HomeMy WebLinkAboutNCC201662_Annual Fee NOD Letter_20210518ROY COOPER
G-
DIONNE DEUI-GATTI
Secrercry
BRIAN WRENN
nbxror
5/18/2021
Exeter Building Company
Attn: Alex Yost
4441 Six Forks Road Ste 10 1 -685
Raleigh, NC 27587
Subject: Notice of Deficiency- Failure to Pay Annual Fee
Invoice No. NCC201662-2021
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater
Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The
annual fee was billed on 4/1/2021 and was due on 5/1/2021. The annual fee applies to the following construction site:
Stonewater S/D Phase 5 Lot 159
809 Brownwich St, Wake Forest, NC
Wake County
Certificate of Coverage No. NCC201662
NC Reference No. NCG01-2020-1662
If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date,
please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at annette.lucas@ncdenr.gov.
Sincerely,
Annette Lucas
Stormwater Program Supervisor
Division of Energy, Mineral, and Land Resources
Nun CarolFa Deparl ment of Environmental Q"Alry I DIvlslnn of Energy, Mlueral and Land Resources
Sl2NanhSallsburyStreet 1 3612 Mall SerAce center I Ralelgk Nanh Carclkn3 276W-1612
w +�+a 919.307.9246