Loading...
HomeMy WebLinkAbout20210951 Ver 1_BP4.R003_Permit Drawings_158_20210513(Version 2.04; Released November 2015)TIP No.:BP4.R003County(ies):Wilson Page 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future: Year:2021Existing: Year:Aquatic T&E Species?NoComments:No N/AN/AN/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)ac.2 lane road with 10' travel lanes and no paved shoulders with total crossing length of 35 feet.400jason.patskoski@summitde.net Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water BodyNeuseBuffer Rules in Effect:Turner SwampNone2002 lane road with 10' travel lanes and no paved shoulders with total crossing length of 45 feet. Waterbody Information2012NCDWR Stream Index No.:Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)Project BP4.R003 involves the replacement of the bridge on SR 1632 (Pelt Rd) over Turner Swamp. The proposed bridge will maintain the existing level of service. Wetland areas are present in all four quadrants. The roadway grade and fill slopes were set to minimize the fill in the wetland areas. Additionally, erosion control devices have been placed to minimize impacts to the wetland areas. In the northeast quadrant, there is a wetland area in the ditch at the toe of the existing embankment. Due to the proposed superelevation and shoulders, a portion of the ditch is being filled over. Toe protection is proposed in this area rather than a new ditch to minimize wetland impacts. A portion of existing bridge abutments is below OHW. To remove and install the new bridge, impervious dikes will be used. Streambank stabilization is being proposed to protect the bridge abutments.Summit Design and Engineering ServicesNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:NCDOT Hydraulics UnitAddress:General Project InformationBP4.R003WBS Element:OtherWBS Element:Jason Patskoski, PhD, P.E.NCDOT Contact:(919) 707-67111110 Navaho Drive, Suite 600Raleigh, NC 27609Contractor / Designer:(919) 322-0115gcail@ncdot.govAddress:2/12/2021WilsonStantonsburgWilliam Cail, PE1020 Birch Ridge DriveRiver Basin(s): City/Town:0.3Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)NoRural area with wooded and agricultural surrounding land.Turner Swamp27-86-9.50.20.8 milesProject DescriptionProposed ProjectNeuseNoneSupplemental Classification: Swamp Waters (Sw) Nutrient Sensitive Waters (NSW)Wetlands within Project Limits? SHEET 1 OF 6 PERMIT DRAWING WETLAND AND SURFACE WATER IMPACTS PERMIT SE = 06 DS = 60 MPH -L- T V = = = =MPH ADT ADT % * FUNC CLASS = DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. 