Loading...
HomeMy WebLinkAboutNCG030265_2021 DMR_20210512 (2)DS GAVE STEEL COMPANY A WALTERS GROUP COMPANY May 14, 2021 NCDEQ - Asheville Regional Office Division of Energy, Mineral, and Land Resources 2090 U.S. 70 Highway Swannanoa, NC 28778-8211 Re: Dave Steel Company, Inc. 40 Meadows Road Asheville, NC 28802 Certificate of Coverage No. NCG030265 Dear Sir or Madam: Attached is the Monthly Stormwater Report for May for Dave Steel Company, Inc. (DSCO). Methods Samples were collected on May 3, 2021, during a "measurable storm event" from the facility stormwater outfall labeled SDO 002 (see Figure 1), as SDO 002 currently has Tier II status and is being monitoring monthly. SDO 002 is the location where previous samples have been collected. Samples were collected from the approximate center of the discharge stream and transferred to laboratory -supplied containers. Samples were collected using good sampling practices in pre -cleaned (and preserved when appropriate) containers supplied by Pace Analytical Laboratories (Pace). The containers were placed in a cooler on ice and delivered to Pace in Asheville, North Carolina, for laboratory analyses. pH was measured in the field by placing a probe within the flow of the respective outfall, and the pH was recorded following stabilization. The pH meter was calibrated before testing with two buffer solutions that bracketed the expected pH range. The pH measurement was taken within 15 minutes of collection as required by the North Carolina Department of Environmental Quality (NCDEQ). A Dave Steel staff representative also conducted a Stormwater Discharge Outfall (SDO) Qualitative Monitoring event for SDO 001 and SDO 002 during the stormwater analytical sampling event. This monitoring report is attached for reference. The total precipitation was 0.56 inches for the storm event that resulted in an actual discharge from the permitted site outfall. The previous measurable storm event with actual discharge was at least 72 hours prior to the sampling. Samples were collected by 11:50 am on the sampling day. Precipitation amounts are based on a local rain gauge. Calculations of the maximum total flow through the outfalls on May 3, 2021, are included as Attachment I. Steel Construction Since 1929 Asheville, NC ■ Cincinnati, OH ■ Chesnee, SC P.O. Box 2630 Asheville, NC 28802 T 828 252 2771 www.davesteel.com tea„ AISC.............. �l�_`," l : CERTIFIE❑ FABRICATOR DS GAVE STEEL COMPANY A WALTERS GROUP COMPANY Findings Analytical Results The laboratory analytical results are summarized in the Discharge Monitoring Report (Attachment II) and discussed below. SDO 002 The results for SDO 002 indicate that the samples contained concentrations less than or within the range of the specified benchmark value concentrations for the following parameters measured on -site or at the laboratory: Oil & Grease, Total Suspended Solids (TSS), pH, copper, and lead. However, there was an exceedance of zinc at this outfall with a zinc concentration of 0.248 milligrams per liter (mg/L) vs. the benchmark of 0.126 mg/L. Monitoring relief was granted at DSCO in 2014 for zinc exceedances, so zinc exceedances by themselves do not trigger Tiered responses. However, due to two prior consecutive TSS exceedances for SDO 002, DSCO implemented a Tier Two response for this outfall, which requires monthly monitoring until three consecutive sampling events do not show an exceedance of TSS. Therefore, monthly monitoring will continue at SDO 002. The laboratory analytical report and chain -of -custody form are included as Attachment III to this document. Qualitative Results The SDO Qualitative Monitoring Report did not warrant further investigation regarding stormwater outfalls SDO 001 or SDO 002. No foam, oil sheen, or erosion/deposition was observed at these outfalls. The SDO 001 and SDO 002 discharges did not have many floating solids, clarity was good, and suspended solids were low. No other deficiencies were observed at SDO 001 and SDO 002 during the Qualitative Monitoring event, and no other obvious indicators of stormwater pollution were observed. The system appeared to be operating as designed and was in good order. Please see the qualitative report included as Attachment IV for more information. Conclusions There were no exceedances of benchmark values or obvious indicators of stormwater pollution at SDO 002 during this monitoring event, with the exception of a zinc exceedance. Due to two prior consecutive TSS exceedances, SDO 002 currently has Tier Two status. DSCO will continue to monitor SDO 002 monthly until three consecutive sample results are below the TSS benchmark value. PAGE 2 OF 3 DS GAVE STEEL COMPANY A WALTERS GROUP COMPANY DSCO will conduct the next semiannual monitoring event for SDO 001 sometime between July 1 and December 31, 2021. SDO 002 will be monitored again in June 2021. Please contact me with operational or compliance issues. Sincerely, Dave Steel Company, Inc. Allan Clontz Environmental Health & Safety Director 828-252-2771 Attachments: Figure 1 — Stormwater Pollution Prevention Plan Figure Attachment I — Stormwater Flow Calculations Attachment 11 — Discharge Monitoring Report for SDO 002 Attachment III — Laboratory Analytical Report and Chain -of -Custody Attachment IV — Qualitative Monitoring Report for SDO 001 and SDO 002 cc: Uploaded to the NPDES Stormwater Permit Data Monitoring Report (DMR) Upload site at https://edocs.deg.nc.gov/Forms/SW-DMR PAGE 3 OF 3