Loading...
HomeMy WebLinkAboutNCC202089_NOT Closeout Documents_20210510Public works Department 140 Memorial Park Court O Southern Pines, NC 28387 April 29, 2021 Eastcoast Development Group PO Box 3519 Pinehurst, NC 28374 RE: Soil Erosion and Sediment Control Plan Certificate of Compliance TSPE# 20-1124 — McCauley 19 Chestertown Drive Pinehurst To whom it may concern: A final inspection of the Soil Erosion and Sediment Control Plan for the above referenced project has been conducted. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. All requirements of the plan have been met and properly completed. You are reminded of the requirement to maintain any permanent structures of this plan. Receipt of this letter is notification that the erosion control project plan is completed and is being removed from our active file. Any further development will require the submittal of a new plan for review and approval. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. If I can be of further assistance, please contact me at 910-592-1983, Phon,:910-092-1983 Fax:910-692-1085