Loading...
HomeMy WebLinkAbout20201733 Ver 1_NOV Response_20191025Moore, Andrew W From: Sent: To: Subject: Attachments: Brandon Quinn <edenrockenterprises@gmail.com> Friday, October 25, 2019 11:10 AM Moore, Andrew W [External] written response dnrCapture.PNG rnal email. Do not click links or open attachments unless you verify. Send all suspicious email as an atta Andrew please find attached the map of the erosion control plan with the impacted area of the wetlands. Plan to restore: 10/15: survey the wetland area and determine the impacted area and sediment pond - Completed 10/16: remove concrete box and drain at end of the impacted area to install in the improved sediment basin. Completed 10/17-10/22:remove berm and restore impacted area to original contours and slope - Completed 10/23: Install new silt fencing and orange construction safety fencing in and around the impacted area. - Completed 10/24: seed and straw slope between the orange construction fence and the silt fencing - Completed 10/28:replant impacted area with wetland seed mix We have been working Larry Ammons on the erosion control plan to get it to an acceptable compliance, in our meetings we have moved the sediment pond and the box and drains to the plan requirements. We had started this work prior to receiving the notice of violation from your office and were not aware of what exactly was expected of us which also impacted some of the work we had to complete for the erosion control measures. We have not received a NOV in writing from them but they have instructed us on which items that will be in the NOV and allowed us to get them resolved and all of those items as well are completed. Please let me how to proceed and if you need more or different documentation. Thank you Brandon Quinn Eden Rock Enterprises LLC Managing Member Direct- (828) 778-9457 NC G.C. Lic # 63794 Limited only by your imagination 1