Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20200816 Ver 1_More Info Received_20210330
Certificate of Coverage STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG010000 NC Reference No. NCG01-2020-3048 Certificate of Coverage No. NCC203048 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Jeff Justus is hereby authorized to discharge stormwater associated with CONSTRUCTION ACTIVITIES to surface waters of North Carolina from a site located at: Jeff Justus Commercial Project Corner of Old Spartanburg Rd and Shepherd St Hendersonville Henderson County in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in N.C. General Permit No. NCG010000. This Certificate of Coverage is affiliated with E&SC Plan Project No. 2020-047 This Certificate of Coverage shall become effective 7/17/2020. This Certificate of Coverage shall remain in effect until rescinded or expired. This Certificate of Coverage will expire on the anniversary of its effective date unless it is renewed by payment of the annual administration and compliance fee. for Brian Wrenn Acting Director, Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission SITE UTILITY F3 LANDSCAPING PLAN / \ GRADING & DRAINAGE PLAN N 3 \ \ SOIL EROSION & SEDIMENT CONTROL PLAN \ } EX S.M.H.#9 4 \ \ RIM=209/.09' \ ti� \ INV.OUT=2082.61' ��G�,w� \\ i EX B.M.H.#8 7 STORMWATER DETAILS `A 1 INV.R1N=20822..66 8 SITE & UTILITY DETAILS ` INV.OUT=2082.66' SHEET INDEX i EXISTING CONDITIONS/DEMOLITION PLAN � z \r 2 5-6 SESC DETAILS PAVEMENTS AND CURB AND GUTTER WITH THE SITE PLAN. INLET 8. SMOOTH SAW CUT OF EXISTING PAVEMENTS, CURBS AND CURBS AND I 209524' GUTTERS TO BE DEMOLISHED SHALL BE PROVIDED. NOTES: \ /' /\\ 1. PROPERTY OWNER: JEFF JUSTUS 303 S. CHURCH STREET ` 1` \ HENDERSONVILLE, NC 28792 r - p\P° ZOO. 2. ENGINEER: QUIBLE & ASSOCIATES, P.C. 90 CHURCH STREET, SUITE B BLACK MOUNTAIN, NC 28711 TEL: (252) 491-8147 CORN GAIL K. 3. PROPERTY IDENTIFICATION: 1601 OLD SPARTANBURG RD. PIN#: 9578-81-0342 SURVEYORS, PLLC.) 5. PROPERTY ZONED: C-3 HIGHWAY BUSINESS 6. REFERENCES: D.B. 1263, PG. 67; 7. EXISTING FEATURES, IMPROVEMENTS, TOPOGRAPHIC, AND BOUNDARY . � ; `` `1 � I , EXISTING - G05NELL, SGOTT � \ I \ I BUILDING IN SANITARY , 31I. 1 , I , I I �,, J . I - - - SEWER M 1. 11, � + , 1. EX 5MH#7 9. PROPERTY IS LOCATED IN NFIP FLOOD ZONE "X" AND "AE" (BFE 2096') \ I ' 1 ' '' �' ZONED: C-5 - 1 1 1 r , 1,/ 1 I \` RJM-2/00.19 SUBJECT TO CHANGES. BASED ON COMMUNITY CID NO. 370128; PANEL 9578; / I , FIRM ZONE'4E" 'I', ', , II ' ' ! ,' ,' �1', I ( ) / / ' , ,1 , L T \ INV. 1N=2083.4T / I . ' ' ' '` \1 INVOUT=2083.47' Ill ' ' ' '1 1' / 3 III I ' . 11 10. SETBACKS SHOWN ARE PER CITY OF HENDERSONVILLE AND DO NOT REFLECT FIRMZOIJELII� I � II ' 1 ' ' I ' 'l ' ' ' I', ''�\` DVATER MET ANY RESTRICTIVE COVENANTS THAT MAY EXIST. \ l \` \ / J I I , I g26 - \ q , / FIRM ZONE z' , 'NOT 5rA2VEYED / , , l 1 , I 1 , , ` , 1 , I I - 5 4g ° Zb' 47" N _ _ _ _ _ _ _ - ' III I I \ \ I l I II - III 11. PROJECT SCOPE: PERMITTING AND CONSTRUCTION OF A ±4,400 SQ.FT. CAR . WASH WITH ASSOCIATED PARKING AND APPURTENANCES \ /\ I ' I ' ' ' \ ' ` I / I I I I JUSTUS'', PREPARED BY WAGGONER & RHODES LAND SURVEYORS, PLLC., DATED JANUARY 2, 2020. THIS DOCUMENT SHALL NOT BE CONSIDERED A BOUNDARY SURVEY. MORGAN, MARTHA M.; MULLINAX, HANDA G. PIN: 9578-5/ 2/70 g� pNIN6 3 1 • • 15- 1 ; , ' I I , ' ZONED: R-I5 • • • - PIN: 9578-5/-4232 /l 20q. - - \ \ • , , - - - - ZONED: R-l5 �\ �' OO`-'- ; - - 1 20 , I , , , , , I , , „ ' 1 / \_ N30°C-/`l` �Ii\�, I F-- x 41. • • \,', \'' I'' --1 ------ \• • 2AZ \ LEGEND • • • • 3 07 \-; - • ♦ \ `1 , z,‘‘ ' I ' ' I I -� ;o4- _• • EXISTING ASPHALT PAVEMENT - - - - _ ♦ , P, \ , I' • ll III' I- N• I �,'\ 1 J 1 I _ _ GOSNELL GEORGER. •`n• J' �a . ' EXISTING CONCRETE • ' ♦ 1 , ,I 1 PIN: 9578-5/-0052 -• LINE TABLE LINE# LENGTH DIRECTION L2 100.26' N54° 03'30"E L4 6.97' N 55 ° 56' 52" IN L5 52.49' N 47° 32'50" PI L6 3/.64' N 47° 59' 59" f"V L7 20.15' 5 48 ° 39' 22" E LO 35.95' S 50° 48' 40" E L 9 45.25' S 52 ° 43' 24" E L /O 33.33' 5 56 ° 43' 35" E L/I 43.00' S59°10'5I"E L12 29.71' 5 60° 43' 43" E L13 /8.24' 561°49'50"E VICINITY MAP \ 8. VERTICAL DATUM NAVD 1988 / HORIZONTAL DATUM NAD 1983 (2011),,I', \ ' ' J - SUFFIX J. MAP NUMBER 3700957800J EFFECTIVE DATE: 10 02 2008 - I. ` \1 1 - ' . - _ _ p. EX. IRON ROD PROPOSED DEMOLITION • 12. WASTEWATER: 10 EMPLOYEES 0 250 GPD/EMPLOYEE = 2,500 GPD vXX• • \c. - V'' .• -1)1\- I I.: 1 1 1, 1 l . • - (WASTEWATER IS PROPOSED TO BE CONVEYED TO CENTRAL SYSTEM) WATER SUPPLY PER CITY OF HENDERSONVILLE. WATER CONNECTION MUST BE MADE IN ACCORDANCE WITH CITY SPECIFICATIONS AND SHALL BE PERFORMED \ O \ I - - - - - - - - - - - - - - I I ' l 1 '� \ ` , `, , , ` ♦\ , , l I \'' `� \ `` `; , , / BY A LICENSED WATER UTILITY CONTRACTOR. NOTIFY CITY PRIOR TO 1 . \ ' . \ ' ' ( / ' , \ 1 ' 1 I` \ \ \: `' ` \[C0 , \ , , h ' 1 14. ALL UTILITIES TO BE PLACED UNDERGROUND UNLESS OTHERWISE NOTED INSTALLATION. \ � ` • �\\; �\ `\♦ \\ \\` \ ' \♦ \ \ ♦ \ \ h ♦ \ _ 15. PRIOR TO LAND DISTURBANCE, A HENDERSON COUNTY APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN IS REQUIRED. • 16. JURISDICTIONAL DETERMINATIONS HAVE NOT BEEN COMPLETED FOR THIS SITE. \ \ . ` \, 1 • 17. EXISTING VEGETATION TO BE PRESERVED WHERE POSSIBLE. 18. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT ALL PROPERTY MONUMENTS DURING CONSTRUCTION. DISTURBED OR REMOVED PROPERTY MONUMENTS SHALL BE REPLACED BY A NORTH CAROLINA LICENSED PROFESSIONAL LAND SURVEYOR. FIRE HYDRANT 19. ALL WORK WITHIN THE NC DOT RIGHT-OF-WAY REQUIRES AN APPROVED NC DOT RIGHT-OF-WAY ENCROACHMENT AGREEMENT. 20. A CITY OF HENDERSONVILLE HIGH DENSITY STORMWATER PERMIT IS REQUIRED IN ADVANCE OF ANY ONSITE DISTURBANCE. 21. THIS PLAN SET TO BE UTILIZED FOR THE INSTALLATION OF SITE LAYOUT IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO, GRADING & DRAINAGE, \--,;_ INSTALLATION OF SEDIMENT CONTROL MEASURES, WATER SYSTEM AND ' WASTEWATER CONNECTION. FOR BUILDING DESIGN AND ASSOCIATED PLUMBING, SEE APPROPRIATE SEPARATE PLANS. \ \ / 1• . ' ' 10�,875.54 S Ft. \ / y�; ' ,' I 1 ' 1 \ \ ` : \\ \ b\\.:: / , / u I c • . • . \ / ;2.48 Acres 1r / �, ' ' ' ' I I o N OE EX. ELECTRICAL CONNECTION 4.366 ACRES+ / - '/ ' , ' I R(( �^/ , ` ,\ \ \ , y\ \ \ \ I 1 I 2::\::::\22\‘‘‘: POINERPOLE i ' r / /,' '/ -/ \ �`/�` `♦` `�'♦�♦`♦ \ ♦ \ \ `\ , ' , ' ' ' , '/, �� ' / / ; -/ `,`\; ` /��♦ \ \ \s \\ \\`, 33 O224'I Sq.FOT 2 t. 1 / ' ' `I` ♦ W . 1 r. 1• PROPOSED LOT /J�'•• , ' / ' / / / ' - ' :S.'s::: ` `l\ \ • ' , \ , _ '/JI`` , : /LINE (TYP.) _�-�'; ' / ' - / -' '' ' : ; **I.'''. ' .......--.1: s •\ \ \ \ \ \ ` \ • 1 s a7• • •' \ /, ♦` WATER ,' I ' /// ' ,•- /•• ••/ •` • ♦` " \ `\ `\'� \ ``` `\``\ `` 1 ` `` �_ • 1. ' ,. i ' METER • / , / ' -/ 15' M.B.S.L.':I" ' ,/� � \ `\ \ \, \ ♦ \ \ � \ \ � \ :2,\:,\2- \ - / / i I , (/� : • • • , N , , _ _.. , l !1 / / \ /� '' '� •' , U , ' • �' - _ -; N 49' 28' 17" E / \ `� \ : \ \ \ '; - " - - I / N/F CITY OF HENDERSONVILLE PIN: 9578-5/-3579 ; . _ % % , , / / , , , ' .r.. e i s ,s‘ % s‘ st% ,‘ s % \ \ , ' s s ,\ s , 1 rn \ ` \ ♦ ♦ ` 1 DEMOLITION NOTES: 1. CONTRACTOR SHALL LOCATE EXISTING UNDERGROUND SERVICES - TO INCLUDE BUT NOT LIMITED TO ELECTRIC, CABLE, TELEPHONE, GAS, \ � ;. �'�� �� 1 \\ ' r ' \ ,/i '1'l1'' � 1''' ,''�e����p15''M.B.S.L.�' o \\`�\\ `�\ \\ \ \ ' \\\�\\\ , 1 , , f I 1 / i J l i ' ,/' Ili/I 17 \ ; ; ` ,�-,-,-z..,......-,. .Q.),- I �� ---\ • % % r - ,r I. I 1 ' ' I ,, ' 111i `,I / ' / \ `\ \\\ \' - / '159.20'1 O • .' J I ` 1 UTILITY. 1 11 , I ' 1 , I i '' , , I, , 1', I I / ' I • \ `\\ \ \ \ \ ` \ ♦ ♦'` \ \ ` 1 POLE , 1 ,, \ :::, `` \\\ \ \ \ \ ' N 49' 28' 17.. E,,I I I 1 1 II '1 1I` ` •• \ \ ` \ \ \ \ ` , 1 ` ' • • • \ I ''1 1 LOT 1 \♦ `' ; \ � \\ - is.- `� ° 1 - . ' ', \ \\ I: 1, , I I I ' ♦1l ''h 'I1'\ I 48,553.60Sq.Ft. \` \\ ``♦ ♦ ' \\,` 1 �� \ % 1 I 1 �, , ' ' , w, �'�I� ' 1\I 1.11Acres ,` \\\\• i‘, \ ,, , ,,, c� \ 1` co L.,-\ I \ ' , ' �'l lI', '11' I'll',' it \' \\ \ , \ :\ �,` I ` \ ,' \ 1•,•\ \ 1 , I , I 1 ,111 I oil I \ \ ,\ \ \ \ , \,\, , l] I -� I STREAM \ ' I ` ` '` \', `-I,`,1, i \ , \ , \ _ 1 ' ` \ \ - \ �\ ` \ \` ` / ) EX15TlN6 BUFFER 1, \ 11 `1 ' \ ` ;, ,11r , `\` \ \ ', \ \ , \� \ 1 \ �1. •WATER (TYP) , \ , , 1 I - - , 11 1`` \ ` \ \ 1 C _ - \\ \ \ METER \ \\, l ' 1,,,'` ` ,, V\ -- - - - -- \, \ �i 1 1 Is 35' M.B S \ !NHITE' I% `\‘ ` ' \ : ' \ - ',' \ . / - EX. 5MH#3 \ 1 I '1 V, , Al I . , , � \ \` \ \ `♦ 0•, i SANITARY SEWER AND WATER - AND SHALL COORDINATE PROPER PROTECTION AND/OR RELOCATE WITH APPROPRIATE OWNER/UTILITY COMPANY. COX, BRENDA 2. CONTRACTOR SHALL WALK THE SITE AND BE FAMILIAR WITH THE SCOPE OF ZONED: R-l5 DEMOLITION REQUIRED. ALL DEMOLITION WORK REQUIRED TO CONSTRUCT NEW IMPROVEMENTS WILL BE PERFORMED BY THE CONTRACTOR AND BE UNCLASSIFIED EXCAVATION. PIN: 9578 5/-1568 3. DEMOLITION SHALL INCLUDE BUT IS NOT LIMITED TO THE EXCAVATION, I HAULING AND OFFSITE DISPOSAL OF CONCRETE CURBS AND GUTTERS, BITUMINOUS CONCRETE PAVEMENTS AND ALL MATERIALS OR VEGETATION CLEARED AND STRIPPED TO THE EXTENT NECESSARY FOR THE • RIM=2096.90' ' INSTALLATION OF NEW IMPROVEMENTS AND WITHIN THE LIMITS OF CLEARING AND GRADING. COORDINATE WITH APPROPRIATE DRAWINGS. 4. THE CONTRACTOR SHALL PROTECT ALL PROPERTY AND STRUCTURES AND UTILITIES ON THE PROPERTY NOT TO BE DEMOLISHED. DAMAGE TO THE PROPERTY DUE TO THE CONTRACTOR'S ACTIVITIES SHALL BE REPLACED IN EX. S.M.H.#1 J KIND BY THE CONTRACTOR AT NO COST TO THE OWNER. 5. ALL EXISTING IMPROVEMENTS INDICATED OR REQUIRED TO BE DEMOLISHED SHALL INCLUDE REMOVAL FROM PROJECT AREA. DEVELOPMENT COMMENCING WITHvA RECORD OF THE SITE AS IT APPEARS BEFORE DEMOLITION IS BEGUN. AFTERWARDS A PHOTOGRAPHIC RECORD SHALL BE MAINTAINED DURING THE CONSTRUCTION PROCESS. 7. EXISTING PAVEMENT, CURB AND GUTTER, LIGHTS, FENCES, TREE/VEGETATION AND UTILITIES NOT INTENDED FOR DEMOLITION SHALL BE MAINTAINED, PROTECTED, AND UNDISTURBED DURING DEMOLITION. CONTRACTOR SHALL COORDINATE THE REMOVAL OF BITUMINOUS CONCRETE \SS ♦ - ``, SS 1 EX SANITARY 5ElNER" 15. 18B' C' -0.05$ SLOPE SS SS - _ -/ _ - IIIYYY, 1 Y , • • • \I • z w m - 30 ,'' 1 1 I 1 J, I ,'I, - ��----\ N/P EX. FIRE HYDRANT • \\� ' '' - -1 ''' - / BUFFER -NI ' 1 I III 1 1 `pl ,.. I `, `, `' , , ,�, ,' - - �5'_M.B. S. L. - - - - - _ N 71),w1•I I \ I N A/STUS HILLIAM G.'/,- '' PIN: 951540-7866 1 1 1 \ , EX. WATER VALVE 0 EX. DRILL HOLE EX. MAG NAIL EX. UTILITY POLE EX. SEWER MANHOLE © EX. WATER METER CURVE TABLE CURVE# LENGTH RADIUS CHD LENGTH GHD BEARING C3 33..66' 35.19' 36.74' 533°55'50"IN RIM=2/01.88' INV. IN=209334' 1 ` ` • ` ` EX. \ , ` ` ♦\/` EX. SANITARY 5EHER"•- - • II I W;11.'. wII I . • • • II I.• ' I I - POPPER POLE • ✓ III 'III'.. WF III e41. • . EX S.MH.#6 .• • R1M=2098.46' • INV. IN=2087/6' •. INV. IN=2087.16' \ \ \ , \ \ J , ` , ,, INLET \ " • . DROP • . • • • SANITARY M.B.S.L. - OAK /� `` ' \ ` \ \ , TREE ``� HEADHALL ' , ` ' - _ . 68' ®4 L9 SLOPE III/ - - A' . •' - INV IN 208965 kj POHER POLE I- • 1 2089.89' I' ,l 2941.33 -_- I -_ - - 'I \ ----' �/ 1• __( S 3,6� SL _1 1/8" ' -/.' S6® GyRXOPENS• NITARSEVIE I L2 I SS-- r#'1DROP INLET - SL_ RGP I EX. SM.H2i LRIM209950�'1/NV 209341' - - -INV 209/80'SHFy 1E TARY SEINER 5 49° 2B' l7" W _� - �9B.�g' �/ ' . • ' .. • . ' . • . ' ALL INFORMATION SHOWN ON THIS DOCUMENT IS SUBJECT TO ANY REQ - - - - %/' . BY ANY REGULATORY AGENCY, ENTITY OR AUTHORITY. • • •• QUIBLE & ASSOCIATES, P.C. DOES NOT GUARANTEE THE ACCURACY OR THE ' '••• .111.• _ - - h'� SST EX SANITARY SEINER EX. S.M.H.#5 COMPLETENESS OF ANY INFORMATION IN THIS DOCUMENT AND IS NOT RESPONSIBLE -7 s \ . / y\lNV 1N-2093.16' , . 59 26� SLOPE RIM=2098.00' FOR ANY ERROR OR OMISSION OR ANY LOSSES OR DAMAGES RESULTING FROM THE OG�3096� _ ,Imo._' . _ . _ _ - 5R INVOUT=2090.10' USE OF THIS INFORMATION. EX. S.M.H.#4 .1•.•INVOUT=2090.1D' / 1 ` �. `I I _ GULV R� • RIM=2096.1T I I , ., �_ . UTILITY POLE DROP - • • INV. 1N=2088.47' :11 • T _ INVOUT=2088.47' I ! 