SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
References.
1. Title 42, USC, Chapter 52, Section 17094, Section 438 Energy Independence and
Security Act, December 2007.
2. Memorandum, Deputy Under Secretary of Defense (Installations and Environment),
19 Jan 10, subject: DoD Implementation of Storm Water Requirements under Section
438 of the Energy Independence and Security Act (EISA).
3. Memorandum, Assistant Secretary of the Army (Installations, Energy and
Environment), ASA(IE&E), 17 Jan 2017, Subject: Sustainable Design and Development
Policy Update.
4. Memorandum, ASA(IE&E), 20 Dec 12, subject: Water Goal Attainment
Responsibility for Installations
5. Army Regulation (AR) 420-1, Army Facilities Management, Feb2008
6. UFC 1-200-02, High Performance and Sustainable Building, Dec2016.
7. AR 210-20, Real Property Master Planning for Army Installations, May 2005
8. Unified Facilities Criteria (UFC) 2-100-01, Installation Master Planning, May 2012
9. UFC 3-210-10, Low Impact Development, Feb2016
10. Army Low Impact Development Technical User Guide, Jan 2013
1. General. Implementing low impact development (LID) stormwater management
features called best management practices (BMPs) provide the Army with increased
sustainable solutions and help the Army achieve High Performance Sustainable
Buildings and Installations.
a. Incorporation of LID BMPs into the Army's construction program is the method
used to meet requirements of Section 438 of the Energy Independence and Security Act
(EISA), Department of Defense and Army policy regarding stormwater management.
The design objective of LID is to maintain or restore the predevelopment (pre -project)
hydrology of the property with regard to the temperature, rate, volume, and duration of
flow. The pre -development hydrology is the hydrology of the site prior to the planned
project being carried out.
b. Low impact development BMPs actively manage stormwater runoff by mimicking
a project site's pre -development hydrology using design techniques that infiltrate, store,
and evaporate runoff close to its source of origin. In planning and development of
installations, we must plan more holistically, around designated area development
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
districts. We must look at more multi -use and compact, multi -story solutions that reduce
the development footprint, incorporating designs that minimize impervious surfaces.
c. Implementation of this guidance will reduce the number and size of conventional
stormwater construction practices of the past (i.e. curb and gutter, storm drain inlets,
retention and detention basins). When properly implemented, LID BMPs will maintain
and/or restore pre -development hydrology and remove pollutants such as nutrients
(nitrogen and phosphorus), oil and grease, and sediments from stormwater with minimal
land requirement, when compared to traditional stormwater practices.
d. Installation/activity commanders and installation managers, master planners,
design engineers, stormwater program managers, maintenance personnel, land users,
tenants, U.S. Army Corps of Engineers and all construction contractors are integral to
the successful implementation of LID within the Army's construction program. Effective
master planning and site planning are critical aspects of implementing sustainable
practices across Army installations. If Army installations are truly to be sustainable, we
must systematically change the way we manage stormwater which requires a
commitment to LID principles in the installation -wide visioning and planning processes
as well as implementing these principles through area development plans and site
specific planning actions.
2. Applicability.
a. This guidance applies to all construction and renovation projects on Army
installations, sites, enclaves and activities, regardless of funding source including
Government Owned Contractor Operated (LOCO) installations, and all Army National
Guard projects that receive federal funds, with a limit of disturbance (LOD) of 5,000 SF
or more in area.
b. Exceptions to policy and this guidance include privatization initiatives (housing
and utilities) and medical facilities constructed using DoD Medical (DoDM) funding. At
Joint Installations, the owning Service guides all construction policy and guidance. If
the Navy or Air Force builds on Army installations, they will comply with Army policy and
guidance. For overseas construction activities at enduring locations, this guidance
applies except where there is direct conflict with Host Nation agreements. In those
instances, installations/activities will strive to achieve LID approaches consistent with
applicable host nation requirements and operate in accordance with applicable
international agreements, e.g., Status of Force Agreements. Construction in
contingency areas (and incorporating semi -permanent or better construction standards)
is to incorporate this policy to the greatest extent practicable considering mission
objectives.
c. The requirement to incorporate LID as a means to manage stormwater differs
when comparing what is written in the Army Sustainable Design and Development
Policy Update Memo (reference 3) with the Low Impact Development UFC (reference
I%
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
9). Army policy is required to be followed in all Army construction, therefore LID is
required to be incorporated in all Army horizontal and vertical construction that meets
the criteria in this guidance.
3. Project Planning and LID. Implementation includes completion of the requirements
identified in the following subparagraphs: site selection, site planning, runoff
assessment, LID BMP strategy, cost estimating and reporting. The implementation
process includes use of the Army LID Planning and Cost Tool. It is necessary that the
"Tool" and "User Guide" located in the Design Tools section of the Hydrology and LID
webpage: https://mrsi.erdc.dren.mil/sustain/cx/lid be saved to your computer for use
(see the "Example" project loaded in the Tool as a reference).
a. Site Selection. The installation/activity Master Planner is responsible for
providing an approved project site. Site selection includes a review of the natural
drainage patterns (micro -sheds) to take advantage of natural slope on the planned site
and incorporates a strategy to minimize: tree removal, soil grubbing activities and
disturbance to sensitive areas/habitats and protected cultural resources. Give
consideration to the location and overall design of LID BMP structures so overflows may
be tied to existing stormwater conveyance systems as necessary.
b. Site Planning. The use of LID BMPs in the management of stormwater warrants
a broad holistic approach that addresses the development of watershed areas across
our installations, sites, enclaves and activities. The installation/activity Master Planner,
shall include LID considerations for stormwater management throughout the planning
and programming process, to include initial visioning, installation planning standards
(IPS)/installation design guide (IDG) principles, area development planning, and
ultimately site planning for specific facilities. Reducing impervious surface and
promoting infiltration, where possible, should be a goal throughout the planning and
programming process.
c. Runoff Assessment. All installation/activity construction projects must start
with developing a runoff assessment in order to determine the stormwater
requirements required to be met using LID. The assessment identifies any increase in
runoff resulting from the project which forms the basis for a LID BMP Strategy and is
developed through use of the Army LID Planning and Cost Tool. Use the planning
and cost tool "User Guide" as a tutorial on how to enter installation/activity project
criteria.
(1) Limit of Disturbance. Identify the project "site boundary" (in acres) as the
estimated limit of disturbance (LOD). Planning the site boundary as the LOD provides
adequate space to locate LID BMPs on the site and supports LEED scoring. The
estimated LOD is identified during the planning and concept design phases and
finalized during the design process.
(2) Runoff Required to be Managed. Use the project "Example" loaded in the
3
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
"Tool", and the Tool "User Guide" to become familiar with the data fields needed to
initiate a new project and address any issues you may have.
i. Once the LID BMPs are selected and sizes are planned, the Cost Tool can be
used to calculate planning level costs of construction and maintenance and assists in
completion of programming documents, such as a DD 1391, to ensure the quantity of
LID BMPs and estimated costs are incorporated into the project.
ii. In addition, the LID Planning and Cost Tool "Report" feature summarizes
project inputs and outputs and begins populating the information needed for annual
reporting.
d. LID BMP Strategy. The Master Planner develops the LID BMP strategy by
selecting the "Type" and "Quantity" of each LID BMP considered for inclusion in the
project. The Master Planner should consider the IPS/IDG, area development plans and
installation network plans where available to identify LID BMPs that complement
installation master planning strategies. The Master Planner coordinates with the DPW
Engineer to finalize the strategy.
(1) Once a LID BMP type and associated quantity is selected the tool auto -
calculates how much runoff is managed/retained by the BMP. The amount of runoff
managed/retained is a function of the type and design of the BMP selected:
bioretention, drainage swale, permeable pavement, rainwater harvesting, green roof,
and infiltration practice.
(2) LID BMPs identified in the Army LID Planning and Cost Tool are cumulative
by BMP type. As an example, If you select 100,000 SF of bioretention and you decide it
will be broken up into several different BMPs you are to enter 100,000 SF in the
planning tool and identify each BMP separately as LID 1 ..., LID 2 ..., etc. (followed by a
description) in the Text Box at Tab J, Storm Drainage / Low Impact Development until
the total square footage of the separate BMPs matches the square footage identified in
the "Tool".
