Loading...
HomeMy WebLinkAbout20210951 Ver 1_ePCN Application_20210513 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form April 4,2021 Ver 4 Initial Review Has this project met the requirements for acceptance in to the review process?* 6 Yes ✓ No Is this project a public transportation project?* 0 Yes r No Change only if needed. BIMS#Assigned* Version#* 20210951 1 Is a payment required for this project?* ✓ No payment required G Fee received Reviewing Office* ✓ Fee needed-send electronic notification Central Office-(919)707-9000 Select Project Reviewer* Rob Ridings:eads\rgridings Information for Initial Review 1a.Name of project: BRIDGE NO.970158 ON SR 1632(PELT RD.)OVER TURNER SWAMP 1a.Who is the Primary Contact?* Chad Goggins lb.Primary Contact Email:* 1c.Primary Contact Phone:* tccoggins@ncdot.gov (252)640-6427 Date Submitted 5/13/2021 Nearest Body of Water Turner Swamp Basin Neuse Water Classification C;Sw,NSW Site Coordinates Latitude: Longitude: 35.599243 -77.871772 A. Processing Information County(or Counties)where the project is located: Wilson Is this a NCDMS Project ✓ Yes G No Is this project a public transportation project?* 6 Yes r No Is this a NCDOT Project?* 6' Yes r No (NCDOT only)T.I.P.or state project number: BP4.R003 WBS#(?) BP4.R003.1 Pre-Filing Meeting Information Is this a courtesy copy notification?* ✓ Yes G No ID# Version Pre-fling Meeting or Request Date 4/4/2019 Attach documentation of Pre-Filing Meeting Request here: Click the upload button or drag and drop files here to attach document ApriI2019-Div4-BridgeScopings.pdf 236.95KB Re type nest be FCF 1a.Type(s)of approval sought from the Corps: I7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) n Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes ✓ No lb.What type(s)of permit(s)do you wish to seek authorization? fJ Nationwide Permit(NWP) n Regional General Permit(RGP) n Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? ✓ Yes 6 No Nationwide Permit(NWP)Number: 03-Maintenance NWP Numbers(for multiple NWPS): Id.Type(s)of approval sought from the DWR: 17 401 Water Quality Certification-Regular n 401 Water Quality Certification-Express n Non-404 Jurisdictional General Permit n Riparian Buffer Authorization n Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes 6' No For the record only for Corps Permit: r Yes 6 No If.Is this an after-the-fact permit application?* ✓ Yes f No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes 6' No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo Acceptance Letter Attachment lh.Is the project located in any of NC's twenty coastal counties? ✓ Yes 6' No 1j.Is the project located in a designated trout watershed? ✓ Yes f No B. Applicant Information Id.Who is applying for the permit? n Owner 17 Applicant(other than owner) le.Is there an Agent/Consultant for this project?* ✓ Yes f No 2.Owner Information 2a.Name(s)on recorded deed: NC DOT 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address P.O.Box 3165 Address Line 2 Oty State/Bovine/FiDgion Wilson NC Fbstal/Zip Code Country 27895-3165 USA 2e.Telephone Number: 2f.Fax Number: (252)640-6427 2g.Email Address:* tccoggins@ncdot.gov 3.Applicant Information(if different from owner) 3a.Name: Chad Coggins 3b.Business Name: NCDOT Div 4 3c.Address Street Address P.O.Box 3165 Address Line 2 Oty State/Province/Region Wilson NC Fbstal/Zip aide Country 27895 USA 3d.Telephone Number: 3e.Fax Number: (252)640-6427 3f.Email Address:* tccoggins@ncdot.gov C. Project Information and Prior Project History L) 1. Project Information lb.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Stantonsburg 2. Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 Cray State/Aovince/Region Postal/Zip aide Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Turner Swamp 3b.Water Resources Classification of nearest receiving water:* C;Sw,NS W 3c. What river basin(s)is your project located in?* Neuse 3d.Please provide the 12-digit HUC in which the project is located. 030202030405 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Forestry and Agriculture are the predominant land uses with some single-family residential housing in the vicinity of this project 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* ✓ Yes G No r Unknown 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) Wilson 158 Topo map.pdf 2.02MB 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) Wilson 158 Soils map.pdf 2.01MB 4f.List the total estimated acreage of all existing wetlands on the property: .17 4g.List the total estimated linear feet of all existing streams on the property: 100 4h.Explain the purpose of the proposed project:* Replace Wilson bridge 158 which is structurally deficient for current NCDOT standards 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* Replace Wilson bridge 158 which is structurally deficient for current NCDOT standards with a new bridge meeting these standards in the existing right-of-way with offsite detours.Heavy road and bridge equipment will be used for this project. 4j.Please upload project drawings for the proposed project. BP4.R003_Permit Drawings_158.pdf 1.61MB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* c Yes r No G Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* ✓ Preliminary r Approved 6 Not Verified r Unknown r N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Chad Coggins Agency/Consultant Company: NC DOT Other: 5d1.Jurisdictional determination upload 6. Future Project Plans 6a.Is this a phased project?