Loading...
HomeMy WebLinkAboutWQ0042446_Application (FTSE)_20210510Permit Number WQ0042446 Program Category Non -discharge Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer dean.hunkele Coastal SWRule Permitted Flow Facility Central Files: APB _ SWP _ 4/14/2021 Permit Tracking Slip Status Project Type In review New Project Version Permit Classification A Individual Permit Contact Affiliation Facility Name Major/Minor Region Church Road NE Morales Property Public Force Main Minor Wilmington Location Address County Brunswick Facility Contact Affiliation Owner Owner Name Owner Type Brunswick Regional Water and Sewer H2go Government - County Owner Affiliation Robert Walker PO Box 2230 Dates/Events Leland NC 2845122: Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 411412021 Regulated Activities Requested /Received Events Additional information requested ITS A G -al Addttonal information received 1 Outfall Waterbody ,/� basin Letter of Transmittal Date: 04/1321 Ceontatics, Surveying & Engineering, Inc. PO Box 16110 Wilmington, NC 28408 To: DEQ- Water Quality ATTN: Dean Hunkele RE: Church Road NE GEOMATICS SURVtxtnc c I NOINI FRna IN(. COPIES DATE DESCRIPTION 1 Feb-21 Set of Plans (Valid for Both Applications) I Feb-21 Cover Letter to Dean Hunkele I Feb-21 Permit Application Fee 2 checks- $480.00, each) I Feb-21 Pump Station & Forcemain Specifications (Valid for Both Applications) 1 Feb-21 Completed Private Fast Track Application(Pump Station & FM- No FTSE; seepublic) Feb-21 Includes Developer's Operational Agreement 1 Feb-21 Complete Public Fast Track Application FM w/ both FTSE's; all flow reported here) These are transmitted as checked below: Remarks: Dean: 1 believe the p I set of drawings, as flow attributed to the CC: file For Approval For Your Use For Review and Comment As Requested Returned for Correction ge to be complete for approval. I have only given you I set of specs and are valid for each application. Additionally, H2O0 and the County chose to lic system. If you need additional conies or further information. Dlease call o Signed: IrA Comer Lyons Owner Professional Firm# C-3796 Phone: 910.742.3860 February 23, 2021 Dean Hunkele Senior Environmental Specialist Division of Water Resources- DEQ 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Morales Property Church Road NE Utilities Fast Track Sewer Applications Dean: On behalf of Mr. Morales, please accept these two applications for sewer extension. GEOMATICS SURVEYING & ENGINEERING IN( P.O. Box 16110 Wilmington, NC 28408 Tel: 910.742.3860 Email: clyons@gsandeinc.com Professional Firm# C-3796 This project employees a small run of 2-inch forcemain within an existing right-of-way, transitioning to private 2-inch forcemain within the parcel boundary. Collected flow will be transmitted through the forcemain via an onsite, private duplex grinder pump station (Package Station provided by Zoeller). The public portion will be owned and maintained by H2GO and the private portion will be owned and maintained by Mr. Morales (note the included Developer's Operational Agreement). Enclosed for your review are both completed FTA 04-16's (one public and one private) and the FTSE, as provided by H2GO. Project Summary: The Morales property will be a 3-lot, single family minor subdivision at the terminus of Church Road in Leland, NC. It is anticipated homes will be site constructed, three bedroom structures. Wastewater will collected by lateral, service connections directly to the duplex grinder station proposed for the site. Anticipated Wastewater Flows: 3 Units x 366-gpdpu = 1,080 GPD. Zio = 4e30C,00 Items Included in Submittal: • Cover Letter • Fast Track Applications • FTSE • Project Specifications • Project Plans No Variance is requested for this project. It is noted that a short section of 4" PVC will be used to transition lateral flows to the grinder basin. Please let me know if you have any questions or concerns. Sincerel m, Coer L ns, PE for GS&E, nc. w/enclosures State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number:W(101t4aL41(i� (to be completed byDWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Brunswick Regional Water & Sewer: 112Go (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Mr. Bob Walker per 15A NCAC 02T .0106(b) Title: Executive Director 4. Applicant's mailing address: PO Box 2230 City: Leland State: NC Zip: 28451-_ 5. Applicant's contact information: Phone number: (9O 371-9949 Email Address: bwalker(a h2goonline.com II. PROJECT INFORMATION: ( { 1. Project name: Church Road NE L44iti s 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000_ and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Brunswick 4. Approximate Coordinates (Decimal Degrees): Latitude: 34.239656' Longitude:-78.059706' 5. Parcel ID (if applicable): 03700009 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Comer Lyons License Number: 030936 Firm: GS&E, Inc. Mailing address: PO Box 16110 City: Wilmington Phone number: (910O 142-3860 State: NC Zip: 28408-_ Email Address: clyons(o,gsandeinc.