(3) Multiple types of LID BMPs may be incorporated into a project site. The LID
BMP Strategy may include a treatment train (LID BMPs in series) and in some
instances may be required to meet enhanced stormwater management and water
quality criteria. Consolidation and/or diversion of stormwater to retention/detention
ponds is not an acceptable LID BMP practice.
(4) Planners and designers must be careful when planning to incorporate LID
BMPs into parts of projects that have a potential to contribute to environmental
contamination. As an example, LID BMPs designed for infiltration are not appropriate
for use where end user activities include petroleum, oil and lubricants (POL)off loading,
fueling, hazmat/waste loading/unloading, etc. Instead stormwater will be managed or
diverted in such a way that any spills will minimize impact on the environment. In order
0
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
to ensure integrity of the environment, project planners and engineers may consider
unique and innovative methodologies on the project under consideration and may apply
LID mitigation initiatives to other areas within the watershed.
(5) Long term operation and maintenance costs are to be incorporated in the
decision process when determining which BMPs to include in a LID BMP Strategy.
e. Cost Estimating. The LID Planning and Cost Tool "Report" provides a planning
level cost estimate (in today's dollars) and is not to be substituted as a detailed cost
estimate developed during design and construction phases.
f. Reporting. An Army LID Planning and Cost Tool Report is required to be
completed and attached to Tab J of all DD1391's for MILCON projects or kept in the DA
4283 project file for non-MILCON projects. Optional reporting of LID BMPs constructed
in "Completed Construction Project Data" may be submitted in the LID module of the
Army Energy and Water Reporting System (AEWRS) website_
https://aewrs.hgda.Pentagon.mil/ . While optional, the LID module in AEWRS serves as
an excellent tool to provide a permanent record of LID BMPs constructed. Reporting is
the responsibility of the installation/activity Master Planner.
(1) Planning Report. Upon completion of the LID BMP Strategy and Planning
Level Cost Estimate through use of the Army LID Planning and Cost Tool, the Master
Planner clicks on the "View Report" button to obtain the Army LID Planning and Cost
Tool Report. The report shows project site details, runoff volume required to be
managed on -site, LID BMP Strategy, and estimated costs for the types of LID BMPs
selected. This report demonstrates planned compliance with EISA, DoD and DA
stormwater policy.
i. The Army LID Planning and Cost Tool Report is required to be saved as a pdf
file and uploaded to the Storm Drainage / Low Impact Development section of Tab J for
the DD1391 (see Appendix A). When using a local job order (DA 4283), The Army LID
Planning and Cost Tool Report is required to be included in the 4283 Project File.
ii. A narrative description of each LID BMP and starting with LID 1 ..., LID 2 ...,
etc. that makes up the LID BMP Strategy is to be included in the Storm Drainage / Low
Impact Development "Text Box" at Tab J (see Appendix B).
iii. The estimated planning level costs for LID BMPs are required to be included
in Tab A Cost Estimate in the Supporting Facilities Section of the DD1391. The cost
estimate will use the nomenclature established in the Tab J, Text Box, i.e. LID 1
bioretention, LID 2 bioretention, LID 3 drainage swale, etc. and making up the LID BMP
Strategy (see Appendix C).
iv. The Army LID Planning and Cost Tool Report is to be carried forward being
updated along with other project documentation in the 1391 or 4283 as applicable, up to
A
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
the "Initial Design Phase."
Note: When using the Army LID Planning and Cost Tool It is recommended the
file be saved frequently. Ensure to use a new file name each time you enter a new
construction project.
(2) Project Completion Report. Upon project completion, LID BMP construction
details may be reported in the LID module of AEWRS. The LID module provides the
installation a location to maintain a permanent record of LID BMPs incorporated in
construction projects.
(i) Reporting in AERWS is recommended for all new construction and
redevelopment projects completed on installation/activity grounds during the fiscal year
of report.
(ii) The center (centroid) of each LID BMP is used to identify its location and is
the HQDA approved Installation Geospatial Information and Services (IGI&S)
methodology.