2018 STANDARD SPECIFICATIONS PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 12-FEB-2021 09:26970158_Hyd_permit_tsh.dgnfaith.jahnkeCONTRACT:TIP PROJECT:ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NAVICINITY MAP Prepared in the Office of: FIRM NO. P-0339 NCDOT CONTACT: LENGTH STRUCTURES PROJECT = 0.009 MILES LENGTH ROADWAY PROJECT = 0.071 MILES TOTAL LENGTH PROJECT = 0.080 MILES 50 25 50 100 100502550 10 5 10 20 WILSON COUNTY BRIDGE NO. 970158 ON SR 1632 (PELT RD.) OVER TURNER SWAMP 2012 60 SUB REGIONAL TIER FAITH E. JAHNKE, PE JEFFREY MUHLBAUER, PE 2021 * TTST =3%DUAL 3% DECEMBER 18, 2020 JULY 13, 2021 200 vpd 400 vpd 111 222 Church St. James WAYNE COUNTY See Sheet 1C-1 For Survey Control Sheet See Sheet 1B For Conventional Symbols See Sheet 1A For Index of Sheets (CARTER RD.) TO SR 1505 END PROJECT -L- STA. 15+52.66 -L- STA. 15+05.34 BEGIN PROJECT -L- STA. 13+00.00 -L- STA. 17+25.00 END BRIDGE BEGIN BRIDGE 6 4 ROW PLANS DETOUR ROUTE THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. SR 1632-L- PELT RD GRADING, DRAINAGE, PAVING, AND STRUCTURE. NA PE RUSSELL BROADWELL, PE PROJECT MANAGER, DIVISION 4 LOCAL RURAL CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. SITE PROJECT TurnerWILSON COUNTY 111 222 111 222 www.summitde.net Fax: (919) 732-6776 Voice: (919) 732-3883 Hillsborough, NC 27278-8551 320 Executive Ct. -L- STA. 14+94.50 BEGIN APPROACH SLAB -L- STA. 15+63.50 END APPROACH SLAB BP4.R003 BP4.R003BP4.R003.1 BP4.R003.2 NA BP4.R003.3 NA ROW & UTILITIES CONST TO N C 222/111TURNER SWAMP Culvert Tentea School Stantonsburg Stantonburg Pop. 730 Contentnea Creek Black Creek Contentnea Creek Swamp IvySwampTu rn e r SwampSwampNAD 83/ 2011St.James1631 Chur chRd.Pelt 1632 1632 Rd.PeltRd . Jaycross 1629 1632 1 6 2 8 1694 Rd.Woodbridge Rd.Rd.Bogue1512 1512 1514 1513Rd.Hill Red1513 1505 1519 Mill Rd.Davis RedHillRd.1516 Old Mill Rd. Ground Natural Geotextile CL II RIP RAP TO ELEV. 66.6' CL II RIP RAP TO ELEV. 66.6' CL II RIP RAP TO ELEV. 66.6' CL II RIP RAP TO ELEV. 66.6' DATE: 07/10/2019 WSEL = 63.6 FT CL II RIP RAP 1.5:1 EST. 24 CY ELEV. 63.8' EXCAVATE TO STABILIZE STREAMBANK TO ELEV. 61.0' EST. 17 CY ELEV. 63.6' EXCAVATE TO CL II RIP RAP1.5:1 STABILIZE STREAMBANK TO ELEV. 61.0' TEMP STREAM IMPACTS TEMP STREAM IMPACTS HAND CLEARING HAND CLEARING HAND CLEARING HAND CLEARING SHEET 2 OF 6 PERMIT DRAWING S S SURFACE WATER DENOTES IMPACTS IN WETLAND DENOTES FILL INFF HC HC CLEARING DENOTES HAND TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SITE 1 CLEARING DENOTES MECHANIZED* * * * ** * ** * * DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 11 12 13 14 15 16 17 18 19 20 30 40 50 60 80 70 30 40 50 60 80 70 90 100 110 110 100 90 EL 65.57' -L- STA 16+01.76, 60.14' RT -BL- STA 11+00.28, 59.25' RT BM #2: R/R SPIKE IN 9" MAPLE SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 4 R/W SHEET NO.8/17/9912-FEB-2021 09:26970158_Hyd_prm_wet_psh_2.dgnfaith.jahnkeBRIDGE NO. 970158 EL 83.30 -BL- STA 