1 ' / , , INV. - _ _•• 1.1, .. . SANITARY SEINER"� INV. 2093.89_ J ,! - - - - - - , - I - _ 20IS _ _ x. PIM 9578-4/-600/ 4 EX. EXTERIOR LIGHT EX. LIGHT POLE - -/0 EXISTING CONTOUR EXISTING SPOT GRADE Know what's below. CaII before you dig. INV.OUT=2089.65'15' M.B.S.L.'i/I1T /, 1 . NOTE: THIS DOCUMENT IS PRELIMINARY - NOT FOR CONSTRUCTION, RECORDATION, SALES OR CONVEYANCES - THIS DOCUMENT IS FOR _N 04° 12' 29" E . . DISCUSSION PURPOSES ONLY! EXISTING INFORMATION SHOWN ON THIS RGP \ - - _ _ _ - ' - l8"RGP ,11262.13' N 49' 2" E_ _ _ - - - - - _ -I, I ,' / 70.32 DOCUMENT IS BASED ON BEST AVAILABLE DATA AND IS NOT A CERTIFIED SURVEY. S ' UIREMENTS _ APPROXIMATE ' 1" 9. ALL DEMOLITION WORK SHALL BE DONE IN STRICT ACCORDANCE WITH I PIN: 9578-4/-95/8 LOCATION II I FEDERAL, STATE AND LOCAL LAWS AS WELL AS OSHA REGULATIONS. I ZONED: R l5 _ OF EXISTING PIPE i� -.7-- .0 GR055/N6: - ' �\ 10. CONTRACTOR'S ACTIVITIES SHALL NOT IMPEDE USAGE OR INGRESS/EGRESS I STAR DRAYGOMPANYLLG l 30" RGP 1 �\ TO ADJACENT PROPERTIES. COORDINATE WITH OWNER MAINTENANCE OF PIN: 9578 4/ 6498 r TRAFFIC/PEDESTRIAN CIRCULATION DURING CONSTRUCTION. / ZONED: G 3 2aB RAN _' r r II NOT FIELD SURVEYED.) I 11. MAINTAIN POSITIVE DRAINAGE AWAY FROM BUILDINGS AT ALL TIMES DURING DEMOLITION. 12. A DEMOLITION PERMIT MUST BE OBTAINED FROM THE CITY OF HENDERSONVILLE PRIOR TO DEMOLITION WORK. i N/F DOTSON, INEZ NOTE: THE DATA GIVEN ON THESE PLANS IS BELIEVED TO BE ACCURATE, BUT THE ACCURACY IS NOT GUARANTEED. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL LEVELS, LOCATIONS, TYPES, AND DIMENSIONS OF THE EXISTING UTILITIES PRIOR TO CONSTRUCTION. IF A DISCREPANCY IS FOUND, WORK SHALL CEASE AND THE ENGINEER I / NOTIFIED. WORK MAY CONTINUE UPON ENGINEERS I \ NOTICE TO PROCEED. I / I � i GRAPHIC SCALE 30' 0 15' 30' 60' ( IN FEET ) 1 inch = 30 ft. NC License#: C-0208 SINCE 1959 L tV •', C.) CA CA U ¢ i- IL 0_Uw AIL O W 0_ V 0 NI- wwO a =roo OU Q w U H 2N V)h- = V U a Z a W 0 >- �'J�0 0 J O J O CO SmQ 5 Za a - 1- r Ld w Q 9 LuiJ V) Z U a N REVISIONS w 0 d z z 4e4 CONDITIONS/DEMOLITION PROJECT NO. P20003 DESIGNED BY CMS DRAWN BY CMS CHECKED BY MWS ISSUE DATE 3/3/21 SHEET NO. 1 OF 8 SHEETS) a 0 E.dwg 3/5/2021 \P20003-2020—B :\2020\P20003 i N/F 7X, BRENDA 45785/-1568 7NED: R-15 J ♦ ♦ • NOTES:' PROPERTY OWNER: JEFF JUSTUS PROPERTY IDENTIFICATION: 1601 OLD SPARTANBURG RD. PIN#: 9578-81-0342 PARCEL AREA: 4.36 ACRES (PER SURVEY BY WAGGONER & RHODES LAND SURVEYORS, PLLC.) PROPERTY ZONED: C-3 HIGHWAY BUSINESS REFERENCES: D.B. 1263, PG. 67; 6. EXISTING FEATURES, IMPROVEMENTS, TOPOGRAPHIC, AND BOUNDARY INFORMATION BASED ON SURVEYS ENTITLED, "PLAT OF SURVEY FOR JEFF JUSTUS'', PREPARED BY WAGGONER & RHODES LAND SURVEYORS, PLLC., DATED JANUARY 2, 2020. THIS DOCUMENT SHALL NOT BE CONSIDERED A BOUNDARY SURVEY. 7. VERTICAL DATUM NAVD 1988 / HORIZONTAL DATUM NAD 1983 (2011) 8. PROPERTY IS LOCATED IN NFIP FLOOD ZONE "X" AND "AE" (BFE 2096') SUBJECT TO CHANGES. BASED ON COMMUNITY CID NO. 370128; PANEL 9578; SUFFIX J. (MAP NUMBER 3700957800J) EFFECTIVE DATE: 10/02/2008. 9. SETBACKS SHOWN ARE PER CITY OF HENDERSONVILLE AND DO NOT REFLECT ANY RESTRICTIVE COVENANTS THAT MAY EXIST. 10. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT ALL PROPERTY MONUMENTS DURING CONSTRUCTION. DISTURBED OR REMOVED PROPERTY MONUMENTS SHALL BE REPLACED BY A NORTH CAROLINA LICENSED PROFESSIONAL LAND SURVEYOR. 11. ALL WORK WITHIN THE NC DOT RIGHT—OF—WAY REQUIRES AN APPROVED NC DOT RIGHT—OF—WAY ENCROACHMENT AGREEMENT. 12. A CITY OF HENDERSONVILLE HIGH DENSITY STORMWATER PERMIT IS REQUIRED IN ADVANCE OF ANY ONSITE DISTURBANCE. 13. BUILDING CONSTRUCTION TO CONFORM TO 2018 NC FIRE PREVENTION CODE OR LATEST EDITION. 14. THE LOCATION, DIMENSIONS, AND ELEVATION OF EXISTING UTILITIES SHOWN ARE BASED ON THE BEST AVAILABLE DATA AND ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY ALL DATA IN THE FIELD PRIOR TO CONSTRUCTION TO HIS/HER OWN SATISFACTION. THE CONTRACTOR SHALL PERFORM ANY TEST PIT WORK OR PROVIDE LOCATION SERVICES AS REQUIRED TO AVOID CONFLICTS WITH EXISTING UTILITIES. CONTACT NORTH CAROLINA ONE —CALL AT TELEPHONE NO. 1-800-632-4949, 48 HOURS PRIOR TO PERFORMING ANY EXCAVATION TO HAVE UTILITIES MARKED. 15. THE CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS FROM PROPOSED FEATURES TO EXISTING FEATURES AS NECESSARY. ,16. THE CONTRACTOR SHALL SEAL THE EDGE OF EXISTING ASPHALT PAVEMENT WITH TACK COAT IN ACCORDANCE WITH THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS WHERE NEW PAVEMENT JOINS EXISTING PAVEMENT. 17. ALL PAVEMENT JOINTS SHALL BE SAW —CUT PRIOR TO PAVING TO PROVIDE A DURABLE AND UNIFORM JOINT. 18. PROOF ROLL ALL NEW PAVED AREAS. NOTIFY OWNER AND ENGINEER OF ANY UNACCEPTABLE AREAS. 19. LOT COVERAGE PROPOSED CARWASH PARCEL PROJECT AREA (LOT 1) = 48,553.6 SF PROPOSED BUILDING = 5,266.6 SF DRIVE AISLE/PARKING = 18,355.8 SF SIDEWALKS/DUMPSTER = 1,151.8 SF TOTAL COVERAGE = 24,774.2 SF (51.0%) REMAINING OPEN SPACE = 23,779.4 SF (48.9%) 20. PARKING: ♦. ♦ CAR WASH FACILITY ) • ♦♦I' EX. S.M.H. #I RIM=2ID1.88' INV IN=2093.34' • PARKING REQUIRED = 0.5 SPACE PER WASH BAY * 1 WASH BAY = 1 SPACE REQUIRED [4 SPACES PROVIDED (1 ADA VAN SPACE)] STACKED PARKING = 2 STACKING SPACES PER WASH BAY * 1 WASH BAY = 2 SPACES REQUIRED [13 STACKING SPACES PROVIDED] • EXISTING / -WATER / METER 35' M.B.S.L. r— W PROPOSED 2" WATER SERVICE ®- 0.3% SLOP 56 SSEX SANITARY 5E1^IER • /• ., • UTILITY POLE i 2104 2/02 2100 20g8 20g6 20g4 20g2 20g0 2088 2086 2085 PROFILE OF STREAM CULVERTS SCALE: 1 "= 20' VERTICAL SCALE: 1 "= 4' VERTICAL SCALE IS EXAGGERATED 5 TIMES • • .L2 -SS INV. IN=2093.16' STREAM BUFFER PROPOSED LOT LINE (TYP.) • • • • • • • • 1\ III PROPOSED DIRECTIONAL DRILL MAXIMUM BEND RADIUS (50') — PROPOSED START DIRECTIONAL DRILL SS INV. IN=20367.65' • PROPOSED BUILDING FFE=2101' • • 30" MITE OAK TREE • 0 IJJ • • zoaqaq • • RCP DROP INLET INV. • 2.-0” MOUNTABLE SPILL CURB & GUTTER (TYP.) • • • o • CULVERT DROF' INLET • • • • — PROPOSED PROPOSED 2.-0” MOUNTABLE CURB AND GUTTER SHEPHERD STREET 2088 2090:5 2091 2092 2093 2094 20,33.90 2095 2096 2098 PROPOSED SCREENED/FENCED DUMPSTER 20)(20' CLEAR SITE TRIANGLE (TYP.) EMPLOYEE PARKING SPACE 9'x20'. (TYP. OF 3) 110 5' M.B.S.L. SIGN FACING SR 1779: DO NOT ENTER (MUTCD CODE R5-1) SIGN FACING SITE: STOP SIGN (MUTCD R1-1) INV. 2093.41' WHITE 24'. THERMOPLASTIC STOP BAR (TYP) • • PROPOSED 2.-0” CURB AND GUTTER (TYP.) PROPOSED 8.0' WIDE BOTTOMLESS CULVERT • • • • • • DISCUSSION PURPOSES ONLY! ,txisTING INFORMATION SHOWN ON THIS • • , p • • • QOCUM,ENT IS BASED ON BEST AVAILABLE DATA AND IS , NOT A CtTIFIED SURV_EY. • • • PROPOSED 1 STORY CAR WASH ± 4,400 SF TOTAL FFE = 2101.0' LEVEL AREA ELEVATION — = 2094.33' 262.13' PROPOSED 5' WIDE CONCRETE SIDEWALK (TYP.) co co CNI 13 01 cNi 10+00 10+50 11+00 11+50 12+00 12+50 2104 2102 2100 20q0 201313 20136 20135 • • \ • • • \ • • , • • • • • ALL ROOF 'DRAINS TO CONNECT TO • STORMWATER NETWORK • • PROPOSED ADA VAN PARKING SPACE 9'x20' 6" SANITARY SEWER LATERAL 84 LF ©- 1.04% MIN. SLOPE VACUUM SPACE 13'x20' CORE EXISTING MANHOLE AND CONNECT PROPOSED 6" PVC AT INV. =2088.7' • • • • • / • HEADWALL , 159.20' • • • • • • • • PROPOSED CANOPY TREE (TYP.) MOUNTABLE CURB AND • GUTTER • EX SANITARY SEINER" INV. IN=2088.47' • • EX. SANITARY SEINER." APPROXIMATE LOGATION OF EXISTING PIPE (LOGAT1ON NOT FIELD SURVEYED) • 3 PIECES REINFORCED RUBBER HOS 4" MULCH. DO NOT LEAVE SOIL ON BURLAP. AFTER ROOT BALL HAS BEEN SET, REMOVE TVVINE OR VVIRE FROM ROOT BALL. SOIL BACKFILL BALLS GREATER THAN 2' DIA. SHALL SIT ON MOUND OF UN— DISTURBED SOIL TO PREVENT SETTLING Know what's below. Call before you dig. II I jj POHER POLE • • INV. IN=2087.16' • DROP • ' INLET EX. SANITARY SEINER" POHER POLE .70.32 LEGEND EXISTING ASPHALT PAVEMENT PROPOSED RIP RAP PROPOSED CONCRETE PROPOSED ASPHALT EX. IRON ROD 0 EX. DRILL HOLE EX. MAG NAIL EX. UTILITY POLE .tr EX. FIRE HYDRANT EX. WATER VALVE O EX. SEWER MANHOLE • EX. WATER METER O EX. ELECTRICAL CONNECTION 4 EX. EXTERIOR LIGHT EX. LIGHT POLE PROPOSED 6" CURB (NO GUTTER) PROPOSED CURB AND GUTTER PROPOSED SPILL CURB AND GUTTER PROPOSED DROP INLET PROPOSED STORM PIPE —W PROPOSED WATERLINE —ss— PROPOSED SANITARY SEWER 0 PROPOSED TREES/SHRUBS (3) NO. 12 GAUGE GALVANIZED WIRE POSITIONED AT 120' AROUND THE TREE 3-2x2x3' TREATED STAKE HOLE DIAMETER FOR BALL SHALL BE TWICE BALL DIAMETER TREE PLANTING DETAIL N.T.S. TREE PLANTING SUMMARY SYMBOL QUANTITY COMMON NAME SPREAD MIN. SIZE 0 PLANTING ti 0 WINTER KING HAWTHORN 25' — 35' 2'' CAL, NOTE: THE DATA GIVEN ON THESE PLANS IS BELIEVED TO BE ACCURATE, BUT THE ACCURACY IS NOT GUARANTEED. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL LEVELS, LOCATIONS, TYPES, AND DIMENSIONS OF THE EXISTING UTILITIES PRIOR TO CONSTRUCTION. IF A DISCREPANCY IS FOUND, WORK SHALL CEASE AND THE ENGINEER NOTIFIED. WORK MAY CONTINUE UPON ENGINEERS NOTICE TO PROCEED. GRAPHIC SCALE 20' 0 10' 20' 40' 1 inch = 20 ft. NC License#: C-0208 SINCE 1959 C.) 0 CA CA 0 ? * 0 * irt CD 1- Lai m co 0 000DNE ct on z to c 000 u)(7)(3 (nwaz i-Oup c,! -<Z b9C: 1Z- a -I:: C '°> 3_ I= -LL 02u -"C L I LILL j'27C3 1:ILL j( )ajZ j8C 1:LL )Z>> -< )1-L jC )1=- v )0C: nv Lju )u )0. f Lz00: REVISIONS 0 d LANDSCAPING eft 1-4 E-4 c.) z z 119i u z v Ado r5)i E-4 A 8 2 0 rn4.,) PROJECT NO. P20003 DESIGNED BY CMS DRAWN BY CMS CHECKED BY MWS ISSUE DATE 3/3/21 SHEET NO. OF 8 SHEETS) 0 g 3/26/2021 4: a \P20003-2020—BASE—Cop :\2020\P20003—Justus Spar NOTES: 1. PROPERTY OWNER: JEFF JUSTUS 2. PROPERTY IDENTIFICATION: 1601 OLD SPARTANBURG RD. PIN#: 9578-81-0342 3. PARCEL AREA: 4.36 ACRES (PER SURVEY BY WAGGONER & RHODES LAND SURVEYORS, PLLC.) 4. PROPERTY ZONED: C-3 HIGHWAY BUSINESS 5. REFERENCES: D.B. 1263, PG. 67; 7. EXISTING FEATURES, IMPROVEMENTS, TOPOGRAPHIC, AND BOUNDARY INFORMATION BASED ON SURVEYS ENTITLED, "PLAT OF SURVEY FOR JEFF JUSTUS'', PREPARED BY WAGGONER & RHODES LAND SURVEYORS, PLLC., DATED JANUARY 2, 2020. THIS DOCUMENT SHALL NOT BE CONSIDERED A BOUNDARY SURVEY. 8. VERTICAL DATUM NAVD 1988 / HORIZONTAL DATUM NAD 1983 (2011) 9. PROPERTY IS LOCATED IN NFIP FLOOD ZONE "X" AND " AE" (BFE 2096') SUBJECT TO CHANGES. BASED ON COMMUNITY CID NO. 370128; PANEL 9578; SUFFIX J. (MAP NUMBER 3700957800J) EFFECTIVE DATE: 10/02/2008. 10. SETBACKS SHOWN ARE PER CITY OF HENDERSONVILLE AND DO NOT REFLECT ANY RESTRICTIVE COVENANTS THAT MAY EXIST. 11. PROJECT SCOPE: PERMITTING AND CONSTRUCTION OF A ±4,400 SQ.FT. CAR WASH WITH ASSOCIATED PARKING AND APPURTENANCES. 12. WASTEWATER: MAX. 2 CARS IN BAY AT A TIME 0 1,200 GPD/BAY = 2,400 GPD (WASTEWATER IS PROPOSED TO BE CONVEYED TO CENTRAL SYSTEM) 13. WATER SUPPLY PER CITY OF HENDERSONVILLE. WATER CONNECTION MUST BE MADE IN ACCORDANCE WITH CITY SPECIFICATIONS AND SHALL BE PERFORMED BY A LICENSED WATER UTILITY CONTRACTOR. NOTIFY CITY PRIOR TO INSTALLATION. 14. ALL UTILITIES TO BE PLACED UNDERGROUND UNLESS OTHERWISE NOTED 15. PRIOR TO LAND DISTURBANCE, A HENDERSON COUNTY APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN IS REQUIRED. 16. JURISDICTIONAL DETERMINATIONS HAVE NOT BEEN COMPLETED FOR THIS SITE. 17. EXISTING VEGETATION TO BE PRESERVED WHERE POSSIBLE. 18. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT ALL PROPERTY MONUMENTS DURING CONSTRUCTION. DISTURBED OR REMOVED PROPERTY MONUMENTS SHALL BE REPLACED BY A NORTH CAROLINA LICENSED PROFESSIONAL LAND SURVEYOR. 19. ALL WORK WITHIN THE NC DOT RIGHT-OF-WAY REQUIRES AN APPROVED NC DOT RIGHT-OF-WAY ENCROACHMENT AGREEMENT. 20. A LOCAL STORMWATER PERMIT IS REQUIRED IN ADVANCE OF ANY ONSITE DISTURBANCE. 21. THIS PLAN SET TO BE UTILIZED FOR THE INSTALLATION OF SITE LAYOUT IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO, GRADING & DRAINAGE, INSTALLATION OF SEDIMENT CONTROL MEASURES, WATER SYSTEM AND WASTEWATER CONNECTION. FOR BUILDING DESIGN AND ASSOCIATED PLUMBING, SEE APPROPRIATE SEPARATE PLANS. LEGEND SUBJECT PROPERTY LINE PROP. SUB -LOT LINE - - ADJACENT PROPERTY LINE EX. STREAM CENTER LINE EX. APPROX. EDGE OF WATER EX. 5' MAJ CONTOUR EX. 1' MIN CONTOUR - - - EX. BUILDING - - - EX. CURB & GUTTER EX. SANITARY SEWER EX. CULVERT = PROP. CULVERT x20g0 EX. SPOT ELEVATION - 9.0- PROP. CONTOUR PROP. SPOT GRADE 9.0 (TOP OF ASPHALT/FLOW LINE UNLESS OTHERWISE NOTED) 9.00'TC PROP. TOP OF CONCRETE ELEV. PROP. FLOW DIRECTION & SLOPE ▪ 1 ▪ -• --J O O A [xi ''X EX. ASPHALT PAVEMENT PROP. CONCRETE PROP. ASPHALT PROP. RIP RAP 30' STREAM BUFFER PROP. FLOODPLAIN BENCH EX. IRON ROD EX. DRILL HOLE EX. MAG NAIL EX. UTILITY POLE EX. FIRE HYDRANT EX. WATER VALVE EX. SEWER MANHOLE EX. WATER METER EX. ELECTRICAL CONNECTION EX. EXTERIOR LIGHT EX. LIGHT POLE PLANTING PLAN FOR RIPARIAN RESTORATION AND ENHANCEMENT AREAS 1. CONSTRUCTION WILL BE SEQUENCED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION SUCH THAT DISTRIBUTED AREAS OF THE PROJECT AREA ARE STABILIZED AT THE END OF EACH WORKING DAY. 2. DISTURBED AREAS WILL BE SEEDED FOR TEMPORARY GROUND COVER WITH A SEED MIX OF ANNUAL GRAINS (WINTER RYE, OATS, BROWN -TOP MILLET) AT RATES SPECIFIED BY THE MANUFACTURER. 