4. Project Execution and LID.
a. Planning Charrette. The Master Planner provides the LID BMP Strategy to the
planning charrette (PC) team members. The PC attendees provide input into the
strategy to enhance management of stormwater runoff.
b. Initial Design Phase (Code 2, 3). The following subparagraphs outline the general
process to include LID in project design.
(1) The USACE Geographic District calculates and validates the runoff volume
required to be managed during the planning/design charrette. The LID BMP Strategy
continues to be refined and BMP cost estimates are to be updated using the "Tool" for
estimated planning level costs and incorporated in the ENG Form 3086. Note: For non-
USACE projects, the designer of record is responsible to plan and design LID BMPs
capable of managing any increase in site runoff.
(2) All planned changes to the LID strategy are required to be coordinated
through the installation/activity Master Planner to develop consensus and approval. Low
impact development is not to be cost engineered out of theproject.
(3) LID BMPs are incorporated into the project definition report (PDR). Refined
LID BMP cost estimates are developed in the ENG Form 3086 process. Each LID BMP
is identified using LID 1 ..., LID 2 ..., etc. and totals (amounts of BMPs) are developed
in the Army LID Planning and Cost Tool Report.
(4) Once the project becomes approved, the LID BMP strategy will be carried
N
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
forward into the project final design. Contract documents will reference stormwater
management criteria/standards from updated IPS/IDG that meet the intent of the Army
LID policy found in reference 3 and this guidance. Where the IPS/IDG has not been
updated, this guidance may be referenced. The LID BMP strategy, designs and
supporting documentation will be provided to support LID implementation through the
RFP process as necessary.
c. LID Strategy Change Management. Changes to the LID BMP strategy must
meet the requirements of Army LID policy; EISA, section 438 and state and local
regulation. In all instances where modifications/wholesale changes to the LID BMP
strategy are planned, the USACE Geographic District representative will coordinatewith
the installation/activity Master Planner on proposed new LID courses of action and
develop consensus on how to best meet LID requirements.
d. Construction Phase. The construction representative will conduct routine
inspections of LID BMPs to ensure they are constructed per the final designs. Any
required changes to the strategy during construction will be coordinated with the Master
Planner for approval. Any construction change orders must be approved by the LID
BMP designer of record. Upon completion of construction and at project closeout, BMP
as -built documentation will be provided to the installation/activity DPW or equivalent.
The LID BMPs will be identified on the DD Form 1354.
e. Real Property Inventory. All structural LID BMPs meet the definition of real
property and require a real property unique identifier (RPUID) number. LID BMPs areto
be included in the accountable property systems of record (APSR), coded with a
category code and included in the sustainment model. Master Planners are to use
CATCODES that best accommodate the LID BMPs constructed on their
installations/activities. New LID BMP specific CATCODES are being pursued
through appropriate channels at HQDA.
f. Operation and Maintenance. A LID BMP Owner's Manual is required to be
included as a deliverable in the contract and contain the processes used to maintain
the BMP to ensure proper operation is achieved. The manual is provided to the
Directorate of Public Works or equivalent.
5. Contract Language. The following example contract language is provided for use in
the event a garrison/activity commander should choose to have the project Designer of
Record, develop reporting data elements. Example contract language: "Upon project
completion the Designer of Record shall provide all data points in the L I D m o d u I e
o f A E W R S located in Appendix D. The Designer of Record will provide the
completed report form, and an Owner's Manual that identifies a schedule of all required
BMP maintenance to the Installation Directorate of Public Works or equivalent as part of
the DD Form 1354 Transfer and Acceptance of DoD real property contract close-out
process."
