Loading...
HomeMy WebLinkAboutNCC202401_NOT Closeout Documents_20210506North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Hoke Turnberry Section Two, Part Two - Lot ty Project: log River basin: Cape Fear Person financially responsible: Caviness and Cates Building and Development, Project #: HOKE-2020-041 Inc. - Patrick Raynor, CFO NCC202401 Address: 639 Executive Place, Suite 400. Fayetteville, NC 1. Project Location: Grantham Drive, McLauchlin Pictures: No 2. Weather and soil conditions: sunny/workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No IfYes, where? (check all that apply) Degree of damage: S. Contact made with (name): Title: Inspection report: Sent Report Date given/sent: January 15, 2021 9. Corrective action needed: 10. COMments: Permanent ground COVer Sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Penny Markle Others present: Date of inspection: January 06. 2021 Time arriving on site: 12:10 PM Time leaving site: 12.20 PM cc: Yes