontrol plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I Mk-S 1 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the. accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Enclosures: Certificate of Approval NCG01 Fact Sheet Kevin E. Herring Engineering Attention: Kevin E Herring, PE 16101 Silver Road Oakboro, North Carolina 28129 Inspection Department s ly, Christopher Graybeal Assistant Regional Engineer Land Quality Section