HomeMy WebLinkAboutNCC201558_NOT Closeout Documents_20210514North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Scotland Project: Laurinburg S. Main Street Dollar River basin: Lumber
Person financially responsible: Par 5 Development Group, LLC -Joseph K Bland, project N: SCOTL-2020-005
Vice President
Address: 2075 Juniper Lake Road, West End, NC 27376
1. Project Location: US 401 Business, Laurinburg
Pictures: No
2. Weather and soil conditions: Clear Soil Workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): None Title:
Inspection report: Sent Report Date given/sent: May 12, 2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Nicholas Mills Others present:
Date of inspection: May 05, 2021 Time arriving on site: 1:00 PM Time leaving site: 1:30 PM
cc:
Yes