Loading...
HomeMy WebLinkAboutNCC203900_NOT Closeout Documents_20210506North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Bedford - Lots 134, 147, 151, 152, 288, County: Hoke Project: 297, 337 & 341 River basin: Cape Fear Person financially responsible: McKee Homes, LLC - Jessica De La Cruz, Project #: HOKE-2021-011 Accounting Specialist NCC203900 Address: 109 Hay Street, Suite 301, Fayetteville, NC 28301 1. Project Location: Springhaven Dr/Trinity Rd/Crom, Pictures: No McLauchlin 2. Weather and soil conditions: sunny/workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: April 29, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Date of inspection: April 27, 2021 Time arriving on site: 3:36 PM Time leaving site: 4:00 PM cc: