Loading...
HomeMy WebLinkAboutNCC212482_ESC Approval Submitted_20210519TOWN OF WEDDINGTON EROSION and SEDIMENTATION CONTROL COMPLIANCE FORM Tracts Less than One -Acre Disturbed Residential and Commercial This compliance form shall be prominently displayed at the primary entrance to the site of the land disturbing activity Before construction begins and remain until all construction is complete. PROPERTY ADDRESS: 2016 Boswell Way PARCEL ID: NAME OF SUBDIVISION: Weddington Acres LOT #: _ NAME OF PROPERTY OWNER: Michael & Wendy Parra 2 7150674 NAME OF CONSTRUCTION COMPANY: Shea Custom NAME OF CONSTRUCTION MANAGER: Scott Hamer CONSTRUCTION MGR PHONE #: 704-400-9985 EMAIL: shameraemplrecommunitieG.cOm PROPOSED START DATE OF CONSTRUCTION: 5/5/2021 PLEASE READ THE BACK SIDE BEFORE COMPLETING. Choose one of the following approaches: i� The most appropriate option from the back of this form is option _ or a combination of options Q and TThe_sediment control plan is as drawn in the space to the right or is attached. Notes: EROSION CONTROL PLAN P-f C Fao,i - o03 THE UNDERSIGNED HEREBY CERTIFIES THAT HE/SHE HAS READ THE INFORMATION ON THE BACK OF THIS FORM AND IS AWARE OF THE STATED REQUIREMENTS OF THE EROSION AND SEDIMENTATION CONTROL ORDINANCE. THE OWNER MUST COMPLY WITH THE PROVISION OF THE ORDINANCE. THE UNDERSIGNED ACKNOWLEDGES FINANCIAL RESPONSIBILITY FOR PAYMENT OF ALL FEES ASSOCIATED WITH THIS PROJECT. PROPERTY OWNER/AUTHORIZED AGENT SIGNATURE 704-400-9985 PHONE APPLICANT CHECKLIST. Scott Hamer PRINT NAME shamer@empirecommunities.com 4/2/2021 EMAIL DATE OFFICE USE ONLY ❑ Exempt from installation of ESC measures. REASON: ❑ El / An Erosion Control Plan Approval is required. REASON: GoMMoi7 la-M < �cLe.re /ivt C 0V 6.7O gr- ❑ Attach approved NCGO1 Certificate of Compliance (CoC) (available at www.deq.nc.gov) y de_ve/7,c,_r ❑ LJ An Existing driveway will be used as the Temporary Construction Entrance. FR,? ❑ U Install Temporary Gravel Construction Entrance in accordance with NCDENR detail attached and as L]/ indicated above.(Atch A) U Install Silt Fencing with steel posts in accordance with NCDENR detail attached and as indicated above.(Atch B) ❑ Confine siltation within 25% of lake or water course buffer zone per ESC Ord. Section 58.606 (a). ❑ Call Gary Wright of LaBella Engineering (704) 351-5306 for inspection 48 hours prior to start of work for inspection of measures. ell ❑ Groundcover on all slopes shall be established within 21 days of completion of any phase of construction (Sect. 58.606 (b)). Upon completion of any phase of construction permanent groundcover shall be established within 60 calendar days (Sect. 58.606 (d)) APPROVED Y: DATE: •vr Ae ' � �/fi6 o2