Loading...
HomeMy WebLinkAboutNCC201662_Annual Fee NOD Letter_20210518ROY COOPER G- DIONNE DEUI-GATTI Secrercry BRIAN WRENN nbxror 5/18/2021 Exeter Building Company Attn: Alex Yost 4441 Six Forks Road Ste 10 1 -685 Raleigh, NC 27587 Subject: Notice of Deficiency- Failure to Pay Annual Fee Invoice No. NCC201662-2021 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 4/1/2021 and was due on 5/1/2021. The annual fee applies to the following construction site: Stonewater S/D Phase 5 Lot 159 809 Brownwich St, Wake Forest, NC Wake County Certificate of Coverage No. NCC201662 NC Reference No. NCG01-2020-1662 If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date, please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at annette.lucas@ncdenr.gov. Sincerely, Annette Lucas Stormwater Program Supervisor Division of Energy, Mineral, and Land Resources Nun CarolFa Deparl ment of Environmental Q"Alry I DIvlslnn of Energy, Mlueral and Land Resources Sl2NanhSallsburyStreet 1 3612 Mall SerAce center I Ralelgk Nanh Carclkn3 276W-1612 w +�+a 919.307.9246