5+00.00, 19.01' LT BM #1: R/R SPIKE IN 10" OAK -L- SR 1632 (PELT RD.) Office of: Prepared in the NC FIRM LICENSE No: P-0339 (919) 732-3883 - (919) 732-6676 (FAX) Hillsborough, NC 27278 320 Executive Ct. BP4.R003 -L- STA. 14+94.50 -L- STA. 15+05.34 BEGIN BRIDGE -L- STA. 15+52.66 END BRIDGE -L- STA. 15+63.50 END APP SLABBEGIN APP SLAB BRIDGE SKETCH (NOT TO SCALE)30'-10"10'10'PI Sta 15+81.11 D L = 180.44' T = 90.24' R = 3,390.00' PI Sta 18+02.38 D L = 261.30' T = 131.07' R = 1,338.20' PI Sta 20+02.72 D L = 140.21' T = 70.11' R = 3,691.03'101520-L- PCC Sta. 16+71.31 -L- PCC Sta. 19+32.61 -L- PC Sta. 14+90.87 -L- PT Sta. 20+72.82 -L- POT Sta. 10+00.00 BEGIN PROJECT END PROJECT -L- STA 17+25.00 -L- STA 13+00.00 -L- SE = 04 SE = 06 DS = 60 MPH DS = 60 MPH -L- TYP INC 27'+50.008:1 8:1 8 :1 8 :120'20'TYP INC 27'+70.00+08.10+45.90+71.50+08.80+14.2016' R=10' 1 1 1 F F F F F F F F F F F F F F F F 24" CMP 18" RCP BEAVER DAMNFLOODED TIMBER TURNER SWAMP TURNER SWAMP OVERGROWTH/WOODED WOODED WOODED BRUSH SOIL PATH GUY GUY PER GIS PER GI S60.00'E X IS T IN G R /W E X IS T IN G R /W60.00'EXISTING R/W EXISTING R/W BL-101 BL-102 970158-1RR SPIKE IN BASE OF 10" OAK BL STATION 5+00.00 N 674655 E 2334883 ELEVATION = 83.30 BM1 RR SPIKE IN BASE OF 9" MAPLE BL STATION 11+00.00 59 RIGHT N 674920 E 2335487 ELEVATION = 65.57 BM2 MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) DB 249 PG 217 T O N C 222TO SR 1505 CULTIVATED FIELD CULTIVATED FIELDNC GRI DNAD 8 3 NA 2 0 11 GRASS FLOODED TIMBER FLOODED OVERGROWTH OVERGROWTH/BRUSH FLOODED WOODED WOODED OVERGROWTH/BRUSH Wilson County , 6 ", PVC W i l son C ount y , 6 ", P V C SR 1632 - PELT RD 19' BST SR 1632 - PELT RD 19 ' BST BM2 MCF Fill Slope3:1 or Flatter 63 SY Geotextile Type of Liner=30 TONS Class B Rip-Rap ( Not to Scale) TOE PROTECTION d DETAIL 4-1 FROM STA. 15+59 TO STA. 16+50 -L- LT d= 2.0 Ft. EL = 70.35' -L- STA 13+00.00 BEGIN GRADE (-)1.6245% EXISTING GRADE EL = 67.73' -L- STA 17+25.00 BEGIN GRADE (-)0.4924% EXISTING GRADE PI = 13+50.00 EL = 69.78' (-)1.1400%(-)0.3360% VC = 100' K = 124 PI = 16+00.00 EL = 68.94' (-)0.3360%(-)0.9680% VC = 100' K = 158DS = 55 MPH DS = 60 MPH EL. = 69.25' -L- STA. 15+05.34 BEGIN BRIDGE EL. = 69.10' -L- STA. 15+52.66 END BRIDGE 1 1 1 24" CMP 18" RCP BEAVER DAMNFLOODED TIMBER TURNER SWAMP TURNER SWAMP OVERGROWTH/WOODED WOODED WOODED BRUSH SOIL PATH =66.59' SEAT SEAT=66.59' SEAT=66.55'SEAT=66.61' GUY GUY PER GIS PER GI S60.00'E X IS T IN G R /W E X IS T IN G R /W60.00'EXISTING R/W EXISTING R/W BL-101 BL-102 970158-1RR SPIKE IN BASE OF 10" OAK BL STATION 5+00.00 N 674655 E 2334883 ELEVATION = 83.30 BM1 RR SPIKE IN BASE OF 9" MAPLE BL STATION 11+00.00 59 RIGHT N 674920 E 2335487 ELEVATION = 65.57 BM2 MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) DB 249 PG 