7
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
6. Exceptions to Policy. Garrison Commanders may request an exception to policy if
LID BMP implementation would adversely affect mission performance, security, or
Antiterrorism/Force Protection requirements, health, safety or welfare, or in instances
where the exception is directly related to the technical infeasibility of LID BMP
performance. The exception request will be provided as follows.
a. The Garrison Commander submits a request through the chain of command, to
the Director, Operations Directorate, Office of the Assistant Chief of Staff for Installation
Management, Attn: DAIM-ODC, 600 Army Pentagon, Washington, DC 20310. Upon
review the OD Director will forward a recommendation of acceptance/denial to the
Deputy Assistant Secretary of the Army for Installations, Housing and Partnerships
(DASA(IH&P)).
b. The memorandum request is to include: Subject: Exception to Policy Requestto
Incorporate LID in (Project Name) Based Upon (choose either Mission
Impact/Security/Technical Infeasibility), A summary statement that demonstrates why
LID BMP implementation is not practical for the specific project, the DPW master
planner name, installation/ activity address, email and phone number, the name and
company of LID design engineer(s), project type considered, site location (using GPS
coordinates), watershed name (per state/EPA), engineering calculations, geologic
reports, hydrologic analyses and site map.
7. Considerations.
a. Site Management. Tree clearing and soil grubbing activities are to be reduced
to the maximum extent possible, but are not to impede contractor requirements for
storage, parking, delivery, and other specific project requirements, e.g. developing clear
zones for airfield construction. LID BMPs are to be constructed within the LOD. Native
vegetative cover will be maintained and replaced as necessary. Projects must take into
account the location of protected species, sensitive areas/habitats, and protected cultural
resources sites, avoiding these areas whenever possible.
b. Ties to Traditional Stormwater Systems. Proper LID BMP designs may require
drain disconnects, underdrain (overflow) connections or reconfigurations to existing
traditional storm sewer systems.
c. Stormwater Harvesting. Installation/activity Master Planners should consider
stormwater harvesting in order to meet both water quantity and quality requirements.
Stormwater harvesting may be used to achieve numerous objectives all while managing
runoff rate and volume. The use of cisterns and the installation of interconnected pipe
networks below parking areas to store runoff are just a couple of techniques for
consideration. Water storage under parking and drive areas accessible to tactical
vehicles, e.g. Striker, MRAP and tanks must be given special consideration during
scoping and budgeting to ensure proper project design. Stormwater re -use includes but
is not limited to: process makeup water, irrigation, grey water (purple pipe), personal
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
and tactical vehicle wash, and emergency firefighting requirements. It is imperative for
garrison DPW staff including Operations and Maintenance personnel to understand
O&M requirements to ensure proper BMP function once complete. Site conditions of
these storage areas including elevation/grade and soil conditions may necessitate
pumping and other maintenance burdens to be included in garrison O&M requirements.
When a cost benefit analysis seems appropriate prior to project consideration it should
take into account a minimum 50-year project period and use the 95th percentile storm
event. Calculations and supporting analysis must remain part of the design
documentation. Projects located in jurisdictions that forbid stormwater harvesting (e.g.
riparian water rights) are exempt from consideration.
d. Retention/Detention Ponds. Land is a dwindling Army resource. Stormwater
retention and detention ponds take up valuable space, are not considered LID BMPs
and are highly discouraged. Traditional retention and detention ponds do not provide for
maintaining pre -development hydrology, allow for minimal infiltration, and provide
minimal water quality benefits.
e. Training Areas. Construction projects in training areas greater than 5,000 S F in
size will incorporate LID BMPs as the methodology to manage stormwater. Construction
of roadways, trails, ranges, pads etc. will incorporate LID BMPs to the greatest extent
possible.
f. Demolition. Project activity including demolition must be evaluated to ensure any
increased runoff from the site is managed using LID principles.
g. Stormwater Modeling. Installation/activity DPW Engineer and USACE
Geographic District PMs are responsible for maintaining all pertinent site modeling data
and calculations.
h. Practical Application. In all instances LID BMPs are to meet local, state and
federal requirements for management of stormwater and will be incorporated into
projects in an attempt to restore pre -project hydrology. As a general rule, EISA
compliance is accomplished through management of the difference in pre and post
project runoff from the 95th percentile rain event. This calculation is based on the
difference in runoff coefficient for the pre and post project land cover. Each planned LID
BMP is modeled to determine its ability to manage an amount of runoff. The volume of
water that each LID BMP is capable of managing is cumulative across the site boundary
and must be greater than the amount of increased runoff from the site.
