HomeMy WebLinkAboutNC0049867_NOV-2021-LV-0282 Response_20210510Town of Cleveland
302 East Main Street
P.O. Box 429
Cleveland, NC 27013
(704)278-4777
May 10, 2021
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
NCDEQ-Mooresville Regional Office
610 East Center Ave., Suite 301
Mooresville, NC 28115
G ECEIVED/NCDEQ/DWR
MAY 1` 7 2021
WQROS
MOORESVILLE REGIONAL OFFICE
SUBJECT: Response to Notice of Violation & Intent To Assess Civil Penalty
Tracking Number: NOV-2021-LV-0282
Permit No. NC0049867 - Cleveland WWTP -Rowan County
Dear Mr. Basinger:
Limit Exceedance Violations: 2/6/21 Value 12,000 and 2/13/21 Value 5,400 - Effluent Coliform,
Fecal MF, MFC Broth, 44.5 C (31616) Weekly Geometric Mean Exceeded. All test results since
February 13 have been between 1 to 84.
Over the last six months we have had several problems exceeding the coliform, Fecal limits. This
started with our new Wastewater Treatment Plant (WW IP) operator who felt that the problem
was due to having a chlorine contact chamber that was too small. After he left our employment in
February 2021, we discovered that the bypass valve was not being sometimes closed all the way.
The bypass valve was used to clean the contact chamber. The cleaning procedure has been used
since the WWTP has been in service. It was part of the design of the WWTP. We certainly did
not intend to leave it open or cracked.
The corrective action to prevent any further use of this contact chamber clean -out procedure is:
(1) Discontinue bypass usage and seal valve. (2) Install a temporary pump to be used to recycle
back to the oxidation ditch to clean the contact chamber. This would occur between 5 and 7 a.m.,
our lowest flow rate time. The cleaning should occur as needed, probably once per month.
(3) Proceed with installing a second chlorine contact chamber as soon as possible. See the
attached engineering action.
Our objective is to operate the Cleveland WWTP within the quality limits and maintain close
follow through with environmental protection.
Sincerely,
Patrick Phifer
Mayor
cc: Commissioner Gerald Osborne
enc
SENT VIA EMAIL — ccorey. b it ern :denr.gov
SENT VIA EMAIL — roberto.seheller( ncdenr zov
HARD COPY SENT FIRST CLASS MAIL
TASK ORDE NO 2
This TASK ORDER NO. 2 dated the /0— , day of iniZ. 2021,
is a supplement to the MASTER SERVICES AGREEMENT betirveen the Town of
Cleveland, North Carolina, dated January 26, 2021, hereinafter referred to as OWNER
and McGill Associates, P.A., hereinafter referred to as "ENGINEER". The purpose of this
Task Order is to authorize the ENGINEER to provide services for the "PROJECT" entitled:
Wastewater Treatment Plant Chlorine Contact Basin.
SECTION 1 - PROJECT DESCRIPTION:
The project can generally be described as:
Construction of a redundant chlorine contact basin parallel to the existing basin,
which will take the place of the current basin bypass. The new basin will be a
mirror of the current basin. Both basins will be controlled by a new flow splitter box
which will replace the current bypass valving, Disinfection will continue to be
accomplished using chlorine gas. Also included in the project are replacement of
the existing duplex return sludge pumps for each of the clarifiers, along with control
panels. It is anticipated tat no special funding requirements will be needed for this
project.
SECTION 2 - SCOPE OF SERVICES:
The Engineer shall provide all professional services (the "Services") for the Project
including, performance of the following:
Provide design, biddinglaward and construction phase services as outlined in the
Master Services Agreement sections 2.2, 2.3, and 2.4, for completion of the
proposed project.
SECTION 3— COMPENSATION The Owner shall pay the Engineer for services outlined
in Task Order No. 2 the following Lump Sum amounts:
1. Design Phase
2. Bidding and Award Phase
3. Construction Phase
$54,200
$7,500
$39,800
Patio 1 of 2