3. DISTURBED AREAS WILL BE SEEDED FOR PERMANENT GROUND COVER WITH A NC MOUNTAIN RIPARIAN MIX AT MANUFACTURER SPECIFIED RATES. 4. SEEDED AREAS WILL BE FERTILIZED AND MULCHED WITH STRAW. FERTILIZER WILL BE STORED AWAY FROM AND KEPT OUT OF THE STREAM. STRAW MULCH WILL BE PLACED SUCH THAT SOIL IS STABILIZED AND ADEQUATE LIGHT REACHES THE SOIL LAYER. 5. DISTURBED AREAS BELOW TWO TIMES BANKFULL ELEVATION WILL BE FURTHER STABILIZED WITH BIODEGRADABLE COIR COCONUT FABRIC WITH A WEIGHT NOT LESS THAN 400 GRAMS PER SQUARE METER. COIR FABRIC WILL BE INSTALLED OVER SEED AND MULCH, PER THE MANUFACTURER'S SPECIFICATIONS. 6. LIVE CUTTINGS WILL BE INSTALLED AS LIVE STAKES AND WHIPS ON THE STREAM BANKS AND BETWEEN GEOLIFTS AT ELEVATIONS BELOW BANKFULL ON STREAM BANKS WITHIN THE PROJECT AREA. LIVE CUTTINGS WILL BE SELECTED FROM NATIVE SHRUB SPECIES INCLUDING: SILKY DOGWOOD (CORONUS AMOMUM), ELDERBERRY (SAMBUCUS NIGRA), AND NINEBARK (PHYSOCARPUS OPULIFOLIUS). LIVE CUTTINGS WILL BE INSTALLED AT A SPACING OF APPROXIMATELY ONE FOOT ON CENTER, WHILE DORMANT, DURING LEAF -OFF 7. CONTAINER HERBACEOUS PLANTINGS MAY BE INSTALLED BELOW TWO TIMES BANKFULL ELEVATION AT A SPACING OF APPROXIMATELY THREE FEET ON CENTER. 8. CONTAINER TREE PLANTINGS MAY BE INSTALLED AS NATIVE SAPLINGS AT A SPACING OF TEN FEET ON CENTER AND WILL CONSIST OF SPECIES NOT LIMITED TO: RED OAK (QUERCUS RUBRA), WHITE OAK (QUERCUS ALBA), TULIP POPLAR (LIRIODENDRON TULIPIFERA), AMERICAN BEECH (FAGUS GRANDIFOLIA), BLACKGUM (NUSSA SULVAIICA), AND RED MAPLE (ACER RUBRUM). 9. THE SITE WILL BE WATERED REGULARLY DURING DRY PERIODS UNTIL A HEARTY STAND OF HERBACEOUS VEGETATION IS ESTABLISHED OVER ALL DISTURBED AREAS WITH A HEIGHT OF AT LEAST SIX INCHES. 10. PLANTING OF THE PROJECT AREA WILL GENERALLY FOLLOW AND ACHIEVE DENSITIES OUTLINED IN A GUIDE FOR THE INSTALLATION. ESTABLISHMENT. AND MAINTENANCE OF RIPARIAN VEGETATION ON RESTORATION PROJECTS IN NORTH CAROLINA - NC COOPERATIVE EXTENSION SERVICE. EXISTING GRADE % \ DOE �' h b /�% \ / 2.0 R SLOPE ,oR //\\/// \ 5.0' FLOODPLAIN BENCH TYPICAL FLOODPLAIN BENCH CROSS SECTION 30.0' BUFFER AREA TO BE SEEDED ACCORDING TO RIPARIAN RESTORATION & ENHANCEMENT SPECIFICATIONS FINA D AWI FOR P MITT 1 G ONLY In In IF IF IF 1• c» 1 I/) F F �nn • • ./,‘ • /. . . / , F \ • . / • N LII�., _�; i® \ 53°5155 -F -F • 30' STREAM BUFFER SEE PLANTING PLAN FOR RIPARIAN RESTORA110N & ENHANCEMENT A EAS (TYP) • • • \ - - __---- 1. r ' F F ,. N.T.S. VARIES 1.0' - 1.5' ABOVE THALWEG 5.0' FLOODPLAIN BENCH 2.0 R SLOPE EXISTING GRADE 4 / /\\/\/\/\/ c coy //\\//\/\ //•/< //•//.//, 7/\/// cps. zap \/\/\ i\i \i\i\i\i / • 11 THALWEG / _ ' / _-L-_-'-F F j _L____-_ _ , . . �;F�F ,F F ; y ,_ . IF F f L - - - / ` - --/ - �' 1 1 1 ,I • / _ .- F/ Fr • / / • • • • • • • \ s s -- ' ' i • 2 ' FOF' -- -x,.,- ------ 23 4gw_ N 50° _g3.�f4' :.:.:...:...fro:_.., • I _F F F pggF F 3 -r -F f F - F P- F -- F - - • 1 - BOTTOMLESS CULVERT DETAIL NTS GEOTEXTILE ALL AROUND AGGREGATE BACKFILL CONCRETE FOOTING 1.0' AGGREGATE TYP CONCRETE OR STONE HEADWALL CLASS B EROSION RESISTANT RIP RAP SCOUR A. )\ • \ ACCEPTABLE FILL MATERIALS reer- ietiz AO' OP 11.0 CLASS B RIP RAP EROSION RESISTANT SCOUR PROTECTION STREAM CHANNEL /82 1 IPA CO CO 18" MIN FOR MODEL MC-3500 24'. MIN FOR MODEL MC-4500 8.0' MAX FOR MODEL MC-3500 7.0' MAX FOR MODEL MC-4500 SECTION VIEW A -A NTS CONCRETE FOOTING PAVEMENT 1-11=11- witims ill , I till' STOR TECH CHA BE ROW 1.0' AGGREGATE SECTION VIEW B-B NTS CONCRETE FOOTING OPEN BOTTOM CONCRETE FOOTING LOW VELOCITY STREAM CROSSING DETAIL STORMTECH TN COMPANY -2090 2090 .2695 • • • • • • • • • 30.0' BUFFER AREA TO BE SEEDED ACCORDING TO RIPARIAN RESTORATION & ENHANCEMENT SPECIFICATIONS • • • • • • • • s • • • • • • XSE 4OTfOMCESS CUL DETAIL)- •- - • • SS ,„)1.0, Nj I 10.S:\84S-8"'--k • 11 . • )('-‘‘‘‘,/eS\N" . , -/- . .... •- • i/ ' ^ '' . •'' •, I / ' ' . •• • - \ • 8<(% ‘0)('' , , . , „........„ „ °N\_,,,1114-\\)‘‘,A(*.,)\-,‘-‘11r / FFFF l''' ''F/..0'7DPLAIN BENCH ' '' ' :•‘,- F:::‘:: ''''-' -1\.-7tC°(1'. :,.. :f F. F S '': ''', S:s: ' 1:::. ' 5::: ::: ::: '',, : \ .N/ : \ • ,. --- \'' 16..: \ 2. \‘'19::: ..\:. "F :FA . ‘r,, ;r:.S, , \ . \S•ii• F \„, Fr, A: i \ F. F F F F F,.1:, \ s‘ ,,,\ :‘: \\ , \ :N.72,•,2\:r.‘:‘ :..15,‘,.,, ....i..\2 \0\\\.•..,F ‘‘s :: i ,:::Ao, \ \‘‘‘.,7‘ . • . . ___________________\. . \ \\ \\ is F‘\ \\FN:\ \\\:2‘‘Fr. ::::\: xr,,,,,\,:\:>\:::::.,:_:::::;\ z::::::,:,:: T‘. F\F:. \.. \. \... \x.....i,s_;\\. \. ,,,,. ,.:.\:.::::.;),::i \‘‘.,,,,\:::: \Ii\s,\‘, 1 s: .s.: ssis\ x., \ s ''.s :::F s'' '\ ' \'`. ' \'`. "" " I '. V.• F ' ' ' ‘.•‘.• 77. `2,:•% \ \\ \\\ \‘'‘\ :\ r: s :g A IS‘ ;f s 1 SF, \XF 1 \‘'F A ):: \:: ‘;. , :F : ::: \r.. ‘ . . , . , \.,, „ w‘,:x:• F‘,:FF \F ‘ ‘ s ,.. N \,... , F ,ro , , ., , ' ' 30‘' \S 'lEsil'i\s:B:U'iliRs:kr\::\.!‘"\F\n's:',,F‘: s:):,•\''\:\s'‘.3'1:':'11\n'F\':::::‘,.::'‘.s.,1::"...\''. \\*-* \\* .1....... . '''' ''''. ‘‘. ' \:: \\*::.' *\ ' • & ENHANCEMENT AREA ‘S \N` ll' .f V. 7%, c:::.‘,•• ''' ' LOT 3 107,875.54 Sq.Ft. 2.48 Acres \\Xe:\ 4.9 53.63' • • • • • • • cri co Q. • PROPOSED FLOODPLAIN BENCH 5.0' WIDE SLOPED AT 2.0% (SEE TYPICAL FLOODPLAIN BENCH CROSS SECTION FOR DETAILS) • Know what's below. Cali before you dig. 2099.8 2100.1 THE DATA GIVEN ON THESE PLANS IS BELIEVED TO BE ACCURATE, BUT THE ACCURACY IS NOT GUARANTEED. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL LEVELS, LOCATIONS, TYPES, AND DIMENSIONS OF THE EXISTING UTILITIES PRIOR TO CONSTRUCTION. IF A DISCREPANCY IS FOUND, WORK SHALL CEASE AND THE ENGINEER NOTIFIED. WORK MAY CONTINUE UPON ENGINEERS NOTICE TO PROCEED. 2097.49 • • rl 20913.00 ODPLAIN BENCH 2093.00 PLAIN BENCH ' GRAPHIC SCALE 411. 20' 1 inch = 20 ft. ME- :IL n:N• 7 • cn • 03 o ▪ co 0 E cr o CD CL La lal ! : 0 (I:1:1 oC)Lj: )1E' -1;7 / 1WEIML )::-<= -Lj: 1'2 :'LL I== )C)( 'Lk9CL:: 'I =EL 9SCi< °L 1-LjUC I. °Oa j''L-LjU )L-L f )1;1- 0 -LL f )W8WC:: ; M : 1 ; I /PROJECT NO. P20003 DESIGNED BY CMS/JDL DRAWN BY CMS/QAT CHECKED BY ISSUE DATE SHEET NO. 8 SHEETS a U E.dwg 3/5/2021 \P20003-2020—B :\2020\P20003 NOTES: 1. PROPERTY OWNER: JEFF JUSTUS 2. PROPERTY IDENTIFICATION: 1601 OLD SPARTANBURG RD. PIN#: 9578-81-0342 3. PARCEL AREA: 4.36 ACRES (PER SURVEY BY WAGGONER & RHODES LAND SURVEYORS, PLLC.) 4. PROPERTY ZONED: C-3 HIGHWAY BUSINESS 5. REFERENCES: D.B. 1263, PG. 67; 7. EXISTING FEATURES, IMPROVEMENTS, TOPOGRAPHIC, AND BOUNDARY INFORMATION BASED ON SURVEYS ENTITLED, "PLAT OF SURVEY FOR JEFF JUSTUS'', PREPARED BY WAGGONER & RHODES LAND SURVEYORS, PLLC., DATED JANUARY 2, 2020. THIS DOCUMENT SHALL NOT BE CONSIDERED A BOUNDARY SURVEY. 8. VERTICAL DATUM NAVD 1988 / HORIZONTAL DATUM NAD 1983 (2011) 9. PROPERTY IS LOCATED IN NFIP FLOOD ZONE "X" AND "AE" (BFE 2096') SUBJECT TO CHANGES. BASED ON COMMUNITY CID NO. 370128; PANEL 9578; SUFFIX J. (MAP NUMBER 3700957800J) EFFECTIVE DATE: 10/02/2008. 10. SETBACKS SHOWN ARE PER CITY OF HENDERSONVILLE AND DO NOT REFLECT ANY RESTRICTIVE COVENANTS THAT MAY EXIST. 11. PROJECT SCOPE: PERMITTING AND CONSTRUCTION OF A ±4,400 SQ.FT. CAR WASH WITH ASSOCIATED PARKING AND APPURTENANCES. 12. WASTEWATER: MAX. 2 CARS IN BAY AT A TIME 0 1,200 GPD/BAY = 2,400 GPD (WASTEWATER IS PROPOSED TO BE CONVEYED TO CENTRAL SYSTEM) 13. WATER SUPPLY PER CITY OF HENDERSONVILLE. WATER CONNECTION MUST BE MADE IN ACCORDANCE WITH CITY SPECIFICATIONS AND SHALL BE PERFORMED BY A LICENSED WATER UTILITY CONTRACTOR. NOTIFY CITY PRIOR TO INSTALLATION. 14. ALL UTILITIES TO BE PLACED UNDERGROUND UNLESS OTHERWISE NOTED 15. PRIOR TO LAND DISTURBANCE, A HENDERSON COUNTY APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN IS REQUIRED. 12. JURISDICTIONAL DETERMINATIONS HAVE NOT BEEN COMPLETED FOR THIS SITE. 13. EXISTING VEGETATION TO BE PRESERVED WHERE POSSIBLE. 14. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT ALL PROPERTY MONUMENTS DURING CONSTRUCTION. DISTURBED OR REMOVED PROPERTY MONUMENTS SHALL BE REPLACED BY A NORTH CAROLINA LICENSED PROFESSIONAL LAND SURVEYOR. 15. ALL WORK WITHIN THE NC DOT RIGHT-OF-WAY REQUIRES AN APPROVED NC DOT RIGHT-OF-WAY ENCROACHMENT AGREEMENT. 16. A LOCAL STORMWATER PERMIT IS REQUIRED IN ADVANCE OF ANY ONSITE DISTURBANCE. 17. THIS PLAN SET TO BE UTILIZED FOR THE INSTALLATION OF SITE LAYOUT IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO, GRADING & DRAINAGE, INSTALLATION OF SEDIMENT CONTROL MEASURES, WATER SYSTEM AND WASTEWATER CONNECTION. FOR BUILDING DESIGN AND ASSOCIATED PLUMBING, SEE APPROPRIATE SEPARATE PLANS. WET DETENTION BASIN MAINTENANCE 1.IMMEDIATELY AFTER THE WET POND IS ESTABLISHED, THE PLANTS ON THE VEGETATED SHELF AND PERIMETER OF THE BASIN SHOULD BE WATERED TWICE WEEKLY IF NEEDED, UNTIL THE PLANTS BECOME ESTABLISHED (COMMONLY SIX WEEKS). 2.NO PORTION OF THE WET POND SHOULD BE FERTILIZED AFTER THE FIRST INITIAL FERTILIZATION THAT IS REQUIRED TO ESTABLISH THE PLANTS ON THE VEGETATED SHELF. 3.STABLE GROUNDCOVER SHOULD BE MAINTAINED IN THE DRAINAGE AREA TO REDUCE THE SEDIMENT LOAD TO THE WET POND. 4.IF THE POND MUST BE DRAINED FOR AN EMERGENCY OR TO PERFORM MAINTENANCE, THE FLUSHING OF SEDIMENT THROUGH THE EMERGENCY DRAIN SHOULD BE MINIMIZED AS MUCH AS POSSIBLE. 5.ONCE A YEAR, A DAM SAFETY EXPERT SHOULD INSPECT THE EMBANKMENT. EAST JORDAN IRON WORKS, INC. MANHOLE FRAME AND GRATE (MODEL 1480M OR APPROVED EQUAL) STRUCTURE WALLS MAY BE TOP OF COVER = 2094.0' BLOCK, BRICK, OR PRECAST NOTE: THIS DOCUMENT IS PRELIMINARY - NOT FOR CONSTRUCTION, RECORDATION, SALES OR CONVEYANCES - THIS DOCUMENT IS FOR DISCUSSION PURPOSES ONLY! EXISTING INFORMATION SHOWN ON THIS DOCUMENT IS BASED ON BEST AVAILABLE DATA AND IS NOT A CERTIFIED SURVEY. ALL INFORMATION SHOWN ON THIS DOCUMENT IS SUBJECT TO ANY REQUIREMENTS BY ANY REGULATORY AGENCY, ENTITY OR AUTHORITY. QUIBLE & ASSOCIATES, P.C. DOES NOT GUARANTEE THE ACCURACY OR THE COMPLETENESS OF ANY INFORMATION IN THIS DOCUMENT AND IS NOT RESPONSIBLE FOR ANY ERROR OR OMISSION OR ANY LOSSES OR DAMAGES RESULTING FROM THE USE OF THIS INFORMATION. " PVC SCREW TYPE PLUG " PVC TEE TEMP. POOL ELEVATION: 2094.0' CONTRACTOR TO PAINT PVC IPE TO PROTECT PIPE FROM UV BIODEGRATION (COLOR BY OWNER) PERM. POOL ELEVATION: 2090.5' 6" PVC STUBBED TO 6" BELOW PERM. POOL 6" PVC CAP WITH 2" HOLE DRILLED \\ BASIN 0 2086.5' + S; j/ j/ • . `'�:. PONCREBASE':: .�; '. ` ': jj /jj DRAW -DOWN STRUCTURE (DI #8) DETAIL N.T.S. NOTE: A FAIRCLOTH SKIMMER TO BE INSTALL DURING THE INITIAL CONSTRUCTION OF THE WET BASIN. THE SKIMMER IS TO BE CONNECTED TO THE 8" STUB -OUT ON THE WETBASIN OVERFLOW STRUCTURE. THE WET BASIN WILL SERVE AS A SEDIMENT BASIN DURING THE CONSTRUCTION OF THE SITE. ONCE THE SITE HAS BEEN FULLY STABILIZED THE FAIRCLOTH SKIMMER IS TO BE REMOVED AND THE SPECIFIED DRAW DOWN PIPE IS TO BE INSTALLED PER THE BASIN OVERFLOW STRUCTURE DETAIL. THE STUB -OUT FOR THE DRAW DOWN PIPE SHALL BE CAPPED DURING CONSTRUCTION kj 'TE EE 2089.89 4.366 ACRES+- 1 FIRM ZONE :4E" PROPOSED TOP OF 7' WIDE FOREBAY 0 2093.0'. 6:1 SLOPE FROM EL. 2090.0' TO EL. 2091.0' RIP -RAP FOREBAY WALL FROM TOP TO EL. 2090.5' 2' THICK OVER GEOTEXTILE FABRIC /8" RCP DROP INLET INV. 2095.24' 3'X5'X0.5' DEEP RIP -RAP (CLASS A EROSION CONTROL STONE) / I / I 1 D.I.#1 RIM=2097.37' 12"INV.=2094.37' / 209133' DROP INLET • INV.2091.80' 30" 6MP CULVERT 15' M.B.S.L 30' STREAM BUFFER (TYP.) 7 15' M.B.S.L. PROPOSED FOREBAY TOP = 2095.0' BOTTOM = 2088.0' cP -2088 2098.46 2094 2095 2099.08 D.I.#2 RIM=2098.00' 12"INV.=2093.79' 12"INV.=2093.79' 12"INV.