i. Watershed Approach. It should be pointed out that modeling of LID BMPs using
the LID Planning and Cost Tool (during the Planning Charrette and/or Design Charrette)
may not be sufficient to address planned/future state requirements for water quality
and/or quantity issues related to construction permits (see the Modeling Section in the
Army LID Tech User Guide). Watersheds including micro- sheds can have a variety of
unique challenges including: threatened and endangered species, historical properties,
Al
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
invasive species, soil instability and erosion, aggressive/steep slope, current and
planned development and associated runoff and others. Installation DPW personnel
must remain knowledgeable of construction permit requirements and may be required to
institute an enhanced modeling approach to meet future requirements. Modeling would
be used to determine the effect of the planned project construction and results will be
incorporated into the designated development area as cited in the installation master
plan. To restore a site to pre -project hydrological conditions an installation/activity may
need to consider a broad area/community or development approach. Project success
may involve the cumulative effect of LID BMP initiatives, as single features by
themselves may not be capable of restoring the site to pre -project hydrologic conditions.
j. LID Guidance and Support. The USACE Hydrology and Low Impact
Development site: https://mrsi.erdc.dren.mil/sustain/cx/lid is a resource for legislation,
policy, guidance and tools for use in development of Army projects. Army LID
implementation will be accomplished using Army Implementing Guidance (this
document), the Army LID Planning and Cost Tool (see Design Tools section of the mrsi
site), and the Army Low Impact Development Technical User Guide (see Best Practices
section of the mrsi site). The Technical User Guide provides practical planning and
design examples on how to construct successful LID BMPs. Design criteria can be
found in the Low Impact Development UFC 3-210-10. Other professionally recognized
industry standards including guidance developed by the Service components should be
considered if it is not available from the Army, Department of Defense (DoD) or EPA.
10
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
APPENDIX A
Army LID Plarill' 19 alad Cost Tool Report
PROJECT INFO
SITE INFO AND EISA VOLUME
Date
7f21l2016
REQUIREMENT
arm] command
1MCOM
i Project limit of dis= ante (AC) 5�
_ —Y autallabAm
55%rainfall depth (1N) 1.6
Fort Meade
Project name
Soil tape 3aadf-Loam
E--ple
Project desaiptioa
I33ologie Soil Group (HSG)
wbuilding and parking lot
r
Pre -project curse number (CV) 58
Post-Froject carte number (CN) 83
User lame
EMC
Pze-p3iojectrunofT3-ohime (CF) 68
-Master Planner
Post -Project runoff volnnae (CF) 9529
EISA section 4-39 retention volume 9462
requirement (CF)
LID PIANNING SUNMIARY
Stractural BNP
Surface area
Rt=ff volume lion-stmc=al BNP Sulfate
;SFj
retainetl (CF) area (AC)
Sioretrntion=
_ 5046�
+0 Veg. Filter Strip (Slope 'r2°r5, Short Grass): O.00
Swale:
1607 Veg. Filter Strip (Slope >2%, Tall Grass): 0.00
Permeable pavement:
20000
2667 Veg. Filter Strip (Slope C2°A. Short Grass)- O.00
Rainwater harvesting:
Veg. Filter Strip (Slope C 2%, Tall Grass): 0.04
Green roof:
15004
1500 Reforestation tTrees - Short Grass): 0_fi4
Infiltration practice:
20[K}
1624 Reforestation (Trees - Shrubs and Tall Grass): 0.66
Iotal retention s,olume provided ln• BMPs (CF): 11457
Project conapheq "ith EISA Section 438.
LID COST SUMAULRY
Type
Surface Area (SF)
Estimated Construction Cost
Estimated Annual .Maintenance Cost
Eioretentiom
i 000
s 178,198.80
5+ 1, 99 8. i r
Drainage sveale
3000
333,093.98
328,497.23
Filter strip
0
SO.00
39.00
lumtration trench
2000
i165,831.82
s20,560.66
Permeable concrete pa-rers
20040
1963,+31.0+
572,893.05
PerSzous concrete
0
S 4.00
s9.00
Parotss asphalt
0
50.00
50.00
Reinforced turf
0
50.00
50-00
Total
51,340,555.55
S164,027.33
Master Planners are to "save as .pdf or .jpeg and attach" each Army LID Planning and
Cost Tool Report to the project DD1391, Tab J.