* ✓ Yes t: No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): 17 Wetlands 17 Streams-tributaries 177 Buffers r Open Waters r Pond Construction 2.Wetland Impacts 2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name* 2e.Forested* 2f.Type of 2g.Impact Jurisdicition*(?) area* 1 Permanent Fill P Riverine Swamp Forest Wa-Wd Yes Both 0.020 (acres) 1 mechanized Clearing P Riverine Swamp Forest Wa-Wd Yes Both 0.070 (acres) 1 Hand Clearing T Riverine Swamp Forest Wa-Wd Yes Both 0.080 (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.080 0.090 2g.Total Wetland Impact 0.170 2i.Comments: 3.Stream Impacts 3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S1 Streambank Stabilization Permanent Bank Stabilization Turner Swamp Perennial Both 30 75 Average(feet) (linear feet) S2 Impervious Dikes Temporary Dewatering Turner Swamp Perennial Both 30 90 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 75 90 3i.Total stream and ditch impacts: 165 3j.Comments: 6. Buffer Impacts(for DWR) 6a.Project is in which protect basin(s)? Check all that apply. FT Neuse r Tar-Pamlico r Catawba r Randleman r Goose Creek r Jordan Lake r Other 6b.Impact Type 6c.Per or Temp 6d.Stream name 6e.Buffer mitigation required? 6f.Zone 1 impact 6g.Zone 2 impact Allowable P Turner Swamp No 1,804 1,234 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 1,804.00 1,234.00 Zone 1 Zone 2 Total combined buffer impacts: 1,804.00 1,234.00 6i.Comments: Supporting Documentation BP4.R003_Permit Drawings_158.pdf 1.61MB Buffer Impact Permits_158.pdf 842.91KB E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Prior to initiating the design phase of this project all jurisdictional areas were identified and taken into consideration by the design team.Based upon this information the design team was able to minimize wetland and buffer impacts to the greatest degree practicable.The new structure will also eliminate the existing in water bent,providing a net improvement to the hydraulic opening. 1b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Throughout construction a copy of the permit will be maintained on site and all permit conditions will be strictly adhered to.All construction equipment and materials will be staged and operated from upland areas.Silt fencing will be installed and regularly inspected to ensure protection of the streams and wetlands adjacent to the project.Safety fencing will be used to delineate jurisdictional and environmentally sensitive areas from encroachment. 2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ✓ Yes ( No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: Proposed impacts fall below the NWP condition threshold of impacts/requirements for compensatory mitigation F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ( Yes rNo What type of SCM are you providing? 1 Level Spreader 1 Vegetated Conveyance(lower SHWT) n Wetland Swale(higher SHWT) n Other SCM that removes minimum 30%nitrogen 17 Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation Bridge 158_SMP.pdf 69.87KB 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* ( Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ( Yes rNo 1b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* ( Yes rNo 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* ✓ Yes ( No Comments:* CE available upon request 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes 6 No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes f• No 3b.If you answered"no,"provide a short narrative description. The purpose of this project is to replace a structurally deficient bridge at an existing location 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes Cr Nor N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ✓ Yes 6' No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ✓ Yes f No 5d.Is another Federal agency involved?* ✓ Yes G No r Unknown 5e.Is this a DOT project located within Division's 1-8? F Yes r No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Neuse River waterdog,Carolina Madtom,and Atlantic Pigtoe all appear on the IPAC TE list dated May 13,2021.Based upon the results of a biological assessment performed by SEPI in early 2021 the recommended BC for all species will be MANLTAA due to lack of habitat and distance to records. Consultation Documentation Upload 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ Yes f• No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* EFH Mapper 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* ✓ Yes 6' No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* HEU Clearance 7c.Historic or Prehistoric Information Upload PA 19-03-0008 No Archaeological Survey Required Form Br No 215 on SR 2159 over Br Little Buffalo Creek 1.6MB Johnston.pdf NoHistArchSurveyReq_158.pdf 1.42MB 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* ✓ Yes 6 No 8c.What source(s)did you use to make the floodplain determination?* NC FRIS Miscellaneous u Comments Miscellaneous attachments not previously requested. Signature R By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Chad Coggins Signature aoyige- Date 5/13/2021