HomeMy WebLinkAbout20201105 Ver 2_USACE Correspondence_20210517Strickland, Bev
From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Sent: Monday, May 17, 2021 11:44 AM
To: Metzler, Lance L; Beasley, Troy; Homewood, Sue
Subject: [External] SAW-2020-01543 / Reidsville Rural Ready Site / Reidsville / Rockingham
County / NWP 39 / Corps Receipt of Individual 401 WQC
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
North Carolina Division of Water Resources (NCDWR): After review of the submitted Pre -Construction Notification
(PCN) for the above referenced project, dated 4/15/2021, and the Nationwide Permit 39 Water Quality General
Certification (GC) No. 4263, dated December 18, 2020 (https://saw-
reg.usace.army.mil/NWP2021/NWP39 StateWQC.pdf) it appears that an individual 401 water quality certification
(WQC) is required from the NCDWR for the proposed activities. The PCN received by our office provided the 9 required
elements for an individual WQC, and constitutes the Corps initial receipt of the 401 WQC application. The reasonable
period of time (RPOT) for you to act on this WQC request is 120 calendar days from the date of the complete 401
request. Unless NCDWR is granted a time review extension, a waiver will be deemed to occur if you do not act on this
request for certification within the RPOT. The date upon which the waiver will occur if you do not act on the certification
is 8/13/2021.
Applicant/Consultant: Please note, should we finalize our review prior to receiving the 401 WQC, you will receive a
provisional general permit verification from the Corps. Once a 401 WQC is issued or waived by the NCDWR, the Corps
will provide you with a final general permit verification. Your proposed work shall not commence until after the 401
WQC has been issued or waived AND until a final general permit verification has been provided to you.
Please let me know if you have any questions.
Sincerely,
Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Office: (919) 554-4884, Ext. 30.
Mobile: (919) 817-2436
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: https://regulatory.ops.usace.army.mil/customer-service-survey/
i
Thank you for taking the time to visit this site and complete the survey.
2