217 T O N C 222TO SR 1505 CULTIVATED FIELD CULTIVATED FIELD WOOD WW/HW WOOD WW/HW NC GRI DNAD 8 3 NA 2 0 11 GRASS FLOODED TIMBER FLOODED OVERGROWTH OVERGROWTH/BRUSH FLOODED WOODED WOODED OVERGROWTH/BRUSH Wilson County , 6 ", PVC W i l son C ount y , 6 ", P V C SR 1632 - PELT RD 19' BST SR 1632 - PELT RD 19 ' BST BM2 DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA = = = = = = = = = = FT= DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY 540 25 65.7 830 100 66.5 1200 500 67.3 63.6 07/10/2019 CONCRETE FLUME DETAIL SEE SHEET 2C-1 FOR MODIFIED Ground Natural Geotextile CL II RIP RAP TO ELEV. 66.6' CL II RIP RAP TO ELEV. 66.6' CL II RIP RAP TO ELEV. 66.6' CL II RIP RAP TO ELEV. 66.6' DATE: 07/10/2019 WSEL = 63.6 FT CL II RIP RAP 1.5:1 EST. 24 CY ELEV. 63.8' EXCAVATE TO STABILIZE STREAMBANK TO ELEV. 61.0' EST. 17 CY ELEV. 63.6' EXCAVATE TO CL II RIP RAP1.5:1 STABILIZE STREAMBANK TO ELEV. 61.0' TEMP STREAM IMPACTS TEMP STREAM IMPACTS HAND CLEARING HAND CLEARING HAND CLEARING HAND CLEARING 565657575858585 9 59 595959596060606060606061 6161616 1 616161 6161616161 61 6 1 62626 2 62 626262626262626262 6 26262626262626262 6 2 62 6 26262 62636363636363636363 63636363636363 63 63 63 6363 636 36363 63 63636363 636 4 6 4 646464 6464 6464 6464646464646464646464646464 6464646464 64 6 4 64 6 4 64646 4 6 4 64646 4 64 646 464 646464 646 4 64646 4 64656565 6565656565 65656565 656565656 56565 65 65 6 5 656565656565656565 65 65 65 6 565 656565 6 565 656565666666 666666666666 66 66 66666666666666 6 6 66 66 66 6 6 6666 66 66 66666666666666666666 6666666666666667 67676767676767 6767676767 67 67 67 6 76767676767 676767 67676767676767 686868 68 68686868686868686868 6 8 68 6868686 8 6 8 6 8 68 68686869 696969 696969696969696969 7070 70 7070707070707070 70 7 1 717171717171717171 727272727272727272737373737373737373 74747474747474757575757575 7676767676767677777777777777 7878787878787 8 797979797979808080808080 8181818181 828282828383838383838 3 84848484848 484 858585858585868686868787 878787 88SHEET 3 OF 6 PERMIT DRAWING S S SURFACE WATER DENOTES IMPACTS IN WETLAND DENOTES FILL INFF HC HC CLEARING DENOTES HAND TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY 4 SITE 1 CLEARING DENOTES MECHANIZED* * * * ** * ** * * 1 1 1 24" CMP 18" RCP BEAVER DAMNFLOODED TIMBER TURNER SWAMP TURNER SWAMP OVERGROWTH/WOODED WOODED WOODED BRUSH SOIL PATH =66.59' SEAT SEAT=66.59' SEAT=66.55'SEAT=66.61' GUY GUY PER GIS PER GI S60.00'E X IS T IN G R /W E X IS T IN G R /W60.00'EXISTING R/W EXISTING R/W BL-101 BL-102 970158-1RR SPIKE IN BASE OF 10" OAK BL STATION 5+00.00 N 674655 E 2334883 ELEVATION = 83.30 BM1 RR SPIKE IN BASE OF 9" MAPLE BL STATION 11+00.00 59 RIGHT N 674920 E 2335487 ELEVATION = 65.57 BM2 MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) DB 