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
APPENDIX B
Example. LID BMP Strategy and TAB J, Storm Drainage/Low Impact Development
1. LID BMP Strategy (pre -Planning Charrette (PC)). The "pre -PC" LID BMP Strategy
is a listing of "Types" and "Quantities of LID BMPs" planned for incorporation in the
project and is a reflection of the LID Planning and Cost Tool Report (see Appendix A).
The pre -PC BMP Strategy is entered in the Text Box at Tab J, Storm Drainage/Low
Impact Development. The following is an example BMPStrategy.
LID 1. Install 3,000 SF of bioretention across parking lot to include tree planting to
reduce heat island effect. Plan for runoff sheet flow to bioretention with water storage
system (w/under drain).
LID 2. Give strong consideration to enhanced bioretention (placing two or more BMPs in
series) as water temperature and sediment are water quality concerns (see State TMDLs
for installation.
LID 3. Construct 2,000 SF of bioretention rain gardens along west edge of LOD and at
two opposing corners of the building (strong consideration to be given to Southeast and
Northwest corners as they have good slope and Northwest corner also has existing
storm water pipe to tie BMP overflow to as necessary).
LID 4. Use 3,000 SF of drainage swale on Southwest and Northeast corners of project
as they have natural drainage from the site.
LID 5. Install 2,000 SF of infiltration trench along north edge of parking lot.
LID 6. Install 20,000 SF of permeable pavers across parking lot and walkways.
LID 7. Install 15,000 SF of green roof on the building. (NOTE: The green roof is not
included in the "LID Cost Summary" table, Appendix A. The "Tool" is not able to
calculate the cost of a green roof due to the many variables that come into play in the
planning and design process. The Master Planner is required to develop an estimated
cost).
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
APPENDIX B
Example. The LID BMP Strategy and TAB J, Storm Drainage/Low Impact Development
(Cont.)
2. LID BMP Strategy (Post -PC). The "post -PC" LID BMP Strategy is a refined listing of
"Types" and "Quantities of LID BMPs" planned for incorporation in the project and
entered in the Text Box at Tab J, Storm Drainage/Low Impact Development. The
following is an example of a refined BMP Strategy and provided in the Text Box. This
LID BMP Strategy goes forward to the PDR/3086 process.
LID 1. Construct 4 - 100 ft. long bio-retention BMPs parallel to one another in the
parking lot. Bio-retention is to have a 6ft W X 4ft D cross -sectional area and utilize
parking lot slope to flow stormwater into the BMPs. Do not install curb that impedes
sheet flow to BMPs. BMP area is 4 X 6' X 1 00'= 2,400 SF. Plant eight (8) White Oak
trees in parking lot BMPs not closer than 80 feet to one another.
LID 2. Construct 2,600 SF of bioretention rain gardens along west edge of LOD and at
Southeast corner of building. Tie underdrain to existing storm water pipe.
LID 3. Install 3,000 SF of drainage swale on Southwest and Northeast corners of
building site.
LID 4. Incorporate 2,000 SF of Infiltration trench adjacent to the Northeast corner of
building site and tie over to the Northwest corner of the parking lot. Do not direct
parking lot drainage to filter trench.
LID 5. Install 20,000 SF of permeable pavers. Make all walkways with pavers.
Remaining square footage required to meet 20,000 SF to be made up around the
parking lot. Provide runoff storage within base material.
LID 6. Install a 15,000 SF low maintenance green roof along the western sloping roof
line. If this BMP turns out to be infeasible, review design data and increase bioretention
as necessary to meet EISA.
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
APPENDIX C
Example. DD1391, Tab A Cost Estimates for LID BMPs
Develop LID Cost Estimate at Planning Charrette. Use the LID Cost Planning Tool to
develop a cost estimate for each planned LID BMP type in the Tab J, Text Box (LID
BMP Strategy) and enter into Tab A Cost Estimate, Supporting Facilities Section. Input
to Tab A may vary but should be developed using nomenclature similar to the following:
Storm Drainage Description
UM
Quan
UC($)
Total ($)
LID 1 Bioretention
SF
2,400
$36.00
$86,400
W/Oak Trees
EA
8
$400.00
$3,200
LID 2 Bioretention
SF
2,600
$36.00
$93,600
LID 3 Drainage Swale
SF
3,000
$11.00
$33,000
LID 4 Infiltration Trench
SF
2,000
$82.00
$164,000
LID 5 Permeable Pavers
SF
20,000
$48.00
$960,000
LID 6 Green Roof*
SF
15,000
$98.67
$1,480,050
* Cost is an estimate and not based on real data.