=2093.59' 12" RCP 33' 0 1.7% SLOPE 2098.00 7 WET DETENTION BASIN SHALL BE UTILIZED AS A SEDIMENT BASIN FOR EROSION CONTROLS DURING CONSTRUCTION. THE BASIN OUTLET STRUCTURE SHALL BE FITTED WITH A "FAIRCLOTH SKIMMER" DURING CONSTRUCTION (SEE DETAILS). UPON COMPLETION OF CONSTRUCTION ACTIVITIES, THE FAIR CLOTH SKIMMER SHALL BE REMOVED AND REPLACED WITH ORIFICE DEVICE PER OUTLET STRUCTURE DETAIL ACCUMULATED SEDIMENT SHALL BE REMOVED FROM THE DETENTION BASIN UPON COMPLETION OF CONSTRUCTION ACTIVITIES � I 1 PROPOSED WET $ y ILp9� DETENTION BASIN TOP = 2095.0' / TEMP. POOL = 2094.0' 9�` PERM. POOL = 2090.5' BOTTOM = 2086.5' SHWT = ±2090.5' 2090.5 2091 2092 2093 2094 100.2b 2100.61 SHEPHER'Q INV. 2093.4/' STREET S.R. /779' • 2098.1 2098.37 2097 2098- 2099 100.34 100.11 099.54 2098.19 12" RCP 51' 0 0.3% SLOPE 2098.73 3 209 S.16 2098.34 2098.58 1 1 1 1 1 \ 11 1 1 1 I\ 1 1 1 bXIS1ING BUILDING I I L_ --543°20'47"W-- PIN: '45785I-0032 ZONED: C-3 EX. S.M.H.#7 RIM=2100.19' INV. IN=2083.47' INV.OUT=2083.47' [-t-7 L PROPOSED 6' WIDE VEGETATED SHELF 6:1 SLOPE FROM EL. 2090.0' TO EL. 2091.0' 2101.00 12" RCP 29' 0 0.5% SLOPE 18" RCP INV. 2093.89' D.I.#3 RIM=2099.93' 12"INV.=2094.14' 12"INV.=2094.14' 12"INV.=2093.94' i 173.26 D.I.#8 RIM=2094.00' 12"INV.=2090.50' D.I.#6 RIM=2095.97' 60"INV.=2089.97' • 12"INV.=2090.10' PROPOSED 1 STORY CAR WASH ±4,400 SF TOTAL FFE = 2101.0' LEVEL AREA ELEVATION = 2094.33' 2100.31 2097.69 2097 3G INSTALL 18" RCP TO CONNECT EXISTING 18" RCP ON EITHER SIDE 35' 0 1.4% N/F STAR DRAY COMPANY LLC PIN: 9578-4I-6498 ZONED: C-3 110.0' 15' M.B.S.L. 96" WIDE BOTTOMLESS RCP 123' LF (DESIGN BY OTHERS) ALL ROOF DRAINS TO CONNECT TO STORM WATER NETWORK INV..2094.05' • '1. . 238'0.55b SLOPE' EX SANITARY SEWER" M.B.S.L. PROPOSED GRASS V-SWALE 0 2.0% LONGITUDINAL SLOPE W/ 3:1 SIDE SLOPES 209850 COORDINATE INSTALLATION OF BUILDING OVER PIPING WITH STRUCTURAL PLANS. COVER MUST MEET A MINIMUM OF 12" SEPARATION PER STRUCTURAL ENGINEER. 2101.00 2100.14 EX. S.M.H.#4 RIM=2096.I7' INV. IN=2033.47' INV.OUT=2088.47' 60" RCP 149' 0 0.3% SLOPE 2100.777. •. PROPOSED CANOPY TREE (TYP.) 2100.20 2099.82 •_ I .1• . EX SANITARY SEWER" . 59' ®2.69 SLOPE • • APPROXIMATE LOCATION OF EXISTING PIPE CROSSING: / - 30" RCP 2-18"RCP (LOCATION NOT FIELD SURVEYED.) .1 In gdo7S „?1�M35 ,l? v11NVS X� cn SANITARY SEWER II I WATER MET II I III II I II I II I II LEGEND QQ EX. IRON ROD O EX. DRILL HOLE EX. MAG NAIL M..) • EX. UTILITY POLE • EX. FIRE HYDRANT EX. WATER VALVE • EX. SEWER MANHOLE ®• EX. WATER METER EE EX. ELECTRICAL CONNECTION 4 . EX. EXTERIOR LIGHT EX. LIGHT POLE • POWER POLE • EX S.M.H#6 RIM=2098.46' INV. IN=2087.16 • INV. IN=208716 DROP INLET PIPE SIZING/CAPACITY BASED ON MAXIMUM UPSTREAM CAPACITY EX SANITARY SEWER" 63' a 4.A SLOPE POWER POLE �. /N04° I2'29"E 70.32' D.I.#7 RIM=2093.36' 18"INV.=2090.63' 18"INV.=2090.63' 36"INV.=2090.63' 60"INV.=2090.43' EX 5.M.H #5 12IM=2098.00' INV OUT=2090.10' INV OUT=2090.10' NOTE: THE DATA GIVEN ON THESE PLANS IS BELIEVED TO BE ACCURATE, BUT THE ACCURACY IS NOT GUARANTEED. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL LEVELS, LOCATIONS, TYPES, AND DIMENSIONS OF THE EXISTING UTILITIES PRIOR TO CONSTRUCTION. IF A DISCREPANCY IS FOUND, WORK SHALL CEASE AND THE ENGINEER NOTIFIED. WORK MAY CONTINUE UPON ENGINEERS NOTICE TO PROCEED. : EXISTING ASPHALT PAVEMENT PROPOSED CONCRETE PROPOSED ASPHALT PROPOSED RIP RAP - - EXISTING CONTOUR -9.0- EXISTING SPOT GRADE PROPOSED CONTOUR PROPOSED SPOT GRADE (TOP OF ASPHALT/FLOW LINE UNLESS OTHERWISE NOTED) 9.00'TC PROPOSED TOP OF ▪ o PROPOSED 12" RCP CONCRETE ELEV. PROPOSED FLOW DIRECTION AND SLOPE 0 Know what's below. Call before you dig. GRAPHIC SCALE 20' 0 10' 20' 40' ( IN FEET ) 1 inch = 20 ft. NC License#: C-0208 SINCE 1959 C.) 0 CA CA * CD 1- CD m v) ram co • co z co Ct • Z co co z CY NI CV e o Ld co u)(7)(3 (nwaz i-Oup c,! L9C: jz:21 C '°> I= -LL jUji: 0(9u -"C L ja I: °I' j( )ajZ j8C 1:LL )Z>> -< )1-L jC REVISIONS 0 d DRAINAGE at 4:4 gr% (;) r5)i E-4 A 8 2 1-6 PROJECT NO. P20003 DESIGNED BY CMS DRAWN BY CMS CHECKED BY MWS ISSUE DATE 3/3/21 SHEET NO. 3 OF 8 SHEETS) a U E.dwg 3/5/2021 \P20003-2020-B 0 :\2020\P20003 NOTES: 1. OWNERS: JEFF JUSTUS 2. SITE ADDRESS: 1601 OLD SPARTANBURG RD. 3. PIN#: 9578-81-0342 4. RECORDED REFERENCE: DB 1263 PG. 67 5. PROPERTY ZONED: C-3SU HIGHWAY BUSINESS SPECIAL USE, C-3 HIGHWAY BUSINESS, & R-15 MEDIUM DENSITY RESIDENTIAL 6. TOTAL PARCEL AREA: 4.36 ACRES (PER SURVEY BY WAGGONER & RHODES LAND SURVEYORS, PLLC.) 7. EXISTING FEATURES, IMPROVEMENTS, TOPOGRAPHIC, AND BOUNDARY INFORMATION BASED ON SURVEYS ENTITLED, "PLAT OF SURVEY FOR JEFF JUSTUS", PREPARED BY WAGGONER & RHODES LAND SURVEYORS, PLLC., DATED JANUARY 2, 2020. THIS DOCUMENT SHALL NOT BE CONSIDERED A BOUNDARY SURVEY. 8. VERTICAL DATUM NAVD 1988 / HORIZONTAL DATUM NAD 1983 (2011) 9. PROPERTY IS LOCATED IN NFIP FLOOD ZONE "X" AND "AE" (BFE 2096') SUBJECT TO CHANGES. BASED ON COMMUNITY CID NO. 370128; PANEL 9578; SUFFIX J. (MAP NUMBER 3700957800J) EFFECTIVE DATE: 10/02/2008. 10. PROJECT SCOPE: THIS PLAN WAS PREPARED IN RESPONSE TO CLEARING, FILLING & GRADING OF THE SUBJECT PARCEL. AT THE TIME OF PLAN PREPARATION, PIPING HAS BEEN PARTIALLY INSTALLED. THIS PLAN ADDRESSES EROSION AND SEDIMENT CONTROL MEASURES TO COMPLETE CLEARING, FILLING AND GRADING ON THE REMAINDER OF THE SITE. THIS PLAN SET TO INCLUDE DESIGN OF EROSION AND SEDIMENT CONTROL MEASURES SHOWN ONLY. DESIGN OF STORMWATER MEASURES, FILL, AND CHANNEL ALTERATIONS NOT INCLUDED IN THIS PLAN SET. SIZING OF STORMWATER PIPING DETERMINED BY NCDOT AND HENDERSON COUNTY REPRESENTATIVES ONSITE PRIOR TO PREPARATION OF THIS PLAN. CONTRACTOR MUST OBTAIN ALL APPLICABLE LOCAL, STATE, AND FEDERAL PERMITS FOR DISTURBANCE ON SITE. 11. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITION BETWEEN SPOT ELEVATION GRADES AND MAINTAIN POSITIVE DRAINAGE. 12. JURISDICTIONAL DETERMINATIONS HAVE NOT BEEN COMPLETED FOR THIS SITE. SOIL EROSION & SEDIMENTATION CONTROL PLAN NOTES: 1. AREA TO BE DISTURBED: ±193,492 (±1.5 ACRES) ONSITE ±32,815 (±0.75 ACRES) OFFSITE 2. PROVIDE A GROUNDCOVER STABILIZATION (TEMPORARY OR PERMANENT) ON ALL DENUDED DOWNSTREAM SURFACES FOLLOWING THE COMPLETION OF LAND DISTURBING ACTIVITIES PER THE CRITERIA LISTED BELOW: a. PERIMETER DIKES, BERMS, SWALES, DITCHES AND SLOPES SHALL BE STABILIZED IN 7 DAYS. b. HIGH QUALITY WATER (HQW) ZONES SHALL BE STABILIZED IN 7 DAYS. c. DOWNSTREAM SLOPES STEEPER THAN 3:1 SHALL BE STABILIZED IN 7 DAYS. IF SLOPES ARE 10' OR LESS AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. d. DOWNSTREAM SLOPES 3:1 OR FLATTER AND LESS THAN 50' IN LENGTH SHALL BE STABILIZED IN 14 DAYS. SLOPES 3:1 OR FLATTER EXCEEDING 50' IN LENGTH SHALL BE STABILIZED IN 7 DAYS. e. ALL OTHER DOWNSTREAM AREAS WITH SLOPES 4:1 OR FLATTER SHALL BE STABILIZED WITHIN 14 DAYS. f. GROUND COVER SHALL BE PROVIDED ON CUT AND FOR FILL SLOPES WITHIN 21 CALENDAR DAYS AFTER COMPLETION OF ANY PHASE OF GRADING. GROUND COVER OVER OTHER AREAS SHALL BE PROVIDED WITHIN SHORTER OF 15 WORKING OR 90 CALENDAR DAYS (60 DAYS IN HQW ZONES) OF COMPLETION OF CONSTRUCTION OF DEVELOPMENT. 3. IF LAND DISTURBING ACTIVITIES OCCUR OUTSIDE THE PERMANENT VEGETATION SEEDING DATES (APR. 1— SEP.30) THEN TEMPORARY VEGETATION SEEDING SPECIFICATIONS SHALL BE FOLLOWED FOR PLANTING UNTIL THE NEXT APPROPRIATE PERMANENT SEEDING PERIOD, AT WHICH TIME PERMANENT VEGETATION SHALL BE ESTABLISHED ACCORDING TO PERMANENT VEGETATION SEEDING SPECIFICATIONS (SEE PERM. & TEMP. SEEDING SPECIFICATIONS). 4. IF EXCESSIVE WIND EROSION OR STORMWATER RUNOFF EROSION DEVELOPS DURING TIME OF CONSTRUCTION ANY LOCATION ON THE PROJECT SITE, ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSTALLED IMMEDIATELY AS DIRECTED BY THE ENGINEER TO ADDRESS THE PROBLEM AREA AND PREVENT DAMAGE TO ADJACENT PROPERTIES. 5. SOIL EROSION AND SEDIMENTATION CONTROLS TO BE INSPECTED, MAINTAINED AND REPAIRED AS NECESSARY UNTIL PERMANENT CONTROLS ARE ESTABLISHED. a. A RAIN GAUGE MUST MUST BE KEPT ON SITE. b. DEDICATED DEMOLITION AND OTHER WASTE AREAS AND EARTHEN MATERIAL STOCKPILES MUST BE LOCATED AT LEAST 50 FEET FROM DRAINS OR STREAMS UNLESS NO ALTERNATIVE IS FEASIBLE. c. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSPECTED AT LEAST ONCE A WEEK AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN A HALF INCH (DURING A 24 HOUR PERIOD). IMMEDIATE CORRECTIVE ACTION MUST BE TAKEN FOR ANY DEVICE FAILURE. d. INSPECT ALL OUTLETS WHERE RUNOFF LEAVES SITE AND EVALUATE EFFECT ON NEARBY STREAMS. TAKE CORRECTIVE ACTION IF NECESSARY. e. MAINTAIN RECORDS OF INSPECTIONS AND CORRECTIVE ACTIONS. f. EARTHWORK NOTE: OFFSITE BORROW MATERIAL SHALL COME FROM AN NCDEQ LAND QUALITY SECTION APPROVED SITE. OFFSITE DISPOSAL OF EXCESS MATERIAL SHALL BE TO AN NCDEQ LAND QUALITY SECTION APPROVED SITE. CONSTRUCTION SEQUENCE: PRECONSTRUCTION: 1) OBTAIN PLAN APPROVAL AND OTHER APPLICABLE PERMITS. 2) FLAG AND/OR ROUGH STAKE WORK LIMITS. 3) FLAG EXISTING VEGETATION TO REMAIN/PROTECT. 4) HOLD PRECONSTRUCTION CONFERENCE (OWNER, CONTRACTOR, ENGINEER, AND APPROPRIATE GOVERNMENT OFFICIALS) AT LEAST ONE WEEK PRIOR TO START OF CONSTRUCTION ACTIVITIES. CONSTRUCTION: 5) INSTALL SILT FENCING, INLET PROTECTION, AND CONSTRUCTION ENTRANCE/EXIT AT LOCATIONS SHOWN ON PLAN. 6) COMPLETE CLEARING, GRUBBING AND DEMOLITION PROCEDURES. 7) INSTALL CONTRIBUTING STORM CONVEYANCES AND ASSOCIATED EROSION CONTROLS. 8) GRADE SITE ACCORDING TO PLAN WITH APPROVED FILL MATERIAL. 9) ALL EROSION & SEDIMENTATION CONTROLS SHALL BE INSPECTED WEEKLY AND AFTER HEAVY RAINFALL EVENT. NEEDED REPAIRS AND MAINTENANCE WILL BE MADE IMMEDIATELY. FURTHERMORE, IF ANY WIND OR STORMWATER RUNOFF EROSION DEVELOPS DURING THE CONSTRUCTION OF THE PROJECT, ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSTALLED TO ADDRESS THE PROBLEM AREA. 10) ONCE THE SITE CONSTRUCTION IS COMPLETE AND DENUDED SURFACES ARE FULLY STABILIZED; ALL STORMWATER CONVEYANCES, STRUCTURES AND PIPING SHALL BE CLEANED OF ALL SILT/DEBRIS WHICH MAY HAVE ACCUMULATED DURING CONSTRUCTION. CONTRACTOR SHALL VERIFY DESIGN GRADES OF ALL STORMWATER CONVEYANCES AND RESTORE TO DESIGN SPECIFICATIONS AS NECESSARY, INCLUDING INSTALLATION OF MEDIA AND VEGETATION. 11) UPON THE REMOVAL OF ACCUMULATED SEDIMENTS AND SITE STABILIZATION, ALL REMAINING EROSION CONTROLS MAY BE REMOVED FROM THE DEVELOPMENT. ALL DOWNSTREAM EROSION CONTROLS SHALL REMAIN IN PLACE UNTIL THE COMPLETION OF ALL OTHER DEVELOPMENT CONSTRUCTION ACTIVITIES. PERMANENT VEGETATION SEEDING DATES: APRIL 1 — AUGUST 31: SEED MIXTURE REBEL II FESCUE COMMON BERMUDA 'SAHARA" (HULLED) SEEDING DATES: SEPT. 1 — MARCH 31: SEED MIXTURE REBEL II FESCUE COMMON BERMUDA 'SAHARA" (UNHULLED) APPLICATION RATES/ACRE 130 LBS. 215 LBS. APPLICATION RATES/ACRE 250 LBS. 215 LBS. TEMPORARY VEGETATION SEEDING DATES: AUG. 16 — APRIL 15: SEED MIXTURE RYE GRAIN SEEDING DATES: APRIL 16 — AUG. 15: SEED MIXTURE GERMAN MILLET APPLICATION RATES/ACRE 120 LBS APPLICATION RATES/ACRE 40 LBS SEEDBED PREPARATION: LOOSEN SOILS TO A DEPTH OF 6-8 INCHES USING A RIPPER, HARROW, OR CHISEL PLOW, BREAK UP CLODS, REMOVE UNACCEPTABLE GROWTH (STICKS, ROOTS), STONES (>3"), AND OTHER MATERIALS, AND WORK THE TOP 3-4 INCHES OF THE SOIL INTO A SEEDBED. THE AREA TO BE SEEDED SHALL BE RE —COMPACTED UTILIZING A CULTIPACKER ROLLER AND A SMOOTH EVEN SOIL SURFACE WITH A LOOSE, UNIFORMLY FINE TEXTURE SHALL BE THE FINISHED GRADE. SOIL AMENDMENTS: OBTAIN A SOIL TEST TO DETERMINE APPLICATION RATES AND FOLLOW RECOMMENDATIONS OF SOIL TESTS. WHEN A SOIL TEST IS NOT POSSIBLE, APPLY 3,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 STARTER FERTILIZER. MULCHING: APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. MAINTENANCE: SATISFACTORY STABILIZATION AND EROSION CONTROL REQUIRES A COMPLETE VEGETATIVE COVER. EVEN SMALL BREACHES IN VEGETATIVE COVER CAN EXPAND RAPIDLY AND, IF LEFT UNATTENDED, CAN ALLOW SERIOUS SOIL LOSS FROM AN OTHERWISE STABLE SURFACE. A SINGLE HEAVY RAIN IS OFTEN SUFFICIENT TO GREATLY ENLARGE BARE SPOTS, AND THE LONGER REPAIRS ARE DELAYED, THE MORE COSTLY THEY BECOME. PROMPT ACTION WILL KEEP SEDIMENT LOSS AND REPAIR COST DOWN. NEW SEEDLINGS SHOULD BE INSPECTED FREQUENTLY AND MAINTENANCE PERFORMED AS NEEDED. IF RILLS AND GULLIES DEVELOP, THEY MUST BE FILLED IN, RE —SEEDED, AND MULCHED AS SOON AS POSSIBLE. DIVERSIONS MAY BE NEEDED UNTIL NEW PLANTS TAKE HOLD. MAINTENANCE REQUIREMENTS EXTEND BEYOND THE SEEDING PHASE. (COMPLETE VEGETATIVE COVER IS REQUIRED REGARDLESS OF COUNTY ISSUANCE OF A CERTIFICATE OF OCCUPANCY AND FINAL PAYMENT WILL NOT BE AWARDED UNTIL COMPLETE ESTABLISHMENT OF VEGETATIVE COVER.) WEAK OR DAMAGED SPOTS MUST BE RELIMED, FERTILIZED, MULCHED, AND RESEEDED AS PROMPTLY AS POSSIBLE. REFERTILIZATION MAY BE NEEDED TO MAINTAIN PRODUCTIVE STANDS. 