HomeMy WebLinkAbout20210863 Ver 1_Pre-Filing Meeting Information_20210507DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low and include location information.*
20210863 1
Wilmington Regional Office - (910) 796-7215
Joanne Steenhuis
Pre-Filing Me eting Reque st submitte d 4/23/2021
Laura J. Meyer
laura.meyer@woodplc.com
CSXT Bridge at MP 305.5 over Big Swamp #3
CSX Real Property, Inc.
Robeson
City
Jacksonville
State / Province / Region
Florida
Postal / Zip Code
32202
Country
USA
Street Address
500 Water Street
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
A jurisdictional forested wetland occurs along both sides of the
railraod tracks at milepost (MP) 305.5 on the CSXT railway. The
forested wetland at the bridge crossing is characterized as a
Bottomland Hardwood Forest. The wetlands within the footprint of the
project encompass a non-forested portion of the Bottomland
Hardwood Forest, as they are in the maintained ROW of the railway.
Please give a couple of dates you are available for a meeting.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
5/23/2021
PCN-Butters_04.23.2021.pdf 23.86MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
4/23/2021