249 PG 217 T O N C 222TO SR 1505 CULTIVATED FIELD CULTIVATED FIELD BRIDGE 158 WOOD WW/HW WOOD WW/HW NC GRI DNAD 8 3 NA 2 0 11 GRASS FLOODED TIMBER FLOODED OVERGROWTH OVERGROWTH/BRUSH FLOODED WOODED WOODED OVERGROWTH/BRUSH Wilson County , 6 ", PVC W i l son C ount y , 6 ", P V C SR 1632 - PELT RD 19' BST SR 1632 - PELT RD 19 ' BST BM2 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 11 12 13 14 15 16 17 18 19 20 30 40 50 60 80 70 30 40 50 60 80 70 90 100 110 110 100 90 EL 65.57' -L- STA 16+01.76, 60.14' RT -BL- STA 11+00.28, 59.25' RT BM #2: R/R SPIKE IN 9" MAPLE SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 4 R/W SHEET NO.8/17/9912-FEB-2021 09:26970158_Hyd_prm_wet_psh_3.dgnfaith.jahnkeBRIDGE NO. 970158 EL 83.30 -BL- STA 5+00.00, 19.01' LT BM #1: R/R SPIKE IN 10" OAK -L- SR 1632 (PELT RD.) Office of: Prepared in the NC FIRM LICENSE No: P-0339 (919) 732-3883 - (919) 732-6676 (FAX) Hillsborough, NC 27278 320 Executive Ct. BP4.R003 -L- STA. 14+94.50 -L- STA. 15+05.34 BEGIN BRIDGE -L- STA. 15+52.66 END BRIDGE -L- STA. 15+63.50 END APP SLABBEGIN APP SLAB BRIDGE SKETCH (NOT TO SCALE)30'-10"10'10'PI Sta 15+81.11 D L = 180.44' T = 90.24' R = 3,390.00' PI Sta 18+02.38 D L = 261.30' T = 131.07' R = 1,338.20' PI Sta 20+02.72 D L = 140.21' T = 70.11' R = 3,691.03'101520-L- PCC Sta. 16+71.31 -L- PCC Sta. 19+32.61 -L- PC Sta. 14+90.87 -L- PT Sta. 20+72.82 -L- POT Sta. 10+00.00 BEGIN PROJECT END PROJECT -L- STA 17+25.00 -L- STA 13+00.00 -L- SE = 04 SE = 06 DS = 60 MPH DS = 60 MPH -L- TYP INC 27'+50.008:1 8:1 8 :1 8 :120'20'TYP INC 27'+70.00+08.10+45.90+71.50+08.80+14.2016' R=10' 1 1 1 F F F F F F F F F F F F F F F F 24" CMP 18" RCP BEAVER DAMNFLOODED TIMBER TURNER SWAMP TURNER SWAMP OVERGROWTH/WOODED WOODED WOODED BRUSH SOIL PATH GUY GUY PER GIS PER GI S60.00'E X IS T IN G R /W E X IS T IN G R /W60.00'EXISTING R/W EXISTING R/W BL-101 BL-102 970158-1RR SPIKE IN BASE OF 10" OAK BL STATION 5+00.00 N 674655 E 2334883 ELEVATION = 83.30 BM1 RR SPIKE IN BASE OF 9" MAPLE BL STATION 11+00.00 59 RIGHT N 674920 E 2335487 ELEVATION = 65.57 BM2 MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) NO DEED FOUND MARY SPEIGHT GLOVER (HEIRS) DB 249 PG 217 T O N C 222TO SR 1505 CULTIVATED FIELD CULTIVATED FIELDNC GRI DNAD 8 3 NA 2 0 11 GRASS FLOODED TIMBER FLOODED OVERGROWTH OVERGROWTH/BRUSH FLOODED WOODED WOODED OVERGROWTH/BRUSH Wilson County , 6 ", PVC W i l son C ount y , 6 ", P V C SR 1632 - PELT RD 19' BST SR 1632 - PELT RD 19 ' BST BM2 MCF Fill Slope3:1 or Flatter 63 SY Geotextile Type of Liner=30 TONS Class B Rip-Rap ( Not to Scale) TOE PROTECTION d DETAIL 4-1 FROM STA. 15+59 TO STA. 16+50 -L- LT d= 2.0 Ft. EL = 70.35' -L- STA 13+00.00 BEGIN GRADE (-)1.6245% EXISTING GRADE EL = 67.73' -L- STA 17+25.00 BEGIN GRADE (-)0.4924% EXISTING