Loading...
HomeMy WebLinkAbout20130918 Ver 11_Site reviews 7 5-11-2021_20210513 Wanucha, Dave From:Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent:Thursday, May 13, 2021 1:51 PM To:Moore, Byron G; Wanucha, Dave Cc:Griffin, Randy W; Elliott, Jason C; Green, Matthew L Subject:\[External\] RE: Site reviews 7 5-11-2021 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Thanks for the notes and pictures, Byron. It was good to see you, Randy, and Matt out there. The Corps agrees with your notes. R-2413A Site #2 lower: the repair work looked good, the site was stable (noting the few very small areas of washouts under the matting), and the Corps looks forward to reviewing the renewed monitoring early next year. R-2413A Site #2 upper: flow was present throughout the channel today, during a period of normal rainfall. Based on my field review and the previous 5 years of monitoring, the Corps is ok with close out. U-2525B Site 5: signs of very high and flashy flows were present throughout this site, and sediment from overbank flows has been deposited to a great extent in the floodplain. Even still, the site was stable except for the areas you noted. Further, the channel did not appear to be over-widened to any significant degree, the structures were all stable, and the vegetation looks healthy. Based on my field review and the previous 5 years of monitoring, the Corps is ok with close out. Thanks again, and please let me know if you have any questions. -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Office: (919) 554-4884, Ext. 30. Mobile: (919) 817-2436 Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: Moore, Byron G <bgmoore@ncdot.gov> Sent: Wednesday, May 12, 2021 8:29 AM To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Griffin, Randy W <rgriffin@ncdot.gov>; Elliott, Jason C <jelliott@ncdot.gov>; Green, Matthew L 1 <mlgreen@ncdot.gov>; Moore, Byron G <bgmoore@ncdot.gov> Subject: \[Non-DoD Source\] Site reviews Division 7 5-11-2021 Here are some notes from yesterday’s field visit. I will be sending 3 separate emails with pictures for each site. If either of you have any questions, let me know. Thanks Byron 252-908-7508 R-2413A Site #2 lower Overall I thought the repair work looked good. There were a couple of very minor local scour areas that we will continue to monitor. NCDOT will restart the monitoring of this site this year. R-2413A Site #2 upper NCDOT is proposing to close this site out. The site is very stable and there was flow in the channel. U-2525B Site 5 NCDOT is proposing to close this site out. The localized scour area at the end of the boulder toe protection has not changed significantly over the past 5 years. It actually showed signs of starting to repair itself in one area. The remainder of the site is highly vegetated and stable. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2