20&g89' NOTE: ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES ON A WEEKLY BASIS AND AFTER EACH MAJOR STORM EVENT; FAILURE TO KEEP ORDER MAY RESULT IN ISSUANCE OF A STOP WORK ORDER. 4.366 ACRES+- 30' STREAM BUFFER (TYP.) 15' M.B.S.L. PROPOSED TOP OF 7' WIDE FOREBAY @ 2093.0'. 6:1 SLOPE FROM EL. 2090.0' TO EL. 2091.0' HP —RAP FOREBAY WALL FROM TOP TO EL. 2090.5' 2' THICK OVER GEOTEXTILE FABRIC RGP DROP INLET INV. 2095.24' 3'X5'XO.5' DEEP HP —RAP (CLASS A EROSION CONTROL STONE) I 7 / I / I D.I.#1 RIM=2097.37' 12"INV.=2094.37' 2O91.33' CD DROP INLET • • INV.. 2O91130' • 30"GMP CULVERT 15' M.B.S.L. PROPOSED FOREBAY BOTTOM = 2088 0' 88 2094 2095 12 INV =2093 79' 12 INV =2093 79' 12" RCP 7 1 1 1 1 1 1 1 ost osi I 7 I WET DETENTION BASIN SHALL BE UTILIZED AS A SEDIMENT BASIN FOR EROSION CONTROLS DURING CONSTRUCTION, THE BASIN OUTLET STRUCTURE SHALL BE FITTED WITH A "FAIRCLOTH SKIMMER" DURING CONSTRUCTION (SEE DETAILS), UPON COMPLETION OF CONSTRUCTION ACTIVITIES, THE FAIR CLOTH SKIMMER SHALL BE REMOVED AND REPLACED WITH ORIFICE DEVICE PER OUTLET STRUCTURE DETAIL, ACCUMULATED SEDIMENT SHALL BE REMOVED FROM THE DETENTION BASIN UPON COMPLETION OF CONSTRUCTION ACTIVITIES 12" RCP 111 CONSTRUCTION ENTRANCE/EXIT (TYP.) RGP 51-/EF'HERD STREET —/ • PROPOSED WET DETENTION BASIN BOTTOM = 2086 5' 209 2091 2092 2093 1 VALL PROPOSED WIDE VEGETATED SHELF 6 1 SLOPE ROM EL 2090 0' TO EL 2091 0' 110) Co 2095 2096 2097 2098 12" RCP SLOPE LD- PROPOSED FAIRCLOTFI SKIMMER 12" RCP INV. 2093.89' INSTALL 18" RCP TO CONNECT EXISTING 18" RCP ON EITHER SIDE BUILDING 173.26 15' M.B.S.L. 60 INV —2089 97 PROPOSED 1 STORY CAR WASH ±4,400 SF TOTAL FFE = 2101.0' LEVEL AREA ELEVATION = 2094.33' CULVERT OUTLET PROTECTION (TYP.) 5TAR DRAY COMPANY LLC ZONED: C-3 BOTTOMLESS RCP BY OTHERS) PROPOSED LIMITS OF DISTURBANCE (TYP.) ALL ROOF DRAINS TO CONNECT TO STORMWATER NETWORK 12" RCP L-D PIN: 4576-5i-0032 ZONED: C-3 PROPOSED SILT FENCE (TYP.) PROPOSED GRASS LONGITUDINAL SLOPE W/ 3:1 SIDE SLOPES EX SANITARY SEHER" LD- INV IN=2033.47' COORDINATE INSTALLATION OF BUILDING OVER PIPING WITH STRUCTURAL PLANS COVER MUST MEET A MINIMUM OF 12" SEPARATION PER STRUCTURAL ENGINEER 60 RCP 2100y/ EX HEADWALL • • INV. IN=2033.47' • mr PROPOSED CANOPY TREE (TYP.) „y3Mg,1Jb11NV9 'X3 SANITARY SEHER ii HATER MET II I II I II I II I • POHER POLE • INV IN=2037.16 DROP • • INLET PIPE SIZING/CAPACITY BASED ON MAXIMUM UPSTREAM CAPACITY EX. SANITARY SEHER" • • • • • • INLET PROTECTION LEGEND EX. IRON ROD C) EX. DRILL HOLE EX. MAG NAIL EX. UTILITY POLE EX. FIRE HYDRANT EX. WATER VALVE O EX. SEWER MANHOLE • EX. WATER METER O EX. ELECTRICAL CONNECTION EX. EXTERIOR LIGHT <X EX. LIGHT POLE NOTE: THE DATA GIVEN ON THESE PLANS IS BELIEVED TO BE ACCURATE, BUT THE ACCURACY IS NOT GUARANTEED. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL LEVELS, LOCATIONS, TYPES, AND DIMENSIONS OF THE EXISTING UTILITIES PRIOR TO CONSTRUCTION. IF A DISCREPANCY IS FOUND, WORK SHALL CEASE AND THE ENGINEER NOTIFIED. WORK MAY CONTINUE UPON ENGINEERS NOTICE TO PROCEED. orogrAl WAVAND EXISTING ASPHALT PAVEMENT EXISTING CONCRETE PROPOSED CONCRETE PROPOSED ASPHALT PROPOSED EXCELSIOR MATTING EXISTING SPOT GRADE PROPOSED CONTOUR PROPOSED FLOW DIRECTION AND SLOPE PROPOSED LIMITS OF DISTURBANCE 3 PROPOSED CULVERT INLET PROTECTION —x— PROPOSED FENCE PROPOSED SILT FENCE Know what's below. Call before you dig. GRAPHIC SCALE 20' 0 10' 20' 40' 1 inch = 20 ft. NC License#: C-0208 SINCE 1959 clais 0 • * 0 Lu * CD * ci LLJ CD LaJ m rsocn co z et CA NI e 7:7 ;*"0/vTrzkiltcp.,0 lllllllll u)(7)(3 (nwaz i—Oup cI! L 1Z- a jzDZ: (9LajCI- 1-11Lj(1)aj CELjC-9.< 1:LnZ>>-‹ (ALLjbb: g LE REVISIONS 0 d 1-4 rYz all 2 r5)1 8 2 0 '4 L6 PROJECT NO. P20003 DESIGNED BY CMS DRAWN BY CMS CHECKED BY MWS ISSUE DATE SHEET NO. OF 8 SHEETS) a 0 E.dwg 3/5/2021 \P20003-2020—B :\2020\P20003 .,k 3' MIN. STAPLE 12" O.C. ALONG /BLANKET AT SLOPE CHANGE �s!Iwi�, STAPLE 12" O.C. ALONG BOTTOM OF BLANKET AT THE END OF SLOPE BOTTOM OF SLOPE TERMINATION N.T.S. SOIL PILE FROM TRENCH /\ TRENCH APPROX. 10" WIDE x 8" DEEP END SEAM OF BLANKETS OVERLAP 2"-4". PLACE STAPLES, ONE ON EACH CORNER OF BLANKET, 12" O.C. ALONG BLANKET END THROUGH BOTH BLANKETS. UPSLOPE BLANKET LAPS OVER DOWNSLOPE BLANKETS IN A SHINGLE AFFECT. END ROLL OVERLAP N.T.S. NOTES: 1. STAPLE PATTERNS ARE DEPENDENT ON SITE CONDITIONS. SEE CURLEX® STAPLE PATTERN GUIDE FOR DETAILS. i \'\i\ I1 TOP OF BLANKET%\\r SLOPE TO \\/ �` \/ 1 ROW OF STAPLES, PROTECT <\ \/�\ 1 1• 12" O.C. STEP 1 \i ,•\\ 6IEP2 SLOPE TRENCHING METHOD "B" CLASS B RIPRAP FLOW N.T.S. 2 ROWS OF STAPLES, STAGGERED, 6" O.C., EA. DIR. 2 ROWS OF STAPLES, STAGGERED, 6" O.C., EA. DIR. SOIL FILLED FROM SOIL PILE II 11 I I I=11 I I I I I=11 I I' II=11 II II II II II II II II II II II 1= I I I=1I I I I I I=1I I I I I'. I. II= I II=11 II II II_II II II II II II II II 11= I I I I I I 11 II II II-� II II II II_�I II II Igor. II -II II 11 II II II II II II- II I II II II II II II II II II _i I=1I I I I I I I .=11 I I I=11. II. II -II II II II II II II II If ilia II II H If II II I II II II II II II II II li= -Il11111111111111 lH11H11H11Hlf. u u u n uuu u u 11' I 3' i CLASS B RIPRAP BLANKET OVERLAP 2"-4" OI OI4 1I / STAPLES ARE THROUGH BOTH BLANKETS. SIDE SEAM OVERLAP STAPLE DETAM N.T.S. CURLEX SLOPE APPLICATION DETAIL AMERICAN EXCELSIOR COMPANY ARLINGTON, TEXAS PIPE INVER1. 36' PIPE MAX ATURAL GROUND RIPRAP HEADWALL, 1' MIN. HEIGHT FROM ROAD SHOULDER NCDOT #5 OR #57 WASHED STONE CONSTRUCTION & MAINTENANCE NOTES: 1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SPOIL. 2. INSTALL THE CLASS B OR CLASS I RIPRAP IN A SEMI -CIRCLE AROUND THE PIPE INLET. THE STONE SHOULD BE BUILT UP HIGHER ON EACH END WHERE IT TIES INTO THE EMBANKMENT. THE MINIMUM CREST WIDTH OF THE RIPRAP SHOULD BE 3 FEET, WITH A MINIMUM BOTTOM WIDTH OF 11 FEET. THE MINIMUM HEIGHT SHOULD BE 2 FEET, BUT ALSO 1 FOOT LOWER THAN THE SHOULDER OF THE EMBANKMENT OR DIVERSIONS. 3. A 1 FOOT THICK LAYER OF NC DOT #5 OR #57 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE RIPRAP. 4. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE OF THE STONE HORSESHOE 18 INCHES BELOW NATURAL GRADE. 5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSION AND ESTABLISH ANAL GRADING ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER. MAINTENANCE: INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT 0/4 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABIUZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER (SURFACE STABIUZATION). CULVERT INLET PROTECTION N.T.S. /r • * i. ,r.. /110/.10/.10/W i - apdat yT �`'a� 1,-I A, -I• A, -I tip v� •�I • .04#-N.1.----411111 �1 11 e. I Pi. 10' • 4411.4111 We) WI Frii WWII* ‘NeetiVION NAM .1� •i s do = PIPE DIAMETER 0 0 PLAN CLASS A NCDOT EROSION CONTROL STONE 1.5' DEEP el biltItA p' 4'• 16 arelb 11 ,,emi,� !lp . 41 be 12 ki 'VW drr gra *NI •' I 0 CLASS A NCDOT EROSION CONTROL STONE Filter blanket SEE APPROPRIATE OUTLET DETAIL FOR DIMENSIONS CONSTRUCTION & MAINTENANCE NOTES: 1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY ALL REQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING UMITS SHOWN ON THE PLANS. 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP SO THE TOP LAYER IS ABOVE THE DOWNSTREAM LAYER A MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. 4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER. 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONE DIAMETER. 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR, HIGHLY WEATHER -RESISTANT AND WELL GRADED. 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFILL AT THE END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT. 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON. 9. IMMEDIATELY AFTER CONSTRUCTION. STABILIZE ALL DISTURBED AREAS WITH VEGETATION MAINTENANCE: INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. RIP -RAP OUTLET DETAIL N.T.S. DEWATERING CONCRETE BLOCK ay."eoo-000vo'0g�o',omime 000 o� o Q oocP 00 D0 0 0 00 0 o$0 r❑.:::. 0 o 0 ot 0 0 o 000 o4 oO D_ DiDDI1l1]l 1QIDQ 00000 00 00 g 0000000 0 0�0 o pp�Ji 000 0 00 0 0 • ,0 00 o o 0 OoCle 00o g' 0 04 00 o 0 o �gCPo 0 0 b0 0 0,�,0' o o_--- 00 0 0;° 00 000 00 90 �' {0�(�0�y�)�('') 0 � /�'.J(o�,00 �X• ,•.p ((1���0 000o0 00� 00 O 00 Opo Vp Op0%00 o ' ooe0 0 LV OC "' 0c ob-000 o0� 0 �eo 0bV d✓go� 0 �0 0�0 0 o o INLET PROTECTIONS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, (LATEST EDITION) SECTION 6.52. 2:1 SLOPE, GRAVEL BERM TEMPORARY SEDIMENT POOL INLET PROTECTION SHALL BE PROVIDED AT ALL DROP INLETS, CURB INLETS YARD INLETS AND ANY OTHER STORMWATER COLLECTION INLET. NCDOT STANDARD #57 WASHED STONE 1' MIN 2' MAX WIRE SCREEN 8"X8"X16" CMU DEWATERING 111III n 111 111-III-III-�III�I I � 1-111=1 I I 11=111- =111-111 111 CONSTRUCTION & MAINTENANCE NOTES: 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT ROWS BY PLACING 2 X 4 WOOD STUDS THROUGH BLOCK OPENINGS. 2. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 14-INCH OPENINGS OVER ALL BLOCK OPENINGS TO HOLD GRAVEL IN PLACE. 3. USE CLEAN GRAVEL, %- TO 34-INCH IN DIAMETER, PLACED 2 INCHES BELOW THE TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. DOT #57 WASHED STONE IS RECOMMENDED. 4. IF ONLY STONE AND GRAVEL ARE USED, KEEP THE SLOPE TOWARD THE INLET NO STEEPER THAN 3:1. LEAVE A MINIMUM 1-FOOT WIDE LEVEL STONE AREA BETWEEN THE STRUCTURE AND AROUND THE INLET TO PREVENT GRAVEL FROM ENTERING INLET. ON THE SLOPE TOWARD THE INLET, USE STONE 3 INCHES IN DIAMETER OR LARGER. ON THE SLOPE AWAY FROM THE INLET USE 1/ - %-INCH GRAVEL (NCDOT #57 WASHED STONE) AT A MINIMUM THICKNESS OF 1 FOOT. MAINTENANCE: INSPECT THE BARRIER AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (34 INCH OR GREATER) RAINFALL AND MAKE REPAIRS AS NEEDED. REMOVE SEDIMENT AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR SUBSEQUENT RAINS. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABIUZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SOIL, AND EITHER SALVAGE OR DISPOSE OF IT PROPERLY. BRING THE DISTURBED AREA TO PROPER GRADE, THEN SMOOTH AND COMPACT IT. APPROPRIATELY STABIUZE ALL BARE AREAS AROUND THE INLET. 6" MIN. WASHED STONE. CONSTRUCTION & MAINTENANCE NOTES: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTIL= FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBUC ROADWAYS. GRAVEL CONSTRUCTION ENTRANCE/EXIT DETAIL N.T.S INLET PROTECTION N.T.S Yj N.T.S. 2' MIN NOTE: 1. CONTRACTOR SHALL CONTINUOUSLY MONITOR THE TEMPORARY DIVERSION DITCHES AND REGRADE AS THE SITE GRADING IS ALTERED. 2. TEMPORARY SEEDING MUST BE PROVIDED ON THE TEMPORARY DIVERSION DIKE IN ACCORDANCE WITH THE TEMPORARY SEEDING SPECIFICATION ON THIS PLAN SET. COMPACTED SOIL 4/ z 1i q m FLOW t At. i \ \ \ 4 \ \ \ / / / /." CONSTRUCTION & MAINTENANCE NOTES: 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, OR OTHER OBJECTIONABLE MATERIAL. FILL AND COMPACT ALL DITCHES, SWALES, OR GULUES THAT WILL BE CROSSED TO NATURAL GROUND LEVEL OR ABOVE. 2. JUST BEFORE PLACEMENT OF FILL, THE BASE OF THE RIDGE SHOULD BE DISKED BY MACHINERY. 3. EXCAVATE, SHAPE, AND STABILIZE THE DIVERSION TO LINE, GRADE, AND CROSS SECTION, AS REQUIRED IN THE DESIGN PLAN. 4. COMPACT THE RIDGE TO PREVENT UNEQUAL SETTLEMENT, AND TO PROVIDE STABILITY AGAINST SEEPAGE. 