GRADE PI = 13+50.00 EL = 69.78' (-)1.1400%(-)0.3360% VC = 100' K = 124 PI = 16+00.00 EL = 68.94' (-)0.3360%(-)0.9680% VC = 100' K = 158DS = 55 MPH DS = 60 MPH EL. = 69.25' -L- STA. 15+05.34 BEGIN BRIDGE EL. = 69.10' -L- STA. 15+52.66 END BRIDGE DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA = = = = = = = = = = FT= DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY 540 25 65.7 830 100 66.5 1200 500 67.3 63.6 07/10/2019 CONCRETE FLUME DETAIL SEE SHEET 2C-1 FOR MODIFIED 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 65 65 70 70 60 6013+75.00 65 65 70 70 60 60 14+00.00 65 65 70 70 60 60 14+25.00 65 65 70 70 60 60 14+50.00 65 65 70 70 60 60 14+75.00 X-2 -L- 2.5 5Office of: Prepared in the NC FIRM LICENSE No: P-0339 (919) 732-6676 (FAX) (919) 732-3883 Hillsborough, NC 27278 320 Executive Ct.12-FEB-2021 09:26970158_Hyd_prm_xpl.dgnfaith.jahnkePROJ. REFERENCE NO.SHEET NO.0 BP4.R003 SHEET 4 OF 6 PERMIT DRAWING WETLANDWETLANDWETLANDWETLANDWETLANDWETLANDWETLANDWETLANDWETLAND3:13:1 0.0250.011 69.32 3:13:1 0.0250.001 69.02 0.0250.008 3:1 3:168.73 0.0250.017 3:1 3:168.49 0.0260.026 3:13:1 68.29 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 65 65 70 70 60 60 16+00.00 65 65 70 70 60 60 16+25.00 65 65 70 70 60 60 16+50.00 65 65 70 70 60 60 16+75.00 65 65 70 70 60 60 17+00.00 65 65 70 70 60 60 17+25.00 X-4 -L- 2.5 5Office of: Prepared in the NC FIRM LICENSE No: P-0339 (919) 732-6676 (FAX) (919) 732-3883 Hillsborough, NC 27278 320 Executive Ct.12-FEB-2021 09:27970158_Hyd_prm_xpl.dgnfaith.jahnkePROJ. REFERENCE NO.SHEET NO.0 BP4.R003 SHEET 5 OF 6 PERMIT DRAWING WETLANDWETLANDWETLANDWETLANDWETLANDWETLANDWETLANDWETLANDWETLANDWETLAND3:10.0400.040 68.253:1 67.98 0.0400.040 68.073:1 3:167.96 0.0400.040 2.75:1 3:167.88 3:1 0.0400.040 3:167.84 3:1 0.0400.040 3:167.84 HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 12+15 TO 14+89 -L- LT Right-of-Way < 0.01 0.03 1 14+10 TO 15+20 -L- RT Temp Construction Easement 0.01 < 0.01 1 14+79 TO 15+12 -L- RT Roadway Fill Slopes < 0.01 1 15+11 To 15+46 -L- Streambank Stabalization 0.02 75 1 15+11 TO 15+46 -L- Impervious Dikes 0.01 90 1 15+28 TO 16+75 -L- LT Right-of-Way 0.03 0.04 1 15+39 TO 16+42 -L- LT Roadway Fill Slopes 0.01 1 15+63 TO 17+15 -L- RT Temp Construction Easement 0.03 < 0.01 1 16+29 TO 17+10 -L- RT Roadway Fill Slopes < 0.01 TOTALS*: 0.02 0.07 0.08 0.02 0.01 75 90 0*Rounded totals are sum of actual impactsNOTES:Revised 2013 10 24SHEET 6OF 6Permanent SW Impacts total: 726 sfThe total length of temporary impacts is 90 LF, but 75 LF is adjacent to the permanent streambank stabilization impact. WETLAND PERMIT IMPACT SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTSWILSON COUNTYBP4.R003BRIDGE REPLACEMENTNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS2021 02 12