Andrew please find attached the map of the erosion control plan with the impacted area of the wetlands.
Plan to restore:
10/15: survey the wetland area and determine the impacted area and sediment pond - Completed
10/16: remove concrete box and drain at end of the impacted area to install in the improved sediment basin.
Completed
10/17-10/22:remove berm and restore impacted area to original contours and slope - Completed
10/23: Install new silt fencing and orange construction safety fencing in and around the impacted area. -
Completed
10/24: seed and straw slope between the orange construction fence and the silt fencing - Completed
10/28:replant impacted area with wetland seed mix
We have been working Larry Ammons on the erosion control plan to get it to an acceptable compliance, in our
meetings we have moved the sediment pond and the box and drains to the plan requirements. We had started
this work prior to receiving the notice of violation from your office and were not aware of what exactly was
expected of us which also impacted some of the work we had to complete for the erosion control measures. We
have not received a NOV in writing from them but they have instructed us on which items that will be in the
NOV and allowed us to get them resolved and all of those items as well are completed. Please let me how to
proceed and if you need more or different documentation. Thank you
Brandon Quinn
Eden Rock Enterprises LLC
Managing Member
Direct- (828) 778-9457
NC G.C. Lic # 63794