5. VEGETATIVELY STABILIZE THE DIVERSION AFTER ITS INSTALLATION. MAINTENANCE: INSPECT PERMANENT DIVERSIONS AFTER EVERY RAINFALL DURING THE CONSTRUCTION OPERATION. IMMEDIATELY REMOVE ANY OBSTRUCTIONS FROM THE FLOW AREA, AND REPAIR THE DIVERSION RIDGE. CHECK OUTLETS, AND MAKE TIMELY REPAIRS AS NEEDED. MAINTAIN THE VEGETATION IN A VIGOROUS, HEALTHY CONDITION AT ALL TIMES. TEMPORARY DIVERSION DIKE DETAIL GRAVEL FACING NCDOT #57 OR #5 WASHED STONE STORM DRAINAGE STRUCTURE W/GRATE UPSTREAM GRAVEL FACING 1 FOOT THICK MINIMUM NCDOT #57 OR #5 WASHED STONE v// NOTE: THIS DOCUMENT IS PRELIMINARY - NOT FOR CONSTRUCTION, RECORDATION, SALES OR CONVEYANCES - THIS DOCUMENT IS FOR DISCUSSION PURPOSES ONLY! EXISTING INFORMATION SHOWN ON THIS DOCUMENT IS BASED ON BEST AVAILABLE DATA AND IS NOT A CERTIFIED SURVEY. ALL INFORMATION SHOWN ON THIS DOCUMENT IS SUBJECT TO ANY REQUIREMENTS BY ANY REGULATORY AGENCY, ENTITY OR AUTHORITY. QUIBLE & ASSOCIATES, P.C. DOES NOT GUARANTEE THE ACCURACY OR THE COMPLETENESS OF ANY INFORMATION IN THIS DOCUMENT AND IS NOT RESPONSIBLE FOR ANY ERROR OR OMISSION OR ANY LOSSES OR DAMAGES RESULTING FROM THE USE OF THIS INFORMATION. SPILLWAY ':FOUNDATION • FILTER FABRIC N.T.S 6' SPILLWAY WIDTH 2:1 TOP OF ROCK ABUTMENT 2:1 dip 411, SPILLWAY lir /1/d ii-.4141k AMn Am CD 3' MIN. I••I •II _1 • CD SPILLWAY DETAIL ROCK ABUTMENT 17 c CLASS B EROSION - CONTROL - FLOW STONE 0Qo ill midi ,g111 Iwiirreownipi PLAN VIEW in Z r- _lb\ gifA "sAdiditateit& CLASS B 3 W411P Wt. 1 •~ �� �� C EROSION P' CONTROL - TONE AP Wt. �_• _• _• �s�v_• _• _• W. ; ROCK APRON 111/ „�ii� ROCK ABUTMENT LEVEL APRON SPILLWAY CREST ELEVATION - SEE PLAN SECTION VIEW OVERFILL 6" FOR SETTLEMENT CONSTRUCTION & MAINTENANCE NOTES: 1. CLEAR, GRUB, AND STRIP THE AREA UNDER THE EMBANKMENT OF ALL VEGETATION AND ROOT MAT. REMOVE ALL SURFACE SOIL CONTAINING HIGH AMOUNTS OF ORGANIC MATTER, AND STOCKPILE OR DISPOSE OF IT PROPERLY. HAUL ALL OBJECTIONABLE MATERIAL TO THE DESIGNATED DISPOSAL AREA. 2. ENSURE THAT ALL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY VEGETATION, ORGANIC MATTER, AND OTHER OBJECTIONABLE MATERIAL. PLACE THE ALL IN UFTS NOT TO EXCEED 9 INCHES, AND MACHINE COMPACT IT. OVER FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. 3. CONSTRUCT THE OUTLET SECTION IN THE EMBANKMENT. PROTECT THE CONNECTION BETWEEN THE RIPRAP AND THE SOIL FROM PIPING BY USING ALTER FABRIC OR A KEYWAY CUTOFF TRENCH BETWEEN THE RIPRAP STRUCTURE AND SOIL. - PLACE THE ALTER FABRIC BETWEEN THE RIPRAP AND THE SOIL. EXTEND THE FABRIC ACROSS THE SPILLWAY FOUNDATION AND SIDES TO THE TOP OF THE DAM; OR - EXCAVATE A KEYWAY TRENCH ALONG THE CENTER LINE OF THE SPILLWAY FOUNDATION EXTENDING UP THE SIDES TO THE HEIGHT OF THE DAM. THE TRENCH SHOULD BE AT LEAST 2 FEET DEEP AND 2 FEET WIDE WITH 1:1 SIDE SLOPES. 4. CLEAR THE POND AREA BELOW THE ELEVATION OF THE CREST OF THE SPILLWAY TO FACIUTATE SEDIMENT CLEANOUT. 5. ALL CUT AND ALL SLOPES SHOULD BE 2:1 OR FLATTER. 6. ENSURE THAT THE STONE (DRAINAGE) SECTION OF THE EMBANKMENT HAS A MINIMUM BOTTOM WIDTH OF 3 FEET AND MAXIMUM SIDE SLOPES OF 1:1 THAT EXTEND TO THE BOTTOM OF THE SPILLWAY SECTION. 7. CONSTRUCT THE MINIMUM FINISHED STONE SPILLWAY BOTTOM WIDTH, AS SHOWN ON THE PLANS, WITH 2:1 SIDE SLOPES EXTENDING TO THE TOP OF THE OVER FILLED EMBANKMENT. KEEP THE THICKNESS OF THE SIDES OF THE SPILLWAY OUTLET STRUCTURE AT A MINIMUM OF 21 INCHES. THE WEIR MUST BE LEVEL AND CONSTRUCTED TO GRADE TO ASSURE DESIGN CAPACITY. 8. MATERIAL USED IN THE STONE SECTION SHOULD BE A WELL -GRADED MIXTURE OF STONE WITH A D50 SIZE OF 9 INCHES (CLASS B EROSION CONTROL STONE IS RECOMMENDED) AND A MAXIMUM STONE SIZE OF 14 INCHES. THE STONE MAY BE MACHINE PLACED AND THE SMALLER STONES WORKED INTO THE VOIDS OF THE LARGER STONES. THE STONE SHOULD BE HARD, ANGULAR, AND HIGHLY WEATHER -RESISTANT. 9. DISCHARGE INLET WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT- LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY (REFERENCES: RUNOFF CONTROL MEASURES AND OUTLET PROTECTION). 10. ENSURE THAT THE STONE SPILLWAY OUTLET SECTION EXTENDS DOWNSTREAM PAST THE TOE OF THE EMBANKMENT UNTIL STABLE CONDITIONS ARE REACHED AND OUTLET VELOCITY IS ACCEPTABLE FOR THE RECEIVING STREAM. KEEP THE EDGES OF THE STONE OUTLET SECTION FLUSH WITH THE SURROUNDING GROUND, AND SHAPE THE CENTER TO CONFINE THE OUTFLOW STREAM (REFERENCES: OUTLET PROTECTION). 11. DIRECT EMERGENCY BYPASS TO NATURAL, STABLE AREAS. LOCATE BYPASS OUTLETS SO THAT FLOW WILL NOT DAMAGE THE EMBANKMENT. 12. STABIUZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE TRAP IMMEDIATELY AFTER CONSTRUCTION (REFERENCES: SURFACE STABIUZATION). 13. SHOW THE DISTANCE FROM THE TOP OF THE SPILLWAY TO THE SEDIMENT CLEANOUT LEVEL (1/2 THE DESIGN DEPTH) ON THE PLANS AND MARK IT IN THE FIELD. 14. INSTALL POROUS BAFFLES AS SPECIFIED ON POROUS BAFFLES DETAIL. MAINTENANCE: INSPECT TEMPORARY SEDIMENT TRAPS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (4 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT, AND RESTORE THE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA, AND REPLACE THE PART OF THE GRAVEL FACING THAT IS IMPAIRED BY SEDIMENT. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FEET BELOW THE LOW POINT OF THE EMBANKMENT. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SUGHTLY ABOVE DESIGN GRADE. ANY RIPRAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. AFTER ALL SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS, AND STABIUZE PROPERLY (REFERENCES: SURFACE STABIUZATION). TEMPORARY SEDIMENT TRAP DETAIL N.T.S 1- TOP OF BASIN (C) �!�\�/ �i`\�/ iiC\i \ `3•• TOP OF WEIR I 3 1 / -Y/\ �/\/� = - (SEE PLAN SHEET) �� FILTER FABRIC TO'/\''\' /' \/ /i\�j/ \%\/�\%\\*\\ >:\\/\/�/�/# \,.\\�/.>\^ ' EXTEND TO INVERT OF SWALE WEIR WIDTH (SEE PLAN 3' 1 SHEET) LEVEL SPREADER TIMBER 3' VEGETATED OVERFLOW \/' \\\/ \//\/ FILTER FABRIC BASIN OVERFLOW WEIR FILTER FABRIC PROPOSED 1.5HMIN. // / I EXISTING GRADE 707:4\riv/ // �••••••••••••••••0•••••••••i ew CLASS A OR B EROSION \ CONTROL STONE EXISTING GRADE 12" OF NCDOT #5 OR #57 WASHED STONE FILTER FABRIC 1.5' MIN. 24" MAX 0 CENTER SECTION A -A CONSTRUCTION & MAINTENANCE NOTES: 1. PLACE STONE TO THE UNES AND DIMENSIONS SHOWN IN THE PLAN SET ON A FILTER FABRIC FOUNDATION. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. 3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM. 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAM. 5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM HEAVY FLOW THAT COULD CAUSE EROSION. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE. 7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT ENTRANCES BELOW THE CHECK DAMS, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES. ni ni A ni 111 u L= THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION u n, n, n, n, ,„ ni ni ni ui is, ui m•�Z SPACE CHECK DAMS IN A CHANNEL SO THAT THE CREST OF DOWNSTREAM DAM IS AT ELEVATION OF THE TOE OF UPSTREAM DAM. MAINTENANCE: INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTAWNG A PROTECTIVE RIPRAP UNER IN THAT PORTION OF THE CHANNEL (NC DEQ SESC MANUAL PRACTICE 6.31, RIPRAP AND PAVED CHANNELS). REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. Volt >�Jwi,I�, fir:;1111:41,14 Lik:,,I, atiffia 111.6-11191 40 11 At i e101 vet • \ \• • • • • • \ \ \ N/E RICHARD POHELL \ % s \ D.B. 484, PG. 337 �` N. �� • " lb • • • `.• • \\ ,� • CHECK DAM DETAIL N.T.S. \ \ \ , \\ \ ` hl/P MOUNTAIN INN B \\ , , '3 �` \ � � `= , ` SUITES, •LLG. \\ �'\ \ , `I` `, \ D.B. 1374, PG. 7%3 \ \ N \ ` PLAT SLIDE 7\ \\ \\ • \• \• u `, \ \ \ \ $ \ `. ,� * ` `. . , \ �, s , `` `` \\ \ \\ ``� \\ I` ` `� `� ``�\ �I \ `, . . \ \ \\ \ ` • \ \ \ 5 \ • \ . \ \ \ ` ` \ \ % . \ \. \•\• \ \ \ • , n , \ \ • • • • • • • PROPOSED LIMITS OF DISTURBANCE 32,815 SQ. FT. (0.75 ACRES) TEMPORARY CONSTRUCTION BORROW, STOCKPILE & STAGING AREA • • • • • • • • • • • • • • • • • • • • • • • ,= ".... \ \)\ ' \ ' . • . ,. \ . . . . % s 4 \ . .. . . . \ .. \ . .. , .. . . . % \ . ‘, v , .. % . . . . . , . . % . . . . . . \ . . \‘, . \\\%% . . si \ \ 1\ \ \ % -\.p. \ \ . . . % . . . s \ . \i‘‘ \ \ \ ss , . , \ , \\ . . . . . \I \ ' , \ . \ \ . \.. . . . . • PROPOSED SILT FENCE (TYP.) • • PROPOSED SILT FENCE . tki CONSTRUCTION ENTRANCE/EXIT (TYP.) .247 7 \ • • OWNER: JEFF JUSTUS • • • • • •.% 4. RECORDED REFERENCE: PLAT SLIDE 9179 5. PROPERTY ZONED: C-3 HIGHWAY BUSINESS `% 6. TOTAL PARCEL AREA: 1.63 ACRES (PER GIS) • • • • • • • • • • • • • • • • *PARCEL INFORMATION SHOWN IS BASED ON HENDERSON COUNTY GIS AND DOES NOT REFLECT A BOUNDARY SURVEY. TOPOGRAPHIC INFORMATION SHOWN PER LIDAR INFORMATION. • 811 Know what's below. Call before you dig. BORROW SITE NOTE: THE DATA GIVEN ON THESE PLANS IS BELIEVED TO BE ACCURATE, BUT THE ACCURACY IS NOT GUARANTEED. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL LEVELS, LOCATIONS, TYPES, AND DIMENSIONS OF THE EXISTING UTIUTIES PRIOR TO CONSTRUCTION. IF A DISCREPANCY IS FOUND, WORK SHALL CEASE AND THE ENGINEER NOTIFIED. WORK MAY CONTINUE UPON ENGINEERS NOTICE TO PROCEED. GRAPHIC SCALE 50' 0 25' 50' 100' 1 inch = 50 ft. NC License#: C-0208 SINCE 1959 wrZI 0 CA CA >- * Ct z Z co Csi .0 0 o to La c ';*\** S'&.-!1:///'s t::: ,,,,,,,,,,,,,,,,,,,,,, u:(3 (1.:z :up n! 1: I jzDZ: aj:Z; (7')ajCI- ELLj:Cj 1-MLLj(1)aj CELjEl aj"LnZ>>-< (ALLj°112: c°:Di REVISIONS 0 d on on c.) ail 2 r5)i En-i A 8 2 0 `,9, PROJECT NO. P20003 DESIGNED BY CMS DRAWN BY CMS CHECKED BY MWS ISSUE DATE SHEET NO. 5 OF 8 SHEETS) GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water (HQW) Zones 7 None (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION will not dislodge the soil. Use one of the Stabilize the ground sufficiently so that rain techniques in the table below: Temporary Stabilization Permanent Stabilization t • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. �No,�NNDFA�E�,aRZA IN PLAN oNSITE CONCRETE WASHOUT STRUCTURE WITH LINER ffEnAlo SECTION A -A ACTUAL LOCATION DETERMINED IN FIELD SHALL2 THE CONCRETE WASHOUT STRUCTURES BE REACHES Ts% OF THE STRUCTURES CAPACITY BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE ♦ A A N CV.('%() / <0> <O>1 <0> <p> o <o vV \ /vvv � , SIDE SLOPE g SECTION B-B" Nanc DF�cE E(sAz4 PLAN D�E UT,ILATION rrAECSTUAL LOCATION DETERMINED IN FIELD WHEN THE LIOUID SOLID REACHES 75% OF THE STRUCTURES CAPACITY 10 PROMDE ADEOLIATE NEs of FREEDOAo AND/OP NMINIMUM 12 3 CONCRETE WASHOUT STRUCTURE EV ARKED WITH ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety of the inspection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. inspection records must include: I I Self -inspections below. When adverse personnel to be in which it is safe to greater than 1.0 performed upon were delayed shall I inspect are required during weather or jeopardy, the inspection perform the inspection. inch occurs outside the commencement be noted in the (1) Rain gauge maintained in good working order ]airy Daily rainfall amounts. if no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un•• attended days (and this will determine if a site inspection is needed). Days an which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least mice per 7 calendar days and within 24 hours o� a rain event > 1-0 inch in 24 hours 1. identification of the measures inspected. 2. Date and time of the inspection, 3. Name of the person performing the inspection, i�of measures r 4. Indication whether the easu .s were operating A g properly, 5. LSescripfion of maintenance needs For the measure, 6. De.scriptitzn, evidence, and data of corrective actions taken. (3) Stormwater At leas_ once per discharge 7 calendar days autfalls ISDOs) i and within 24 hours of a rain event P 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5- Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least unce per 7 calendar days and within 24 hours of a rain event > 1-0 inch in 24 hours If visible sedimentation is found outside site lirnits, then a record of the following shall be made: 1. Actions taken to dean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of Corrective actions taken, and 3. An explanation as to the, actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At leas_ once per 7 calendar days and within 24 hours of a rain event ? 1-0 inch in 24 hours if the stream er wetland has increased visible sedimentation ar a stream has visible increased turbidity from: the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the pro required reports to the appropriate Division q P P P Regional Office per Part III, Section C, Item l ,2)(a) of this permit of this permit. (6) Ground stabilization measures Aster each phase of grading 1. The Phase of grading (installation of perimeter EF..SC measures, clearing and grubbing. installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided veithin the required timeframe or an assurance that they will be provided as soon as passible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document (a) Each E&SC Measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC Plan. Documentation Requirements Initial and date each E&SC Measure on a copy of the approved E&SC Plan or complete, date and sign an inspection report that lists each E&SC Measure shown an the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. (c) Ground cover is located and installed in accordance with the approved E&SC Plan. (d) The maintenance and repair requirements for al. E&SC Measures have been performed. (e) Corrective actions have been taken to E&SC Measures. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications . Complete, date and sign an inspection report. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. 2. Occurrences that must be reported Permittees shall report the following occurrences: p g (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within24hours, an oral or electronic notification. • days, s, reportdescription that contains a descri tion of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a Y q P case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance q P with the federal or state impaired -waters conditions. (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above • Within24hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within24hours, an oral or electronic notification. • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(1)(7)] • Within24hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. CONSTRUCTION & MAINTENANCE NOTES: 1. GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE. 2. INSTALL THE COIR FIBER BAFFLES IMMEDIATELY UPON EXCAVATION OF THE BASINS. 3. INSTALL POSTS ACROSS THE WIDTH OF THE SEDIMENT TRAP (PRACTICE 6.62, SEDIMENT FENCE). 4. STEEL POSTS SHOULD 8E DRIVEN TO A DEPTH OF 24 INCHES AND SPACED A MAXIMUM OF 4 FEET APART. THE TOP OF THE FABRIC SHOULD 8E A MINIMUM OF 6 INCHES HIGHER THAN THE INVERT OF THE SPILLWAY. TOPS OF BAFFLES SHOULD BE A MINIMUM OF 2 INCHES LOWER THAN THE TOP OF THE EARTHEN EMBANKMENT. 5. INSTALL AT LEAST THREE ROWS OF BAFFLES BETWEEN THE INLET AND OUTLET DISCHARGE POINT. BASINS LESS THAN 20 FEET IN LENGTH MAY USE 2 BAFFLES. 6. ATTACH A 9 GAUGE HIGH TENSION HARE STRAND TO THE STEEL POSTS AT A HEIGHT OF 6 INCHES ABOVE THE SPILLWAY ELEVATION WITH PLASTIC TIES OR WIRE FASTENERS TO PREVENT SAGGING. IF THE TEMPORARY SEDIMENT BASIN WILL BE CONVERTED TO A PERMANENT STORMWATER BASIN OF A GREATER DEPTH, THE BAFFLE HEIGHT SHOULD BE BASED ON THE POOL DEPTH DURING USE AS A TEMPORARY SEDIMENT BASIN. 7. EXTEND 9 GAUGE MINIMUM HIGH TENSION WIRE STRAND TO SIDE OF BASIN OR INSTALL STEEL T-POSTS TO ANCHOR BAFFLE TO SIDE OF BASIN AND SECURE TO VERTICAL END POSTS AS SHOWN IN FIGURE 6.658. 8. DRAPE THE COIR FIBER MAT OVER THE WIRE STRAND MOUNTED AT A HEIGHT OF 6 INCHES ABOVE THE SPILLWAY ELEVATION. SECURE THE COIR FIBER MAT TO THE WIRE STRAND WITH PLASTIC TIES OR WIRE FASTENERS. ANCHOR THE MATTING TO THE SIDES AND FLOOR OF THE BASIN WITH 12 INCH WIRE STAPLES, APPROXIMATELY 1 FT APART, ALONG THE BOTTOM AND SIDE SLOPES OF THE BASIN. 9. DO NOT SPLICE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN 10. ADJUSTMENTS MAY BE REQUIRED IN THE STAPLING REQUIREMENTS TO FIT INDIVIDUAL SITE CONDITIONS. MAINTENANCE: INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL, TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT, AND REPLACE IF DAMAGED DURING CLEANOUT OPERATIONS. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT. STEEL POST WIRE FENCE FILTER FABRIC BACKFILL TRENCH AND COMPACT THOROUGHLY FLU \7\ BAFFLE CONSTRUCTION DETAIL SYNTHETIC FILTER FABRIC (TYP.) NOTE: THIS DOCUMENT IS PRELIMINARY - NOT FOR CONSTRUCTION, RECORDATION, SALES OR CONVEYANCES - THIS DOCUMENT IS FOR DISCUSSION PURPOSES ONLY! EXISTING INFORMATION SHOWN ON THIS DOCUMENT IS BASED ON BEST AVAILABLE DATA AND IS NOT A CERTIFIED SURVEY. ALL INFORMATION SHOWN ON THIS DOCUMENT IS SUBJECT TO ANY REQUIREMENTS BY ANY REGULATORY AGENCY, ENTITY OR AUTHORITY. QUIBLE & ASSOCIATES, P.C. DOES NOT GUARANTEE THE ACCURACY OR THE COMPLETENESS OF ANY INFORMATION IN THIS DOCUMENT AND IS NOT RESPONSIBLE FOR ANY ERROR OR OMISSION OR ANY LOSSES OR DAMAGES RESULTING FROM THE USE OF THIS INFORMATION. N.T.S TEMPORARY SEDIMENT TRAP, SEDIMENT BASIN WITH ROCK DAM. OR SEDIMENT BASIN 8' MAX SPACING FOR STANDARD STRENGTH FABRIC WITH WIRE FENCE 6' MAX SPACING FOR EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE /0/ PLASTIC OR WIRE TIES (EACH POST) 4"X8" COMPACTED BACKFILL TRENCH SILT FENCE DETAIL N.T.S N CONSTRUCTION & MAINTENANCE NOTES: 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER (FIGURE 6.62A). 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. INSTALLATION: 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS NATH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION. 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. NC License#: C-0208 SINCE 1959 C.) 0 CA CA m FW^ O N roc"' NU 0l0 v a LJ I w M pp ra �? O Z m o 0000c,12 2y pj NE O o x E J t o_ o an m d LL o W e V 1 Z O < N W < J U Z O J Z u- Z O H U o W W 0 b OU rgp� • w Z V 1 a O w< F-NUO:Lna 0oW0zmWpmW V1 L. 0 J J Z H Z o W 0<< 0 a O O 0 O w Z O w J E o V1p U0z0 V1 0 [N/1 m < = a Q �_z 00 a V1 U REVISIONS w 0 d z v) U con PROJECT NO. P20003 DESIGNED BY CMS DRAWN BY CMS CHECKED BY MWS ISSUE DATE 3/3/21 SHEET NO. 6 NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 OF 8 SHEETS) y C.I. FRAME & GRATE SEE PLANS FOR DEPTH e SEE STRUCTURE SCHEDULE FOR OPENING NOTES: MANHOLE CONSTRUCTION SHALL CONFORM TO ASTM SPEC. C-478 FOR DUAL PIPE INSTALLATION, A MINIMUM OF 6" OF SEPARATION MUST BE HELD ALL GASKET JOINTS TO CONFORM TO ASTM C443 SEE STRUCTURE SCHEDULE FOR INNER DIAMETER 1- H • a e LARGE DIAMETER STORM MANHOLE N.T.S. SCH 40 COUPLING CONNECTION DIAMETER VARIES PVC FLOAT SCH 40 SOLID PVC BARREL OR "ARM" - DIAMETER VARIES, MINIMUM DIAMETER TO MATCH ORIFICE DIAMETER NO INLET EXTENSION JUST THE BARREL CONNECTED TO THE TEE 1.5" VENT WITH GREEN TIP HEAD ON CENTER OF INLET & ORIFICE SEE STRUCTURE SCHEDULE FOR MIN. WALL THICKNESS PATENT # 5,820,751 FLEXIBLE HOSE, SS CLAMP & THREADED MALE FITTING ON OUTLET END (DIAMETER VARIES, DIAMETER FAIRCLOTH SKIMMER DETAIL TO MATCH ORIFICE DIAMETER) NOTES: INSTALL, DEWATER AND MAINTAIN PER PVC END CAP MANUFACTURER'S SPECIFICATIONS PVC TEE (AS SPECIFIED BY MANUFACTURER) N.T.S. STRUCTURE SCHEDULE SIZING TABLE NOTES: 1. FOR RECTANGULAR STRUCTURES DI#1-4 SEE NCDOT 840.45 PRECAST DRAINAGE STRUCTURE DETAIL. 2. FOR CIRCULAR STRUCTURES SEE LARGE DIAMETER STORM MANHOLE DETAIL. 3. DIMENSIONS ARE BASED ON THE INNER MEASUREMENT OF THE STRUCTURE. Structure ID Structure Type O.D. Length (ft) O.D. Width (ft) Min. Wall Thickness (in) Grate Type (Approved Equal will be accepted) DI #1 NCDOT 840.02 3'-6" 2'-8" 6 NCDOT Typical 840.03 DI #2 NCDOT840.02 3'-6" 2'-8" 6 NCDOT Typical 840.03 DI #3 NCDOT840.02 3'-6" 2'-8" 6 NCDOT Typical 840.03 DI #4 NCDOT840.02 3'-6" 2'-8" 6 NCDOT Typical 840.03 DI #5 NCDOT840.02 3'-6" 2'-8" 6 NCDOT Typical 840.03 DI #6 See Large Manhole Detail 9'-0" 12'-0" 8 East Jordan Iron Works 1080M DI #7 See Large Manhole Detail 7'-0" 10'-0" 8 East Jordan Iron Works 1080M DI #8 See Drawdown Structure Detail East Jordan Iron Works 1080M LEGEND I I ORIFICE INLET FOR BASIN (A) RCP PIPE DIA. "D" 0' - 24" 8" 27" - 36" 12" 42" - 72" 15" NOTE: THE FAIRCLOTH SKIMMER TO BE INSTALL DURING THE INITIAL CONSTRUCTION OF THE STORM WATER BASINS. THE BASINS WILL SERVE AS A SEDIMENT BASIN DURING THE CONSTRUCTION OF THE SITE. ONCE THE SITE HAS BEEN FULLY STABILIZED THE FAIRCLOTH SKIMMER IS TO BE REMOVED. OVERFLOW WEIR TABLE SEDIMENT BASIN 1 (WET POND) SEDIMENT BASIN 2 (TEMP) SKIMMER SIZE 8" 6" ORIFICE INLET (A) 6" 3" PVC VENT PIPE CH 40 PVC PIPE WATER SURFACE VC END CAP PVC PIPE 1 /2" HOLES IN UNDERSIDE SCH 40 PVC PIPE FLEXIBLE HOS 11111111111k ORIFICE PLATE PVC TEE BOTTOM SURFACE • END VIEW N.T.S. "C" ENCLOSURE WATER ENTRY UNIT ARM ASSEMBLY IIIIIIIIIIIIIIIIIIIII I1 PVC ELBO FRONT VIEW TOP VIEW N. T.S. N.T.S. SKIMMER DETAIL N.T.S. RUSHES, SAWGRASS, OR WATER MILLET HDPE PIPE DIA. "D" 4-6" 8.5" 8-12" 9" NOTES: 1. SELECT MATERIAL PIPE COVER SHALL BE 12" (MINIMUM) DEEP OVER TOP OF PIPE. 2. SELECT MATERIAL BACKFILL SHALL BE CBR 20 COMPACTED TO 95% DENSITY. BACKFILL COMPACTED IN 12" LIFTS. -1I11111 1 1-111-.. -1 11-1 1 1-1 d 111-111-1 11-1 1-1 1-111E111E111E111-11 -111E111E111-111-1I1 1111111 II-III-III -111=111 11I-111-111 111111111 UIII-III I I I -III -I I I III 1111II-III 11I11 III =1111 TRENCH WIDTH MUST BE WIDE ENOUGH TO ACCOMMODATE COMPACTION EQUIPMENT X x� /i',i‘,i‘,iy/\\/ EXCAVATED TRENCH WIDTH \/ RCP or HDPE 10' WIDE TEMPORARY POOL VEGETATIVE SHELF REFERENCE 10' TOP OF BERM 3:1 MAX. SLOPE ( VEGETATE AS PER NARRATIVE RANT TYPESR ARMORED WIDTH TYPICALFOREBAY E GENERAL SEEDING AND SPACING WALL SPECIFICATIONS• p, /1P P PERMANENT POOL PERMANENT PERMANENT POOL EWALL 0 3:1 MAX. SLOPEp00LSIDEWALL 0 3:1 MAX. t[,1agpESLOPE FLOOR SOO FROM TOP BERM OUT SEED DETENTION BAST AS PER THE GENERAL SEEDING SPECIFICATION FOREBAY SIDEWALL 2:1 MAX. SLOPE FOREBAY FLOOR FOREBAY SIDEWALL 2:1 MAX. SLOPE 10' WIDE VEGETATED SHELF REFERENCE NARRATIVE FOR PLANT TYPES AND SPACING 1(1.1 Si OPE TEMPORARY POOL 3:1 MAX. SLOPE VEGETATE AS PER THE GENERAL EEDING SPECIFICATIONS TEMPORARY POOL MAXIMUM ELEVATION: SEE PLAN Ai rtPERMANENT POOL � RFACE ELEVATION: SEE PLAN .WIN RODIDr TEMPORARY POOL MAXIMUM ELEVATION: SEE PLAN PERMANENT POOL A E TI E SIN S IN CI A \ P P r .- r r r r • • • • =• • �� �FOREBA r \, ' \ \/\\ \/ r ah r r r r r • e•' • �`� •• PERMANENT o T" r r r r r r \ , \\\/\\�' J�° n� /\/\ �\ ��\\� TRENCH SHALL BE BACKFILLED WITH CLEAN SAND AND TOPPED WITH TOP SOIL. IF LOCATED IN PAVEMENT, PAVE PER PAVEMENT SPECIFICATIONS. HDPE NOTES: 1. ALL PIPE SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THESE SPECIFICATIONS OR AS MODIFIED BY THE OWNER. 2. TRENCH BOX OR OTHER SHORING METHODS SHALL NOT DISTURB THE PIPE BEDDING AND BACKFILL MATERIAL AFTER THEIR COMPACTION. 3. WHERE THE TRENCH BOTTOM IS UNSTABLE, THE CONTRACTOR SHALL EXCAVATE TO A DEPTH INDICATED ON THE DRAWING OR AS DIRECTED BY THE OWNER AND REPLACE WITH BEDDING MATERIAL. 4. BEDDING MATERIAL SHALL BE CRUSHED STONE OR WASHED #67 STONE, UNLESS OTHERWISE NOTE ON THE DRAWINGS OR REQUIRED BY THE OWNER. MINIMUM BEDDING THICKNESS SHALL BE 6-INCHES. 5. BACKFILL MATERIAL SHALL CONFORM TO THE FOLLOWING: A. INITIAL BACKFILL: AGGREGATE NO. 25, 26, 21A, OR 21 B; AS INDICATED ON THE DRAWINGS OR AS DIRECTED BY THE OWNER, SHALL BE INSTALLED AS INITIAL BACKFILL IN THE PIPE ZONE EXTENDING NOT LESS THAN 12-INCHES ABOVE THE CROWN OF PIPE. MATERIAL SHALL BE INSTALLED AS REQUIRED IN ASTM 02321, LATEST EDITION. B. ANAL BACKFILL: ANAL BACKFILL MATERIALS SHALL BE THE SAME AS THE INITIAL BACKFILL UNLESS OTHERWISE INDICATED ON THE DRAWINGS OR DIRECTED BY THE OWNER. 6. MINIMUM COVER: I I I1 111 111 1 I 1 TRAFFIC PAVEMENT PUCATIONO-TMIINIMUM NE TMPCOFERIGSID HALL BEE2 ", MEASURED FROM THE TOP OF THE PIPE TO THE BOTTOM OF 11= III-III=III- NON -TRAFFIC APPUCATIONS - MINIMUM COVER IN GRASS OR LANDSCAPE AREA IS 12-INCHES FROM THE TOP OF THE COMPACTED SELECT PIPE TO GROUND SURFACE. r r 111-MATERIAL PIPE COVER III-III-III- 1-111-111-1 I 11I;II III 111E FOR RCP, BEDDING AND HAUNCH MATERIAL TO BE CATEGORY I,II,&III SOIL TYPES -.:ca�sr•_i.� . i.�:���` I I I -III -III 1-111E111-111-III-III-III-III-I -III-III-11 II-111-111-1 1-III-III-II-III-_ I COMPACTED GRANULATED MATERIAL 11 III-III-1 1 �I I= I-1 I �I I=I I^III-I I #57 STONE CHOCKED WITH 21 A I-,o :iiI-IIIFOR MULTIPLE PIPE INSTALLATIONIIIIIIII I I- 11 -III-1IN A SINGLE TRENCH, MAINTAIN -III-III-I11-�-: I I -III MINIMUM 6" CLEARANCE BETWEEN I -III -III -I 1r- 111-111-I , , PIPES. _ 111 -III--III= 11 1 I III-IIIIIIIII=1 11911EIII=III I=I I I -III -I I 11111I i III=I1I=I11=11I=I1I=I1I=I11-111=11I=III= -III I II III-III-III-III-III-III-III-III- IIII;11111i11111I11111111111�11111�1111-' END \ DIRECTIONAL DRILL ROMAC "RC501" COUPLING \' CONNECT SDR9 HDPE TOY C900 PVC (CL200) / ��\\\\\/\\/ p \/.\/.\//.\/, C900 PVC WATERLINE (CL 200) y\ EXCAVATE MATERAL /\\/ REQUIRED FOR CONNECTION DIRECTIONAL DRILL\ SDR 9 \ DP\ /\/\\/\jam . /\ /\// / EXISTING ASPHALT ROADWAY (\\/\/ \/\// ///\\//` .•\\ TYPICAL WET DETENTION BASIN PLANTING DETAIL END DIRECTIONAL DRILL ROMAC "RC501" COUPLING /CONNECT SDR9 HDPE TO , /C900 PVC (CL200) /.\//.\//.\//.