Notes:
1. Changes to the BMP strategy may take place along the way through project
development. These changes may take place during the project definition report (PDR)
(Code 3) and the Design (Code 6/7). In all instances installation/activity Master
Planners are to be coordinated with planned changes. The Designer of Record uses
the information in the DD1391 as the starting point to identify installation Master Planner
supported LID BMPs that meet Army Policy and Guidance.
2. A PDR consists of a 1391 scope validation resulting in a refined scope of work and a
completed ENG Form 3086 cost estimate. LID BMPs identified in Tab J are refined
during the PDR process and updated in the PDR and ENG Form 3086.
C-1
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
APPENDIX D
Example. Input to LID Module, Army Energy and Water Reporting System
1. Description. The enclosed metrics may be recorded for each LID BMP constructed.
2. Installation/Activity.
a. SUID:
b. Installation/Activity Name
c. Sub Installation/Activity Name
d. Land Holding Command Name
e. Sub Command Name
3. Administrative Details.
a. Project Number: (DD1391, DA4283, other)
b. From Date: (Same as Project Completion Date from HQIIS)
c. Project Funding Source (MILCON, OMA, etc.)
d. Project Name
e. Project Description
f. Project Address
g. GPS Coordinates for Center of Overall Project: (from GoogleEarth)
4. Project Planners and Designers.
a. Master Planner Name
(1) Phone Number (Commercial)
(2) Email
b. USACE Geographic District Name
c. USACE or AE Project Manager Name
(1) Phone Number (Commercial)
(2) Email
d. USACE or AE LID Designer of Record Name
(1) Phone Number (Commercial)
(2) Email
5. Site Conditions.
a. Limit of Disturbance (Acres)
b. Pre -Project Curve Number
c. Post Project Curve Number
d. 95th Percentile Storm Event (inches of rain)
e. Pre Project Runoff Volume(ft3)
f. Post Project Runoff Volume(ft3)
APPENDIX D
D-1
DAIM-OD
SUBJECT: 2017 Implementing Guidance, Army Stormwater Management Using Low Impact
Development
Example. Input to LID Module, Army Energy and Water Reporting System (Cont.)
g. Volume required to be retained on -site (ft3) (difference in Pre and Post Runoff)
h. LID BMP Capacity Constructed (ft3)
i. Does Project Comply with EISA (If No, provide justification and submit Infeasibility
Report)
j. Reduction in Impervious Surface Area (SF)
6. BMPs Constructed.
Description BMP Centroid Impervious Volume of BMP
(northings, Surface Area Runoff Cost
eastings) Treated (SF) Retained (CF) ($)
a. LID 1 ...
b. LID 2 ...
c. LID 3 ...
d. Etc.
7. Other Stormwater Regulatory Requirements.
a. Name of State and/or Local Stormwater Management Regulatory Authority
b. Is installation/Activity required to meet Total Maximum Daily Loads?
c. Pollutants and Limits Listed in TMDL Permit
d. Name of Regulatory Authority
8. Infeasibility.
a. If project does not fully comply with EISA, GC provides: all site constraints that
prevent the project from full compliance (e.g. engineering calculations, soil data,
hydrologic analyses, geotechnical considerations, local water restrictions, etc.) through
the Chain of Command to Director, Operations Directorate, Office of the Assistant Chief
of Staff for Installation Management, Attn: DAIM-ODC, 600 Army Pentagon,
Washington, DC 20310
b. Date Garrison CDR Mailed Infeasibility Data to respective LHC.
c. Date LHC Mailed Infeasibility Data to DAIM-OD.
d. Date OD Provides Infeasibility Data and recommendation to ODASA(IH&P).
e. DASA(IH&P) approves/disapproves Infeasibility Submission.
D-2