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: N✓Aek3 j kiw l f Permit Number: Ncoo g 4. b 1-1 Owner Name: a(unSw:c I: Cvu. l y V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQD�OLmJbH6M) Downstream (Receiving) Sewer Size: 9 inch System Wide Collection System Permit Number(s) (if applicable): WQCS 0690n1 Owner Name(s): P�b;0 l lug te✓ d SSW e,Z 1-l1Go FORM: FTA 04-16 Pagel of 5 VI, GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Aereement (FORM: DEV) been attached? ❑ Yes []No ®N/A 3. If the Applicant is a Home/Property Owners' Association. has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ❑N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial _ % Industrial (See 15A NCAC 02T .0103(20)) "Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ® No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0I14(t)) Daily Design Flow a'" No. of Units Flow 5; I� Fai :1 P Vw r_ gal/,21 U 6-P13 3 (a30 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total (638GPD a See 15A NCAC 02T .0114(b), (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flowTatta, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project:-GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: N IA dump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: 34.239644' Longitude:-78.059678' 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 2 152 PVC or CTS 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g,) ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems, ® Yes [:]No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II im ounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any s imming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g). see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. _Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional /Engine„er's Certification: L l-�1'a4'� L-1 name from Application Item III.1.) that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): A l k e iR- - '- Y- � C UUG i \1 (r attest that this application for Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE - In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: so60� Date: `t � (- .2' FORM: FTA 04-16 Page 5 of 5 v State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Brunswick Regional Water Sewer Project Name for which flow is being requested: Church Road (Three SFR) More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible for all pump stations along the rose of the proposed wastewaterflow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: NORTHEAST BRUNSWICK REGIONAL WWTF b. WWTP Facility Permit #: WQ 0086819 AIIJlows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 2.475 1.080 2.014 0.000630 3.0950 125.0% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx, Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: Page 1 of 6 FTSE 10-IR I11. Certification Statement: certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Title of Signing Official Page 2 of 6 State of North Carolina rol 9, - ILLj Division of Water Resources Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Brunswick Regional Water & Sewer Project Name for which flow is being requested: Church Road More than one FTSE may be requiredfor a single project if the owner of the WWTP is not responsible for all prnnnp stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Northeast WWTP b. WWTP Facility Permit #: NC0086819 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used Allflows are in MGD .000630 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Approx. Average Current Obligated, Total Pump Pump Daily Avg. Not Yet Current Station Station Firm Flow** Daily Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Flow, Daily Flow, Obligated Available Number) No. MGD MGD MOD MGD Flow Capacity*** 11 W00016854(M) .353 .141 .192 .121 .313 -0.172 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped now that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Brunswick Regional Water Sewer Downstream Permit Number: WQ0016854(M) Page 1 of 6 FTSE 10-18 III. Certification Statement: I Bob Walker certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. q-F-z/ Signing Official bignalure Date CkeCw�iJ� I/ircclor- Title of Signing Official Page 2 of 6 FTSE 10-18 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section 11 where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 38 % and .121 MGD of the Available Capacity (E) is Pump Station North Lanvale#I l ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately .01 MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely See Below is is design or under construction with planned completion in Sec Below ; and/or d. The following applies: Permit modifications for this lift station will be complete by the end of May 2021 and subsequent improvements for upgrade will be complete by September 2021. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of 6 FTSE 10-18 t-P) I Flat Bay 5r G - iN� IH p i'10PIil INDEX 9HEET NO. pIgN NO alum arm IR , PF 4i� 07 its PP-R a29,'L2�], yPg Pas DELETED Pfl 0.32. M133 FPSfi PPi] }p•yd5 PD'`5 PNE1 H6 Pfl 61 .so. ais as],a 6o Pfl63 664.658 PP$9 45B. As9 41* EDPP DEIETED 66 PR69 DELETED SYSTEM 4 � 2 F i +m. eio J �,p�YYYYYY�I SCALE: 1" = 600' O �N'b434"Fc i-3'l.Pm i-w+ cen.a c sysh 71, & 06mr s*mlo.l * iZ P PD,„p srrmo� *�o ��5't9 Cu�w n•J �p Psdiz sccn..l II m '•' < roe+.w : m 6✓n a oa«,wx. � p w PiW_Csno _ `ct N y€ m�vQi Ciaew•�cu� c,Ns-, � s� �, ' � iutaF uFau uc FCFauu FFc - nuig ivaape uupa.0 w w w.witg.cuitu utapat : y-cuumu i uau Ftc miauu ncoouuun V bing maps Church Rd NE, Leland, NC 28451 to�dan toi eCt 0 7e Andrew Jac ' Iz wick Community �nHW n RKe Ro College g. =F yFVE' mvoa0 7t o'a F4} d Jaage Rd tF. n r FH Flat Bay090 t tk Rp c � ac4so' Jumper Bay �Fyo rM.� Oekjo K qdN i to q.E �4f v f 07 � 6 IWI Path ryE y'i' F m`ir 7f 3 d Daln Si NF u o`IV fe 1 Old F yedt * Rd NE Elidh Cemeetery gE ` ON FayenA.4ie Rd NE Oitl Fares@v k Rd rg WJ,e Rd� N�✓o,C m _ 2 v NaPona low 1es1 fedm Church Rd NE, c t 03f131 TomTom, C OPenSrb4%, $Rd N L S ,