\ XV C900 PVC WATERLINE (CL 200) EXCAVATE MATERAL REQUIRED FOR CONNECTION DIRECTIONAL DRILL SDR 9 HDPE SDR 9 HDPE WATERLINE /\\/\\/\" DIRECTIONAL DRILL DETAIL N.T.S. N.T.S. PLANT SPECIES COMMON NAME SPACING LOCATION Schoenoplectus tabemaemontanl SOFTSTEM BULRUSH 2' O.C. BELOW (WAIN 1 FOOT) PERM. POOL Juncus effusus COMMON RUSH 2' O.C. BELOW (WAN 1 FOOT) PERM. POOL Cladium spp. SAWGRASS 2' O.C. BELOW (WAN 1 FOOT) PERM. POOL Zizaniopsis mliacae WATER MILLET 2' O.C. BELOW (WAN 1 FOOT) PERM. POOL NOTES: THREE ROWS OF PLANTINGS ARE PROPOSED; A SINGLE ROW OF GROUNDSEL BUSH OR WAX MYRTLE AT THE UPPER EDGE OF THE VEGETATED SHELF AND TWO ROWS OF RUSHES, SAWGRASS OR WATER MILLET (MIXTURE) TO BE LOCATED ON THE VEGETATED SHELF WITHIN THE PERMANENT POOL WATERUNE (ON 10:1 SHELF).A MINIMUM OF THREE SPECIES SHALL BE PROVIDED. SUBSTITUTIONS ALLOWED PROVIDED SUBSTITUTE PLANT IS IN ACCORDANCE WITH THE NCDEQ STORMWATER BMP MANUAL, CHAPTER 6 AND CHAPTER 9 REQUIREMENTS. ALL SUBSTITUTIONS SHALL BE APPROVED BY ENGINEER. DIRECTIONAL DRILLING INSTALLATION SHALL COMPLY WITH SECTION 1550-4 DIRECTIONAL DRILLING AS WRITTEN IN THE NCDOT STANDARD SPECIFICATIONS FOR ROADS & STRUCTURES JULY 2006 DRILLED HOLE DIAMETER SINGLE PASS REAMING MINIMUM DEPTH OF COVER MULIT-PASS REAMING MINIMUM DEPTH OF COVER > 6 INCHES TO 22 INCHES 8 TIMES THE HOLE DIAMETER 12 TIMES THE HOLE DIAMETER 2 INCHES TO 6 INCHES 4 FEET 4 FEET • BEGIN BORES AT LOCATIONS THAT ALLOW TRANSITIONING THE BORE TO MEET THE ABOVE DEPTHS. • USE DRILLING FLUIDS AS APPROPRIATE FOR THE SOIL TYPES. PUMP DRILLING FLUIDS ONLY WHILE DRILLING OR REAMING. MONITOR FLOW RATES TO MATCH THE AMOUNT LEAVING THE BORE HOLE. DO NOT INCREASE PRESSURE OR FLOW TO FREE STUCK DRILLHEADS, REAMERS OR PIPING. • LIMIT DRILLED OR REAMED HOLES TO 2 INCHES LARGER THAN PIPE i BRICK COPING 1 1 1 1 1 1 Y 1 1 1 1 PLAN WITH COPING REMOVED 1 A _8"1 8„1 II II II II II II II II II II 1 a :• • CONCRETE BASE a NOTE: ALL CATCH BASINS WITHIN CURB AND GUTTER SHALL MEET NCDOT STANDARD DETAIL 840.02 WITH 840.03 STD. FRAME, GRATE, AND HOOD. MIN. DIMENSIONS FOR CATCH BASIN (NCDOT 840.05) PIPE SPAN WIDTH HEIGHT D A B H 12" 3'-6" 2'-3" 1'-1a" 15" 3'-6" 2'-3" 2'-1" 18" 4'-0" 2'-8" 2'-4" 4"x8"xl 6" SOLID BLOCK (TYPICAL) Wlor • �-I 24"x24" GRATE FRAME & GRATE: CAPITOL FOUNDRY 2424PED CATCH BASIN INLET GRATE & FRAME -IIM EM CONCRETE BASE .� SECTION X-X SECTION Y-Y Know what's below. Call before you dig. / STORM INLET DETAIL N.T.S. NOTE: THE DATA GIVEN ON THESE PLANS IS BELIEVED TO BE ACCURATE, BUT THE ACCURACY IS NOT GUARANTEED. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL LEVELS, LOCATIONS, TYPES, AND DIMENSIONS OF THE EXISTING UTILITIES PRIOR TO CONSTRUCTION. IF A DISCREPANCY IS FOUND, WORK SHALL CEASE AND THE ENGINEER NOTIFIED. WORK MAY CONTINUE UPON ENGINEERS NOTICE TO PROCEED. 20' BRICK COPING GRAPHIC SCALE 0 10' 20' 40' ( IN FEET ) 1 inch = 20 ft. NC License#: C-0208 SINCE 1959 U n • W U C7 * J * zz1-J 0 D- * m CD 1- Z * . W C/1 U L Z O 0 U Lit Z * J * Z *E I- >- 0 Z w Ct LJJ 0 0 Z § U' Z z Z Paggt e‘mcl -IN:(s)0IrER40 % *&##:344:::::,:el".*****\);\; r N Ld w Q cl _1V l Z < N REVISIONS w 0 d z STORMWATER PROJECT NO. P20003 DESIGNED BY CMS DRAWN BY CMS CHECKED BY MWS ISSUE DATE 3/3/21 SHEET NO. 7 OF 8 SHEETS) 18'-0" MAX. 18'-0" MAX. 18'-0" MAX. EQUAL SPACES EQUAL SPACES EQUAL SPACES E 0 O E 0 0 I I I FOR "W" = 6'-0" OR LESS 18'-0" MAX. EQUAL SPACES E 0 0 18'-0" MAX. t_ 18'-0" MAX. EQUAL SPACES I EQUAL SPACES E 0 NOTES: '• e EDD E E 0 I I D O E I I 0 0 0 ID 0 FOR "W" = MORE THAN 6'-0" E = EXPANSION JOINT D = DUMMY JOINT E E 0 0 O E 0 D �� 3 O E 0 I I I EXCEPT WHERE SHOWN IN THE PLAN, ALL NEW CONC. WALKS SHALL HAVE JOINTS SPACED AS SHOWN IN THESE DETAILS. AN EXPANSION JOINT SHALL BE USED TO SEPARATE THE NEW CONC. WALK FROM OTHER NEW OR EXISTING CONCRETE CONSTRUCTION. JOINT PATTERN 1/4"± DUMMY JOINT PREFORMED EXPANSION JOINT MATERIAL EXPANSION JOINT JOINT DETAIL SIDEWALK JOINTS y c •'12:1. :, • e N.T.S. 4e 8 20' e RAMP • •r''12:1..0.. 6' PLAN VIEW 8' ASPHALT TOP OF CURB and WALKWAY 6' CURB TRANSITION DROP CURB 1/2" RADIUS SECTION A -A CURB TRANSITION GUAR WHEELCHAIR RAMP N.T.S. 1. USE ADJACENT TO ALL HANDICAPPED SPACES CURB LINE 6" 4" LAYER OF CRUSHED STONE 1'-3" RAD. 1'-0" RAD. A TYPICAL 7' WIDTH 3000 PSI CONCRETE FINISHED 6" . PAVEMENT 3000 PSI FIBERMESH CONCRETE STANDARD MOUNTABLE CURB N.T.S. 6" 1.5' 3" RADIUS .04 SLOPE ABC11• 1 4 z ` • s• . TOP OF PAVEMENT 1/8" RAD. SLOPE 8 8 8 8 88 pp.p 8 0 , • O0'i � 88 8p� • �OOOO:SO4 CURB & GUTTER CROSS SECTION (1.5' GUTTER) 12" VAN ,A CCESSIBLE RESERVED PARKING fJ MAXIMUM PENALTY $ 250 GS 20-37.8 N.T.S. "VAN ACCESSIBLE" SIGN SIGN: R7-8 OR R7-8A GREEN - BORDER AND LEGEND WHITE - BACKGROUND BLUE - IN ACCORDANCE W/ ADA STANDARDS SIGN: R7-80 GREEN - BORDER AND LEGEND WHITE - BACKGROUND SIGN TO BE 'J MOUNTED 60" FROM FINISHED GRADE ADA RESERVED PARKING SIGN DETAIL N.T.S. FINISHED GRADE TYPICAL SPECIFICATIONS SPECIFICATIONS FOR SIDEWALKS, CURBS, ALLEYS, CONCRETE PAVEMENT ALL REINFORCING STEEL SHALL BE GRADE 60 (ASTM A615) ALL WELDED WIRE FABRIC SHALL BE 6 x 6, W1.4 x W1.4 (ASTM A185) A 1-1/2" CLEAR CONCRETE COVER SHALL BE MAINTAINED ON ALL REINFORCEMENT ALL CONCRETE SHALL BE 3000 PSI FIBER MESH UNLESS OTHERWISE NOTED SPECIFICATIONS OF ASPHALT ALL ABC STONE SHALL BE COMPACTED TO 100% OF STANDARD PROCTOR (ASTM 0698) ASPHALT SHALL BE 2" SF9.5A SPECIFICATIONS FOR SUBBASE ALL SUBBASE SHALL BE COMPACTED TO 95% OF STANDARD PROCTOR (ASTM D698) INSTALL IN ACCORDANCE WITH CLEANOUT DETAIL TO SEWER MAIN 45 PVC BEND 4" OR 6" WYE 4" PVC 1.00% MIN. OR 6" PVC CO 0.60% MIN. (SEE SERVICE CONNECTION DETAIL) A TO SEWER MAIN 1' PVC SCREW CAP GROUND ELEVATION 4" OR 6" PVC EXTENSION PIECE TO RAISE SCREW CAP 6" ABOVE GRADE 4" OR 6" PVC SECTION L4" OR 6" PVC PLUG FOR FUTURE HOOKUP CONTRACTOR TO INSTALL PROPER FITTING FOR ATTACHMENT OF PVC PIPE FROM BUILDING SECTION A PVC SCREW CAP ==in(m A 4" OR 6" WYE PLAN VIEW SINGLE SERVICE LATERAL CONNECTION N.T.S. SEWER MAIN SEWER MAIN 30" MAX. PLAN (Ki= 45 ° WYE & 1/8 REDUCING BEND AS REQUIRED ROTATE WYE SO THAT AIR IS NOT TRAPPED AT TOP OF FITTING SECTION MINIMUM SLOPE 1/8 BEND (45 ) EXTENSION PIECE (WHERE ALLOWED) FLOW FROM BUILDING FLOW FROM BUILDING SERVICE CONNECTION CURB LINE 3/4" RAD. FINISHED PAVEMENT (SF9.5A) OR CONCRETE COMPACTED SAND BASE 3" ABC 8" PARKWAY CURB N. T. S. N.T.S. DRIVE REBAR FLUSH WITH TOP OF WHEEL STOP PRE -CAST 6"H x 9"W x 6'L CONCRETE WHEEL STOP (TYP) (INSTALL AT ALL PARKING SPACES WHERE SHOWN) 24" LONG #4 REBAR ANCHOR ROD (EXTEND 10" INTO GROUND) PIPE SIZE 4" 6" 8" 12" MIN. SLOPE 1.00% .60% .40% .22% VARIES n WIDTH SEE PLAN \//. \//,A THOROUGHLY COMPACTED SUBGRADE WHEEL STOP DETAIL N.T.S. 12" — 6" CONCRETE (BROOM FINISH) — W.W.F. (TYP.) NOTE: 5" THICK CONCRETE WILL BE ALLOWED WITHIN THE AREA OF THE DUMPSTER PAD. ALL OTHER CONCRETE AREAS SHALL BE 6", UNLESS OTHERWISE NOTED. SLOPE TO DRAIN X .d '. . X X — • d . a °. a ram, ��� • Ilk Oh ,011,'%AO Oh"olik. 11x% l •• '904 .• ,t0.0 i'lt•������ s'�., r \y \\��\\��\\��\\��\\��\\�Ny \ — THOROUGHLY COMPACTED SUBGRADE CONCRETE PAVEMENT SECTION N.T.S. CONCRETE RIBBON OR CONC. SLAB FLOOR PVC SCREW CAP AND ADAPTER 3/8" TO 1" DIA WASHED STONE PVC PIPE LENGTH AND SIZE TO SUIT LENGTH & SIZE TO SUIT TYPICAL SEWER CLEAN —OUT N.T.S. 12" TOP OF ASPHALT (SF9.5A) 24• °.n' A..'. I^GRAVEL BASE00,01,�I�I` z :-;:,Y-;:,Y-;:,Y-;:,Y 11l�W�W�W�W�W�W�W OW) • efil efil efil e. e. —'. ' %\ 2' CONCRETE MOUNTABLE CURB & SPILL GUTTER 7/ NTS MODIFIED NCDOT STANDARD 846.01 0 SERVICE CLAM w + C od KNOCK HOLE IN WALL AT REQUIRED LOCATION MANHOLE WALL IN FIELD PIPE OPENINGS N.T.S. NOTES: 1. THIS APPLIES TO ALL PIPES 6" DIAMETER OR LESS UNLESS OTHERWISE SPECIFIED. 2. CLOSE WITH NON -SHRINK GROUT AFTER PIPE INSTALLATION. EASEMENT OR R/W UNE METER BOX AS PER SPECIFICATIONS (METER INSTALLED BY OWNER 4 711 POLYETHYLENE TUBING u 0 MIN. ' +n OV °°°po"�po°^p2' CLEAR>°.^p^"^p^" po° ° ° • 0°"or°..°n ° ° opo"oA .... oA a o�o"o 0 o,yovonoe o� �o, pn° 0 "SHUT OFF CHECK it.BALL VALVE/ VALVE (BY OWNER) TAMPED OUT W/ LINE CURB STOP 1" CORPORATION STOP (ANGLE) FINISH GRADE NEE: CONTRACTOR TO CONSULT WITH OWNER'S WATER SYSTEM MANAGING ENTITY AND OWNER'S ENGINEER PRIOR TO ORDERING METER BOX AND SHUT OFF BALL VALVE/ CURB STOP TO MAKE SURE THEY MEET THEIR REQUIREMENTS. STANDARD I" SERVICE LINE AND METER BOX INSTALLATION N.T.S. 2" ASPHALT S9.5A ��ty,�'i������it+3.y,�1i�, ���•1iy,�S.�,�iyi 8" ABC (NCDOT TYPE "A") j j�4��fr3��y��•��ti��ii�y��iy�i Nv COMPACTED SUBGRADE TYPICAL ASPHALT SECTION N.T.S. COMPACTION NOTES: 1. PROOF ROLL ALL NEW PAVED AREAS. NOTIFY OWNER AND ENGINEER OF ANY UNACCEPTABLE AREAS. 2. COMPACT BACKFILL AND SUBGRADE TO 95% OF THE MODIFIED PROCTOR MAXIMUM DRY DENSITY (ASTM D1557) ALL BACKFILL MATERIAL SHALL BE SELECT BACKFILL UNLESS OTHERWISE SPECIFIED BY THE ENGINEER. 3. SELECT FILL SHALL CONSIST OF SAND OR GRAVEL CONTAINING LESS THAN 20% BY WEIGHT OF FINES [SP, SM, SW, GP, GW] HAVING A LIQUID LIMIT LESS THAN 20 AND PLASTIC LIMIT LESS THAN 6, AND FREE OF RUBBLE, ORGANICS, CLAY, DEBRIS, AND OTHER UNSUITABLE MATERIAL. COMPACTION NOTES 10' x 20' CONCRETE DUMPSTER PAD - 6" CONC. (3000 PSI) WITH 6"x6" W1.4xW1.4 W.W.F. OVER 4" ABC BASE CONC. SLAB 4"x4" TREATED WOOD POSTS (TYP) — SET IN CONC. PAD PLAN 4"x4" POSTS ELEVATION TREATED (TYP) 2 "x4" CEDAR PLAN 1"x 8" CEDAR 2" GAP 2"x4" (TREATED) 101,1L DUMPSTER PAD a W O ENCLOSURE CONCRETE DUMPSTER PAD AND ENCLOSURE N.T.S. (NOTE: DUMPSTER PAD DRAIN NOT SHOWN) RESTORE DISTURBED AREAS TO PRE CONSTRUCTION CONDITIONS J 1 FINISH GRADE J U a m TAMPED IN %` 4" - 6" LAYERS \ PER / SPECIFICATIONS \/ METALUC LOCATING TAPE: TERRA -TAPE OR APPROVED EQUAL, 6" WIDE AND BURIED 12" BELOW FINISHED GRADE 6" +/- TOP SOIL BACKFILL IN NON PAVED AREAS TAMPED IN 4"-6" LAYERS PER \'/ SPECIFICATIONS �\ HAUNCHING NOTES: ss Lef 0.D. PIPE 12" 0.D. PIPE iXe\//,e�`'� NOTE: COMPACT BACKFILL TO 95% OF THE MODIFIED PROCTOR MAXIMUM DRY DENSITY (ASTM 01557) NUMBER 12 SOUD COPPER WIRE CONDUCTER TO BE LOCATED ON TOP OF ALL LINES AND SERVICE UNES TERMINATING TO EACH VALVE BOX AND METER BOXES. UNDISTURBED EARTH PIPE GRADE MINIMUM SIDE CLEARANCE 12" MAXIMUM SIDE CLEARANCE 1. FOR TRENCHES REQUIRING SHORING AND BRACING, DIMENSIONS SHALL BE TAKEN FROM THE INSIDE FACE OF THE SHORING AND BRACING 2. NO ROCKS OR BOULDERS 4" AND LARGER SHALL BE USED IN INITIAL BACKFILL AREA. 3. ALL BACKFILL MATERIAL SHALL BE SATISFACTORY SOIL MATERIALS UNLESS OTHERWSE SPECIFIED BY THE ENGINEER. (SATISFACTORY SOIL FILL SHALL CONSIST OF SAND OR GRAVEL CONTAINING LESS THAN 20% BY WEIGHT OF FINES [SW, SP, SP-SM, SM], HAVING A LIQUID LIMIT LESS THAN 20 AND PLASTIC LIMIT LESS THAN 6, AND FREE OF RUBBLE, ORGANICS, CLAY, DEBRIS, AND OTHER UNSUITABLE MATERIAL.) TYPICAL WATERLINE BACKFILLING REQUIREMENTS AND Know what's below. CaII before you dig. TRENCH BOTTOM DIMENSIONS N.T.S. SELECT MATERIAL COMPACTED IN 6" UFTS SHEETED OPEN TRENCH 11 SELECT MATERIAL 1111 COMPACTED IN 3" UFTS 24" MAX. • 12 GAGE COPPER TRACER WIRE SECURED TO PIPE 12" MAX illl =11- 1 1 UNDISTURBED EARTH OR ROCK 1 ppP - A NOTE: BELL HOLES NOT SHOWN STANDARD EXCAVATION NOTE: MINIMUM 30" COVER IN PIEDMONT AND COASTAL AREAS NOTES: 1 . CROSSING A WATER MAIN OVER A SEWER; WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 18" ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDMONS OR BARRIERS PREVENT AN 18 INCH VERTICAL SEPARATION; IN WHICH CASE BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. 2. CROSSING A WATER MAIN UNDER A SEWER; WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 1 0 FEET ON EACH SIDE OF THE POINT OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. TYPICAL SANITARY SEWER TRENCHING NOTE: THE DATA GIVEN ON THESE PLANS IS BELIEVED TO BE ACCURATE, BUT THE ACCURACY IS NOT GUARANTEED. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL LEVELS, LOCATIONS, TYPES, AND DIMENSIONS OF THE EXISTING UTILITIES PRIOR TO CONSTRUCTION. IF A DISCREPANCY IS FOUND, WORK SHALL CEASE AND THE ENGINEER NOTIFIED. WORK MAY CONTINUE UPON ENGINEERS NOTICE TO PROCEED. GRAPHIC SCALE 20' 0 10' 20' 40' 1 inch = 20 ft. NC License#: C-0208 SINCE 1959 0 CA CA 0 * z Lai 6 I— CD V)01021 • eE :11> -- <= _:(11; c!LL9C j EEL )1-L j( )1- U: iz j"Lnz>> LJL j! ci_coLuin,f) 0:(f)= 00(1 oc< REVISIONS 0 d 1-4 1-4 ot CIJ r5)1 E-4 A 8 2 0 rn4.,) PROJECT NO. P20003 DESIGNED BY CMS DRAWN BY CMS CHECKED BY MWS ISSUE DATE 3/3/21 SHEET NO. OF 8 SHEETS)